CN105244817B - A kind of 10kV three-core cable shrinks transition joint improves mounting process - Google Patents

A kind of 10kV three-core cable shrinks transition joint improves mounting process Download PDF

Info

Publication number
CN105244817B
CN105244817B CN201510626756.1A CN201510626756A CN105244817B CN 105244817 B CN105244817 B CN 105244817B CN 201510626756 A CN201510626756 A CN 201510626756A CN 105244817 B CN105244817 B CN 105244817B
Authority
CN
China
Prior art keywords
copper
cable
connector
rtv
core
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510626756.1A
Other languages
Chinese (zh)
Other versions
CN105244817A (en
Inventor
王浩鸣
孟峥峥
朱晓辉
刘梦璇
张黎明
唐庆华
刘宝成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Tianjin Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Tianjin Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201510626756.1A priority Critical patent/CN105244817B/en
Publication of CN105244817A publication Critical patent/CN105244817A/en
Application granted granted Critical
Publication of CN105244817B publication Critical patent/CN105244817B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of 10kV three-core cable shrinks transition joints to improve mounting process, includes the following steps:(1), filler between cable jacket, steel band, sheath and core is peelled off by size;(2), the copper shield and outer semiconducting layer of cable are peelled off by size;(3), cable major insulation is cleaned;(4) copper connecting tube, is crimped, and is inserted in shrinkage connector and copper shield net cover respectively, with hydraulic tongs crimping copper connecting tube and both ends conducting wire, is extremely highly flushed with major insulation with semi-conductive adhesive band winding copper conductor;(5), brushing polyethylene special type special-purpose adhesive;(6), two-component RTV is smeared;(7), shrinkage connector is installed;(8), it is set with copper shield net cover and overlaps flat copper braid over braid;(9), waterproof protective and mechanical protection are done.The present invention substitutes traditional silicone grease application process using the technique for smearing polyethylene special type special-purpose adhesive and RTV, can effectively smooth crosslinked polyetylene insulated surface layer, improve attachment insulation performance, save raw material consumptive material and simultaneously improve working efficiency.

Description

A kind of 10kV three-core cable shrinks transition joint improves mounting process
Technical field
The present invention relates to power cable field, especially a kind of 10kV three-core cable shrinks transition joint improves erector Skill.
Background technology
Power cable is generally made of conductor, insulating layer and sheath three parts, and wherein sheath includes metal sheath and rubber and plastic Sheath is respectively used to ensure the mechanical strength of power cable and prevents extraneous erosiveness.
It is limited to traffic condition, power cable is usually produced as 500 meter of one axis, when cable length needed for scene is more than 500 Meter Shi connects two cables by making transition joint.Transition joint be mainly used for restoring the conductor of power cable, insulating layer and Sheath three-decker.Transition joint at present, if cable is caused to scratch when exploiting cable insulation, needs diameter in installation process The whole section of cable scratched to excision, not only causes that cable consumption is big, financial cost is high, and returns staff and bring not Just, working efficiency is reduced.
Invention content
In place of making up the deficiencies in the prior art, raw materials consumption can be reduced and add by providing one kind The 10kV three-core cable shrinks transition joint of fast operating rate improves mounting process.
The purpose of the present invention is what is realized by following technological means:
A kind of 10kV three-core cable shrinks transition joint improves mounting process, it is characterised in that:Include the following steps:
(1), peelled off between cable jacket, sheath and core according to size as defined in the instruction for mounting of attachment manufactory Filler if any steel band, also needs to peel off steel band, steel band stripping length mainly allows bending radius and defined phase spacing by core To determine, and need to consider to be adapted with the shrinkage set length provided;
(2), defined size peels off the copper shield and outer semiconducting layer of cable to specifications, is removed in outer semiconducting layer It should prevent plowing from major insulation as possible in the process;
(3) cable major insulation, is cleaned with detergent, but is sure not to be allowed to touch outer semiconducting layer;
(4), crimp copper connecting tube, and be inserted in shrinkage connector and copper shield net cover respectively, with the matched liquid of conductor cross-section Pressing tongs point left, center, right crimp copper connecting tube and both ends conducting wire three times;After the completion of crimping, with semi-conductive adhesive band winding copper conductor extremely It is highly flushed with major insulation;
(5), brushing polyethylene special type special-purpose adhesive:Polyethylene special type special-purpose adhesive is uniformly applied to centre for 360 ° Joint surface, application area are advisable so that major insulation is completely covered but does not contact the semi-conductive layers of both sides;
(6), two-component RTV is smeared:Reconciliation A, B bi-component RTV according to a certain percentage, the RTV after reconciliation is uniformly smeared On polyethylene special type special-purpose adhesive surface layer, after smearing RTV about half an hours, RTV can solidify completely;
(7) a mark, is made on semi-conductive screen according to shrinkage joint length, positioning baseline is installed as shrinkage connector;It will Shrinkage connector alignment positioning baseline, taking out core rope shrinks connector, and connector center label and baseline distance are verified in contraction process From whether meet the requirements and in time left and right adjustment joint location;
(8), the copper shield net cover on connector exterior set, and flat copper braid over braid is overlapped on copper shield net cover, with constant force bullet Spring is fixed on copper shield net cover;
(9) wrapped water blocking tape partly, is overlapped outside entire connector and does waterproof protective, belt armour is finally wound and does mechanical protection.
Moreover, step (2) in, after copper shield and outer semiconducting layer are removed, preferably outer semiconducting layer edge is fallen Angle handles or gradient winding semi-conductive adhesive band, and major insulation edge preferably carries out chamfered.
Moreover, step (3) in, if there are residual semiconductive particle, cut or pit in major insulation surface, before cleaning Grinding process is carried out with the sand paper that nonconducting, divided by maximum granularity is 120.
Moreover, step (4) in, copper conductor winding semi-conductive adhesive band height should not be higher by major insulation, to avoid generate gas Gap.
Moreover, (5) the polyethylene special type special-purpose adhesive should within an hour use step after ingress of air.
Moreover, step, (6) in the bi-component RTV, component A is adhesive, and B component is curing agent, two component of A, B Weight ratio is 1~1.5:100, two kinds of components should stand 10 minutes or so to discharge bubble, Ying Jie after being mixed evenly It is used within 4 hours after touching air.
The advantages and positive effects of the present invention are:
1st, the present invention provides a kind of 10kV three-core cable shrinks transition joints to improve flow of installation, poly- using smearing The technique of ethylene special type special-purpose adhesive and RTV substitute traditional silicone grease application process, can effectively smooth crosslinked polyethylene it is exhausted Attachment insulation performance is improved on edge surface layer.
2nd, using technological process of the present invention, scuffing insulating layer can be realized certain by smearing two-component RTV Consumptive material is saved in reparation in degree.
3rd, operation difficulty can be reduced using technological process of the present invention, improves working efficiency.
Specific embodiment
Describe the embodiment of the present invention in detail below in conjunction with the accompanying drawings;It should be noted that the present embodiment is narrative, no It is limited, it is impossible to which protection scope of the present invention is limited with this.
A kind of 10kV three-core cable shrinks transition joint improves mounting process, includes the following steps:
(1), peelled off between cable jacket, sheath and core according to size as defined in the instruction for mounting of attachment manufactory Filler if any steel band, also needs to peel off steel band, steel band stripping length mainly allows bending radius and defined phase spacing by core To determine, and need to consider to be adapted with the shrinkage set length provided;
(2), defined size peels off the copper shield and outer semiconducting layer of cable to specifications, is removed in outer semiconducting layer It should prevent plowing from major insulation as possible in the process;After copper shield and outer semiconducting layer are removed, preferably to outer semiconducting layer edge into Row chamfered or gradient winding semi-conductive adhesive band, major insulation edge preferably carries out chamfered;
(3) cable major insulation, is cleaned with detergent, but is sure not to be allowed to touch outer semiconducting layer;If major insulation surface has Semiconductive particle, cut or pit are remained, is polished before cleaning with the sand paper that nonconducting, divided by maximum granularity is 120 Processing;
(4), crimp copper connecting tube, and be inserted in shrinkage connector and copper shield net cover respectively, with the matched liquid of conductor cross-section Pressing tongs point left, center, right crimp copper connecting tube and both ends conducting wire three times;After the completion of crimping, with semi-conductive adhesive band winding copper conductor extremely It is highly flushed with major insulation;The semi-conductive adhesive band height of copper conductor winding should not be higher by major insulation, to avoid air gap is generated;
(5), brushing polyethylene special type special-purpose adhesive:Polyethylene special type special-purpose adhesive should after ingress of air 1 hour it Interior use.360 ° of adhesive is uniformly applied to transition joint surface, application area is to be completely covered major insulation but not contact two The semi-conductive layer of side is advisable, and (polyethylene special type special-purpose adhesive is insulating materials, can absolutely not be applied to outer semiconducting layer and lead On the semi-conductive adhesive band wound on body);
(6) two-component RTV (room temperature vulcanized silicone rubber), is smeared:Reconciliation A, B bi-component RTV according to a certain percentage, component A For adhesive, B component is curing agent, and the weight ratio of two component of A, B is 1~1.5:100, two kinds of components are after being mixed evenly 10 minutes or so should be stood to discharge bubble, should be used within 4 hours after ingress of air;
RTV after reconciliation is uniformly applied to polyethylene special type special-purpose adhesive surface layer, after smearing RTV about half an hours, RTV can solidify completely;Polyethylene special type special-purpose adhesive smearing can smear bi-component RTV after ten minutes, and bi-component RTV smears 30 It is solidified after minute, cold-shrinkable terminal or connector can be inserted in;Bi-component RTV uses application process, avoids, using brushing technique, avoiding applying Apply blocked up influence setting time;Bi-component RTV is insulating materials, can absolutely not be applied to what is wound on outer semiconducting layer and conductor On semi-conductive adhesive band;
(7) a mark, is made on semi-conductive screen according to shrinkage joint length, positioning baseline is installed as shrinkage connector;It will Shrinkage connector alignment positioning baseline, taking out core rope shrinks connector, and connector center label and baseline distance are verified in contraction process From whether meet the requirements and in time left and right adjustment joint location;
(8), the copper shield net cover on connector exterior set, and flat copper braid over braid is overlapped on copper shield net cover, with constant force bullet Spring is fixed on copper shield net cover;
(9) wrapped water blocking tape partly, is overlapped outside entire connector and does waterproof protective, belt armour is finally wound and does mechanical protection.

