CN105220770B - Slip hinge support and construction method - Google Patents

Slip hinge support and construction method Download PDF

Info

Publication number
CN105220770B
CN105220770B CN201510697377.1A CN201510697377A CN105220770B CN 105220770 B CN105220770 B CN 105220770B CN 201510697377 A CN201510697377 A CN 201510697377A CN 105220770 B CN105220770 B CN 105220770B
Authority
CN
China
Prior art keywords
vestibule
connector
wall
location division
locating surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510697377.1A
Other languages
Chinese (zh)
Other versions
CN105220770A (en
Inventor
叶小斌
李果
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC5 Group Corp Ltd
Original Assignee
China MCC5 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC5 Group Corp Ltd filed Critical China MCC5 Group Corp Ltd
Priority to CN201510697377.1A priority Critical patent/CN105220770B/en
Publication of CN105220770A publication Critical patent/CN105220770A/en
Application granted granted Critical
Publication of CN105220770B publication Critical patent/CN105220770B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention provides a kind of slip hinge support and construction method, belong to Architectural Equipment technical field, slip hinge support is used for the connection of wall and vestibule, and wall includes the first connector and the first location division, and locating surface is protruded in direction of first connector along the locating surface perpendicular to wall;First position point is on the weight-bearing surface of wall;Vestibule includes floor and support frame, and vestibule is overlapped on weight-bearing surface by support frame, and the end face and locating surface for making vestibule are arranged at intervals;The bottom of support frame is provided with the second location division, and the first location division is slidably connected with the second location division;The second connector is additionally provided with support frame, multiple bar holes are respectively arranged with first connector and the second connector, connecting rod is plugged with first connector bar hole corresponding with the second connector, connecting rod can be slided along the length direction of bar hole in bar hole.Vestibule is connected with wall by slip hinge support, and its sound construction is reliable, and the torsional forces that vestibule is born is small, uses safety.

Description

Slip hinge support and construction method
Technical field
The present invention relates to Architectural Equipment technical field, in particular to a kind of slip hinge support and construction method.
Background technology
As the continuous improvement of building function, architectural image become increasingly abundant, many architects like adjacent to build Build monomer to connect, form the aerial vestibule rich in fashion breath.Especially in large-scale commercial circle, school, hospital, sports building Etc. in crowded groups of building, aerial vestibule often turns into apt word added to clinch the point, the effect of relieving traffic congestion both has been played, but also as view Platform etc..
In the prior art, the connected mode at vestibule two ends is a lot, specifically using which kind of depend on the span of vestibule, rigidity, The factors such as vertical position.If certain it is noted that must accomplish " strong node, strong anchoring " using rigid connection scheme.If using hinge Connect scheme, it should be noted that the node designed must coincide with model.If sliding support is also noted that slip The problems such as selection of amount, setting of stopping means, accomplish not slump during geological process, do not collide with agent structure.Prior art By the way of being hinged, by setting axis of rotation to connect between wall and vestibule, when vestibule and wall are subjected to displacement, even Corridor receives certain torsional forces with wall, and the torsional forces can not be adjusted by self structure, be deposited in use In potential safety hazard;And when producing Relative sliding between wall and vestibule, the glide direction of vestibule is indefinite, causes the stress of vestibule not Uniformly, there is potential safety hazard, the service life of total is short, adds manufacturing cost.
The content of the invention
It is big to improve the torsional forces that the vestibule of prior art bears it is an object of the invention to provide a kind of slip hinge support The problem of causing that the shock resistance of vestibule is weak, there is potential safety hazard.
The purpose of this law rice also resides in a kind of slip hinge support construction method of offer, is built with the vestibule for improving prior art Vestibule bears the problem of larger torsional forces causes that the shock resistance of vestibule is weak, there is potential safety hazard afterwards.
What the present invention was realized in:
Based on above-mentioned first purpose, the invention provides a kind of slip hinge support, for wall and steel construction vestibule it Between connection, the wall is vertically arranged, and the wall has the locating surface and weight-bearing surface being arranged in a mutually vertical manner, the wall The first connector is fixedly connected with, the positioning is protruded in direction of first connector along the locating surface perpendicular to the wall Face;The wall is also fixedly connected with the first location division, and first position point is on the weight-bearing surface of the wall;
The vestibule includes the support frame of floor and the support floor, and support frame as described above is located at the bottom of the floor Portion, the vestibule is overlapped on by support frame as described above on the weight-bearing surface of the wall, makes the end face of the vestibule and the positioning Face is arranged at intervals;The bottom of support frame as described above is provided with the second location division, and first location division is slided with second location division Dynamic connection, and first location division and the relative slip of second location division direction perpendicular to the side of the locating surface To;
The second connector is additionally provided with support frame as described above, second connector is located at the close described of support frame as described above One end of locating surface, first connector on second connector with being respectively arranged with multiple bar holes, the multiple bar Shape hole is vertically arranged at intervals;The length direction of the bar hole is on the locating surface, first connector Bar hole and the corresponding bar hole on second connector by connecting rod grafting, and the connecting rod can be along described The length direction of bar hole is slided in the bar hole;The two ends of the connecting rod are respectively provided with limiting section, and the limiting section is used Skidded off in preventing the connecting rod out of described bar hole.
It is preferred that, first location division is set to Rectangular Plate Structure, and second location division is set to rectangular recess, institute The first location division is stated to be inserted into second location division.
It is preferred that, it is provided with teflon coatings on the face that first location division is in contact with second location division.
It is preferred that, first location division is set to bar-shaped trough, and the two ends of the length direction of the bar-shaped trough have opening, Second location division is Rectangular Plate Structure, and two location division is inserted into first location division.
It is preferred that, first connector includes bottom plate and two pieces of connecting plates being oppositely arranged, two pieces of connecting plates It is perpendicularly fixed on the bottom plate, and is arranged at intervals between two pieces of connecting plates, the bar hole on first connector point The connecting plate is not run through along perpendicular to the plate face direction of the connecting plate;
Second connector is located between two pieces of connecting plates.
It is preferred that, many reinforcements are also fixedly connected with the bottom plate, the bottom plate and many reinforcements are pre- It is embedded in the wall where the locating surface.
It is preferred that, the section of second connector is I-steel shape.
It is preferred that, support frame as described above includes upper backup pad and lower supporting plate, and the upper backup pad is fixed with the floor Connection, is fixedly connected between the upper backup pad and the lower supporting plate by multiple ribbed stiffeners;The lower supporting plate is overlapped on On the weight-bearing surface of the wall.
Based on above-mentioned second purpose, the invention provides a kind of slip hinge support construction method, for wall and steel construction Vestibule connection, this method includes:
