CN105257008A - Wall building machine - Google Patents

Wall building machine Download PDF

Info

Publication number
CN105257008A
CN105257008A CN201510807578.2A CN201510807578A CN105257008A CN 105257008 A CN105257008 A CN 105257008A CN 201510807578 A CN201510807578 A CN 201510807578A CN 105257008 A CN105257008 A CN 105257008A
Authority
CN
China
Prior art keywords
brick
wall
building machine
spiral
rope yarn
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510807578.2A
Other languages
Chinese (zh)
Other versions
CN105257008B (en
Inventor
杨义华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaocheng Yuezhi Intellectual Property Operation Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510807578.2A priority Critical patent/CN105257008B/en
Publication of CN105257008A publication Critical patent/CN105257008A/en
Application granted granted Critical
Publication of CN105257008B publication Critical patent/CN105257008B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

A rack of a wall building machine is rectangular, a speed changing box is arranged in the center of the upper surface of the rack, a motor is arranged on the upper surface of the speed changing box, a mortar storage device is arranged in front of the speed changing box, a spiral mortar spreading device is arranged below the mortar storage device, a rope feeding machine is arranged behind the speed changing box and connected with a conveying telescopic supporting rod through a rope, the conveying telescopic supporting rod is arranged in the center of a wall, the lower face of the conveying telescopic supporting rod is connected with a central controller, a brick storage device is arranged in front of the motor, and a building block taking device is arranged on the brick storage device. Machine body front advancing wheels are arranged on the front face below the rack, a front mortar outlet of the spiral mortar spreading device is formed behind the front advancing wheels, a front brick placing port of the building block taking device is formed behind the front mortar outlet of the spiral mortar spreading device, a lifting wheel is arranged behind the front brick placing port and in the center of the rack, rear advancing wheels are arranged behind the rack, a rear mortar outlet of the spiral mortar spreading device is formed in front of the rear advancing wheels, a rear brick placing port of the building block taking device is formed in front of the rear mortar outlet, the motor is connected with an input shaft of the speed changing box, and an output shaft of the speed changing box is connected with the rear advancing wheels, the telescopic supporting rod, the spiral mortar spreading device and the building block taking device.

Description

Wall-building machine
Technical field
The present invention relates to a kind of wall-building machine, belong to building machinery technical field.
Background technology
In recent years, there is multiple mechanical application number of building a wall: 2,015,103,235,766 1 kinds of machineries of building a wall, be provided with chassis (1) and road wheel (2), rotary working platform (3) and master station (6) and electric rotating machine (10) is provided with on chassis (1), working platform (3) is connected on chassis (1) by wearing axle (5), and thrust bearing (4) is housed between it; Working platform (3) is provided with external toothing (18) and engages with the driving gear (19) of motor (10); Working platform (3) is installed arms (11) and main support telescopic oil cylinder (13), and upper position dress telescopic oil cylinder (12) of arms (11) is the lifting drive of upper arm (14); Upper arm (14) front end is provided with manipulator (17), manipulator (17) is established telescopic oil cylinder (15), (16); Master station (6) is made up of hydraulic power unit (9), hydraulic oil container (8), operating grip (7).Although this invention can decrease construction worker's labour intensity, structure too complicated difficult for building trade.
Summary of the invention
In order to solve the problem of prior art complex structure usability difference.The invention provides the wall-building machine that a kind of structure is simple, usability is strong.
The object of wall-building machine of the present invention is achieved in that this wall-building machine comprises: frame, motor, gearbox, front travel wheel, lifting wheel, rear travel wheel, organism level controller, transmit retractable support device, ground master controller, rope yarn feeder, upload into grey device, upload put brick device, storage brick device, ash storage, the vertical control valve of metope, spiral spread out grey device, get device of laying bricks, cut brick cutter.
The object of wall-building machine of the present invention realizes like this, this wall-building machine frame is rectangle, and the center above of frame is gearbox, has motor above gearbox, it is ash storage before gearbox, being that spiral spreads out grey device below ash storage, is rope yarn feeder after gearbox, and rope yarn feeder is by rope yarn and transmission telescopic supporting rod, transmit telescopic supporting rod at the center of body of wall, be connected with ground master controller below, being storage brick device before motor, is get device of laying bricks above storage brick device; Travel wheel before body above below frame, the front ash hole that spiral spreads out grey device after front travel wheel, before spiral spreads out grey device, ash hole is put brick mouth before getting device of laying bricks below, before what put brick mouth be below the center of body is lifting wheel, it is rear travel wheel after frame, that spiral spreads out ash hole after grey device before rear travel wheel, put brick mouth after getting device of laying bricks before after rear ash discharge, motor is connected with the power shaft of gearbox, and the output shaft of gearbox spreads out grey device respectively at rear travel wheel telescoping vertical bar spiral, get device of laying bricks is connected.
The object of wall-building machine of the present invention realizes like this, the transmission retractable support device of this wall-building machine comprises: telescoping vertical bar, folding rod, pulley, telescoping vertical bar has two groups, the quantity often organizing telescoping vertical bar has the height of body of wall to determine, be slidably connected each other with group telescoping vertical bar, folding rod and telescoping vertical bar quantity are together, between two groups of folding rods, center is connected by axis of rotation, folding rod is connected by pivot pin with telescoping vertical bar, first group of telescoping vertical bar first segment top is connected with second group of telescoping vertical bar first segment end by folding rod, second group of telescoping vertical bar first segment top is connected with first group of telescoping vertical bar first segment end by folding rod, first group of telescoping vertical bar second section top is connected by folding rod and second group of telescoping vertical bar Section of three end, second group of telescoping vertical bar second section top is connected by folding rod and first group of telescoping vertical bar Section of three end, by that analogy.The two ends of folding rod are equipped with pulley, the rope yarn of rope yarn feeder respectively by folding rod both sides pulley and when moving to opposite side pulley along folding rod, will along the supreme pulley of folding vertical rod, the spiral that plaster and fragment of brick are delivered to wall-building machine by two groups of rope yarns respectively spreads out grey device, get device of laying bricks, the bottom of telescoping vertical device with upload into grey device, upload put brick device be connected, upload and grow up to be a useful person, upload and put brick device and be equipped with ground travel wheel, telescoping vertical masthead portion is equipped with body of wall conveyer, body of wall conveyer is connected with rope yarn feeder by rope yarn, rope yarn and by the pulley at folding rod two ends respectively with upload into grey device, upload put brick device be connected.
The object of wall-building machine of the present invention realizes like this, the rope yarn feeder of this wall-building machine comprises: frame, belt pulley, power transmission shaft, rope yarn drive sprocket, rope yarn driving-chain, rope yarn, ash pocket, upload storage brick device, rope yarn is equipped with grey pocket and upload the hook storing up brick device uniform, this hook spreads out grey device plaster and fragment of brick being put the spiral to wall-building machine, after getting device of laying bricks, to be connected with the hook of rope yarn driving-chain and run the power making it to obtain transmission with chain, chain has two covers, respectively with upload grey device and upload the rope yarn putting brick device and be connected, often overlap uniform three groups of hooks on chain, one group of hook is had at least to be connected with rope yarn during work, frame is installed on after wall-building machine frame gearbox, belt pulley to be installed on power transmission shaft and to be connected with the output wheel of gearbox by belt, power transmission shaft is equipped with rope yarn rope yarn drive, rope yarn drive is equipped with rope yarn, rope yarn has two groups to connect grey pocket respectively and upload storage brick device and be connected.
During wall-building machine work of the present invention, first wall-building machine is walked to place of building a wall, the plaster being used for building a wall be stirred is put into ash storage, brick or building block are put into storage brick device, starter drives wall-building machine to bring into operation by gearbox subsequently, first spiral spread out grey device rotate the plaster in ash storage is started to divide all places of building a wall, get subsequently the brick clamp of laying bricks in device with get when device chain of laying bricks walks to storage brick device, brick clamp to be lived (brick two pieces of building blocks one piece) brick folding time two bricks between have the space of 10-12 millimeter, starting first floor is laterally place, after the place that lays bricks placed by fragment of brick, with the operation of wall-building machine, rear travel wheel will proceed to the place that lays bricks, to lay bricks and make it abundant bonding with plaster compacting, travel wheel is often advanced 1 meter and is got device of laying bricks and put brick 4 pieces, it should be noted that in the process of building a wall at this, first spiral is had to spread out after grey device divides plaster above one deck below, getting device of laying bricks can place on plaster by fragment of brick, advance on wheel load people fragment of brick subsequently afterwards, when wall-building machine is about to finish building first floor, fragment of brick lifting wheel rises and makes front travel wheel unsettled, lifting wheel and rear travel wheel support wall-building machine and move ahead, after wall-building machine finishes building first floor, spiral spreads out grey device and starts stand ash on this layer of brick, get device of laying bricks get brick and get cut brick cutter brick is struck off 1/4 and by brick tail and wall unjustified, wall-building machine retreats first floor is subsequently laterally place, the second layer is longitudinally place, wall-building machine retreats subsequently, the brick that simultaneously, travel wheel to last layer has just been put spreads out grey device with wall-building machine retrogressing spiral on this layer of brick, spreads out ash, getting device of laying bricks subsequently places on plaster to by fragment of brick, before advance on wheel load people fragment of brick subsequently, when wall-building machine retreat to the non-rear screw of wall spread out grey device ash hole equidistant time wall-building machine move ahead before travel wheel to wall end, rear screw spreads out grey device and starts working subsequently, get device of laying bricks subsequently afterwards to start to put brick on plaster, wall-building machine starts to retreat subsequently, front travel wheel regression is to the place that lays bricks, to lay bricks and make it abundant bonding with plaster compacting, when wall-building machine is first to wall, lifting wheel rises and makes rear travel wheel unsettled, lifting wheel and front travel wheel support wall-building machine and retreat, when wall-building machine builds near second layer wall head, get device of laying bricks to get brick and get and cut brick cutter and brick is struck off 3/4 and brick tail is alignd with wall head, spiral spreads out grey device and starts stand ash on this layer of brick, get device of laying bricks to get to lay bricks will have longitudinally to place to become and laterally place and align with wall head, wall-building machine moves ahead subsequently, on the brick that simultaneously, travel wheel to last layer has just been put, spread out grey device on this layer of brick, spread out ash with the wall-building machine spiral that moves ahead, before getting device of laying bricks subsequently places on plaster to by fragment of brick, repeat above process.
Specific embodiment is in order to solve the baroque problem of prior art.The invention provides the wall-building machine that a kind of structure is simple, usability is strong.
The object of wall-building machine of the present invention is achieved in that this wall-building machine comprises: frame, motor, gearbox, front travel wheel, front lifting wheel, rear travel wheel, rear lifting wheel, organism level controller, transmit retractable support device, ground master controller, rope yarn feeder, upload into grey device, upload put brick device, storage brick device, ash storage, the vertical control valve of metope, spiral spread out grey device, get device of laying bricks, cut brick cutter.
The object of wall-building machine of the present invention realizes like this, this wall-building machine frame is rectangle, and the center above of frame is gearbox, has motor above gearbox, it is ash storage before gearbox, being that spiral spreads out grey device below ash storage, is rope yarn feeder after gearbox, and rope yarn feeder is by rope yarn and transmission telescopic supporting rod, transmit telescopic supporting rod at the center of body of wall, be connected with ground master controller below, being storage brick device before motor, is get device of laying bricks above storage brick device; Travel wheel before body above below frame, the front ash hole that spiral spreads out grey device after front travel wheel, before spiral spreads out grey device, ash hole is put brick mouth before getting device of laying bricks below, before what put brick mouth be below the center of body is lifting wheel, it is rear travel wheel after frame, that spiral spreads out ash hole after grey device before rear travel wheel, put brick mouth after getting device of laying bricks before after rear ash discharge, motor is connected with the power shaft of gearbox, and the output shaft of gearbox spreads out grey device respectively at rear travel wheel telescoping vertical bar spiral, get device of laying bricks is connected.
The object of wall-building machine of the present invention realizes like this, the transmission retractable support device of this wall-building machine comprises: telescoping vertical bar, folding rod, pulley, telescoping vertical bar has two groups, the quantity often organizing telescoping vertical bar has the height of body of wall to determine, be slidably connected each other with group telescoping vertical bar, folding rod and telescoping vertical bar quantity are together, between two groups of folding rods, center is connected by axis of rotation, folding rod is connected by pivot pin with telescoping vertical bar, first group of telescoping vertical bar first segment top is connected with second group of telescoping vertical bar first segment end by folding rod, second group of telescoping vertical bar first segment top is connected with first group of telescoping vertical bar first segment end by folding rod, first group of telescoping vertical bar second section top is connected by folding rod and second group of telescoping vertical bar Section of three end, second group of telescoping vertical bar second section top is connected by folding rod and first group of telescoping vertical bar Section of three end, by that analogy.The two ends of folding rod are equipped with pulley, the rope yarn of rope yarn feeder respectively by folding rod both sides pulley and when moving to opposite side pulley along folding rod, will along the supreme pulley of folding vertical rod, the spiral that plaster and fragment of brick are delivered to wall-building machine by two groups of rope yarns respectively spreads out grey device, get device of laying bricks, the bottom of telescoping vertical device with upload into grey device, upload put brick device be connected, upload and grow up to be a useful person, upload and put brick device and be equipped with ground travel wheel, telescoping vertical masthead portion is equipped with body of wall conveyer, body of wall conveyer is connected with rope yarn feeder by rope yarn, rope yarn and by the pulley at folding rod two ends respectively with upload into grey device, upload put brick device be connected.
The object of wall-building machine of the present invention realizes like this, the rope yarn feeder of this wall-building machine comprises: frame, belt pulley, power transmission shaft, rope yarn drive sprocket, rope yarn driving-chain, rope yarn, ash pocket, upload storage brick device, rope yarn is equipped with grey pocket and upload the hook storing up brick device uniform, this hook spreads out grey device plaster and fragment of brick being put the spiral to wall-building machine, after getting device of laying bricks, to be connected with the hook of rope yarn driving-chain and run the power making it to obtain transmission with chain, chain has two covers, respectively with upload grey device and upload the rope yarn putting brick device and be connected, often overlap uniform three groups of hooks on chain, one group of hook is had at least to be connected with rope yarn during work, frame is installed on after wall-building machine frame gearbox, belt pulley to be installed on power transmission shaft and to be connected with the output wheel of gearbox by belt, power transmission shaft is equipped with rope yarn rope yarn drive, rope yarn drive is equipped with rope yarn, rope yarn has two groups to connect grey pocket respectively and upload storage brick device and be connected.
During wall-building machine work of the present invention, first wall-building machine is walked to place of building a wall, the plaster being used for building a wall be stirred is put into ash storage, brick or building block are put into storage brick device, starter drives wall-building machine to bring into operation by gearbox subsequently, first spiral spread out grey device rotate the plaster in ash storage is started to divide all places of building a wall, get subsequently the brick clamp of laying bricks in device with get when device chain of laying bricks walks to storage brick device, brick clamp to be lived (brick two pieces of building blocks one piece) brick folding time two bricks between have the space of 10-12 millimeter, starting first floor is laterally place, after the place that lays bricks placed by fragment of brick, with the operation of wall-building machine, rear travel wheel will proceed to the place that lays bricks, to lay bricks and make it abundant bonding with plaster compacting, travel wheel is often advanced 1 meter and is got device of laying bricks and put brick 4 pieces, it should be noted that in the process of building a wall at this, first spiral is had to spread out after grey device divides plaster above one deck below, getting device of laying bricks can place on plaster by fragment of brick, advance on wheel load people fragment of brick subsequently afterwards, when wall-building machine is about to finish building first floor, fragment of brick lifting wheel rises and makes front travel wheel unsettled, lifting wheel and rear travel wheel support wall-building machine and move ahead, after wall-building machine finishes building first floor, spiral spreads out grey device and starts stand ash on this layer of brick, get device of laying bricks get brick and get cut brick cutter brick is struck off 1/4 and by brick tail and wall unjustified, wall-building machine retreats first floor is subsequently laterally place, the second layer is longitudinally place, wall-building machine retreats subsequently, the brick that simultaneously, travel wheel to last layer has just been put spreads out grey device with wall-building machine retrogressing spiral on this layer of brick, spreads out ash, getting device of laying bricks subsequently places on plaster to by fragment of brick, before advance on wheel load people fragment of brick subsequently, when wall-building machine retreat to the non-rear screw of wall spread out grey device ash hole equidistant time wall-building machine move ahead before travel wheel to wall end, rear screw spreads out grey device and starts working subsequently, get device of laying bricks subsequently afterwards to start to put brick on plaster, wall-building machine starts to retreat subsequently, front travel wheel regression is to the place that lays bricks, to lay bricks and make it abundant bonding with plaster compacting, when wall-building machine is first to wall, lifting wheel rises and makes rear travel wheel unsettled, lifting wheel and front travel wheel support wall-building machine and retreat, when wall-building machine builds near second layer wall head, get device of laying bricks to get brick and get and cut brick cutter and brick is struck off 3/4 and brick tail is alignd with wall head, spiral spreads out grey device and starts stand ash on this layer of brick, get device of laying bricks to get to lay bricks will have longitudinally to place to become and laterally place and align with wall head, wall-building machine moves ahead subsequently, on the brick that simultaneously, travel wheel to last layer has just been put, spread out grey device on this layer of brick, spread out ash with the wall-building machine spiral that moves ahead, before getting device of laying bricks subsequently places on plaster to by fragment of brick, repeat above process.
Advantage compared with prior art
The advantage that the present invention compared with prior art at least wants: structure of the present invention is simple, and practicality is good, and wall-building machine just increases the bonding force of brick and brick subsequently with travel wheel compacting after putting brick, enhance the integraty of body of wall.
Specific embodiment
During wall-building machine work of the present invention, first wall-building machine is walked to place of building a wall, the plaster being used for building a wall be stirred is put into ash storage, brick or building block are put into storage brick device, starter drives wall-building machine to bring into operation by gearbox subsequently, first spiral spread out grey device rotate the plaster in ash storage is started to divide all places of building a wall, get subsequently the brick clamp of laying bricks in device with get when device chain of laying bricks walks to storage brick device, brick clamp to be lived (brick two pieces of building blocks one piece) brick folding time two bricks between have the space of 10-12 millimeter, starting first floor is laterally place, after the place that lays bricks placed by fragment of brick, with the operation of wall-building machine, rear travel wheel will proceed to the place that lays bricks, to lay bricks and make it abundant bonding with plaster compacting, travel wheel is often advanced 1 meter and is got device of laying bricks and put brick 4 pieces, it should be noted that in the process of building a wall at this, first spiral is had to spread out after grey device divides plaster above one deck below, getting device of laying bricks can place on plaster by fragment of brick, advance on wheel load people fragment of brick subsequently afterwards, when wall-building machine is about to finish building first floor, fragment of brick lifting wheel rises and makes front travel wheel unsettled, lifting wheel and rear travel wheel support wall-building machine and move ahead, after wall-building machine finishes building first floor, spiral spreads out grey device and starts stand ash on this layer of brick, get device of laying bricks get brick and get cut brick cutter brick is struck off 1/4 and by brick tail and wall unjustified, wall-building machine retreats first floor is subsequently laterally place, the second layer is longitudinally place, wall-building machine retreats subsequently, the brick that simultaneously, travel wheel to last layer has just been put spreads out grey device with wall-building machine retrogressing spiral on this layer of brick, spreads out ash, getting device of laying bricks subsequently places on plaster to by fragment of brick, before advance on wheel load people fragment of brick subsequently, when wall-building machine retreat to the non-rear screw of wall spread out grey device ash hole equidistant time wall-building machine move ahead before travel wheel to wall end, rear screw spreads out grey device and starts working subsequently, get device of laying bricks subsequently afterwards to start to put brick on plaster, wall-building machine starts to retreat subsequently, front travel wheel regression is to the place that lays bricks, to lay bricks and make it abundant bonding with plaster compacting, when wall-building machine is first to wall, lifting wheel rises and makes rear travel wheel unsettled, lifting wheel and front travel wheel support wall-building machine and retreat, when wall-building machine builds near second layer wall head, get device of laying bricks to get brick and get and cut brick cutter and brick is struck off 3/4 and brick tail is alignd with wall head, spiral spreads out grey device and starts stand ash on this layer of brick, get device of laying bricks to get to lay bricks will have longitudinally to place to become and laterally place and align with wall head, wall-building machine moves ahead subsequently, on the brick that simultaneously, travel wheel to last layer has just been put, spread out grey device on this layer of brick, spread out ash with the wall-building machine spiral that moves ahead, before getting device of laying bricks subsequently places on plaster to by fragment of brick, repeat above process.

Claims (5)

1. a wall-building machine comprises: frame, motor, gearbox, front travel wheel, lifting wheel, rear travel wheel, organism level controller, transmit retractable support device, ground master controller, rope yarn feeder, upload into grey device, upload and put brick device, storage brick device, ash storage, the vertical control valve of metope, spiral spreads out grey device, get device of laying bricks, cut brick cutter, it is characterized in that: wall-building machine frame is rectangle, the center above of frame is gearbox, motor is had above gearbox, it is ash storage before gearbox, that spiral spreads out grey device below ash storage, rope yarn feeder after gearbox, rope yarn feeder is by rope yarn and transmission telescopic supporting rod, transmit retractable support device at the center of body of wall, be connected with ground master controller below, it is storage brick device before motor, get device of laying bricks above storage brick device, travel wheel before body above below frame, the front ash hole that spiral spreads out grey device after front travel wheel, before spiral spreads out grey device, ash hole is put brick mouth before getting device of laying bricks below, before what put brick mouth be below the center of body is lifting wheel, it is rear travel wheel after frame, that spiral spreads out ash hole after grey device before rear travel wheel, put brick mouth after getting device of laying bricks before after rear ash discharge, motor is connected with the power shaft of gearbox, and the output shaft of gearbox spreads out grey device respectively at rear travel wheel, telescoping vertical bar, spiral, get device of laying bricks is connected.
2. the transmission retractable support device of wall-building machine comprises according to claim 1: telescoping vertical bar, folding rod, pulley, telescoping vertical bar has two groups, it is characterized in that: the quantity often organizing telescoping vertical bar has the height of body of wall to determine, be slidably connected each other with group telescoping vertical bar, folding rod and telescoping vertical bar quantity are together, between two groups of folding rods, center is connected by axis of rotation, folding rod is connected by pivot pin with telescoping vertical bar, first group of telescoping vertical bar first segment top is connected with second group of telescoping vertical bar second section end by folding rod, second group of telescoping vertical bar first segment top is connected with first group of telescoping vertical bar second section end by folding rod, first group of telescoping vertical bar second section top is connected by folding rod and second group of telescoping vertical bar Section of three end, second group of telescoping vertical bar second section top is connected by folding rod and first group of telescoping vertical bar Section of three end, the two ends of folding rod are equipped with pulley, the rope yarn of rope yarn feeder respectively by folding rod both sides pulley and when moving to opposite side pulley along folding rod, to continue to run along folding rod after the supreme pulley of telescoping vertical bar, the spiral that plaster and fragment of brick are delivered to wall-building machine by two groups of rope yarns respectively spreads out grey device, get device of laying bricks, the bottom of telescoping vertical device with upload into grey device, upload put brick device be connected, upload and grow up to be a useful person, upload and put brick device and be equipped with ground travel wheel, telescoping vertical masthead portion is equipped with body of wall conveyer, body of wall conveyer is connected with rope yarn feeder by rope yarn, rope yarn and by the pulley at folding rod two ends respectively with upload into grey device, upload put brick device be connected.
3. the rope yarn feeder of wall-building machine comprises according to claim 1: frame, belt pulley, power transmission shaft, rope yarn drive sprocket, rope yarn driving-chain, rope yarn, ash pocket, upload storage brick device, it is characterized in that: rope yarn is equipped with grey pocket and uploads the hook storing up brick device uniform, this hook spreads out grey device plaster and fragment of brick being put the spiral to wall-building machine, after getting device of laying bricks, be connected with the hook of rope yarn driving-chain, and run with chain, chain has two covers, be connected respectively and upload grey device and upload the rope yarn putting brick device, often overlap uniform three groups of hooks on chain, one group of hook is had at least to be connected with rope yarn during work.
4. wall-building machine according to claim 1 brings into operation and it is characterized in that: first spiral spread out grey device rotate the plaster in ash storage is started to divide all places of building a wall, get the brick clamp of laying bricks in device subsequently with getting when device chain of laying bricks walks to storage brick device brick clamp to live, after the place that lays bricks placed by fragment of brick, with the operation of wall-building machine, rear travel wheel will proceed to the place that lays bricks, to lay bricks and make it abundant bonding with plaster compacting, travel wheel gait of march is got device of laying bricks and is put brick to put brick speed identical.
5. wall-building machine according to claim 1, it is characterized in that: when being about to finish building first floor, wall-building machine lifting wheel rises and makes front travel wheel unsettled, lifting wheel and rear travel wheel support wall-building machine and move ahead, after wall-building machine finishes building first floor, spiral spreads out grey device and starts stand ash on this layer of brick, get device of laying bricks get brick and get cut brick cutter brick is struck off 1/4 and by brick tail and wall unjustified, wall-building machine retreats subsequently, wall-building machine retreats subsequently, the brick that simultaneously, travel wheel to last layer has just been put spreads out grey device with wall-building machine retrogressing spiral on this layer of brick, spreads out ash, getting device of laying bricks subsequently places on plaster to by fragment of brick, before advance on wheel load people fragment of brick subsequently, when wall-building machine retreat to the non-spiral of wall spread out grey device after ash hole equidistant time wall-building machine before exercise the end that to move ahead into wheel to wall, after spreading out grey device with rear screw, ash hole is started working, put brick mouth after getting device of laying bricks subsequently to start to put brick on plaster, first floor is laterally place, the second layer starts to retreat for longitudinally placing wall-building machine subsequently, front travel wheel regression is to the place that lays bricks, to lay bricks and make it abundant bonding with plaster compacting, repeat above process.
CN201510807578.2A 2015-11-23 2015-11-23 Wall-building machine Active CN105257008B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510807578.2A CN105257008B (en) 2015-11-23 2015-11-23 Wall-building machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510807578.2A CN105257008B (en) 2015-11-23 2015-11-23 Wall-building machine

Publications (2)

Publication Number Publication Date
CN105257008A true CN105257008A (en) 2016-01-20
CN105257008B CN105257008B (en) 2017-11-21

Family

ID=55096910

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510807578.2A Active CN105257008B (en) 2015-11-23 2015-11-23 Wall-building machine

Country Status (1)

Country Link
CN (1) CN105257008B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107432234A (en) * 2016-05-27 2017-12-05 李文泽 A kind of parallel-moving type solar energy irrigation sprinkler
CN107700858A (en) * 2017-09-21 2018-02-16 曹丽美 A kind of wall-building machine with automatic charging function
CN110952790A (en) * 2018-09-27 2020-04-03 千寻位置网络有限公司 Wall building method and system based on differential positioning and wall building machine
US10635758B2 (en) 2016-07-15 2020-04-28 Fastbrick Ip Pty Ltd Brick/block laying machine incorporated in a vehicle
US10865578B2 (en) 2016-07-15 2020-12-15 Fastbrick Ip Pty Ltd Boom for material transport
US11401115B2 (en) 2017-10-11 2022-08-02 Fastbrick Ip Pty Ltd Machine for conveying objects and multi-bay carousel for use therewith
US11441899B2 (en) 2017-07-05 2022-09-13 Fastbrick Ip Pty Ltd Real time position and orientation tracker
US11958193B2 (en) 2017-08-17 2024-04-16 Fastbrick Ip Pty Ltd Communication system for an interaction system

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1104705A (en) * 1994-05-24 1995-07-05 宋峰 Wall building machine
CN101100903A (en) * 2007-07-26 2008-01-09 刘金前 Wall building machine
FR2919322A1 (en) * 2007-07-25 2009-01-30 Francois Nicolas DEVICE FOR ERECTION OF A VERTICAL WALL FROM CONSTRUCTION BLOCKS.
CN201574591U (en) * 2009-10-19 2010-09-08 济南大学 Walling robot
CN201972413U (en) * 2011-01-17 2011-09-14 淮安信息职业技术学院 Automatic wall building machine
CN203603514U (en) * 2013-11-01 2014-05-21 陈帮成 Automatic wall building machine
CN203701626U (en) * 2014-01-21 2014-07-09 鄂大锐 Automatic wall building machine
EP1977058B1 (en) * 2005-12-30 2014-07-16 Goldwing Nominees Pty Ltd. An automated brick laying system for constructing a building from a plurality of bricks
CN203867204U (en) * 2014-06-09 2014-10-08 河南摩西机械制造有限公司 Wall building machine
CN104141391A (en) * 2013-12-03 2014-11-12 殷家土 Wall building robot
CN104153591A (en) * 2014-08-11 2014-11-19 山东科技大学 Full-automatic intelligent wall building machine

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1104705A (en) * 1994-05-24 1995-07-05 宋峰 Wall building machine
EP1977058B1 (en) * 2005-12-30 2014-07-16 Goldwing Nominees Pty Ltd. An automated brick laying system for constructing a building from a plurality of bricks
FR2919322A1 (en) * 2007-07-25 2009-01-30 Francois Nicolas DEVICE FOR ERECTION OF A VERTICAL WALL FROM CONSTRUCTION BLOCKS.
CN101100903A (en) * 2007-07-26 2008-01-09 刘金前 Wall building machine
CN201574591U (en) * 2009-10-19 2010-09-08 济南大学 Walling robot
CN201972413U (en) * 2011-01-17 2011-09-14 淮安信息职业技术学院 Automatic wall building machine
CN203603514U (en) * 2013-11-01 2014-05-21 陈帮成 Automatic wall building machine
CN104141391A (en) * 2013-12-03 2014-11-12 殷家土 Wall building robot
CN203701626U (en) * 2014-01-21 2014-07-09 鄂大锐 Automatic wall building machine
CN203867204U (en) * 2014-06-09 2014-10-08 河南摩西机械制造有限公司 Wall building machine
CN104153591A (en) * 2014-08-11 2014-11-19 山东科技大学 Full-automatic intelligent wall building machine

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107432234A (en) * 2016-05-27 2017-12-05 李文泽 A kind of parallel-moving type solar energy irrigation sprinkler
US10635758B2 (en) 2016-07-15 2020-04-28 Fastbrick Ip Pty Ltd Brick/block laying machine incorporated in a vehicle
US10865578B2 (en) 2016-07-15 2020-12-15 Fastbrick Ip Pty Ltd Boom for material transport
US10876308B2 (en) 2016-07-15 2020-12-29 Fastbrick Ip Pty Ltd Boom for material transport
US11106836B2 (en) 2016-07-15 2021-08-31 Fastbrick Ip Pty Ltd Brick/block laying machine incorporated in a vehicle
US11299894B2 (en) 2016-07-15 2022-04-12 Fastbrick Ip Pty Ltd Boom for material transport
US11687686B2 (en) 2016-07-15 2023-06-27 Fastbrick Ip Pty Ltd Brick/block laying machine incorporated in a vehicle
US11441899B2 (en) 2017-07-05 2022-09-13 Fastbrick Ip Pty Ltd Real time position and orientation tracker
US11958193B2 (en) 2017-08-17 2024-04-16 Fastbrick Ip Pty Ltd Communication system for an interaction system
CN107700858A (en) * 2017-09-21 2018-02-16 曹丽美 A kind of wall-building machine with automatic charging function
US11401115B2 (en) 2017-10-11 2022-08-02 Fastbrick Ip Pty Ltd Machine for conveying objects and multi-bay carousel for use therewith
CN110952790A (en) * 2018-09-27 2020-04-03 千寻位置网络有限公司 Wall building method and system based on differential positioning and wall building machine

Also Published As

Publication number Publication date
CN105257008B (en) 2017-11-21

Similar Documents

Publication Publication Date Title
CN105257008A (en) Wall building machine
CN201826540U (en) Wall-building machine
CN101956462A (en) Walling machine
CN104153553B (en) A kind of fully-automatic intelligent mud wall machine
CN204283256U (en) A kind of drill stem conveying device
CN105835221B (en) A kind of ceramic injection molding mould unloading equipment and its control method
CN206417585U (en) A kind of material frame recycling storage feed device
CN203476256U (en) Magnetic hoisting type drill rod conveying device of drilling machine
CN204252506U (en) A kind of liftable scaffold
CN106150110A (en) Wall building machine
CN109914832A (en) Quick all-in-one machine of laying bricks
CN106542255B (en) A kind of engineering machinery production angle adjustment device of conveyer
CN103372896B (en) Container wood floor row type boring machine and boring method
CN111115132B (en) A suspension type conveying equipment for pyrotechnic composition
CN208427528U (en) Multilayer slab rotating roller
CN103130153A (en) Grasp holding machine for aerated brick carrying
CN203197209U (en) Automatic sand filling device
CN204280047U (en) The gripping of a kind of fragment of brick secondary frames up compress automatically
CN203592092U (en) Automatic feeding mechanism of straight reinforcement bar cutting machine
CN208182141U (en) A kind of hollow brick adobe transfer device of portable
CN205443873U (en) Machine is filled and led up to ground brickwork joint
CN105984813A (en) Movable rotation type elevator
CN210312098U (en) Lifting device for granulated feed feeding hopper
CN108824140A (en) A kind of construction ground apparatus for leveling
CN207273490U (en) The die station runtime of assembled architecture wallboard

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191210

Address after: No. 529, North Shanghai Road, Chuzhou City, Anhui Province

Patentee after: Anhui yinuokang New Material Technology Co.,Ltd.

Address before: Ji'nan Xindian Longshan office in Zhangqiu City, Shandong province 250213 City

Patentee before: Yang Yihua

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230117

Address after: Room 107, Floor 1, Office Building of Liaocheng Industrial Technology Research Institute, No. 88, Huanghe Road, Jiuzhou Street, High-tech Zone, Liaocheng City, Shandong Province, 252042

Patentee after: Liaocheng Yuezhi Intellectual Property Operation Co.,Ltd.

Address before: 239000, No. 529, Shanghai North Road, Chuzhou City, Anhui Province

Patentee before: Anhui yinuokang New Material Technology Co.,Ltd.