The invention will be further described below in conjunction with drawings and Examples:
Referring to Fig. 1, Fig. 2, flat concrete pile generally adopts b: h=1: the flat more than 3, have enough resistances to torsion for making stake, and b: h also should not be greater than 5.When foundation depth during, still should in stake, establish and reserve connecting hole 5, so that linking beam is set greater than 5m.Many advocated muscle 1 and bearing rods 4 are arranged on the cross direction b at two ends, waist muscle 3 is arranged on the length direction h of both sides, by stirrup 2 described advocated muscle 1 and bearing rod 4 are linked together, length is pressed actual needs production, when surpassing 12m, the welding of employing scale, weld bond intensity must be greater than main rigidity of soft tissues degree.Can give full play to for the intensity that makes the muscle of being advocated, must make flat concrete pile when being subjected to soil pressure, the fulcrum of the muscle of being advocated can accurately drop on the concrete at bearing rod position, and therefore, main muscle arrangement constraints is:
A
S masterFy≤0.1bhf
Cm+ A
The s frameIn the fy formula:
A
S master-muscle cross-sectional area mm is advocated
2
A
The s frame-bearing rod cross-sectional area mm
2
The tension of fy-plain bars, compressive strength design load N/mm
2
f
Cm-concrete flexural compressive strength design load N/mm
2
B---flat concrete pile breadth of section mm;
H---flat concrete pile cross-sectional length mm;
As: 225 * 900, join 4 Φ, 22 main muscle, 2 Φ, 12 bearing rods, then:
A
S masterFy=1520.53 * 310=471.37KNm
0.1bhf
Cm+ A
The s frameFy=0.1 * 225 * 900 * 21.5+226.2 * 310
=505.5KN.m>471.37KN·m
And for example: 250 * 1000, join 3 Φ 22+2 Φ, 25 main muscle, 2 Φ, 16 bearing rods, then:
A
S masterFy=(1140.1+981.75) * 310=657.87KNm
0.1bhf
Cm+ A
The s frameFy=0.1 * 250 * 1000 * 21.5+201.06 * 310
Its resistance to bending of=662.1KNm>657.87KNm calculate by " concrete design specification " (GBJ10-89) attached 3-1 formula calculate, concrete strength should not be lower than C
40
In above-mentioned two examples: (with C
40Concrete calculates)
225 * 900, join 4 Φ, 22 muscle, M=387.0KNm
(even waist muscle, bearing rod are 1972mm
2)
250 * 1000, join 3 Φ 22+2 Φ, 25 muscle, M=597.9KNm
(even waist muscle, frame master muscle are 2750mm
2) referring to Fig. 3, Fig. 4, Fig. 5, be certain reservoir foundation ditch figure of water factory (the dark 6m of foundation ditch).
Former scheme: pile tube 11 is joined deep-mixed pile 9 supportings.
The AB section: design bending moment value M=744.26KNm, adopt single Φ 500 pile tubes, pilespacing 0.6m, the long 12m of stake lays out pile 63; Three row Φ, 500 deep-mixed piles are arranged in the stake back, pilespacing 0.4m, and the long 12m of stake lays out pile 255.
The CD section: design bending moment value M=482.9KNm, adopt single Φ 400 pile tubes, pilespacing 1.0m, the long 12m of stake lays out pile 38; Stake back three row Φ, 500 deep-mixed piles, several 255 of stake, the long 10m of stake.
AC, BD section: adopt and put the slope at 1: 2 and dig dark 3m, supporting 3m.Adopt double Φ 500 deep-mixed piles, the long 7m of stake lays out pile 180 altogether.
Add up to 63 of Φ 500 pile tubes, 756m, 15.12 ten thousand yuan of costs; 38 of Φ 400 pile tubes, 456m, 6.84 ten thousand yuan of costs; 690 of Φ 500 deep-mixed piles, 6615m, 39.69 ten thousand yuan of costs.61.65 ten thousand yuan of total costs.
New departure: flat concrete pile 10 is joined deep-mixed pile 9 supportings (the design moment value is the same).
The AB section: adopt single 250 * 1000mm flat concrete pile (the muscle 3 Φ 22+2 Φ 25 that advocated, down together), pilespacing 0.8m, the long 12m of stake lays out pile 47; The single deep-mixed pile in stake back, the long 10m of stake lays out pile 100.
The CD section adopts single 250 * 1000mm flat concrete pile, pilespacing 1.2m, and the long 12m of stake lays out pile 32; Stake back one row Φ, 500 deep-mixed piles, the long 9m of stake lays out pile 100.
AC, BD section: with former scheme.
Add up to 79 of the flat stakes of 250 * 1000mm, the long 948m of stake, 28.44 ten thousand yuan of costs; 200 of Φ 500mm deep-mixed piles, the long 1900m of stake, 11.4 ten thousand yuan of costs.39.84 ten thousand yuan of total costs.
Flat concrete pile is saved 21.81 ten thousand yuan than pile tube scheme, and the saving amplitude reaches 35%.Referring to Fig. 6, Fig. 7, Fig. 8, be certain foundation ditch figure of hotel.
This segment base hole is from highway 10.5m, supporting degree of depth 8.84m, and length 110m, the supporting degree of depth and substratum geological condition are very poor, are C=5.6KPa, the silt matter soil of Φ=6 °.
Former scheme: drilled pile 13 is joined deep-mixed pile 9 supportings.
1. be close to highway and do a row Φ 500 deep-mixed piles, dark 15m amounts to 274.
2. arrange Φ 500 deep-mixed piles to foundation ditch place plum blossom shape by road, dark 12m amounts to 545.And in this section to put the slope at 1: 2.5.Put back, slope residue supporting degree of depth 5.84m.
3. be close to the foundation ditch limit and make 1 of Φ 1200 drilled pile every 1.4m, dark 23-24m, in join 16 Φ, 18 main muscle, amount to 79,0.6 * 1m collar tie beam is made on the drilled pile top.
Agitation pile: ten thousand yuan of (274 * 15+545 * 10.5) * 65=63.9
Add up to: 372.1 ten thousand yuan (not containing collar tie beam)
New departure: flat concrete pile 10 is joined deep-mixed pile two-layer supporting in 9 fens:
1. every meter 250 * 1000 flat concrete pile (the muscle 3 Φ 22+2 Φ 25 that advocated, down with) on the highway limit, dark 16m amounts to 110, does a row Φ 500 deep-mixed piles after the stake, and dark 15m amounts to 273, and 0.5 * 1m collar tie beam is done on the flat concrete pile top.
But the soil pressure of said structure supporting 4.4m, 4.43m is by the secondary supporting for residue.
2. be close to every meter 250 * 1000 flat concrete piles in foundation ditch place, dark 16m amounts to 110.
Ten thousand yuan of cost: flat concrete pile: 220 * 16 * 300=105.6
Ten thousand yuan of deep-mixed pile: 273 * 15 * 65=26.6
Add up to: 132.2 ten thousand yuan (not containing collar tie beam)
Two compare, and the flat concrete pile supporting scheme is saved 239.9 ten thousand yuan, and cost only is 35.5% of a former scheme.Still save 39.4% even the drilled pile cost is calculated by half (this moment, former scheme was 2,180,000 yuan) flat concrete pile supporting scheme.In the present embodiment:
1. soil pressure is calculated
Undertaken by People's Republic of China's industry standard " building foundation pit supporting tecnical regulations " (exposure draft).
2. water-stop curtain design
According to geological condition, undertaken by People's Republic of China's industry standard " building foundation pit supporting tecnical regulations " (exposure draft).
When the flat concrete pile spacing is bigger, when the waterproof between piles curtain has the unstability possibility, should linking beam be set at cantilever flat concrete pile middle part, the soil pressure that water-stop curtain is born directly is passed on the flat concrete pile.As making water-stop curtain with deep-mixed pile, then deep-mixed pile can be designed to outer arch suffered soil pressure is delivered on the flat concrete pile.
3. job practices: the flat concrete pile construction should be carried out with static pressure type, and construction machinery be good with skirt piles pile press (No. 96237670.1, Chinese patent) or front-located mode pile press (No. 97240064.8, Chinese patent application), with reduce to around interference and damage.
4. construction technology main points: roughly the same (undertaken) with construction of Static Pressure Pile, but the allowable variation of stake should not be greater than 50mm by " building pile foundation tecnical regulations " JGJ94-94.Soldering opening intensity must be greater than main rigidity of soft tissues degree, and meets the requirement of JGJ94-94 standard.