Step S100, the first connector and the first location division are set on wall, wherein, the wall includes mutually hanging down Straight locating surface and weight-bearing surface, first connector is fixedly installed in the wall where the locating surface, and described first Position point is in the wall where the weight-bearing surface;
Step S200, vestibule is overlapped on the weight-bearing surface of the wall, makes the end of the vestibule and the wall Locating surface is arranged at intervals, wherein, the vestibule includes setting on the support frame of floor and the support floor, support frame as described above Second location division, first location division is slidably connected with second location division, and first location division and described second The glide direction of location division is perpendicular to the direction of the locating surface;
Step S300, the second connector is set on support frame as described above, wherein, first connector connects with described second Fitting is respectively arranged with bar hole, and connecting rod is inserted into the bar hole of first connector and pair of second connector In the bar hole answered, the connecting rod is made to be slided in the bar hole, the direction that the connecting rod is slided is perpendicular to described fixed The direction of plane.
It is preferred that, in the step S200, mortise and tenon of first location division with second location division to cooperate Structure.
The beneficial effects of the invention are as follows:
In summary, the invention provides a kind of slip hinge support, simple and reasonable, the processing system of the slip hinge support Make conveniently, manufacturing cost is low;Meanwhile, the hinged-support can effectively reduce the torsional forces that vestibule is subject in use, pass through The relative motion of vestibule and wall, it is ensured that vestibule reduces impulsive force when by foreign impacts power by the regulation of itself, makes With more safe and reliable, service life is long.It is specific as follows:
Vestibule is built on wall, wall has orthogonal locating surface and weight-bearing surface, weight-bearing surface was being used Play a part of support vestibule in journey, there is a certain distance between vestibule and locating surface, be easy to building for vestibule, meanwhile, even Corridor has certain mobile space in loading process, and vestibule will not extrude the locating surface of wall when being relatively moved with wall, just In the regulation of itself.When vestibule is relatively moved with wall, vestibule passes through the first connector and the second connector with wall Connection, the first connector and the second connector are by connecting rod grafting, during vestibule stress, and the second connector is relative to the first connection Part is slided, due to the effect of connecting rod, and the position and direction that the second connector is slided have a limitation, and the second connector will not be with Meaning is slided, i.e. the slip of vestibule has regularity, it is ensured that the security used.By the slip of vestibule, it will effectively be subject to External force absorbs, and the use of vestibule is more safe and reliable.Meanwhile, it is also fixed with the first location division and second between wall and vestibule Position portion, in sliding process, the first location division is same with the second location division to have the effect being oriented to, and further ensures vestibule Security.
The vestibule built by the construction method, the annexation between vestibule and wall is solid and reliable, by vestibule certainly The regulation of body, can effectively reduce the torsional forces that vestibule is subject to, and use is more safe and reliable.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be attached to what is used required in embodiment Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore is not construed as pair The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other related accompanying drawings.
The structure chart for the slip hinge support that Fig. 1 provides for the present invention;
The schematic diagram that Fig. 2 is A-A in Fig. 1;
The malformation figure for the slip hinge support that Fig. 3 provides for the present invention.
Reference collects:
Wall 100, vestibule 200,
Locating surface 101, weight-bearing surface 102, the first connector 103, the second connector 104, the first location division 105, second determines Position portion 106, floor 107, support frame 108, bar hole 109, connecting rod 110,
Bottom plate 201, connecting plate 202, reinforcement 203, upper backup pad 204, lower supporting plate 205, ribbed stiffener 206.
Embodiment
In the prior art, the connected mode at vestibule two ends is a lot, specifically using which kind of depend on the span of vestibule, rigidity, The factors such as vertical position.Prior art by the way of being hinged, by setting axis of rotation to connect between wall and vestibule, When vestibule is subjected to displacement with wall, vestibule receives certain torsional forces with wall, and the torsional forces can not pass through self structure It is adjusted, there is potential safety hazard in use;And when producing Relative sliding between wall and vestibule, the sliding side of vestibule To indefinite, cause the discontinuity of vestibule, there is potential safety hazard, the service life of total is short, adds manufacturing cost.
In consideration of it, the designer of the present invention devises a kind of slip hinge support, between wall and the vestibule of steel construction Connection, simple and reasonable, the firm and reliable connection between vestibule and wall, by foreign impacts of the slip hinge support During power, vestibule is by certain torsional forces, and by the function of slip hinge support structure, relative to wall position occurs for vestibule It is mobile, can effectively it reduce until absorbing extraneous impulsive force, it is ensured that the safety in utilization of vestibule.
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention, rather than whole embodiments.The present invention implementation being generally described and illustrated herein in the accompanying drawings The component of example can be arranged and designed with a variety of configurations.Therefore, reality of the invention below to providing in the accompanying drawings The detailed description for applying example is not intended to limit the scope of claimed invention, but is merely representative of the selected implementation of the present invention Example.Based on the embodiment in the present invention, what those of ordinary skill in the art were obtained under the premise of creative work is not made Every other embodiment, belongs to the scope of protection of the invention.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi It is defined in individual accompanying drawing, then it further need not be defined and explained in subsequent accompanying drawing.
In the description of the invention, it is necessary to explanation, term " " center ", " on ", " under ", "left", "right", " vertical ", The orientation or position relationship of the instruction such as " level ", " interior ", " outer " be based on orientation shown in the drawings or position relationship, or should Orientation or position relationship that invention product is usually put when using, are for only for ease of the description present invention and simplify description, without It is that instruction or the signified device of hint or element must have specific orientation, with specific azimuth configuration and operation, therefore not It is understood that as limitation of the present invention.In addition, term " first ", " second ", " the 3rd " etc. are only used for distinguishing description, and it can not manage Solve to indicate or imply relative importance.
In the description of the invention, in addition it is also necessary to explanation, unless otherwise clearly defined and limited, term " setting ", " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or one Connect body;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirect by intermediary It is connected, can is the connection of two element internals.For the ordinary skill in the art, on being understood with concrete condition State the concrete meaning of term in the present invention.
Slip hinge support embodiment
Fig. 1-3 are referred to, a kind of slip hinge support is present embodiments provided, for wall 100 and the vestibule 200 of steel construction Between connection, the wall 100 is vertically arranged, and the wall 100 has the locating surface 101 being arranged in a mutually vertical manner and load-bearing Face 102, the wall 100 is fixedly connected with the first connector 103, and first connector 103 is along perpendicular to the wall 100 The direction of locating surface 101 protrude the locating surface 101;The wall 100 is also fixedly connected with the first location division 105, described First location division 105 is located on the weight-bearing surface 102 of the wall 100;
The vestibule 200 includes the support frame 108 of floor 107 and the support floor 107, support frame as described above 108 In the bottom of the floor 107, the vestibule 200 is overlapped on the weight-bearing surface 102 of the wall 100 by support frame as described above 108 On, the end face and the locating surface 101 for making the vestibule 200 are arranged at intervals;The bottom of support frame as described above 108 is provided with second and determined Position portion 106, first location division 105 is slidably connected with second location division 106, and first location division 105 and institute The direction of relative slip of the second location division 106 is stated perpendicular to the direction of the locating surface 101;
The second connector 104 is additionally provided with support frame as described above 108, second connector 104 is located at support frame as described above One end of the 108 close locating surface 101, first connector 103 on second connector 104 with being respectively arranged with Multiple bar holes 109, the multiple bar hole 109 is vertically arranged at intervals;The length direction of the bar hole 109 is vertical In the bar hole 109 on the locating surface 101, first connector 103 and the corresponding bar on second connector 104 Shape hole 109 is by the grafting of connecting rod 110, and the connecting rod 110 can be along the length direction of the bar hole 109 in the bar Slided in shape hole 109;The two ends of the connecting rod 110 are respectively provided with limiting section, and the limiting section is used to prevent the connecting rod 110 Skidded off out of described bar hole 109.
The slip hinge support that the present embodiment is provided, its is simple and reasonable, and convenient processing and manufacture, manufacturing cost is low;Meanwhile, The slip hinge support can effectively reduce the torsional forces that vestibule 200 is subject in use, pass through vestibule 200 and wall 100 Relative motion, it is ensured that vestibule 200 reduces impulsive force when by foreign impacts power by the regulation of itself, using more pacifying Complete reliable, service life is long.It is specific as follows:
Vestibule 200 is built on wall 100, wall 100 has orthogonal locating surface 101 and weight-bearing surface 102, Weight-bearing surface 102 plays a part of support vestibule 200 in use, have between vestibule 200 and locating surface 101 it is certain away from From, it is easy to building for vestibule 200, meanwhile, vestibule 200 has certain mobile space, vestibule 200 and wall in loading process The locating surface 101 of wall 100 will not be extruded during 100 relative movement, is easy to the regulation of itself.With wall 100 phase occurs for vestibule 200 During to movement, vestibule 200 is connected with wall 100 by the first connector 103 and the second connector 104, the first connector 103 With the second connector 104 by the grafting of connecting rod 110, during 200 stress of vestibule, the second connector 104 is relative to the first connector 103 slide, and the position and direction slided due to the effect of connecting rod 110, the second connector 104 have limitation, the second connection Part 104 will not be slided arbitrarily, i.e. the slip of vestibule 200 has regularity, it is ensured that the security used.Pass through vestibule 200 Slide, effectively absorb the external force being subject to, the use of vestibule 200 is more safe and reliable.Meanwhile, between wall 100 and vestibule 200 Also there is the first location division 105 and the second location division 106, in sliding process, the first location division 105 and the second location division 106 is same with the effect being oriented to, and further ensures the security of vestibule 200.
For the ease of processing and adjusting the position relationship between vestibule 200 and wall 100, the connecting rod 110 is preferred Bolt is set to, when bolt is plugged in positioning hole, knob nut;During knob, according to the first connector 103 And second connector 104 thickness difference, the knob elasticity of the screw rod and nut that may be selected in different length can be with Suitably it is adjusted, is provided conveniently for the operation of whole installation process.Various sizes of connector need not be fabricated, is saved Manufacturing cost is saved.When actually building, the quantity of the bar hole 109 is set on demand, processes more flexible, in the present embodiment Four are preferably arranged to, accordingly, the bolt is set to be provided with bolt in four, corresponding bar hole 109, it is ensured that The connectivity robustness of vestibule 200 and wall 100, and then add security.
The structure of first location division 105 and folded location division is varied, in the preferred scheme of the embodiment, and described first determines Position portion 105 is set to the tenon structure of mutual cooperation with second location division 106, and the processing of tenon structure is simple, positioning effect It is really good, and be easy to use cooperatively.
In the alternative of above-mentioned embodiment, first location division 105 is set to Rectangular Plate Structure, and described second determines Position portion 106 is set to rectangular recess, and first location division 105 is inserted into second location division 106, rectangular slab it is relative Two sides and rectangular recess two relative groove sidewalls between there is gap, be easy to relative slip, while when installing more Plus conveniently.In actual processing, it is preferably arranged to, teflon coatings, teflon coatings is provided with first location division 105 Positioned at the first location division 105 with the face being in contact of the second location division 106, being easy to the first location division 105 and the second location division Relative slip between 106.
In another alternative of above-mentioned embodiment, first location division 105 is set to bar-shaped trough, the bar-shaped trough The two ends of length direction there is opening, second location division 106 is Rectangular Plate Structure, and two location division is inserted into described In first location division 105.The sliding type of first location division 105 and the second location division 106 is simple and reliable.
In the preferred scheme of the embodiment, first connector 103 includes bottom plate 201 and two pieces of companies being oppositely arranged Fishplate bar 202, two pieces of connecting plates 202 are perpendicularly fixed on the bottom plate 201, and are spaced between two pieces of connecting plates 202 Set, the bar hole 109 on first connector 103 runs through institute along perpendicular to the plate face direction of the connecting plate 202 respectively State connecting plate 202;Second connector 104 is located between two pieces of connecting plates 202.The structure letter of first connector 103 It is single, it is easy to processing, meanwhile, the first connector 103 is easier for installation with the second connector 104, and the second connector 104 is set Corresponding platy structure is calculated as, when between two pieces of connecting plates 202 of the first connector 103, is more facilitated;Meanwhile, plate Shape structure is easy to the setting of bar hole 109.In actual processing, two pieces of connecting plates 202 are welded on bottom plate 201, structure It is solid and reliable, use safety.
In order to increase in the structural strength of support frame 108, the preferred scheme of the embodiment, second connector 104 Section is I-steel shape.
In the preferred scheme of the embodiment, many reinforcements 203, the bottom plate are also fixedly connected with the bottom plate 201 201 and many reinforcements 203 be embedded in the wall 100 where the locating surface 101, bottom plate 201 and wall 100 Sound construction is reliable, and bottom plate 201 can bear the bigger pulling force of vestibule 200, and use is safer.
In the preferred scheme of the embodiment, support frame as described above 108 includes upper backup pad 204 and lower supporting plate 205, described Upper backup pad 204 is fixedly connected with the floor 107, by multiple between the upper backup pad 204 and the lower supporting plate 205 Ribbed stiffener 206 is fixedly connected;The lower supporting plate 205 is overlapped on the weight-bearing surface 102 of the wall 100.The structure of vestibule 200 Simply, material is saved during processing, and then reduces cost.Ribbed stiffener 206 is the reinforcer of strip, it is possible to increase upper backup pad 204 and the stability and torsional property of lower supporting plate 205.
Slip hinge support construction method embodiment
Fig. 1-3 are referred to, a kind of slip hinge support construction method are present embodiments provided, for wall 100 and steel construction Vestibule 200 connection, this method includes:
Step S100, the first connector 103 and the first location division 105 are set on the wall 100, wherein, it is described Wall 100 includes orthogonal locating surface 101 and weight-bearing surface 102, and it is described fixed that first connector 103 is fixedly installed on In wall 100 where plane 101, first location division 105 is located in the wall 100 at the place of weight-bearing surface 102;
Step S200, the vestibule 200 is overlapped on the weight-bearing surface 102 of the wall 100, makes the vestibule 200 End and the locating surface 101 of the wall 100 are arranged at intervals, wherein, the vestibule 200 includes floor 107 and support is described Second location division 106 is set on the support frame 108 of floor 107, support frame as described above 108, first location division 105 and described the Two location divisions 106 are slidably connected, and first location division 105 and second location division 106 glide direction perpendicular to institute State the direction of locating surface 101;
Step S300, the second connector 104 is set on support frame as described above 108, wherein, first connector 103 with Second connector 104 is respectively arranged with bar hole 109, and connecting rod 110 is inserted into the bar shaped of first connector 103 Hole 109 is with the corresponding bar hole 109 of second connector 104, making the connecting rod 110 in the bar hole 109 Slide, the direction that the connecting rod 110 is slided is perpendicular to the direction of the locating surface 101.
The construction method builds obtained vestibule 200, and the annexation between vestibule 200 and wall 100 is solid and reliable, leads to Vestibule 200 regulation of itself is crossed, the torsional forces that vestibule 200 is subject to can be effectively reduced, use is more safe and reliable.
In the preferred scheme of the embodiment, in the step S200, first location division 105 and second location division 106 tenon structure to cooperate, the first location division 105 is simple in construction with the second location division 106, is easy to processing, meanwhile, Matching relationship is good.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (2)

1. a kind of slip hinge support construction method, the connection for wall and the vestibule of steel construction, it is characterised in that this method bag Include:
Step S100, the first connector and the first location division are set on the wall, wherein, the wall includes mutually hanging down Straight locating surface and weight-bearing surface, first connector is fixedly installed in the wall where the locating surface, and described first Position point is in the wall where the weight-bearing surface;
Step S200, the vestibule is overlapped on the weight-bearing surface of the wall, makes the end of the vestibule and the wall Locating surface is arranged at intervals, wherein, the vestibule includes setting on the support frame of floor and the support floor, support frame as described above Second location division, first location division is slidably connected with second location division, and first location division and described second The glide direction of location division is perpendicular to the direction of the locating surface;
Step S300, the second connector is set on support frame as described above, wherein, first connector and second connector Bar hole is respectively arranged with, the bar hole that connecting rod is inserted into first connector is corresponding with second connector In bar hole, the connecting rod is made to be slided in the bar hole, the direction that the connecting rod is slided is perpendicular to the locating surface Direction.
2. slip hinge support construction method according to claim 1, it is characterised in that
In the step S200, tenon structure of first location division with second location division to cooperate.
CN201510697377.1A 2015-10-23 2015-10-23 Slip hinge support and construction method Active CN105220770B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510697377.1A CN105220770B (en) 2015-10-23 2015-10-23 Slip hinge support and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510697377.1A CN105220770B (en) 2015-10-23 2015-10-23 Slip hinge support and construction method

Publications (2)

Publication Number Publication Date
CN105220770A CN105220770A (en) 2016-01-06
CN105220770B true CN105220770B (en) 2017-10-03

Family

ID=54990002

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510697377.1A Active CN105220770B (en) 2015-10-23 2015-10-23 Slip hinge support and construction method

Country Status (1)

Country Link
CN (1) CN105220770B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284677A (en) * 2016-08-24 2017-01-04 安徽瑶海钢构建设集团股份有限公司 A kind of steel frame construction on vestibule
CN106522360A (en) * 2016-11-22 2017-03-22 华东建筑设计研究院有限公司 Connection bridge structure between buildings
CN111379316B (en) * 2020-03-25 2021-05-11 广东现代建筑设计与顾问有限公司 Weak connection structure of superelevation layer vestibule
CN111456219B (en) * 2020-03-27 2021-09-24 广州大学 Damping corridor of bent lever type double-tower high-rise building

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102005060375A1 (en) * 2005-12-16 2007-06-21 Steelpat Gmbh & Co. Kg Bearing for protection for structures, formed as sliding pendulum bearing, has slide material which comprises a plastic with elasto-plastic compensating quality, especially plastic with low friction
JP5318538B2 (en) * 2008-11-17 2013-10-16 鉄建建設株式会社 Steel structure construction method
CN201695519U (en) * 2010-04-30 2011-01-05 湖北弘毅建筑装饰工程有限公司 Sliding bearing of building
JP2013096169A (en) * 2011-11-02 2013-05-20 Tokkyokiki Corp Vibration reducing device
CN202913510U (en) * 2012-11-28 2013-05-01 机械工业第三设计研究院 Nest truss sliding support
CN203594102U (en) * 2013-10-31 2014-05-14 同济大学建筑设计研究院(集团)有限公司 Steel-structure corridor sliding support structure
CN103541430B (en) * 2013-10-31 2015-12-30 同济大学建筑设计研究院(集团)有限公司 A kind of support connection structure for steel structure corridor
CN205153134U (en) * 2015-10-23 2016-04-13 中国五冶集团有限公司 Hinged -support slides

Also Published As

Publication number Publication date
CN105220770A (en) 2016-01-06

Similar Documents

Publication Publication Date Title
CN105220770B (en) Slip hinge support and construction method
CN106121113A (en) Truss floor support plate
KR20140051434A (en) Wide span static structure
CN107574929A (en) Girder with rolled steel section en cased in concrete spinous process of the seventh cervical vertebra frame node and joint construction method
CN205153134U (en) Hinged -support slides
CN102061806B (en) Building template
CN113323213A (en) Assembled trompil steel sheet rib superimposed sheet
CN110700409B (en) Steel structure for assembly type building and assembly method
CN112922323A (en) Concatenation formula aluminum mould board for building
CN205557838U (en) Assembled antidetonation honeycomb girder steel - shear force wall connection structure
CN209261212U (en) A kind of aluminum alloy formwork system for building
CN208783974U (en) Portable assembly shelf and intelligent sorting system
CN206299126U (en) A kind of assembled plate-column structure floor and floor panels component
CN107587638A (en) Steel bar truss floor support plate and combined type floor support plate
CN106320692A (en) Building splicing formwork
CN209494093U (en) A kind of assembled architecture installation curtain wall connection component
CN207892016U (en) A kind of H profile steel combination pedestal in house
CN207244966U (en) Steel bar truss floor support plate and combined type floor support plate
CN205894425U (en) Truss building carrier plate
CN206174235U (en) Steel bar truss's building carrier plate
CN205976216U (en) A steel structrual concrete supporting beam
CN217379747U (en) High-rise building aluminum formwork combined structure
CN212689389U (en) Box post for building
CN220928212U (en) Sliding support of beam type stair
CN209244252U (en) A kind of construction concrete-pouring template

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant