CN1051958A - Casing valve - Google Patents

Casing valve Download PDF

Info

Publication number
CN1051958A
CN1051958A CN90109069A CN90109069A CN1051958A CN 1051958 A CN1051958 A CN 1051958A CN 90109069 A CN90109069 A CN 90109069A CN 90109069 A CN90109069 A CN 90109069A CN 1051958 A CN1051958 A CN 1051958A
Authority
CN
China
Prior art keywords
sliding sleeve
shell
intercommunicating pore
lug
casing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN90109069A
Other languages
Chinese (zh)
Inventor
约翰·T·布兰德尔
戴维·D·索尔考
鲍勃·L·苏拉威
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Halliburton Co
Original Assignee
Halliburton Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Halliburton Co filed Critical Halliburton Co
Publication of CN1051958A publication Critical patent/CN1051958A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/14Valve arrangements for boreholes or wells in wells operated by movement of tools, e.g. sleeve valves operated by pistons or wire line tools
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B23/00Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells
    • E21B23/004Indexing systems for guiding relative movement between telescoping parts of downhole tools
    • E21B23/006"J-slot" systems, i.e. lug and slot indexing mechanisms
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • E21B33/14Methods or devices for cementing, for plugging holes, crevices or the like for cementing casings into boreholes
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/063Valve or closure with destructible element, e.g. frangible disc
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/11Perforators; Permeators
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B2200/00Special features related to earth drilling for obtaining oil, gas or water
    • E21B2200/06Sleeve valves

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)
  • Valve Housings (AREA)
  • Sliding Valves (AREA)

Abstract

A kind of casing valve that supplies drilling well to use, it comprises a shell (50), this shell has the vertical passage (52) and the shell wall that has shell intercommunicating pore (56) that connect himself, this shell intercommunicating pore penetrates shell wall, and this shell is equipped with the first easy cracked plunger (96) that the shell intercommunicating pore is lived in initial filling; This float valve also comprises a sliding sleeve (66) that slidably is placed in the vertical passage; This sliding sleeve has one and connects the longitudinal sleeve tube inner chamber (90) in it and have the jacket wall (92) that overlaps intercommunicating pore, this cover intercommunicating pore (94) penetrates jacket wall, this sliding sleeve is equipped with the second easy cracked plunger (98) that intercommunicating pore is firmly overlapped in initial filling, sliding sleeve can be between shell intercommunicating pore and the second place that the cover mutual out-of-alignment primary importance of intercommunicating pore and two kinds of holes are aimed at mutually selectively opposite shell slide.

Description

Casing valve
The present invention relates generally to the casing valve used for drilling well, more accurately but be not restrictedly to say, relate to a kind ofly can obviously depart from the casing valve that the leg portion of vertical orientations is used for drilling well.
As everyone knows, the sleeve type casing valve can be placed in the well cover so that can make cannula cavity selectively and keep being communicated with near between the subterranean strata of casing valve.A kind of in such casing valve has been disclosed in the United States Patent (USP) No. 3768562 (Baker) of our application.The patent of Baker also discloses a kind of orientation tool that is used for the sliding sleeve of actuating sleeve float valve.
United States Patent (USP) No. 4880059 (Brandell) discloses the method for partly using the sleeve type casing valve at borehole decline.Embodiment of Brandell device adopts in the housing that is contained in casing valve the aluminium plunger that can remove with acid washing method.
At present, we have invented a kind of improved casing valve, and it especially but be not the drilling well that ad hoc is used for obvious deflection.
According to the invention provides a kind of sleeve type sleeve barrel tool apparatus that supplies the well casing post to use, this apparatus comprises a shell, this shell has the vertical passage and the shell wall that has the shell intercommunicating pore that connect himself, described shell intercommunicating pore penetrates described shell wall, and described shell is equipped with the first easy cracked plunger that the shell intercommunicating pore is stated in initial filling residence; This apparatus also comprises a sliding sleeve that is placed on slidably in the described vertical passage, this sliding sleeve has a longitudinal sleeve tube inner chamber and the sliding sleeve wall that has the sliding sleeve intercommunicating pore that connects in it, described sliding sleeve intercommunicating pore penetrates described sliding sleeve wall, described sliding sleeve is equipped with the second easy cracked plunger that the sliding sleeve intercommunicating pore is stated in initial filling residence, and described sliding sleeve can slide at relative selectively described shell between described shell intercommunicating pore and the second place that the mutual out-of-alignment primary importance of described sliding sleeve intercommunicating pore and described two kinds of holes align.
Preferably, first, second sealing ring that vertically separates is placed between sliding sleeve and the shell, so that constitute the annular space that is sealing between sliding sleeve and shell.The annular space of sealing is kept apart with shell hole and trepanning fully.
Casing valve can comprise that one is used for sliding sleeve is releasably locked at the position of its first and second position locking devicen, and this locking devicen is arranged in the annular space of the sealing of protecting its casing valve of avoiding the influence of drilling well residue usually.
Between sliding sleeve and shell, can advantageously dispose a sealing ring, so that when sliding sleeve is in it with respect to first lengthwise position of shell, shell hole and trepanning are kept apart.
Trepanning and shell hole are all lived by easy cracked plunger filling at first.When sliding sleeve moved to the second place of aiming in two kinds of holes, easy cracked plunger can spray by liquid to be disposed.
An aligning device is preferably disposed in the annular space of sealing, keeps when moving to its second place at sliding sleeve trepanning to aim at the shell hole.
Understand in order to have more fully the present invention, below with reference to appended accompanying drawing, only by way of example, graphic embodiment is described, wherein:
Fig. 1 is the facade view with drilling well drilling well partly of obvious deflection.An operation cover group that includes location device, a spraycan assembly and a flushing tool just is being inserted in the drilling well, and the leg portion of drilling well has a plurality of casing valves that are placed in the casing string.
Fig. 2 A-2D is the facade view of an embodiment of casing valve of the present invention.Sleeve is in make position, and trepanning and shell hole are all being clogged.
Fig. 3 A-3E is the facade view of orientation tool, spraycan and flushing tool.These instruments are to submit on the same day with the application and respectively based on the theme of three european patent applications of document UNNS 435302,435305 and 433933.
Fig. 4 A-4E is the facade view of the instrument cover group that is positioned at casing valve appropriate position shown in Fig. 2 A-2D shown in Fig. 3 A-3E.Sleeve has moved to an enable possition, and plunger has sprayed from trepanning and shell hole and squeezed out.
Fig. 5 is the expansion view that is positioned at an embodiment of the J-shaped groove of orientation tool and lug device.
Fig. 6 is the view that is similar to Fig. 1, shows drilling well near the situation after the position fragmentation of each casing valve, and an embodiment who draws spray instrument cover group is in the drilling well appropriate position.
Fig. 7 is the view that is similar to Fig. 1, shows a mining tubular column of in position locating by a casing valve mining rock stratum stream under.
Fig. 8 and Fig. 9 are respectively facade side elevation and the front elevation view through the gear block of change.
Figure 10 is Fig. 8 and the facade view that is positioned at the gear block of orientation tool appropriate position shown in Figure 9.
Referring now to accompanying drawing, particularly with reference to Fig. 1, the drilling well of representing with label 10 as shown in the figure.Drilling well 10 is by putting into a casing string 12 and this casing string is fixed on the method construct of appropriate position in order to the cement shown in the label 16 in well 14.Casing string can adopt the lining form to replace illustrated integral cannula post.Casing string 12 has a cannula cavity 13.
Drilling well 10 has a basic vertical component 18, a turn fractions 20 and to resemble the leg portion 22 of the obvious offset from perpendicular of the substantially horizontal drilling well part 22 shown in the figure.Though this described instrument be designed to be specially adapted to the leg portion of drilling well, they can certainly be used for the vertical component of drilling well.
Deflection drilling well part 22 along casing string 12 is intervally distributed with a plurality of casing valves 24,26 and 28.The casing valve 24 the same with casing valve 26 and 28 is shown in greater detail among Fig. 2 A-2D.Each casing valve all is positioned at lower area closely promptly respectively as the position of having a mind to mining rock stratum in zone 30,32 and 34.
In Fig. 1, one has a plurality of tubing strings 36 that are connected the instrument of its lower end and just is being lowered in the well casing post 12.Between tubing string 36 and casing string 12, constitute drilling well annular space 38.A blowout hookup 40 that is positioned at ground is provided with and seals drilling well annular space 38.Pump 42 be connected with tubing string 36 in case with fluid pump into tubing string 36 below.
Tubing string 36 shown in Figure 1 has an orientation tool apparatus 44, a spraycan apparatus 46 and a flushing tool apparatus 48, and they are all linked on the tubing string 36.This instrument cover group at length illustrates among Fig. 3 A-3E.
Casing valve 24 generally also can be called sleeve type sleeve barrel tool apparatus (sliding sleeve casing tool apparatus) 24, and it is shown in greater detail among Fig. 2 A-2D.Casing valve 24 comprises a shell 50, and it has the vertical passage 52 and the sidewall 54 that has a plurality of shell intercommunicating pores 56 that connect himself, and these intercommunicating pores penetrate sidewall 54.
Shell 50 is to be made of a shell section 62 and a lower part 64 that a upper casing section 58, a capsul section 60, have an aperture.Upper and lower loading and unloading section 65,67 is contained in the two ends of shell 50 so that dismantle and slidingtype sleeve barrel tool 24 is put in the casing strings 12.Loading and unloading section 65 and 67 is threaded at position shown in label 69 and 71 respectively, so that be connected with casing string 12.
Casing valve 24 also comprises a sliding sleeve 66 that is placed on slidably in shell 50 and the vertical passage 52.Sliding sleeve 66 can shell intercommunicating pore 56 shown in the primary importance of stopping up or cover shell intercommunicating pore 56 shown in Fig. 2 A-2D and Fig. 4 A-4E be not covered but with the second place that vertical passage 52 is communicated with between opposite shell 50 slips selectively.
Casing valve 24 also comprises first, second sealing ring 68,70 that vertically separates, and they are placed between sliding sleeve 66 and the shell 50, and constitutes the annular space 72 that is sealing between sliding sleeve 66 and shell 50.First, second sealing ring 68,70 preferably adopts the chev(e)ron seal part.The seal of this pattern can provide the sealing of longer life, compares with the sealing ring of many other patterns, and this sealing ring is to the cutting that caused by the abrasive material that is wrapping that resembles broken sand and the rock stratum fines and/or grind not too responsive.
A position locking devicen 74 is set, so that sliding sleeve 66 is releasably locked in its first and second position.This position locking devicen 74 is arranged in the annular space 72 that is sealing.
Position locking devicen 74 comprises that one also can be called spring-loaded locking devicen (Spring biased lotch means) 76 and is contained on the sliding sleeve 66 so that the collet 76 that this sliding sleeve 66 vertically moves with it.
Position locking devicen 74 also be included in form in the shell 50 towards radially inner side and first, second groove 78,80 of vertically separating, they are corresponding with first, second position of sliding sleeve 66 respectively.
Collet 76 is placed in the annular space 72 of sealing, preventing water mud, the particle of this class of sand or the like is wrapped in around the chuck and the overslaugh chuck is worked effectively, thereby chuck is protected.
It should be noted that, position locking devicen 74 also can constitute by a form that is contained in the spring breech lock on the shell and processes first, second groove on sliding sleeve 66 is set, rather than adopts and resemble the sort of form opposite with it formation of having described.
68 holdings of the first font sealing ring formula seal are suitable position between the supine annular shoulder 84 of the lower end 82 of upper casing section 58 and capsul section 60.
70 holdings of the second chev(e)ron seal circle formula seal are suitable position between the ventricumbent annular shoulder 88 of the upper end 86 of the shell section 62 that has the aperture and capsul section 60.
Sliding sleeve 66 has one to connect the vertical sliding sleeve inner chamber 90 of himself and a sliding sleeve wall 92 that has a plurality of sliding sleeve intercommunicating pores 94 is arranged, and these intercommunicating pores penetrate sliding sleeve wall 92.
All shell intercommunicating pores 56 and sliding sleeve intercommunicating pore 94 all have easy cracked plunger 96 and 98 respectively, and these plungers clog shell intercommunicating pore 56 and sliding sleeve intercommunicating pore 94 at first.
Easy cracked plunger 96,98 preferably respectively by threaded hollow aluminum or hollow steel insert ring 120,122 within it portion fill with can be from " Cal Seal " such material constitutes U.S. Gypsum company being called of buying, as following meeting further describe, these fillers can be disposed by liquid jet.
At first, easy cracked plunger is installed in intercommunicating pore 56 and 94, so just can prevent cement and other fine particle materials enter the aperture and arrive sliding sleeve 66 and shell 50 between.
When sliding sleeve 66 is in primary importance shown in Fig. 2 A-2D with respect to shell 50, shell intercommunicating pore 56 and sliding sleeve intercommunicating pore 94 are not aim at each other, and the 3rd chev(e)ron seal circle formula seal 100 between sliding sleeve 66 and the shell 50 is kept apart sliding sleeve intercommunicating pore 94 and shell intercommunicating pore 56.
Sliding sleeve 66 can opposite shell 50 slips selectively between the second place of each shell intercommunicating pore 56 shown in the primary importance shown in Fig. 2 A-2D and Fig. 4 A-4E and the sliding sleeve intercommunicating pore corresponding with it 94 alignings.
Aligning device 102 operably connects mutually with shell 50 and sliding sleeve 66, so that when sliding sleeve 66 is in its said second position, promptly under the situation of collet 76 and groove 80 engagements, keeps sliding sleeve intercommunicating pore intercommunicating pore 94 to aim at shell intercommunicating pore 56.Comprise that over against device 102 many resemble and are arranged in the shell 50 with the represented the sort of longitudinally guiding groove of label 104,106 and a plurality ofly are arranged on the sliding sleeve 66 and are contained in corresponding lug 108,110 in their corresponding groove 104,106.
Aligning device 102 is located in the annular space 72 of the sealing that constitutes between first, second sealing ring 68,70.
Lug 108,110 preferably has and runs through the weep hole 112,114 that is communicated with of annular space 72 that makes sliding sleeve inner chamber 90 and sealing in it, so that carry out pressure balance between first, second sealing ring 68,70.The straight pin that lug 108,110 preferably adopts the radial bore 116,118 that constitutes with the form of being spirally connected and break-through sliding sleeve wall 92 to cooperate.
It should be noted that, casing valve 24 also can be configured to such form, it can make lug or pin be contained on the shell 50, and it is contained in the longitudinal fluting that constitutes in sliding sleeve 66, so that can realize aligning between shell intercommunicating pore 56 and the sliding sleeve intercommunicating pore 96.
Compare with the sleeve type casing valve of prior art, the cover barrel stroke of the sliding sleeve 66 of casing valve 24 is quite short.In an embodiment of casing valve 24, needed cover barrel stroke only is 10.75 inches (27.3 centimetres).
The inner chamber 124 that sliding sleeve 66 has an internal diameter that constitutes between ventricumbent upper shoulder 126 and supine lower shoulder 128 to strengthen.As following meeting further describe, orientation tool 44 will be with upper shoulder 126 engagement so as upwards to spur sliding sleeve 66 and with lower shoulder 128 engagements so that can spur sliding sleeve 66 downwards.
Now forward Fig. 3 A-3E to, the instrument cover group shown in the figure is made of orientation tool 44, spraycan 46 and flushing tool 48.Fig. 4 A-4E is on the appropriate location in the casing valve 24 in the casing string 12 showing these same members.
Orientation tool apparatus 44 generally can be described as a kind of sliding part that is used for drilling tool, for example, and the orientation tool apparatus that the sliding sleeve 66 of casing valve 24 is positioned.
The critical piece of orientation tool apparatus 44 comprises a viscous motion assembly 130, a positioned internal axle 132 and a manipulation device 134.
Viscous motion assembly 130 comprises a lug shell section 136 that is connected with viscous motion piece shell section 138 at threaded linkage section 140 places.A plurality of viscous motion pieces 142,144 that radially outward load are being carried by viscous motion piece shell section.Viscous motion assembly 130 has a vertical passage 146 that is applied in lug shell section 136 and viscous motion piece shell 138 scopes.
Apotting spindle 132 places in the vertical passage 146 by viscous motion assembly 130, it relatively this viscous motion assembly 130 vertically move, promptly apotting spindle 132 can be slided in vertical passage 146 and slide.Be equipped with one on the apotting spindle 132 and be used for the star guider or the centring device 133 of in casing valve 24 or casing string 12, orientation tool 44 being felt relieved.
Manipulation device 134 provides a kind of like this device, and it can respond apotting spindle has selection operably to be meshed with the sliding sleeve 66 of casing valve 24 with respect to vertical reciprocating motion of viscous motion assembly 130.
In more detail, manipulation device 134 comprises that one is connected and is used for the geared assembly 148 that operably is meshed with the sliding sleeve 66 of casing valve 24 on the viscous motion assembly 130.Manipulation device 134 also comprises an actuating device 150, and it is connected and is used to activate geared assembly 148 on the apotting spindle 132, thereby geared assembly 148 operably is meshed with the sliding sleeve 66 of casing valve 24.Manipulation device 134 also comprises a position control 152, this device operably connects mutually with viscous motion assembly 130 and apotting spindle 132, so that the vertical reciprocating motion that allows apotting spindle 132 to do, and allow apotting spindle to utilize actuating device 150 to activate selectively and do not activate geared assembly 148 with respect to viscous motion assembly 130.
Geared assembly 148 comprises circumferential isolated first gear block 154 of a plurality of longitudinal axis 156 around viscous motion assembly 130, each gear block 154 all has a conical cam face 160 in the one end thereof formation, and each gear block 154 also all has an engagement shoulder 162 that constitutes and face away from the direction with conical cam face 160 those ends thereon.Should be understood that gear block 154 is to be seated in apotting spindle 132 secter pat on every side in the ring-type mode.First charger that is made of a plurality of springs 164 is connected the upper end of a plurality of first gear blocks 154 with the lug shell section 136 of viscous motion device 130, so that radially inside longitudinal axis 156 directions towards viscous motion assembly 130 apply fexible bias pressure to a plurality of first gear blocks 154.
Geared assembly 148 further comprises a plurality of second gear blocks 166 that are positioned at equally near the lower end of viscous motion piece shell section 138.Each second gear block 166 all has one at an one conical cam face 168 that constitutes towards the end away from a plurality of first gear block, 154 directions.Each gear block 166 all has that constitute an and engagement shoulder 170 that face a plurality of first gear block, 154 directions thereon.Geared assembly 148 also comprises second charger 172 that is made of a plurality of springs, each sheet spring is connected with viscous motion piece shell section 138 one in a plurality of second gear blocks 166, so that radially inside longitudinal axis 156 directions towards viscous motion assembly 130 apply fexible bias pressure to a plurality of second gear blocks 166.
In general, geared assembly 148 can be said to and comprises separative first and second geared assemblies, promptly comprises a plurality of first, second gear blocks 154,166 respectively.
Actuating device 150 comprises upper and lower annular voussoir 174,176 respectively.
The first annular voussoir 174 comprise one with the tapered annular wedge surface 178 of 160 one-tenth complementary relationships of conical cam face of a plurality of first gear blocks 154.Annular voussoir 174 is set on apotting spindle 132, so that at apotting spindle 132 when the position shown in Fig. 3 A-3E is moved down into first lengthwise position with respect to viscous motion assembly 130, annular wedge surface 178 is pressed to conical cam face 160 with wedge, and with the radially outside bias voltage of gear block 154.
The second annular voussoir 176 similarly also have one with the tapered annular wedge surface 180 of 168 one-tenth complementary relationships of conical cam face of a plurality of second gear blocks 166.
The setting that faces each other of the tapered annular wedge surface 178,180 of first, second annular voussoir 174,176 and a plurality of first, second gear blocks 154,166 between them.
Position control 152 comprises one at the J-shaped groove 182 and a plurality of lug 184,186 that is connected on the viscous motion assembly 130 that constitute on the apotting spindle 132, and these lugs 184,186 are placed in the J-shaped groove 182.In general, it is to constitute in apotting spindle 132 and viscous motion assembly 130 one that the J-shaped groove is said to, and lug then is connected in apotting spindle 132 and the viscous motion assembly 130 another.But, perhaps J-shaped groove 182 constitutes on viscous motion assembly 130, and the situation that lug 184 is connected on the apotting spindle 132 is better.
J-shaped groove 182 is represented more clearlyly in the expanded view of Fig. 5, and J-shaped groove 182 is closed loop grooves.
Again referring to Fig. 3 B, lug the 184, the 186th is contained in the rotatable hoop 188, this hoop is clipped between lug shell section 136 and the viscous motion piece shell section 138, and bearing 190,192 is positioned at the upper and lower end of rotatable hoop 188, lug 184,186 lug 184,186 rotated when promptly vertically moving with respect to viscous motion assembly 130 in that apotting spindle 132 is reciprocating, so that can cross closed loop J-shaped groove 182 with respect to J-shaped groove 182.
The J-shaped groove 182 of position control 152 and lug 184,186 are interconnected apotting spindle 132 and viscous motion device 130, and define the repeat pattern of a kind of apotting spindle 132 that can obtain with respect to vertical reciprocating motion of viscous motion assembly 130 according to apotting spindle 132 with respect to the lengthwise position of viscous motion assembly 130 at least in part.It is more clearly that this repeat pattern of position is represented in Fig. 5, and wherein the diverse location of lug 184 is shown in broken lines.
See one of them represented position earlier by label 184A, this position is corresponding with such position, promptly in this position, go up annular voussoir 174 with its wedge surface 178 and 154 engagements of a plurality of first gear block, and it is outwards pushed, so that make shoulder 128 engagements of its shoulder 162 and sliding sleeve 66, thereby sliding sleeve 66 is drawn in downwards in the shell 50 of casing valve so that push sliding sleeve 66 to shown in Fig. 2 A to Fig. 2 D make position.Like this, gear block 154 can be called closure blocks.As Fig. 5 clearly illustrated, at this primary importance 184A place, this position was not to define by the lug 184 and the direct engagement of the terminal part of groove 182, but define by the last wedge 174 and the engagement of last gear block 154.
Trombone slide post 36 and apotting spindle 132 then make progress, viscous motion assembly 130 just is clamped in the appropriate position by the friction engagement of viscous motion piece 142,144 and casing string 12 or casing valve 24, like this, J-shaped groove 182 can move up, and makes that lug 184 is traversing to position 184B shown in Figure 5 downwards.In can be described as the position 184B in centre position, lug 184 directly meshes with J-shaped groove 182 terminal parts, and allow viscous motion device 130 to move up with the apotting spindle 130 that has two cover gear blocks 154 and 166 in the not position of engagement shown in Fig. 3 B-3C,, orientation tool 44 need not engage its sliding sleeve 66 so that can being gone out casing valve 24 by the tractive that makes progress with handling.
Apotting spindle 132 can be advanced to lug 184C place, position with respect to the next downward stroke of viscous motion device 130, this position is another centre position, in this position, lug 184 can directly mesh with another terminal part of groove 182, so that apotting spindle 132 and viscous motion device 130 can move down together by casing string 12 and casing valve 24, need not activate down gear block 166 and neither need activate gear block 154 yet.
In the stroke that apotting spindle 132 makes progress with respect to the next one of viscous motion device 130, lug 184 moves to and is actually the position 184D that is defined by the down annular voussoir 176 and the engagement of last gear block group 166, squeeze so that gear block 166 is pushed outwards, thereby this gear block like that operably is meshed with the shoulder 126 of the sliding sleeve 66 of casing valve 24 shown in Fig. 4 C.In this upward stroke, sliding sleeve 66 can upwards be pulled to the enable possition.Like this, gear block 166 can be called the unlatching piece.
Apotting spindle 132 next time relatively the following shifting movement of viscous motion device 130 lug can be advanced to position 184E, with respect to regard to the lengthwise position of viscous motion device 130, position 184E is actually the repetition of position 184C with regard to apotting spindle 132.The going up shifting movement next time and lug can be advanced to position 184F of apotting spindle 132, with respect to regard to the lengthwise position of viscous motion device 130, position 184F is actually the repetition of position 184B with regard to apotting spindle 132.
Then, the following shifting movement of relative viscous motion device 130 next time of apotting spindle 132, lug can be promoted to turn back to position 184A, in this position, last voussoir 178 will mesh with last gear block 154, so that gear block is outwards pushed, thereby mesh with sliding sleeve 66 and make it in inner chamber 124, to move down.
But orientation tool 44 also comprises an emergent tripper 194 that connects with each actuating in first, second actuating device 174,176, be used to remove first, second geared assembly 154,166 with the actuating of sliding sleeve 66 engagement, and do not need apotting spindle 132 is advanced in the centre position that resembles 184B, 184C, 184E or the 184F one, this emergent tripper 194 comprises that respectively first, second being activated voussoir 174,176 is connected to first, second shearing lock pin group 196,198 on the apotting spindle 132.For example, if orientation tool 44 is the positions corresponding with lug position 184D that are in shown in Fig. 4 A-4E, gear block 166 is pushed outwards under this position squeezes and is in and sliding sleeve 66 actuating engagements, if and position control 152 such as lost efficacy because of lug and J-shaped groove block mutually, so, upwards traction force enough on tubing string 36 will be cut off shearing lock pin, like this, annular voussoir 176 just can glide along the external surface 199 of apotting spindle 132 down, so that this voussoir 176 is thrown off from following gear block 166, thus make these gear blocks inwardly bias voltage break away from and the engagement of sliding sleeve 66.
Fig. 8, Fig. 9 and Figure 10 show the replacement type embodiment of the gear block that resembles gear block 154.Fig. 8 is the lateral view through the gear block 154A of change.Fig. 9 is the front elevation drawing through the gear block 154A of change.Figure 10 is the sectional view through the gear block 154A of change that the peripheral part with orientation tool 44 fits together.
In Fig. 8 and Fig. 9, can see that gear block 154A comprises the end portion of a routine T shape, it has a vertical rod 155 and a cross bar 157.One insurance stop flange 159 is stretched out downwards from the back edge of cross bar 157.
Example T shape part 155,157 places in the routine T-slot 161 that constitutes on the lug shell section 136, and the dotted portion among Fig. 9 is represented very clearly to this.
Can clearly be seen that in Figure 10 an inboard recess 163 that just in time is positioned at the below of groove shown in the label 161 is arranged on the lug shell section 136, its size should make greatly its at the radially outermost position place of gear block 154A near stop flange 159.
The dependency structure of stop flange 159 and lug shell section 136 is combined together and forms an insurance stop device, in order under the situation of sheet spring 164 fractures, and the connection between the lug shell section 136 of maintenance gear block 154A and viscous motion assembly 130.Like this, as chankings spring 164 fracture, gear block 154A just can not come off from the assembly of the remainder that has viscous motion assembly 130.On the contrary, because the interlocking that the T shape part 155,157 in T-slot 161 is surpassed with stop flange 159, gear block 154A will remain on original position.
Because the relation of stop flange 159, gear block 154A must fit together by mode and the lug shell section 136 that gear block 154A is slipped into from the inboard of lug shell section 136 T-slot 161.
Spraycan 46 generally can be described as a kind of object that is used for and place the casing valve 24 such drilling tools in the drilling well 10 to carry out the apparatus that liquid sprays.
The structure of the structure of spraycan 46 and orientation tool 44 is closely related.When orientation tool 44 engages the sliding sleeve 66 of casing valve 24 and it is advanced when falling the enable possition, the construction size of orientation tool 44 and spraycan 46 should make spraycan 46 obtain suitable aligning, and sprays so that easy the to be cracked plunger of seeking in casing valve is carried out liquid.
Spraycan 46 generally can be described as a kind of injection apparatus 46, and it is connected on the orientation tool 44 with the connecting mechanism for rotating that is made of a swivel 201, so that injection apparatus 46 can rotate with respect to orientation tool 44 and casing valve 24.Like this, when spraycan 46 rotated with respect to orientation tool 44 and casing valve 24, spraycan 46 just can spray easy cracked plunger with the liquid spray regime and squeeze out from casing valve 24.
Spraycan 46 comprises that is sprayed a paragraph header 200, and it has a stream chamber 202 that constitutes within it, and the stream chamber has the upper end 204 of opening and the lower end 206 of opening up and down respectively.Paragraph header 200 has a peripheral wall 208, this cornice a plurality of break-through walls are arranged and with the spray-hole 210 that is communicated with of stream chamber 202.Each spray-hole 210 all is a formation on the screw thread loose tongue 212 in the sunk part 214 that is arranged on the cylindrical outer surface 216 that sprays paragraph header 200.
Lower end in stream chamber 202 is provided with a check valve apparatus 218, so that allow liquid stream upwards freely flow through chamber 202 and to prevent that downward liquid stream from flowing out from the lower end 206 of stream chamber 202, thereby the downward liquid stream of the chamber 202 of flowing through is turned to by spray-hole 210.
Check valve apparatus 218 comprises that a valve seat 220 that constitutes at lower open end 206 places of stream chamber 202 and size can just in time mesh the ball valve element 222 of valve seat 220 hermetically.This ball valve element can upwards enter in the stream chamber 202 without restriction.
Spray paragraph header 200 and also comprise a retainer with balls 224 that is arranged in paragraph header 200 upper open ends 204, go out stream chamber 202 to prevent the liquid stream that ball valve element 222 is risen.
This flap valve can make tubing string 36 be full of liquid stream when entering drilling well 10, and can make liquid stream carry out recycled back by flushing tool 48.In addition, ball valve element 22 is self-centering, so that it can be on the valve seat than being easier to when spraycan 46 is in horizontal level as in the leg portion 22 of drilling well 10.
The flushing tool 48 that is positioned at spraycan 46 belows just as will be further described below like that, but also be with spraycan 46 actuatings link.Flushing tool 48 generally can be described as a kind of below that is positioned at orientation tool 44 and spraycan 46, is used for the flusher of irrigating sleeve tubing string 12 inner chambers when reverse reflux flows down drilling well annular space 38 and rise by flushing tool 48 and spraycan 46.
Swivel 201 is represented the most clearly in Fig. 3 A, and it can be described as and a kind ofly is used to provide the rotational coupling mechanism between orientation tool 44 and spraycan 46 that the front mentioned and is used to be connected orientation tool 44 and spraycan 46 so that both can be with respect to the common slewing equipment 201 that vertically moves done of drilling well 10.
Spraycan 46 comprises that also is installed on a rotatable injection axle 224 of spraying on the paragraph header 200 by tube connector 226.Tube connector 226 is screwed at thread segment 228 places and sprays on the axle 224 connection that dog screw 230 is maintained fixed.Tube connector 226 is fixedly attached at the section of being threaded 232 places and sprays on the paragraph header 200, and is kept connecting by dog screw 234." O " shape sealing ring 236 is arranged on and sprays between axle 224 and the tube connector 226, then is provided with " O " shape sealing ring 238 between tube connector 226 and injection paragraph header 200.
Like this, spray axle 224 and just be installed on the injection paragraph header 200, thereby but injection axle 224 and injection paragraph header 200 relative positioning instruments 44 are rotated together by tube connector 226.
Spraying axle 224 has one to run through in it and the injection axle inner chamber 240 that is communicated with the stream chamber 202 of spraying paragraph header 200.
Spraying axle 224 is to wear with one heart and rotationally in the inner chamber 242 of the apotting spindle 132 that is dissolved in orientation tool 44.
Spray axle 224 and upwards reach swivel 201 places by whole apotting spindle 44.
Swivel 201 comprises a swivel housing 244, and it is connected on the upper end of apotting spindle 132 at the section of being threaded 246 places, and this keeps connecting with dog screw 148." O " shape sealing ring 250 is arranged between swivel housing 224 and the apotting spindle 132.Swivel housing 244 is to be made of a shell section 252 and a upper casing section 254 of being connected at the section of being threaded 256 places.
Upper and lower shell section 252,254 constitutes the interior annular groove 258 of swivel housing 244.
Spray axle 224 and comprise that one is connected to down to spray with screw thread 262 and goes up injection axle extension 260 on the mandrel segment.There is an interior annular shoulder 264 of annular groove that constitutes and be contained in swivel housing 244 thereon last injection axle extension.
Upper and lower thrust bearing 266,268 places the above and below of annular shoulder 264 in the annular groove 258 respectively.Last thrust bearing 266 has an outer race 270 and that is fixed on the swivel housing 244 to be fixed on the inside race 272 that sprays on the axle extension 260.Following thrust bearing 268 comprises that an outer race 274 and that is fixed on the swivel housing 244 is fixed on the inside race 276 that sprays on the axle 224.
The upper part 278 of injection axle extension 260 is passed the upper end of swivel shell section 254 and is stretched out, and is provided with " O " shape sealing ring 280 between them.
Last adapter(-tor) 282 is connected on the upper part 278 of spraying axle extension 260 with screw thread 284, is provided with " O " shape sealing ring 286 between them.Last adapter(-tor) 282 comprises the screw thread 288 that is connected with tubing string 36 shown in Figure 1, thereby can make tubing string 36 and inner chamber 240 fluid connections that spray axle 224.
As mentioned above, easy cracked plunger 96,98 preferred design Cheng Youyi band external screw threads are also filled hollow edge ring 120 or 122 with easy cracked material, the material of " Cal Seal " trade mark that these materials preferably can be bought from U.S. Gypsum (U.S.Gypsum Company)." Cal Seal " is a kind of calcium sulfate cement, and it has 2500 pounds of/square inch bearing strengths about (17.2MPa), i.e. yield strengths.This material is that the water liquid of 4000 pounds/square inch (27.6MPA) or higher cleaning is very easy to be cracked when spraying being under pressure, and this water under high pressure is to be supplied with by traditional tubing string at an easy rate.Plunger by Cal Seal material structure is carried out the liquid injection preferably to carry out in the fluid pressure scope of about 5000 pounds/square inch (27.6 to 34.5MPa) at about 4000 pounds/square inch.
Traditional tubing string 36 of standard can be carried high hydraulic coupling at 12000 pounds/square inch (82.7MPa).Like this, in order to adopt the traditional tubing string that has each instrument of the present invention, easy cracked plunger preferably is made of such material, this material will have enough low bearing strength so that it be subjected to being easy to when spraying less than the liquid about 12000 pounds/square inch (82.7MPa) chipping.Like this, cracked for this material can be undertaken by each instrument of the present invention, only need to adopt to have the tubing string of traditional tube column strength, and do not need to use the volatile material of any abrasive material or acid or other.
Should be understood that preferably being used for the liquid stream of cleaning that plunger is sprayed from intercommunicating pore only is " cleaning " of relative meaning.It just means does not contain a large amount of abrasive materials in order to the removing plunger in the water, need not contain the material of acid and so on yet.Like this, preferable plunger material is made of a kind of like this material, it is cracked that the bearing strength that this material had makes that its water liquid about being under pressure less than 12000 pounds/square inch is easy to when spraying, certainly, using the liquid that contains abrasive material or the material resemble the acid to spray also can make such plunger cracked.
Most of materials are being subjected to all presenting one " threshold pressure " when water purification liquid sprays, and this threshold pressure is meant to spray with liquid and is easy to just can make material cracked or be easy to excise the needed hydraulic coupling of material.Material is seldom cracked when pressure is lower than this threshold value, and pressure during apparently higher than this threshold value material will be cracked rapidly.But pressure further is elevated to and substantially exceeds this threshold value and do not have tangible benefit.
The size of the value of " threshold pressure " of given material depends on the character of material to a certain extent.But, under any circumstance, threshold pressure always is greater than the bearing strength of material.
For example, resemble bearing strength that a kind of calcium sulfate cement " Cal Seal " has 2500 pounds/square inch (17.2MPa) size, this kind material is cracked rapidly under can spraying at the water liquid that hydraulic coupling is about 4000 pounds/square inch (27.6MPa).Under such pressure effect, the cracked only thing of a few minutes of " Cal Seal " plunger.
From the maximum pressure that traditional tubing string generally can bear, promptly be not more than the hydraulic coupling of 12000 pounds/square inch (82.7MPa), easily cracked plunger should use the material of bearing strength less than about 5000 pounds/square inch (34.5MPa).This material can be that 12000 pounds/square inch (82.7MPa) or smaller again jet cutting fall by hydraulic coupling generally.If use cement-type materials, the bearing strength of these materials are generally less than about 3500 pounds/square inch.
Except the calcium sulfate cement of " Cal Seal " trade mark, in some cases, for the structure of easy cracked plunger, it is believed that also having many materials also is selecting materials to be total to waiting of using of being fit to.Bearing strength through the ordinary Portland cement of proper formulation is 1000-3500 pound/square inch (6.9 to 24.1MPa), and its concrete intensity level depends on factors such as its prescription, timeliness, and this cement can use under some occasion.In addition, by adopting some plastics.Equally, the composite material that is compounded with the constituents that resembles iron powder or other metal charge end in epoxy resin carrier also is alternative material.
Flushing tool 48 generally can be retouched this and become a kind of and slide on tubing string 36 in order to the apparatus of cannula cleaning inner chamber 13, flushing tool 48 comprises that is threaded a flushing tool housing 290 of 292 in the top, and this screw thread generally can be described as a kind of utilization other instrument between housing 290 and tubing string 36 housing is connected to linkage 292 on the tubing string.
Flushing tool 48 comprise one be connected to be used on the housing 290 form between housing 290 and the cannula cavity 13 sealing on hold down gag 294.
Last hold down gag 294 shown in Fig. 4 E is positioned on casing string 12 appropriate locations.As can be seen from the figure, last hold down gag 294 has defined the top 38A of drilling well annular space 38 above last hold down gag 294.
Flushing tool 48 also comprises a following hold down gag 296, it is used on the housing 290 forming sealing between housing 290 and the cannula cavity 13 and define the middle part 38B of drilling well annular space 38 between upper and lower hold down gag 294,296 being connected to below the last hold down gag 294, defines the bottom 38C of drilling well annular space 38 below hold down gag 296 down.
Housing 290 has a last fluid bypass device 298 that constitutes within it, and it is used for being communicated with the top 38A and the middle part 38B of drilling well annular space.So that pump into the middle part 38B that liquid streams in the drilling well annular space 38 are walked around hold down gag 294 importing drilling well annular spaces 38 downwards, thus in the 38B of the middle part of drilling well annular space irrigating cannula inner chamber 13.
Housing 290 also has a following fluid bypass device 300 that constitutes within it, it is used for being communicated with the middle part 38B and the bottom 38C of drilling well annular space 38, so that walk around down the bottom 38C that hold down gag 296 imports the drilling well annular spaces, thereby the cannula cavity 13 of flushing below following hold down gag 296 from the next liquid stream of drilling well annular space middle part 38B by-pass flow.
Housing 290 also has one to run through the vertical housing inner chamber 302 that has a lower open end 304 in it, so that the interior liquid stream of the bottom 38C of drilling well annular space can be gone up by flushing tool housing inner chamber 302 and tubing string 36, thereby takes the residue of cement granules and so on to cannula cavity 13 outsides.
Last hold down gag 294 be one towards the last cup 294 that compresses, following hold down gag 296 is the prone cups 296 that compress.
Flushing tool housing 290 comprises a heart axle housing section 306, and it has a vertical inner chamber 302 that connects in it.
Housing 290 also comprises the assembly 308 that holds down mandrel, it be placed on one heart heart axle housing section 306 around, and between it and heart axle housing section 306, constitute an instrument annular space 310.Axle housing section 306 and hold down mandrel and be provided with a sealing device 312 between the assembly 308 at heart, be used for instrument annular space 310 is divided into instrument annular space part 314 and following instrument annular space part 316 two parts, they are respectively the parts of upper and lower by-pass collar 298,300.
The assembly 308 that holds down mandrel comprises holding down mandrel on one and holds down mandrel 320 and hold down mandrel 322 once in the middle of 318, one.
Heart axle housing section 306 comprises one near its lower end and supine ring-shaped bearing shoulder 324, holds down mandrel down 322 to be bearing in this lower end.On hold down mandrel 318 in the depression cannelure 326 of the last bell tap 328 that is contained in flushing tool housing 290.
Bell tap 328 and heart axle housing section 306 are screwed onto together at 330 places, and hold down mandrel assembly 308 and the upper and lower cup 294,296 that compresses tightly are clipped on the position suitable between bell tap 328 and the heart axle housing section 306.
On compress cup 294 an anchor ring part 332 arranged, it be arranged near the external surface 334 of 318 the reduced of holding down mandrel and be clipped in hold down mandrel 318 and the centre hold down mandrel between 320.
Under compress cup 296 an anchor ring part 336 arranged, it be arranged on down near the external surface 338 of 322 the reduced of holding down mandrel and be clipped in the middle hold down mandrel 320 and under hold down mandrel between 322.
" O " shape sealing ring 340 be arranged on hold down mandrel 318 and the centre hold down mandrel between 320, the centre hold down mandrel 320 and under hold down mandrel and then be provided with " O " shape sealing ring 342 between 322.
The last fluid bypass device 298 of housing 290 comprises and a plurality ofly passes the sprocket hole 344 that holds down mandrel, so that drilling well annular space part 38A is communicated with last instrument annular space part 314.Last fluid bypass device 298 also comprises a plurality of jet orifices 346 that also can be described as flushing hole 346, hold down mandrel 320 so that instrument annular space part 314 is communicated with the middle part 38B of drilling well annular space in the middle of their break-through, downward-sloping jet orifice 346 points to the longitudinal axis 156 of heart axle housing section 306 with acute angle 348.
Following fluid bypass device 300 comprises a plurality of return ports 350, and they hold down mandrel 320 so that drilling well annular space 38B is communicated with following instrument annular space part 316 in the middle of making in the middle of the break-through below jet orifice 346.Following fluid bypass device 300 also comprises a plurality of flushing holes 352 down, holds down mandrel 322 under their break-through so that instrument annular space part 316 is communicated with the bottom 38C of drilling well annular space.
Jet orifice 346 provides a kind of device with cannula cavity 13 spray liquid flows in the middle part 38B of drilling well tomorrow annular space.Jet orifice is with acute angle 348 directed downwards so that facing to the residue that flushes out the cannula cavity 13 of return port 350 downward flushings in middle drilling well annular space part 38B.
The heart axle housing section 306 of flushing tool housing 290 comprises a plurality of teeth 354 that constitute in its lower end, so that when housing 290 rotates, tooth 354 will be pulverized the residue in the cannula cavity 13, for example Can Yu cement.
Flushing tool 48 uses in the following manner.When flushing tool descended by casing string 12, it rotated by the rotation of tubing string 36, and meanwhile, liquid flows to down magnetic and goes in the drilling well annular space 38.
Turning gear 354 will be beaten pine at the residue in the part of cannula cavity.Respectively by feedthrough 298,300 walk around upper and lower compress cup 294,296 by the drilling liquid flow that sleeve annular space 38 refluxes downwards, and flow out flushing hole 352 down, so that the essence that turning gear 354 produces in rinsing out considers to be worth doing and utilizes the drilling liquid flow that gos up to make the sort of pure bits by vertical housing inner chamber 302 and tubing string 36 recycled back.
Initial that part of by the inner chamber of tooth 354 contacts, compress cup 296 down and when flushing tool 48 moves down by casing string 12, can touch and wipe that part of of cannula cavity 13 by after flushing hole 352 flushings down.
Cannula cavity 13 is touched that part of liquid stream of then promptly going up flushing hole 346 by jet orifice that nuzzles up and is carried out hydro-peening by compressing cup 296.
This method of just having described is a kind of continuous method, wherein residue just beaten pine and just from the part of cannula cavity above drilling well during recycled back, another part of cannula cavity is just being smeared wiping, and cannula cavity also has another part just by hydro-peening.These steps are carried out simultaneously in the different piece of cannula cavity, and are by top each counterpart of the cannula cavity of mentioning in sequence.
In addition, it should be noted that: the drilling liquid flow of the part of hydro-peening cannula cavity then is used for making the residue recycled back to flow out near the end portion that descends flushing hole 352 on cannula cavity sometimes when flowing out jet orifice 346.
Casing valve 24 in the drilling well well cavity segment 22 of high deflection provides a kind of completion system that is used for the drilling well of high deflection with the use of the instrument cover group shown in Fig. 3 A-3E, this system can be by eliminating punch operation and by using compactor and hollow plunger to eliminate the needs of setting up zone isolation, reducing the completion cost greatly.In general, this system can reduce drilling well greatly and finish drilling time in the process into.
Adopt the completion method of the drilling well 10 of this system, beginning is with the cement shown in the label 16 the exploitation casing string 12 of putting into well 14 to be fixed.Particularly, drilling well is coated cement at the wall in valuable zone, is placed on these location with the casing valve shown in label 24,26 and 28 before importing casing string 12 in the drilling well.Adopt this system, casing valve as shown in the reference numeral 24 can be arranged in the drilling well 10 each position near some the valuable subterranean strata that resembles subterranean strata 30,32 and 34 to draw the spray operation.These positions that extraction value is arranged are pre-determined according to the analysis data of drilling measuring record and other storage.The feasible practice that employing is cemented the well in the horizontal hole application scenario is to have the casing string of casing valve as shown in the reference numeral 24 of right quantity or lining post 12 centering and cementing on the appropriate location in the well 14 in well 14.
After well cementation, should shovel and remove the residual water spare of casing string 12 bottoms that accumulate in horizontal segment 22 with a drilling well and held stationary device as much as possible, the size of the drill bit that adopts should be to make drill bit safety pass the maximum gauge of casing string 12.Cleared up drilling well complete dark by mode that bore to remove residual cement after, if the liquid stream when replacing last cement plunger in the well cementation process in the casing string 12 is also changed, so just these liquid should be changed entirely into the clean completion liquid that filters of crossing that is suitable for completion.
Be lowered to next string devices in the drilling well and be the tool string among Fig. 3 A-3E, it as schematically shown in Figure 1 comprise orientation tool 44, spraycan 46 and flushing tool 48 like that.In Fig. 1, shown this tool assembly is just beginning to be lowered in the vertical component 18 of drilling well 10.This tool assembly will enter into the horizontal component 22 of drilling well 10 by the turn fractions 20 of drilling well 10.Tool assembly at first should slide to the casing valve 28 under just in time.
Then, begin to carry out the liquid injection with crossing the clean completion liquid that filters.Liquid sprays is by liquid being pumped into tubing string 36 downwards liquid to be sprayed with spraycan 46 from spray-hole 210, so that the mode that allows high pressure liquid jet wash away cannula cavity 13 realizes.When spraycan 46 moves on by casing valve 28, tubing string 36 will rotate, so that remove all residual cement from all grooves of casing valve 28 internal diameters.When casing valve 28 was positioned at the drilling well part of inclination, this accounts for was particular importance, because can amass a large amount of cement along 28 times inner surfaces of casing valve.These cement must be disposed to guarantee the good engagement of orientation tool 44 and sliding sleeve 66.In this jet-action process, orientation tool 44 should move on to a position that resembles by between its interposition of lug position 104B and 104F representative, so that orientation tool 44 can pass on the casing valve 28 and move, and does not contact with the sliding sleeve 66 of casing valve 28.
It should be noted that, when " making progress " and " downwards " is used to represent the direction of motion in the drilling well, these two speech are used to refer to going out well or go into the well and move along the drilling well axis respectively, in many cases, this is not really to refer to vertically motion, in fact, can refer to horizontal movement in the level orientation of drilling well part.
After the inner chamber to casing valve 28 carried out the liquid injection, orientation tool 44 can pass casing valve and fall for 28 times, and moves to the represented position by lug position 184D.Orientation tool is pulled upwardly, so that lower wedge block 176 is meshed with following gear block 166, thereby they is radially outwards pushed, they just are meshed with the shoulder 126 of sliding sleeve 66 towards last shoulder 170 like this.Upwards spur tubing string 36, so that the sliding sleeve 66 of casing valve 28 is applied 10000 pounds of active forces that make progress about (44000 newton).The interior chuck 76 that first groove 78 initial and valve casing 50 meshes owing to 10000 pounds (44000 newton) thus the virial effect that makes progress first groove 78 this groove that slips away of extruding.When interior chuck 76 extrusion first grooves 78 and when slipping away this groove, can notice on the ground that active force has upwards reduced, thus the beginning that is indicating opening program.Thereby sliding sleeve 66 continues to be subjected to pull moves to its full stroke position, and by ground weight indicator weight being shown when this situation can compress the bottom 63 of load segment 65 like that at the top of sliding sleeve 66 shown in Fig. 4 B increases suddenly and be confirmed.At the moment, chuck 76 just engages second latch recess 80.
At this moment, the virial that makes progress on the tubing string can reduce, so that keep having an appointment 5000 to 8000 pounds of active forces that (2200 to 3500 newton) makes progress on unlatching piece 166.Keeping that pulling force that makes progress, thereby making when opening piece 166 and contact with the shoulder 126 maintenance actuatings of sliding sleeve 66, the rotation of operation post 36 begins to keep the minimum speed that reaches as far as possible.When tubing string 36 rotated, the spraycan 46 that is connected on the tubing string 36 by injection axle 224 also rotated.In rotation operation post 36 and spraycan 46 at leisure, highly pressurised liquid is pumped in the tubing string 36 and flows out spray-hole 210 outsides.
When sliding sleeve 66 when upwards slippage is to its enable possition as just described, each sliding sleeve intercommunicating pore 94 all is in the position of aiming at that hole corresponding with it in the shell intercommunicating pore 56 like that shown in Fig. 4 D.Equally, a plurality of spray-holes 210 of spraycan 46 can arrange that the plane 354,356,358 and 360 in trepanning 56 and shell hole 94 aligns (referring to Fig. 4 D) mutually with a plurality of longitudinally-spaced being used to.Plane 354 to 360 shown in Fig. 4 D is perpendicular to the upright plane of the paper that is decorated with Fig. 4 D.
When keeping spray-hole 210 and plane 354-360 to align, rotate spraycan 46, can be subjected to repeatedly from the impact of the high velocity liquid stream of spray-hole 210 ejections so that be positioned at easy the to be cracked plunger 96,98 of shell intercommunicating pore 56 and sliding sleeve through hole 94 at first, thereby make plunger cracked.
Fill in the enough long liquid injection of row for the easy cracked material coupled columns of removing intercommunicating pore after, if desired and feasible words then can according to the precognition crushing rock formation pressure and the pressure limit value of blowout hookup 40 and casing string 12, close blowout hookup 40(and see Fig. 1) and drilling well 10 carried out supercharging so that liquid is pumped near in the rock stratum 34 of casing valve 28, thus confirm the removing of plunger.
In case finish the injection of plunger and finish pressure test, orientation tool 44 can be moved on to by the position shown in the lug position 184A, till wherein apotting spindle 132 slides into voussoir 174 for 130 times and engages closure blocks 154 with respect to the viscous motion assembly.When orientation tool 44 passed casing valve 28 and moves down, closure blocks 54 can pushed outwardsly be squeezed, and their ventricumbent shoulders 162 will be meshed with the shoulder 128 of sliding sleeve 66.On sliding sleeve 66, apply the downward active force of about 1000 pounds (4400 newton) then,, thereby break away from engagement with upper groove 80 so that chuck 76 produces buckling.Sliding sleeve 66 then will glide and be meshed with low groove 78 until chuck 76, and float valve except its plunger now by towards broken and from trepanning 94 and shell hole 56, removed, be in the position shown in Fig. 2 A-2E again.
If necessary, can close blowout hookup 40 once more and also can make pressure test to confirm the casing valve 28 actual closed conditions that are in sleeve pipe.
Then, make outside the penult casing valve that moves on the instrument cover group as casing valve 26 places, repeat said procedure.At casing valve 26 with after just described this mode is handled, instrument cover group moves on to next casing valve place on once more again, all carried out the liquid injection up to all casing valves for removing remaining cement, and then all opened and plunger sprayed from it, till then these float valves cutting out again.
Remove and close again in case all casing valves have all sprayed, just the operation post should be risen to the top of bushing pipe, the top of perhaps moving the sloping portion 22 of casing string 12 to, and it is carried out back scrubbing.Back scrubbing is to utilize reverse reflux, makes its by-pass flow road 298,300 by flushing tool 48 enter drilling well annular space 38, gets back to then in the inner chamber 302 of flushing tool 48, then realizes by tubing string 36 risings again.Draw for the first time in the spray operation preparing, when instrument cover group was moved down by drilling well, casing string was subjected to the back scrubbing of downward direction, up to casing string for all residues that stays being disposed back scrubbing till its total depth from the liquid spraying operation.In case back scrubbing is finished, must from drilling well, extract out so that for drawing the spray operation by the operation post, i.e. crushing operation, and change needed tool assembly into.
Fig. 6 shows a kind of spray instrument cover group of drawing, and in this case, it is a kind of fragmentation that is positioned at drilling well 10 appropriate positions with instrument cover group.The operation cover group that is used for crushing operation comprises the flushing tool 48 that is contained on orientation tool 44 bottoms, and orientation tool 44 is positioned at the below of hold down gag 362, and all instruments all are suspended on the tubing string 36.Other ancillary service as safety valve and so on also can be arranged in this operation cover group.
The bottom of the sliding Decanning post 12 of operation cover group shown in Figure 6, a bottom casing valve 28 will be meshed with orientation tool 44 so that the sliding sleeve 66 of casing valve 28 is moved to the enable possition, and wherein its sliding sleeve intercommunicating pore 94 is aimed at its shell intercommunicating pore 56.Kong Zhongyi has sprayed plunger, and therefore, when sliding sleeve 66 moved to the enable possition, the inside of casing string 12 just was communicated with on every side rock stratum 34 by open pore 94 and 56.
Then, orientation tool 44 is thrown off from sliding sleeve 66, and operation cover group rises to needs the well section place that exploits above casing valve 28, at this position hold down gag 362 is set.Then, spray is drawn in zone 34 on request.Utilize broken sleeve column, the rock stratum around the liquid of the fragmentation usefulness aperture by casing valve 28 is pumped into is to form crack 364.Be appreciated that drawing the spray operation and also can on rock stratum 34, implementing by casing valve 28 of many other types, for example the operation of acidification and so on etc.
After drawing the spray operation, can clear up zone 34 and also can carry out conduct by tubing string 36 desired exploitation support bit tests.After test,, and unclamp hold down gag 362 for maintenance is abandoned zone 34 to the control of drilling well.Then, once more back scrubbing is carried out in the inside of cannula cavity 12 and the inside of casing valve 28, so that sand grains and the rock stratum chip pulverized are disposed from the inside of cannula cavity 12 with from the inside of casing valve 28 by flushing tool 48.Then, casing valve 28 meshes with orientation tool 44 once more, and the sliding sleeve 66 of this casing valve 28 then moves to make position.
Afterwards, move on to penult casing valve 26 on the operation cover group, repeat operation process: make crushing rock formation, then back scrubbing casing valve 26, closure sleeve float valve 26 again then.Then, move on to next casing valve 24 on the operation cover group, repeat this operation process again.
Finish the drawing after the spray of all subterranean stratas 30,32 and 34, if necessary, slipping into the exploitation hold down gag or preparing to use in the preparation of exploitation set of connectors, can reopen casing valve 24,26 and 28 selectively, from drilling well, extract fragmentation cover group shown in Figure 6 then out.
It only is the selectivity completion method of drilling well 10 lower areas 34 that Fig. 7 schematically shows, and before removing operation cover group shown in Figure 6, the sliding sleeve 66 of nethermost casing valve 28 has moved to the enable possition.Then, after operation cover group shown in Figure 6 is removed, a mining tubular column 366 and exploitation hold down gag 368 are slipped into and place the top of casing valve 28.Then, the well liquid from subterranean strata 34 exploitations upwards refluxes by casing valve 28 with by mining tubular column 366.
This shows, the present invention be easy to obtain above-mentioned purpose and advantage and the present invention intrinsic advantage.Owing to some preferred embodiments of the present invention have been done diagram and description for fully open, have changed so person skilled in the art person can make many kinds.

Claims (10)

1, a kind of sleeve type sleeve barrel tool apparatus that supplies the well casing post to use, this apparatus comprises a shell (50), this shell has the vertical passage (52) and the shell wall (54) that has a kind of shell intercommunicating pore (56) that connect himself, described shell intercommunicating pore penetrates described shell wall, and described shell is equipped with the first easy cracked plunger (96) that the shell intercommunicating pore is stated in initial filling residence; This apparatus also comprises a sliding sleeve (66) that is placed on slidably in the described vertical passage, described sliding sleeve has one and connects the longitudinal sleeve tube inner chamber (90) in it and have a sliding sleeve wall (92) that has sliding sleeve intercommunicating pore (94), described sliding sleeve intercommunicating pore penetrates described sliding sleeve wall, described sliding sleeve is equipped with the second easy cracked plunger (98) that the sliding sleeve intercommunicating pore is stated in initial filling residence, and described sliding sleeve can slide at relative selectively described shell between described shell intercommunicating pore and the second place that the mutual out-of-alignment primary importance of described sliding sleeve intercommunicating pore and described two kinds of holes are aimed at mutually.
2, apparatus as claimed in claim 1, it is characterized in that: this apparatus also comprises: the aligning device (102) that connects mutually with described shell and described sliding sleeve operably, be used for when described sliding sleeve (66) is in it with respect to the described second place of described shell, keeping described two kinds of holes (56,94) to aim at mutually.
3, apparatus as claimed in claim 2, it is characterized in that: described aligning device (102) be included in described shell (50) and described sliding sleeve (66) both one of a kind of lug (108,110) of going up a kind of groove (104,106) of constituting and on another of described shell and described sliding sleeve, constituting, described lug is contained in the described groove.
4, apparatus as claimed in claim 3 is characterized in that: described groove (104,106) is gone up at described shell (50) and is constituted, and described lug (108,110) is gone up at described sliding sleeve (66) and constituted.
5, as each described apparatus in the claim 1 to 4, it is characterized in that: this apparatus also comprises first, second sealing ring (68 that vertically separates, 70), they are placed between described sliding sleeve (66) and the described shell (50), and between described sliding sleeve and described shell, constituting the annular space (72) that seals, described aligning device (102) is arranged in the annular space of described sealing.
6, as claim 4 and 5 described apparatuses, it is characterized in that: described lug (108,110) have to run through described sliding sleeve inner chamber (90) is communicated with so that carry out pressure balanced leakage opening (112,114) between described first and second seals with the annular space (72) of described sealing.
7, apparatus as claimed in claim 6 is characterized in that: described lug (108,110) be the cylinder that cooperates with the form that is spirally connected with the radial bore (116,118) of the described sliding sleeve wall of break-through (92) slightly.
8, as each described apparatus in the claim 1 to 7, it is characterized in that: this apparatus also comprises and being arranged between described sliding sleeve (66) and the described shell (50) so that when described sliding sleeve is in it with respect to the primary importance of described shell described sliding sleeve intercommunicating pore (94) and described shell intercommunicating pore (56) are kept apart.
9, as each described apparatus in the claim 1 to 8, it is characterized in that: described first (96) and second (98) the easy cracked plunger all is to be constructed less than the material of 5000 pounds/square inch (34.5MPa) by bearing strength.
10, apparatus as claimed in claim 9 is characterized in that: the described bearing strength of the described material of described first and second plungers (96,98) is not more than 3500 pounds/square inch (24.1MPa).
CN90109069A 1989-11-08 1990-11-08 Casing valve Pending CN1051958A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US43514489A 1989-11-08 1989-11-08
US435,144 1989-11-08

Publications (1)

Publication Number Publication Date
CN1051958A true CN1051958A (en) 1991-06-05

Family

ID=23727166

Family Applications (1)

Application Number Title Priority Date Filing Date
CN90109069A Pending CN1051958A (en) 1989-11-08 1990-11-08 Casing valve

Country Status (6)

Country Link
EP (1) EP0427422B1 (en)
CN (1) CN1051958A (en)
AU (1) AU638282B2 (en)
CA (1) CA2029529C (en)
DE (1) DE69018192T2 (en)
MY (1) MY104783A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103299028A (en) * 2010-10-18 2013-09-11 Ncs油田服务股份有限公司加拿大分公司 Tools and methods for use in completion of a wellbore
CN106837242A (en) * 2017-03-27 2017-06-13 牡丹江博实石油机械科技有限公司 Blowout-proof apparatus of oil well
CN115110916A (en) * 2022-07-25 2022-09-27 中国石油化工股份有限公司 Pressure-adjustable vortex tube

Families Citing this family (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5450697A (en) * 1994-04-19 1995-09-19 Von Duprin, Inc. Removable cylinder locked mullion assembly
US20070261851A1 (en) * 2006-05-09 2007-11-15 Halliburton Energy Services, Inc. Window casing
NO20063074L (en) * 2006-07-03 2008-01-04 Rune Freyer Method and apparatus for counteracting the functioning of a valve
US8261761B2 (en) 2009-05-07 2012-09-11 Baker Hughes Incorporated Selectively movable seat arrangement and method
US8272445B2 (en) 2009-07-15 2012-09-25 Baker Hughes Incorporated Tubular valve system and method
US8251154B2 (en) 2009-08-04 2012-08-28 Baker Hughes Incorporated Tubular system with selectively engagable sleeves and method
US8397823B2 (en) 2009-08-10 2013-03-19 Baker Hughes Incorporated Tubular actuator, system and method
US8291988B2 (en) 2009-08-10 2012-10-23 Baker Hughes Incorporated Tubular actuator, system and method
US8291980B2 (en) 2009-08-13 2012-10-23 Baker Hughes Incorporated Tubular valving system and method
US8479823B2 (en) 2009-09-22 2013-07-09 Baker Hughes Incorporated Plug counter and method
US8418769B2 (en) 2009-09-25 2013-04-16 Baker Hughes Incorporated Tubular actuator and method
US8316951B2 (en) 2009-09-25 2012-11-27 Baker Hughes Incorporated Tubular actuator and method
US8646531B2 (en) 2009-10-29 2014-02-11 Baker Hughes Incorporated Tubular actuator, system and method
US9279311B2 (en) 2010-03-23 2016-03-08 Baker Hughes Incorporation System, assembly and method for port control
US8789600B2 (en) 2010-08-24 2014-07-29 Baker Hughes Incorporated Fracing system and method
US8662162B2 (en) 2011-02-03 2014-03-04 Baker Hughes Incorporated Segmented collapsible ball seat allowing ball recovery
US9546529B2 (en) * 2012-02-01 2017-01-17 Baker Hughes Incorporated Pressure actuation enabling method
US8931557B2 (en) 2012-07-09 2015-01-13 Halliburton Energy Services, Inc. Wellbore servicing assemblies and methods of using the same
US9163493B2 (en) 2012-12-28 2015-10-20 Halliburton Energy Services, Inc. Wellbore servicing assemblies and methods of using the same
US10180046B2 (en) 2014-12-23 2019-01-15 Ncs Multistage Inc. Downhole flow control apparatus with screen
WO2018049533A1 (en) 2016-09-16 2018-03-22 Ncs Multistage Inc. Wellbore flow control apparatus with solids control
EP3504398A4 (en) * 2016-11-15 2019-09-04 Halliburton Energy Services, Inc. Top-down squeeze system and method
MY201369A (en) 2016-11-15 2024-02-20 Halliburton Energy Services Inc Top-down squeeze system and method
US10648287B2 (en) * 2017-09-26 2020-05-12 Dreco Energy Services Ulc Actuable downhole tools for attachment to tubular strings
US10704354B2 (en) * 2018-03-27 2020-07-07 Saudi Arabian Oil Company Zonal isolation of a subterranean wellbore
CN114427419B (en) * 2020-09-25 2023-12-01 中国石油化工股份有限公司 Stage fracturing completion string for unlimited full-drift-diameter oil and gas well
CN113417580B (en) * 2021-06-23 2024-04-09 四川宏华石油设备有限公司 Manifold device and manifold system adopting same

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2248305A (en) * 1938-05-16 1941-07-08 Rasmussen Service Company Producing apparatus for oil wells
US3994338A (en) * 1975-11-17 1976-11-30 Hix Richard E Hydrostatic pressure release for bottom hole oil well pumps
US4031957A (en) * 1976-07-23 1977-06-28 Lawrence Sanford Method and apparatus for testing and treating well formations
US4286662A (en) * 1979-11-05 1981-09-01 Page John S Jr Tubing drain
US4372388A (en) * 1980-11-24 1983-02-08 Halliburton Company Subsurface control valve
US4524831A (en) * 1983-12-27 1985-06-25 Camco, Incorporated Hydraulic controlled well valve

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103299028A (en) * 2010-10-18 2013-09-11 Ncs油田服务股份有限公司加拿大分公司 Tools and methods for use in completion of a wellbore
CN103299028B (en) * 2010-10-18 2016-06-15 Ncs油田服务股份有限公司加拿大分公司 The instrument used in the completing of pit shaft and method
CN106121599A (en) * 2010-10-18 2016-11-16 Ncs油田服务股份有限公司加拿大分公司 The tool and method used in the completing of pit shaft
CN106837242A (en) * 2017-03-27 2017-06-13 牡丹江博实石油机械科技有限公司 Blowout-proof apparatus of oil well
CN106837242B (en) * 2017-03-27 2023-01-31 牡丹江博实石油机械科技有限公司 Blowout preventer for oil well
CN115110916A (en) * 2022-07-25 2022-09-27 中国石油化工股份有限公司 Pressure-adjustable vortex tube

Also Published As

Publication number Publication date
DE69018192D1 (en) 1995-05-04
CA2029529A1 (en) 1991-05-09
EP0427422B1 (en) 1995-03-29
AU6465490A (en) 1991-05-16
MY104783A (en) 1994-05-31
EP0427422A2 (en) 1991-05-15
AU638282B2 (en) 1993-06-24
EP0427422A3 (en) 1991-10-23
DE69018192T2 (en) 1995-07-27
CA2029529C (en) 1999-08-03

Similar Documents

Publication Publication Date Title
CN1021072C (en) Downhole jetting tool
CN1052717A (en) Orientation tool
CN1051958A (en) Casing valve
CN1052166A (en) Flushing tool
CN1051607A (en) The completion method of oil gas well and completion system
CN1281846C (en) Method and appts. for stimulation of multiple formation intervals
CN1860282A (en) Method of suspending, completing and working over a well
CN113803020B (en) Rapid leaking stoppage and production recovery method for horizontal well
CN108952610B (en) Hydraulic drive coring tool for complex well
CN1053278A (en) Well casing flotation device and method
CN215927327U (en) Multifunctional integrated bridge plug
CN1777736A (en) Wellstring assembly
US11015417B2 (en) Using cement slurries in hydrajetting tools
CN1289780C (en) Hydraulic underreamer and sections for use therein
CN1942652A (en) A jar for use in a downhole toolstring
CN113898314A (en) Quick drilling type sitting and squeezing integrated temporary plugging device
CN104373075A (en) Fracturing packer
CN100347404C (en) Method and apparatus for treating a subterranean formation
CN101560875A (en) Multifunctional horizontal well completion tubular pile device
CN201794527U (en) Casing float collar
CN113898286A (en) Single-action drilling tool and combined type coring drilling tool
CN204252930U (en) Fracturing packer
RU2515739C1 (en) Repair method for well with defective area with displaced casing string
CN201544128U (en) Hydraulic sand-blasting cutter
CN106522863B (en) Inverse circular sand washing adapter device and sand washing process tubing string

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned
C20 Patent right or utility model deemed to be abandoned or is abandoned