China
Prior art keywords
underground wall
wall body
body structure
giant
underground
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510568356.XA
Other languages
Chinese (zh)
Inventor
冯克俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510568356.XA priority Critical patent/CN105239577A/en
Publication of CN105239577A publication Critical patent/CN105239577A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The invention discloses a method for carrying out settlement of an underground wall structure by means of high-pressure water guns. The method for carrying out the settlement of the underground wall structure by means of the high-pressure water guns comprises the following steps that (a) a field is leveled, and setting-out is conducted for positioning; (b) the underground wall structure is poured in place; (c) a total station is installed; (d) pre-preparation for the settlement of the underground wall structure is conducted; (e) the high-pressure water guns are arranged; (f) settlement of the first stage of the underground wall structure is conducted by means of the high-pressure water guns; (g) the second stage of the underground wall structure is poured in place; and (h) the underground wall structure is reinforced through grouting. According to the method for carrying out the settlement of the underground wall structure by means of the high-pressure water guns, an annular slurry groove is formed in the periphery of the underground wall structure, so that a soil body supporting the underground wall structure collapses in order, and accordingly the underground wall structure sinks slowly under the action of the self-weight, and construction of an underground building wall and a building enclosure is achieved; the method for carrying out the settlement of the underground wall structure by means of the high-pressure water guns has the advantages of being high in construction speed and high in working efficiency.

Description

The method of underground wall body structure sediment implemented by a kind of giant
Technical field
The present invention relates to the construction of civil engineering foundation engineering technical field underground structure body of wall and space enclosing structure, the method for underground wall body structure sediment implemented by especially a kind of giant.
Background technology
In the foundation construction of building site, before excavation of foundation pit, first to implement the construction of underground structure space enclosing structure, then in foundation ditch, implement precipitation and excavation, after having excavated, the construction of underground wall body structure can be implemented, because this working procedure is complicated, cost is high, efficiency is low and do not favored, underground wall body structural entity sedimentation construction method is adopted to be exactly form of construction work space enclosing structure and underground wall body structure united two into one, the construction of prior art underground wall body structure, that underground wall body structure that is prefabricated or cast in situs is located on ground, the soil of underground wall body inside configuration support zone is excavated, namely to cut the earth sedimentation, design elevation is sunk down into after making underground wall body structure rely on the gravity of structure self to overcome the frictional resistance of periphery, then bed course and construction of bottom plates is carried out, this technique is gone along with sb. to guard him before instead of excavation of foundation pit and the construction of wall body structure, there is saving of labor, timesaving advantage is rather well received, and Problems existing is, the harmony of shoveling sedimentation to the amount and shoveling of excavating the underground wall body support structure position soil body requires very high, otherwise will cause the inclination of underground wall body structure, tear, once run-off the straight correction is very difficult, shoveling sedimentation also easily causes structural outer surface settlement, cuts the earth in the foundation ditch that especially groundwater table is high, and the impact caused periphery soil body environment is comparatively large, thus also causes the local buckling of underground wall body structure, in addition this construction method is also by the restriction of space enclosing structure foundation depth, is not suitable for the space enclosing structure construction that basis is darker.
Summary of the invention
The method of underground wall body structure sediment implemented by a kind of giant that the object of the invention is to provide for the deficiencies in the prior art, the present invention adopts giant to form mud annular groove at the periphery of underground wall body structure, cause the soil body of support underground wall body structure to be burst in order to collapse, underground wall body structure is slowly sunk under the effect of deadweight, to realize the construction of underground wall body and space enclosing structure, there is the advantage that speed of application is fast, operating efficiency is high.
The concrete technical scheme realizing the object of the invention is:
A method for underground wall body structure sediment implemented by giant, and its feature comprises the steps:
A), smooth location unwrapping wire location
Place for implementing underground wall body structure sediment is carried out smooth and is excavated to original soil layer, the position of line setting setting underground wall body sedimentation;
B), cast-in-place underground wall body structure
Install template, cloth muscle, cast-in-place underground wall body structure at the scene by designing requirement, until underground wall body structure completes maintenance, the basil is set in the bottom of underground wall body structure, and neonychium block is set under the basil;
C), total powerstation is installed
At the position periphery for implementing underground wall body sedimentation, total powerstation is installed;
D), prepare before underground wall body structure sediment
For multistage underground wall body structure, implement the operation of sedimentation step by step, first will complete the form removable of the first order underground wall body structure of maintenance, take out the protection cushion block under the underground wall body structure basil;
E), layout giant
Choose giant number cover, be distributed in the periphery of underground wall body inner structural wall, described giant is made up of shower nozzle, high-pressure water pipe and guide peg, and shower nozzle is located at the termination of high-pressure water pipe, and guide peg is strapped in high-pressure water pipe, and giant layout is complete;
F) sedimentation of first order underground wall body structure, is implemented with giant
Open high-pressure hydraulic pump, the shower nozzle ejection water under high pressure of giant, the soil body under the high pressure water impact underground wall body structure basil, the soil body of underground wall body structural base is made to form mud annular groove, cause the soil body of support underground wall body structure to be burst in order to collapse, underground wall body structure is slowly sunk under the effect of deadweight; Now, the dynamic vertical degree that total powerstation monitoring underground wall body structure is sunk, and the flow controlling giant is implemented to control, adjust to the sinking watching of underground wall body structure, until first order underground wall body structure sediment arrives the absolute altitude of design, close high-pressure hydraulic pump and make the shower nozzle of giant stop water spray;
G), cast-in-place second level underground wall body structure
The basis of first order underground wall body structure installs template, cloth muscle, cast-in-place second level underground wall body structure, until after second level underground wall body structure completes maintenance, reopens high-pressure hydraulic pump and again implement; And complete all the other grade of underground wall body structure successively, until afterbody underground wall body structure has been sunk;
H), grouting and reinforcing underground wall body structure
After descending wall body structure to be deposited to design elevation fully, grout and strengthen processing is carried out at the periphery of underground wall body structure inside and outside wall, grouting and reinforcing completes until arrive defects liability period, can implement the precipitation in underground wall body structure 1, soil excavation, bed course and construction of bottom plates.
The present invention adopts giant to form mud annular groove at the periphery of underground wall body structure, cause the soil body of support underground wall body structure to be burst in order to collapse, underground wall body structure is slowly sunk under the effect of deadweight, to realize the construction of underground structure underground wall body and space enclosing structure, there is the advantage that speed of application is fast, operating efficiency is high.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is A-A cross section structure schematic diagram of Fig. 1;
Fig. 3 is the using state schematic diagram of first order underground wall body structure sediment;
Fig. 4 is the using state schematic diagram that underground wall body structure sediment completes grouting and reinforcing.
Detailed description of the invention
Embodiment:
Consult Fig. 1, Fig. 2, for the construction of certain underground structure, building site wall body structure, further illustrate as follows to the invention process process:
A), smooth location unwrapping wire location
Place for implementing underground wall body structure sediment is carried out smooth and is excavated to original soil layer, the position of line setting setting underground wall body sedimentation;
B), cast-in-place underground wall body structure
Install template, cloth muscle, cast-in-place underground wall body structure 1 at the scene by designing requirement, until underground wall body structure 1 completes maintenance, the basil is set in the bottom of underground wall body structure 1, and neonychium block is set under the basil;
C), total powerstation is installed
At the position periphery for implementing underground wall body sedimentation, total powerstation 3 is installed;
D), prepare before underground wall body structure sediment
For multistage underground wall body structure, implement the operation of sedimentation step by step, first will complete the form removable of the first order underground wall body structure 1 of maintenance, take out the protection cushion block under underground wall body structure 1 basil;
E), layout giant
Choose giant 2 number cover, be distributed in the periphery of underground wall body structure 1 inwall and outer wall, the spacing of setting-out rifle 2 is at about 1.5m, described giant 2 is made up of shower nozzle 21, high-pressure water pipe 22 and guide peg 23, and shower nozzle 21 is located at the termination of high-pressure water pipe 22, guide peg 23 is strapped in high-pressure water pipe 22, and giant 2 layout is complete;
F) sedimentation of first order underground wall body structure, is implemented with giant
Consult Fig. 2, Fig. 3, open high-pressure hydraulic pump, the shower nozzle 21 of giant 2 sprays water under high pressure, the soil body under high pressure water impact underground wall body structure 1 basil, the soil body bottom underground wall body structure 1 is made to form mud annular groove, cause the soil body of support underground wall body structure 1 to be burst in order to collapse, underground wall body structure 1 is slowly sunk under the effect of deadweight; Now, total powerstation 3 monitors the dynamic vertical degree that underground wall body structure 1 is sunk, the constructor of giant 2 is gripped according to monitoring result commander, with the downstream rate of the flow and guide peg 23 that control giant 2, to implement to control, adjust to the sinking watching of underground wall body structure 1, until the sedimentation of first order underground wall body structure 1 arrives the absolute altitude of design, close high-pressure hydraulic pump and make the shower nozzle 21 of giant 2 stop water spray;
G), cast-in-place second level underground wall body structure
Consult Fig. 2, Fig. 3, Fig. 4, the basis of first order underground wall body structure 1 installs template, cloth muscle, cast-in-place second level underground wall body structure 1, until after second level underground wall body structure 1 completes maintenance, reopen high-pressure hydraulic pump and again implement; And complete all the other grade of underground wall body structure 1 successively, until afterbody underground wall body structure 1 has been sunk;
H), grouting and reinforcing underground wall body structure
Consult Fig. 4, after descending wall body structure 1 to be deposited to design elevation fully, carry out grout and strengthen processing at the periphery of underground wall body structure 1 inside and outside wall, grouting and reinforcing completes until arrive defects liability period, can implement the precipitation in underground wall body structure 1, soil excavation, bed course and construction of bottom plates.
The present invention is main enforcement sedimentation work to be distributed in the giant 2 of underground wall body structure 1 inner peripheral wall, if desired, the giant 2 being arranged in underground wall body structure 1 outer wall can be employed, to implement more effective control and adjustment to underground wall body structure 1 sinking watching.

Claims (1)

1. a method for underground wall body structure sediment implemented by giant, it is characterized in that it comprises the steps:
A), smooth location unwrapping wire location
Place for implementing underground wall body structure sediment is carried out smooth and is excavated to original soil layer, the position of line setting setting underground wall body sedimentation;
B), cast-in-place underground wall body structure
Install template, cloth muscle, cast-in-place underground wall body structure (1) at the scene by designing requirement, until underground wall body structure (1) completes maintenance, the basil is set in the bottom of underground wall body structure (1), and neonychium block is set under the basil;
C), total powerstation is installed
At the position periphery for implementing underground wall body sedimentation, total powerstation (3) is installed;
D), prepare before underground wall body structure sediment
For multistage underground wall body structure, implement the operation of sedimentation step by step, first will complete the form removable of the first order underground wall body structure (1) of maintenance, take out the protection cushion block under underground wall body structure (1) basil;
E), layout giant
Choose giant (2) number cover, be distributed in the periphery of underground wall body structure (1) inwall, described giant (2) is made up of shower nozzle (21), high-pressure water pipe (22) and guide peg (23), and shower nozzle (21) is located at the termination of high-pressure water pipe (22), guide peg (23) is strapped in high-pressure water pipe (22), and giant (2) layout is complete;
F) sedimentation of first order underground wall body structure, is implemented with giant
Open high-pressure hydraulic pump, shower nozzle (21) the ejection water under high pressure of giant (2), the soil body under high pressure water impact underground wall body structure (1) basil, the soil body of underground wall body structure (1) bottom is made to form mud annular groove, cause the soil body of support underground wall body structure (1) to be burst in order to collapse, underground wall body structure (1) is slowly sunk under the effect of deadweight; Now, the dynamic vertical degree that total powerstation (3) monitoring underground wall body structure (1) sinks, and the flow controlling giant (2) is implemented to control, adjust to the sinking watching of underground wall body structure (1), until first order underground wall body structure (1) sedimentation arrives the absolute altitude of design, close high-pressure hydraulic pump and make the shower nozzle (21) of giant (2) stop water spray;
G), cast-in-place second level underground wall body structure
The basis of first order underground wall body structure (1) installs template, cloth muscle, cast-in-place second level underground wall body structure (1), until after second level underground wall body structure (1) completes maintenance, reopens high-pressure hydraulic pump and again implement; And complete all the other grade of underground wall body structure (1) successively, until afterbody underground wall body structure (1) has been sunk;
H), grouting and reinforcing underground wall body structure
After descending wall body structure (1) to be deposited to design elevation fully, grout and strengthen processing is carried out at the periphery of underground wall body structure (1) inside and outside wall, grouting and reinforcing completes until arrive defects liability period, can implement precipitation, soil excavation, bed course and construction of bottom plates in underground wall body structure (1).
CN201510568356.XA 2015-09-09 2015-09-09 Method for carrying out settlement of underground wall structure by means of high-pressure water guns Pending CN105239577A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510568356.XA CN105239577A (en) 2015-09-09 2015-09-09 Method for carrying out settlement of underground wall structure by means of high-pressure water guns

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510568356.XA CN105239577A (en) 2015-09-09 2015-09-09 Method for carrying out settlement of underground wall structure by means of high-pressure water guns

Publications (1)

Publication Number Publication Date
CN105239577A true CN105239577A (en) 2016-01-13

Family

ID=55037376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510568356.XA Pending CN105239577A (en) 2015-09-09 2015-09-09 Method for carrying out settlement of underground wall structure by means of high-pressure water guns

Country Status (1)

Country Link
CN (1) CN105239577A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975029A (en) * 2017-12-29 2018-05-01 章胜南 It is a kind of integrally to descend wall construction method
CN108086302A (en) * 2017-12-29 2018-05-29 章胜南 A kind of transverse direction based on underground wall body construction is whole to pour wall width subsidence process
CN108104111A (en) * 2017-12-29 2018-06-01 章胜南 It is a kind of accurately to descend wall construction method
CN108104112A (en) * 2017-12-29 2018-06-01 章胜南 A kind of underground wall body construction method based on the slurrying of original soil original position
CN108149694A (en) * 2017-12-29 2018-06-12 章胜南 A kind of wall width based on underground wall body construction longitudinally splices subsidence process
CN113216235A (en) * 2021-05-31 2021-08-06 上海兴怡基础工程有限公司 Construction method for large open caisson water storage settlement

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1120104A (en) * 1994-09-16 1996-04-10 阎林森 Film water wall sinking method
JP2000170158A (en) * 1998-12-02 2000-06-20 Randekku:Kk Recharging method for underground stream intercepted by construction of linear underground structure
CN1958966A (en) * 2006-07-20 2007-05-09 廖河山 Underground consecutive sinking well type openweb wall body, and construction method
CN103898927A (en) * 2014-04-23 2014-07-02 中铁十三局集团第四工程有限公司 Underground diaphragm wall joint, clamping device matched with underground diaphragm wall joint and underground diaphragm wall construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1120104A (en) * 1994-09-16 1996-04-10 阎林森 Film water wall sinking method
JP2000170158A (en) * 1998-12-02 2000-06-20 Randekku:Kk Recharging method for underground stream intercepted by construction of linear underground structure
CN1958966A (en) * 2006-07-20 2007-05-09 廖河山 Underground consecutive sinking well type openweb wall body, and construction method
CN103898927A (en) * 2014-04-23 2014-07-02 中铁十三局集团第四工程有限公司 Underground diaphragm wall joint, clamping device matched with underground diaphragm wall joint and underground diaphragm wall construction method

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107975029A (en) * 2017-12-29 2018-05-01 章胜南 It is a kind of integrally to descend wall construction method
CN108086302A (en) * 2017-12-29 2018-05-29 章胜南 A kind of transverse direction based on underground wall body construction is whole to pour wall width subsidence process
CN108104111A (en) * 2017-12-29 2018-06-01 章胜南 It is a kind of accurately to descend wall construction method
CN108104112A (en) * 2017-12-29 2018-06-01 章胜南 A kind of underground wall body construction method based on the slurrying of original soil original position
CN108149694A (en) * 2017-12-29 2018-06-12 章胜南 A kind of wall width based on underground wall body construction longitudinally splices subsidence process
CN108086302B (en) * 2017-12-29 2019-06-28 章胜南 A kind of transverse direction based on underground wall body construction is whole to pour wall width subsidence process
CN107975029B (en) * 2017-12-29 2019-09-24 章胜南 It is a kind of integrally to descend wall construction method
CN108104111B (en) * 2017-12-29 2019-09-24 章胜南 It is a kind of accurately to descend wall construction method
CN108104112B (en) * 2017-12-29 2019-09-24 章胜南 A kind of underground wall body construction method based on the slurrying of original soil original position
CN108149694B (en) * 2017-12-29 2019-10-18 章胜南 A kind of wall width based on underground wall body construction longitudinally splices subsidence process
CN113216235A (en) * 2021-05-31 2021-08-06 上海兴怡基础工程有限公司 Construction method for large open caisson water storage settlement

Similar Documents

Publication Publication Date Title
CN105239577A (en) Method for carrying out settlement of underground wall structure by means of high-pressure water guns
CN107059906A (en) A kind of method that utilization underground shaft robot applies major diameter open caisson
CN104196034A (en) Foundation pit construction method employing steel sheet piles as support cofferdam
CN103114599B (en) Deep basal pit sealing dewatering device and construction method thereof
CN108547639B (en) Tunnel closes on the advanced same more conduit delamination pour slurry construction methods in hole of existing buildings
CN203174616U (en) Clay foundation rain falling and water saving system
CN102635119A (en) Supporting method for construction of swirl well
CN107587516A (en) A kind of efficient sealing of Follow-up type hinders sand precipitation hybrid system and its construction method
CN108086296B (en) Dynamic and static combined grouting foundation reinforcing construction method
CN100510281C (en) Semi-inverse construction method of super large diameter, ultra-burial depth storage pond
CN106759384A (en) A kind of method that use prefabricated pipeline base plate does Brace in Deep Footing Groove
CN110387884A (en) The construction method gushed for ultra-deep foundation pit protrusion-dispelling
CN108951641A (en) It is a kind of for the compound support method of ultra-deep pipe gallery foundation trench in water river
CN107013225B (en) The anti-collapse tunneling shield method of whirl spraying water shutoff
CN114411756A (en) Construction method and construction device for water-rich sand layer subway station open excavation foundation pit without precipitation
CN104695457B (en) The construction method of a kind of Novel silo horizontal jet grouting pile foundation hole back cover water barrier
CN106088126A (en) A kind of open caisson deviation rectification construction method
CN103572764A (en) Watertight structure for retaining wall of ultra-deep manually excavated pile and construction method thereof
CN103643690A (en) Deep-foundation-pit exploration-hole water-gushing processing method
CN202202335U (en) Flow guiding and water draining structure in deep foundation pit
CN105155564A (en) Anti-inrushing construction method for weak water-resisting layer of deep foundation pit
CN102635126B (en) Method for constructing casting well for aluminum alloy hot-rolled sheet ingots
CN104594367B (en) A kind of combined type cofferdam structure and construction method
CN107034893A (en) Shaft construction method
CN110747861A (en) High-water-level deep foundation pit excavation construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160113

RJ01 Rejection of invention patent application after publication