CN105370307B - 采煤工作面过超高段支护工艺 - Google Patents
采煤工作面过超高段支护工艺 Download PDFInfo
- Publication number
- CN105370307B CN105370307B CN201510643512.4A CN201510643512A CN105370307B CN 105370307 B CN105370307 B CN 105370307B CN 201510643512 A CN201510643512 A CN 201510643512A CN 105370307 B CN105370307 B CN 105370307B
- Authority
- CN
- China
- Prior art keywords
- wooden frame
- layer
- freeboard section
- sleeper
- layers
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 21
- 239000003245 coal Substances 0.000 title claims abstract description 16
- 241001669679 Eleotris Species 0.000 claims description 16
- 239000000178 monomer Substances 0.000 claims description 5
- 238000005728 strengthening Methods 0.000 claims description 3
- 239000002023 wood Substances 0.000 claims description 3
- 238000005065 mining Methods 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 abstract description 2
- 239000010410 layer Substances 0.000 description 42
- 238000010276 construction Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 235000017375 Brosimum guianense Nutrition 0.000 description 2
- 241000985650 Brosimum guianense Species 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 239000002356 single layer Substances 0.000 description 1
- 238000012876 topography Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
- E21D23/04—Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Machines For Laying And Maintaining Railways (AREA)
- Road Paving Structures (AREA)
Abstract
本发明涉及一种采煤工艺,具体为一种采煤工作面过超高段支护工艺。解决了回采工作面超高段支护中存在的劳动强度大、成本大,不易操作等技术问题,本发明所述的过超高段的方法,将原来整个超高段巷道棚梁顶部需要全部施工“#”木垛的方法,改进为不施工棚梁和棚梁上侧的“#”木垛,而只在2个支架上施工木垛的方法让支架通过超高段,该方法不仅操作省力,而且很好安全的通过超高段。
Description
技术领域
本发明涉及一种采煤工艺,具体为一种采煤工作面过超高段支护工艺。
背景技术
采煤工作面回采过程中,进回风两巷道顺槽经常由于地质构造等原因遇到超高段,进回风巷局部地段巷道超高段长达40米,人行道侧低,非人行道侧高,巷道最大高度约4.0m左右,如附图1所示意,需使用单体柱,一般采用每隔不大于1米架设一架棚梁,每二架棚梁梁头顶部人工施工“#”字木垛接顶板的方法支护顶板,让支架从棚梁通过来通过巷道的超高段,配合棚架上打木垛进行顶板支护,此方法要求施工人员高空作业,经常到棚梁上面离地3米以上的地方进行人工打木垛作业,并需要大量的消耗木材施工“#”字木垛进行维护顶板的工作,劳动强度大,使用支护材料多且支架过后无法复用支护材料,为解决以上问题,特对支护工艺进行改进优化,提高进回巷道的维护速度,减轻职工的劳动强度。最主要的表现为:劳动强度大、成本大,不易操作。
发明内容
本发明为了解决回采工作面超高段支护中存在的劳动强度大、成本大,不易操作等技术问题,提供了一种采煤工作面过超高段支护工艺。
本发明的技术方案是,一种采煤工作面过超高段支护工艺,采煤工作面机头或者机尾推进到巷道超高段时,采用3.5m及以上的单体柱4打超前柱支设,以加强支护超高段的顶板,支架顶梁上打木垛接顶,具体方案是,在支架板梁上用2根4.4m的第一层木梁垂直工作面铺设,第一层木梁露出支架顶梁前端距离不超过1m,再在第一层木梁上铺设不少于四个的一层道木,其中一个道木设置于第一层木梁的外端头,在一层道木上再铺设二层木梁,二层木梁超出一层木梁的距离不超过1m,二层木梁和一层木梁的最里端对齐;然后再在二层木梁上铺设不少于五个的二层道木,其中一个道木设置于二层木梁的端部,在二层道木上铺设第三层木梁,第三层木梁和第二次木梁的最里端对齐,第三层木梁上再设置第四层木梁,以此类推,直至接顶为止。
与现有技术相比,本发明所述的过超高段的方法,将原来整个超高段巷道棚梁顶部需要全部施工“#”木垛的方法,改进为不施工棚梁和棚梁上侧的“#”木垛,而只在2个支架上施工木垛的方法让支架通过超高段,该方法不仅操作省力,而且很好安全的通过超高段。
附图说明
图1为现有的支护方式示意图;
图2为图1的侧断面结构示意图;
图3为本发明的支护方式侧断面结构示意图之一;
图4为本发明的支护方式侧断面结构示意图之二(巷道顶板有一定坡度情况下);
图5为本发明所述方案的布置俯视图;
图中:1-液压支架、2-棚梁、3-木垛、4-单体柱、5-一层木梁、6-二层木梁、7-二层道木、8-道木、9-三层木梁。
具体实施方式
如图3、4、5所示意,一种采煤工作面过超高段支护工艺,采煤推进至超高段时,采用3.5m及以上的单体柱4打超前柱支设,以加强支护超高段的顶板,采煤工作面机头或者机尾推进到巷道超高段时,在支架顶梁上打木垛接顶,具体方案是,在支架板梁上用2根4.4m的第一层木梁5垂直工作面铺设,第一层木梁5露出支架顶梁前端距离不超过1m,再在第一层木梁5上铺设不少于四个的一层道木其中一个道木8设置于第一层木梁5的外端头,在一层道木上再铺设二层木梁6,二层木梁6超出一层木梁5的距离不超过1m,二层木梁6和一层木梁5的最里端对齐;然后再在二层木梁6上铺设不少于五个的二层道木,其中一个二层道木7设置于二层木梁8的端部,在二层道木上铺设第三层木梁9,第三层木梁9和第二次木梁6的最里端对齐,第三层木梁9上再设置第四层木梁,以此类推,直至接顶为止。
Claims (1)
1.一种采煤工作面过超高段支护工艺,其特征在于:采煤推进至超高段时,采用3.5m以上的单体柱(4)打超前柱支设,以加强支护超高段的顶板,采煤工作面机头或者机尾推进到巷道超高段时,在支架顶梁上打木垛接顶,具体方案是,在支架顶梁上用2根4.4m的第一层木梁(5)垂直工作面铺设,第一层木梁(5)露出支架顶梁前端距离不超过1m,再在第一层木梁(5)上铺设不少于四个的一层道木其中一个道木(8)设置于第一层木梁(5)的外端头,在一层道木上再铺设第二层木梁(6),第二层木梁(6)超出第一层木梁(5)的距离不超过1m,第二层木梁(6)和第一层木梁(5)的最里端对齐;然后再在第二层木梁(6)上铺设不少于五个的二层道木,其中一个二层道木(7)设置于第二层木梁(6)的端部,在二层道木上铺设第三层木梁(9),第三层木梁(9)和第二层木梁(6)的最里端对齐,第三层木梁(9)上再设置第四层木梁,以此类推,直至接顶为止。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510643512.4A CN105370307B (zh) | 2015-10-08 | 2015-10-08 | 采煤工作面过超高段支护工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510643512.4A CN105370307B (zh) | 2015-10-08 | 2015-10-08 | 采煤工作面过超高段支护工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105370307A CN105370307A (zh) | 2016-03-02 |
CN105370307B true CN105370307B (zh) | 2018-12-11 |
Family
ID=55372864
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510643512.4A Active CN105370307B (zh) | 2015-10-08 | 2015-10-08 | 采煤工作面过超高段支护工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105370307B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106481346A (zh) * | 2016-12-16 | 2017-03-08 | 中国神华能源股份有限公司 | 一种综采工作面回采通过空巷的方法 |
CN106640148B (zh) * | 2016-12-27 | 2018-11-30 | 山西晋城无烟煤矿业集团有限责任公司 | 煤矿井下超高巷道永久加固工艺 |
CN108798723B (zh) * | 2018-06-29 | 2020-01-17 | 河南理工大学 | 一种应用于厚煤层的含托顶煤的超高回采巷道支护方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2422819A1 (fr) * | 1978-04-11 | 1979-11-09 | Marion Rene | Pile de soutenement hydraulique |
CN103032091A (zh) * | 2012-12-26 | 2013-04-10 | 内蒙古北方重工业集团有限公司 | 自移式液压支架 |
CN103161480A (zh) * | 2013-03-14 | 2013-06-19 | 中国矿业大学 | 主动支撑巷旁充填沿空留巷的方法 |
-
2015
- 2015-10-08 CN CN201510643512.4A patent/CN105370307B/zh active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2422819A1 (fr) * | 1978-04-11 | 1979-11-09 | Marion Rene | Pile de soutenement hydraulique |
CN103032091A (zh) * | 2012-12-26 | 2013-04-10 | 内蒙古北方重工业集团有限公司 | 自移式液压支架 |
CN103161480A (zh) * | 2013-03-14 | 2013-06-19 | 中国矿业大学 | 主动支撑巷旁充填沿空留巷的方法 |
Non-Patent Citations (1)
Title |
---|
《垛式支架对稳定性不同的顶板的支护效果》;陆士良等;《煤炭科学技术》;19780829(第08期);第19页 * |
Also Published As
Publication number | Publication date |
---|---|
CN105370307A (zh) | 2016-03-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
WO2015090128A1 (zh) | 一种跳采式旺格维利采场支巷充填采煤方法 | |
CN108194088A (zh) | 一种软顶煤层无爆破切顶卸压沿空留巷方法 | |
CN202064981U (zh) | 软煤层巷道支护结构 | |
CN103775084B (zh) | 大倾角、大采高综采设备过地质构造破碎带施工工艺 | |
CN105041349A (zh) | 一种在地铁区间盾构隧道基础上扩挖车站的暗挖施工方法 | |
CN103244123B (zh) | 一种急倾斜中厚矿体采矿方法 | |
CN104763425A (zh) | 一种卸压预裂爆破沿空留巷无煤柱开采方法 | |
CN103375170A (zh) | 三孔小净距隧洞下穿铁路干线的暗挖施工变形控制方法 | |
CN103939113B (zh) | 一种悬轨式施工台车 | |
CN102268998A (zh) | 大跨度切眼双微拱减跨支护方法 | |
CN105370307B (zh) | 采煤工作面过超高段支护工艺 | |
CN104500078B (zh) | 一种巷外施工优化巷道区域应力场的方法 | |
CN103758529A (zh) | 一种煤矿沿空留巷巷旁支护方法 | |
CN108005654A (zh) | 仰采大采高工作面过老巷施工工艺 | |
CN104265294A (zh) | 大倾角煤层炮采面无煤柱开采技术 | |
CN116537794A (zh) | 一种浅埋暗挖三洞大断面隧道下穿既有铁路组合施工方法 | |
CN205445623U (zh) | 沿空护巷开采近距离煤层的支护设施 | |
CN103967052B (zh) | 一种防护新旧框构桥基底高差土体的方法 | |
CN101446200A (zh) | 前进式采煤法 | |
CN105370286A (zh) | 一种进路式空场嗣后充填采矿方法 | |
CN108166395A (zh) | 一种跨越营业线修建梁桥的施工方法 | |
CN103883336B (zh) | 一种先主动后让压支护的可调节沿空留巷墙体及其施工方法 | |
CN103016008B (zh) | 煤层群下行式开采下部煤层的停采方法 | |
CN205477640U (zh) | 对采空区切顶卸压的安全支护装置 | |
CN108952803A (zh) | 一种适合破碎矿体回采的下向充填采矿法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |