地铁既有整体道床切割凿除顶推破除改造施工方法 Download PDFInfo
- Publication number
- CN105274911A CN105274911A CN201510794255.4A CN201510794255A CN105274911A CN 105274911 A CN105274911 A CN 105274911A CN 201510794255 A CN201510794255 A CN 201510794255A CN 105274911 A CN105274911 A CN 105274911A
- Authority
- CN
- China
- Prior art keywords
- cutting
- construction
- subway
- pushing tow
- chiseling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 40
- 238000005520 cutting process Methods 0.000 title claims abstract description 35
- 230000001131 transforming effect Effects 0.000 title 1
- 238000000034 method Methods 0.000 claims abstract description 14
- 239000000498 cooling water Substances 0.000 claims abstract description 4
- 239000000428 dust Substances 0.000 claims abstract description 4
- 239000007787 solid Substances 0.000 claims description 13
- 230000009466 transformation Effects 0.000 claims description 7
- 238000007667 floating Methods 0.000 claims description 3
- 239000010729 system oil Substances 0.000 claims description 3
- 238000005516 engineering process Methods 0.000 abstract description 2
- 230000007613 environmental effect Effects 0.000 description 5
- 239000002699 waste material Substances 0.000 description 2
- 239000003921 oil Substances 0.000 description 1
Landscapes
- Working Measures On Existing Buildindgs (AREA)
- Road Repair (AREA)
- Processing Of Stones Or Stones Resemblance Materials (AREA)
Abstract
本发明公开了一种既有整体道床切割凿除顶推破除施工方法,包括有以下施工步骤:(1)选用的切割、凿除设备须采用机电、液压技术控制,切割作业均施加冷却水,能有效地减少设备混凝土切割施工中产生的粉尘及振动;(2)对地铁既有设施和主体结构进行测量控制,确保在施工中不受损坏;(3)利用墙锯和电镐将既有整体道床切割分段、凿除设定宽度、深度的顶推槽;该方法施工成本低、操作简单、施工效率高、噪音低、运营线不停运施工、安全可靠,满足城市文明施工、运营线运输、运营线安全和施工工效要求,填补该领域施工方法空白。
Description
技术领域
本发明涉及地铁整体道床施工方法,具体属于地铁既有整体道床切割凿除顶推破除改造施工方法。
背景技术
随着地铁行业的蓬勃发展以及人们对生活质量要求的提高,部分地铁线路在运营时产生的振动和噪音严重影响了人们的生活质量,同时随着运营年限达到大量地铁达到大修时间,因此线路升级改造已势在必行,如采用一般凿除方法时,投入设备及人力较大,工效低、经济性差,满足不了运营不停运改造需要,同时凿除施工的建筑垃圾量大及噪音污染较大,很难达到环保需求。因此急需一种安全、可靠、高效、环保和经济且满足运营线不停运的施工方法保证既有线普通整体道床改造施工,经验证和试验总结采用切割、凿除、顶推的方法可满足施工要求。
发明内容
本发明的目的是提供一种运营状态下地铁既有整体道床切割凿除顶推破除改造的施工方法,该方法安全、可靠、高效、环保、经济且满足运营线不停运改造施工要求,该方法施工成本低、操作简单、施工效率高、环保、可不停运施工、安全可靠,满足城市城市轨道运营线不停运施工要求,该方法填补了该领域施工方法空白。
本发明的技术方案如下:
一种地铁既有整体道床切割凿除顶推破除改造施工方法,包括有以下施工步骤:
(1)选用的切割、凿除、顶推设备须采用机电、液压技术控制,切割作业均施加冷却水,能有效地减少设备混凝土切割施工中产生的粉尘及振动;
(2)利用圆形隧道特点,利用指定长度直尺对地铁既有混凝土道床切割深度进行测量控制,确保切割不伤及管片;
(3)利用墙锯和电镐将既有整体道床按设定长度切割分段、凿除设定宽度及深度的顶推槽;
(4)将顶推系统油缸放入顶推槽中并加固,加压顶推直至混凝土板块与管壁脱离;
(5)利用地铁隧道内悬臂吊吊运切割的既有板块并施工新铺浮置板,从而完成既有整体道床改造。
目前国内外尚无运营线路状态下既有道床改造的成功方法,如采用一般凿除方法时,投入设备及人力较大,经济性差,工效低,满足不了营业线运营需要,同时凿除施工的建筑垃圾量大及噪音污染较大,很难达到环保需求。本发明是一种安全、可靠、高效、环保和经济的道床破除施工方法,该方法可满足运营状态施工需求,保证了地铁隧道内运营线整体道床改造施工,该方法工效高、安全可靠、环保经济适合城市施工,该方法填补国内外该领域施工方法空白。
附图说明
图1为顶推设备的油顶布置横截面图。
具体实施方式
参见附图,一种既有整体道床切割凿除顶推破除施工方法,包括有以下施工步骤:
(1)选用的切割、凿除、顶推设备须采用机电、液压技术控制,切割作业均施加冷却水,能有效地减少设备混凝土切割施工中产生的粉尘及振动,顶推系统为新研制的专项施工设备;
(2)利用圆形隧道特点,利用指定长度直尺对地铁既有混凝土道床切割深度进行测量控制,确保切割不伤及管片;
(3)利用墙锯和电镐将既有整体道床按一定长度切割分段、凿除设定宽度及深度的顶推槽;
(4)将顶推系统油缸放入顶推槽中并加固,加压顶推直至混凝土板块与管壁脱离;
(5)利用地铁隧道内悬臂吊吊运切割的既有板块并施工新铺浮置板,从而完成既有整体道床改造。
Claims (1)
1.一种地铁既有整体道床切割凿除顶推破除改造施工方法,其特征在于,包括有以下施工步骤:
(1)选用的切割、凿除、顶推设备须采用机电、液压技术控制,切割作业均施加冷却水,能有效地减少设备混凝土切割施工中产生的粉尘及振动;
(2)利用圆形隧道特点,利用指定长度直尺对地铁既有混凝土道床切割深度进行测量控制,确保切割不伤及管片;
(3)利用墙锯和电镐将既有整体道床按设定长度切割分段、凿除设定宽度及深度的顶推槽;
(4)将顶推系统油缸放入顶推槽中并加固,加压顶推直至混凝土板块与管壁脱离;
(5)利用地铁隧道内悬臂吊吊运切割的既有板块并施工新铺浮置板,从而完成既有整体道床改造。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510794255.4A CN105274911A (zh) | 2015-11-17 | 2015-11-17 | 地铁既有整体道床切割凿除顶推破除改造施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510794255.4A CN105274911A (zh) | 2015-11-17 | 2015-11-17 | 地铁既有整体道床切割凿除顶推破除改造施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105274911A true CN105274911A (zh) | 2016-01-27 |
Family
ID=55144677
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510794255.4A Pending CN105274911A (zh) | 2015-11-17 | 2015-11-17 | 地铁既有整体道床切割凿除顶推破除改造施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105274911A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106835864A (zh) * | 2017-03-17 | 2017-06-13 | 中铁三局集团有限公司 | 高铁无砟轨道维修整体道床切割运输方法 |
CN111927145A (zh) * | 2020-07-21 | 2020-11-13 | 广州地铁设计研究院股份有限公司 | 一种轨道梁与底板凿除方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2279638A1 (en) * | 1998-08-18 | 2000-02-18 | Pfleiderer Infrastrukturtechnik Gmbh & Co. Kg | Method for installing a steady rail track |
CN101063289A (zh) * | 2006-04-30 | 2007-10-31 | 中铁一局集团有限公司新运工程公司 | 城铁钢弹簧浮置板道床道岔施工方法 |
CN102108658A (zh) * | 2009-12-29 | 2011-06-29 | 上海市城市建设设计研究院 | 将既有结构板改造为地铁道床基础的建造方法 |
CN102259353A (zh) * | 2010-05-25 | 2011-11-30 | 拜耳材料科技(中国)有限公司 | 一种切割聚氨酯铁路道床的方法、装置及其应用 |
CN104631219A (zh) * | 2015-01-04 | 2015-05-20 | 中铁四局集团有限公司 | 地铁运营线路隧道内整体道床改浮置板道床施工方法 |
CN104727192A (zh) * | 2015-02-09 | 2015-06-24 | 安徽兴宇轨道装备有限公司 | 一种拆卸整体道床的施工方法 |
-
2015
- 2015-11-17 CN CN201510794255.4A patent/CN105274911A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2279638A1 (en) * | 1998-08-18 | 2000-02-18 | Pfleiderer Infrastrukturtechnik Gmbh & Co. Kg | Method for installing a steady rail track |
CN101063289A (zh) * | 2006-04-30 | 2007-10-31 | 中铁一局集团有限公司新运工程公司 | 城铁钢弹簧浮置板道床道岔施工方法 |
CN102108658A (zh) * | 2009-12-29 | 2011-06-29 | 上海市城市建设设计研究院 | 将既有结构板改造为地铁道床基础的建造方法 |
CN102259353A (zh) * | 2010-05-25 | 2011-11-30 | 拜耳材料科技(中国)有限公司 | 一种切割聚氨酯铁路道床的方法、装置及其应用 |
CN104631219A (zh) * | 2015-01-04 | 2015-05-20 | 中铁四局集团有限公司 | 地铁运营线路隧道内整体道床改浮置板道床施工方法 |
CN104727192A (zh) * | 2015-02-09 | 2015-06-24 | 安徽兴宇轨道装备有限公司 | 一种拆卸整体道床的施工方法 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106835864A (zh) * | 2017-03-17 | 2017-06-13 | 中铁三局集团有限公司 | 高铁无砟轨道维修整体道床切割运输方法 |
CN106835864B (zh) * | 2017-03-17 | 2019-04-05 | 中铁三局集团有限公司 | 高铁无砟轨道维修整体道床切割运输方法 |
CN111927145A (zh) * | 2020-07-21 | 2020-11-13 | 广州地铁设计研究院股份有限公司 | 一种轨道梁与底板凿除方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104631219A (zh) | 地铁运营线路隧道内整体道床改浮置板道床施工方法 | |
CN105484110B (zh) | 高速铁路crtsi型板式无砟轨道底座板与路基表层间离缝冒浆整治方法 | |
CN103966930B (zh) | 一种用于高速铁路无砟轨道的换板设备 | |
CN105274911A (zh) | 地铁既有整体道床切割凿除顶推破除改造施工方法 | |
CN106702912A (zh) | 一种既有铁路拆旧梁顶进新桥的施工方法 | |
CN104727192B (zh) | 一种拆卸整体道床的施工方法 | |
CN104631231B (zh) | 地铁运营线路隧道内整体道床破除施工方法 | |
CN103276645B (zh) | 既有线隧道基底病害预制桩梁板整治技术 | |
CN104313993B (zh) | 一种公路桥及其施工方法 | |
CN105350408A (zh) | 地铁既有整体道床切割劈裂破除改造施工方法 | |
CN203925511U (zh) | 带有多功能掘进平台的单轨吊车 | |
CN109594480A (zh) | 钢箱梁顶推与落梁施工工艺 | |
CN203807900U (zh) | 用于高速铁路无砟轨道的换板设备 | |
CN102628243A (zh) | 一种有砟道床横向约束装置 | |
CN110029530A (zh) | 一种新型轨道系统 | |
CN105986539A (zh) | 一种装配式临时路面 | |
CN105525572A (zh) | 巧用千斤顶更换t梁负弯矩预应力束 | |
CN203475433U (zh) | 无噪音钢板桩压桩设备 | |
CN204457797U (zh) | 一种地铁车站的顶纵梁结构 | |
CN201981452U (zh) | 一种矿用工字钢轨枕 | |
KR20080053442A (ko) | 라이닝콘크리트 종방향 균열유도줄눈 시공장치 및 방법 | |
CN108343180A (zh) | 超高层建筑单元式玻璃幕墙安装施工工法 | |
CN204024670U (zh) | 预制装配式地铁车站拼装台车 | |
KR20140000434A (ko) | 저심도 도시철도 터널의 시공방법 | |
CN204397684U (zh) | 用于组装曲线状箱型结构的夹具 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160127 |
|
RJ01 | Rejection of invention patent application after publication |