Claims (4)

1. a kind of 10kV three-core cable shrinks transition joint improves mounting process, it is characterised in that:Include the following steps:
(1), filler between cable jacket, sheath and core is peelled off according to size as defined in the instruction for mounting of attachment manufactory, If any steel band, also need to peel off steel band, steel band stripping length mainly allows bending radius and defined phase spacing to determine by core It is fixed, and need to consider to be adapted with the shrinkage set length provided;
(2), defined size peels off the copper shield and outer semiconducting layer of cable to specifications, in outer semiconducting layer stripping process In should prevent plowing from major insulation as possible;
(3) cable major insulation, is cleaned with detergent, but is sure not to be allowed to touch outer semiconducting layer;
(4), crimp copper connecting tube, and be inserted in shrinkage connector and copper shield net cover respectively, with the matched hydraulic tongs of conductor cross-section Point left, center, right crimp copper connecting tube and both ends conducting wire three times;After the completion of crimping, with semi-conductive adhesive band winding copper conductor to master Insulation height flushes;
(5), brushing polyethylene special type special-purpose adhesive:Polyethylene special type special-purpose adhesive is uniformly applied to transition joint for 360 ° Surface, application area are completely covered major insulation but do not contact the semi-conductive layer of both sides;
(6), two-component RTV is smeared:Reconciliation A, B bi-component RTV according to a certain percentage, the RTV after reconciliation is uniformly applied to poly- Ethylene special type special-purpose adhesive surface layer, after smearing RTV about half an hours, RTV can solidify completely;
(7) a mark, is made on semi-conductive screen according to shrinkage joint length, positioning baseline is installed as shrinkage connector;By shrinkage Connector alignment positioning baseline, taking out core rope shrinks connector, and connector center label is verified in contraction process is with parallax range It is no to meet the requirements and control adjustment joint location in time;
(8), the copper shield net cover on connector exterior set, and flat copper braid over braid is overlapped on copper shield net cover, it will with constant force spring It is fixed on copper shield net cover;
(9) wrapped water blocking tape partly, is overlapped outside entire connector and does waterproof protective, belt armour is finally wound and does mechanical protection;
(5) the polyethylene special type special-purpose adhesive should within an hour use step after ingress of air;
For step (6) in the bi-component RTV, component A is adhesive, and B component is curing agent, and the weight ratio of two component of A, B is 1 ~1.5:100, two kinds of components should stand 10 minutes or so to discharge bubble after being mixed evenly, should be 4 after ingress of air It is used within hour.
2. a kind of 10kV three-core cable shrinks transition joint according to claim 1 improves mounting process, it is characterised in that: Step (2) in, after copper shield and outer semiconducting layer is removed, chamfered is carried out to outer semiconducting layer edge or gradient is wound Semi-conductive adhesive band, major insulation edge carry out chamfered.
3. a kind of 10kV three-core cable shrinks transition joint according to claim 1 improves mounting process, it is characterised in that: Step (3) in, if there are residual semiconductive particle, cut or pit in major insulation surface, before cleaning with nonconducting, most The sand paper that bulky grain degree is 120 carries out grinding process.
4. a kind of 10kV three-core cable shrinks transition joint according to claim 1 improves mounting process, it is characterised in that: Step (4) in, copper conductor winding semi-conductive adhesive band height should not be higher by major insulation, to avoid generate air gap.
CN201510626756.1A 2015-09-28 2015-09-28 A kind of 10kV three-core cable shrinks transition joint improves mounting process Active CN105244817B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510626756.1A CN105244817B (en) 2015-09-28 2015-09-28 A kind of 10kV three-core cable shrinks transition joint improves mounting process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510626756.1A CN105244817B (en) 2015-09-28 2015-09-28 A kind of 10kV three-core cable shrinks transition joint improves mounting process

Publications (2)

Publication Number Publication Date
CN105244817A CN105244817A (en) 2016-01-13
CN105244817B true CN105244817B (en) 2018-07-03

Family

ID=55042353

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510626756.1A Active CN105244817B (en) 2015-09-28 2015-09-28 A kind of 10kV three-core cable shrinks transition joint improves mounting process

Country Status (1)

Country Link
CN (1) CN105244817B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111092395B (en) * 2019-12-26 2021-03-19 杭州矽能新材料有限公司 Fusion type cold-shrink intermediate joint and installation method of cold-shrink terminal

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102780195A (en) * 2012-07-27 2012-11-14 中国二十二冶集团有限公司 10-35KV cold-shrink cable terminal and manufacture method thereof
CN103337813B (en) * 2013-05-30 2016-03-30 国家电网公司 Low-voltage cable intermediate joint cold contraction technology
CN104242174A (en) * 2013-06-24 2014-12-24 鲍震 Manufacturing method of intermediate cable joint
CN103944117A (en) * 2014-03-11 2014-07-23 汕头市南帆电器有限公司 Manufacturing method for intermediate connector of high voltage cable

Also Published As

Publication number Publication date
CN105244817A (en) 2016-01-13

Similar Documents

Publication Publication Date Title
CN103972825B (en) Manufacture method around packet mode transition joint
CN108233282A (en) A kind of power cable scene welded-connecting type belting type straight coupling technique
CN106329268A (en) Wrapping and molding manufacturing method for middle connector of cross-linked polyethylene insulated power cable
CN104967065A (en) Copper hood type high voltage cold shrink intermediate joint production method based on inner electrode
CN103151630B (en) Quick inserting and drawing cable connecting device
CN106505509A (en) A kind of 500kV cable systems transition joint mounting process
CN105226583B (en) A kind of 10kV three-core cable shrink terminals improve mounting process
CN105244817B (en) A kind of 10kV three-core cable shrinks transition joint improves mounting process
CN203826912U (en) Rear joint of cable
CN206489916U (en) Shield heat-shrink tube
CN209401864U (en) A kind of 35kV--220kV pouring type cable ontology fusion splice
CN103985469A (en) Embedded type optical fiber composite overhead ground wire capable of melting ice
CN103904591A (en) Method for manufacturing 35 kV thermal contraction intermediate cable head
CN103824632A (en) Intelligent extra-high-voltage photoelectric composite cable with built-in optical fiber
CN114709765B (en) High-voltage cable transfer connection construction method
CN208190228U (en) A kind of crosslinked cable hot melting connector
CN203150755U (en) Quick-plugging cable connecting device
CN109301768A (en) A kind of emergency repair method of seabed three-core cable
CN205542132U (en) Insulating power cable
CN114360764A (en) Manufacturing method of high-pressure submarine cable factory joint
CN110379541A (en) A kind of manufacturing process of fusing type cable connector
CN113507023A (en) Method for manufacturing split end of coaxial radio frequency cable assembly
CN106384977B (en) A kind of restorative procedure of twisted polyethylene cable single-phase fault
CN201608003U (en) Stranded optical fiber composite cable at nominal voltage of 0.6/1 kV and below
EP3221868B1 (en) Electric power cable

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant