CN105178311B CN201510652573.7A CN201510652573A CN105178311B CN 105178311 B CN105178311 B CN 105178311B CN 201510652573 A CN201510652573 A CN 201510652573A CN 105178311 B CN105178311 B CN 105178311B
Authority
CN
China
Prior art keywords
pile
stake
section
friction
grouting pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510652573.7A
Other languages
Chinese (zh)
Other versions
CN105178311A (en
Inventor
张永杰
夏旖琪
邓俊强
邢校崟
王桂尧
杨兴山
李志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha University of Science and Technology
Original Assignee
Changsha University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha University of Science and Technology filed Critical Changsha University of Science and Technology
Priority to CN201510652573.7A priority Critical patent/CN105178311B/en
Publication of CN105178311A publication Critical patent/CN105178311A/en
Application granted granted Critical
Publication of CN105178311B publication Critical patent/CN105178311B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to the technical field of constructional engineering, in particular to a partially prefabricated friction pile and a construction method thereof. The invention provides a partially prefabricated friction pile, which comprises an upper pile, a lower pile and a partition template arranged between the upper pile and the lower pile, wherein the upper pile comprises a standard section and a pile bottom section, the lower pile comprises a force transmission structure section, a variable cross-section structure section and a bearing structure section which are sequentially connected from top to bottom, the standard section and the pile bottom section are both prefabricated prestressed reinforced concrete pipe piles, the standardized production of the friction pile is realized, the labor intensity and the manufacturing cost of construction personnel are reduced, the upper pile is sleeved outside the force transmission structure section, the split design of the upper pile and the lower pile can fully exert the bearing performance of the side friction resistance and the pile end resistance of the full-length pile, therefore, the whole bearing capacity of the friction pile is improved, and under the same upper load action, the required pile length or pile diameter is smaller, and the settlement deformation of the top of the friction pile can be effectively controlled, so that the construction cost of the friction pile is reduced, and social resources are saved.

Description

The friction pile of a kind of partial precast and construction method thereof
Technical field
The present invention relates to construction engineering technical field, particularly relate to the friction pile of a kind of partial precast And construction method, be specifically related to one can give full play to foundation pile upper and lower part pile side friction with The great diameter and long friction pile of end resistance.
Background technology
Along with the construction of the heavy constructions such as high-rise, Super High and Loads of Long-span Bridges, great diameter and long base Stake has that bearing capacity is high because of it, deform the advantage such as little and is widely used as the basis of such engineering. According to " architecture foundation pile technical specification " (JGJ 94-2008), great diameter and long foundation pile need to meet with Lower condition: D >=800mm, L >=50m, L/D >=50, D is foundation pile diameter, and L is that foundation pile is total Long.Currently, existing substantial amounts of theoretical research all shows with engineering practice, the carrying of overlength foundation pile The working trait of deformation mechanism, pile side resistance and end resistance all exists the biggest with common foundation pile Difference, designs the great diameter and long foundation pile obtained according to conventional method of analysis, should at Practical Project It is generally not capable of in effectively playing its load-carrying properties, thus construction cost is caused to a certain degree Waste.Therefore, it is necessary on the basis of tradition Pile integrity computational methods, propose major diameter The methods such as version that ultra-long pile is new and design thereof calculate, construction and quality control so that it is energy Give full play to the load-carrying properties of large diameter and very long pile.
At present, architectural engineering foundation pile is primarily subjected to the load that superstructure applies, i.e. on foundation pile top Portion applies load straight down, due to the stake of large diameter and very long pile upper soil horizon Yu bottom soil layer Soil relative displacement difference is relatively big, when the pile side friction on foundation pile top reaches peak value, under foundation pile The pile side friction in portion may the most not give full play to, and causes foundation pile upper and lower part pile side friction Performance not there is synchronicity.Trace it to its cause predominantly: the load that foundation pile top is born is relatively big, Pile-soil relative displacement is big, and the pile side friction on foundation pile top plays fully;And foundation pile bottom is subject to Load relatively small, pile-soil relative displacement is little, and the pile side friction of foundation pile bottom can not be abundant Play or not yet play.Additionally, end resistance gives full play to required pile tip settlement is generally foundation pile About the 5% of diameter, for large diameter and very long pile, this value gives full play to much larger than pile side friction Required pile-soil relative displacement amount, therefore, the performance of foundation pile side friction and end resistance is also It not to synchronize.
It addition, when the length of foundation pile exceedes certain limit, under foundation pile top load effect, Foundation pile top is relatively big due to pile-soil relative displacement, and foundation pile side friction there will be ruckbildung, makes Foundation pile top bearing capacity is become to be gradually lowered, and with the increase of foundation pile top settling amount, on foundation pile The pile side friction softened region in portion will gradually develop to foundation pile bottom, make the stake side of foundation pile bottom Frictional resistance plays degree to be increased, and the bearing capacity of foundation pile bottom increases, and the settling amount at foundation pile top Constantly persistently increasing, sinking because of its top on the premise of the satisfied requirement of total bearing capacity of foundation pile Fall amount is excessive and makes it lose efficacy, and now, foundation pile top bearing capacity reaches the limit values or enters softening In the carrying stage, foundation pile bottom bearing capacity plays the most completely.Exist for large diameter and very long pile Above-mentioned load metamorphism characteristic, it is necessary to propose the new version of large diameter and very long pile and design thereof The methods such as calculating and construction, make Under Pile top settling amount before meeting superstructure deformation requirements Put, it is possible to give full play to the bearer properties of foundation pile upper and lower part, and then reduce construction costs, Save social resources.Meanwhile, existing great diameter and long friction pile use first pore-forming, after put steel The operating procedure that muscle cage pours again, the efficiency causing friction pile work progress is low, is unfavorable for realizing Standardized production, too increases labor intensity and the cost of manufacture of site operation personnel, no simultaneously It is beneficial to save construction period.
Therefore, for above not enough, the invention provides a kind of partial precast friction pile and Construction method.
Summary of the invention
(1) to solve the technical problem that
The technical problem to be solved in the present invention is avoided by the design of existing analysis method and obtains Great diameter and long foundation pile causes what building cost wasted to show because not playing its load-carrying properties completely As, and the unitary design method of existing foundation pile causes foundation pile self upper and lower part pile side friction Between and pile side friction and end resistance between play asynchronous, thus cause foundation pile top to reach The situation that bottom load plays the most completely to load ultimate value, the most existing friction pile limits to In specific execution conditions, the efficiency causing friction pile work progress is low, is unfavorable for realizing standard Metaplasia is produced, thus causes long construction period and the higher problem of construction cost.
(2) technical scheme
In order to solve above-mentioned technical problem, one aspect of the present invention provides rubbing of a kind of partial precast Wiping stake, the friction pile of this partial precast includes upper piles and lower piles and is located between upper piles and lower piles Cutting off template, upper pile includes section at the bottom of standard paragraphs and stake, and lower pile includes from top to bottom depending on The force transferring structure section of secondary connection, variable section structure section and carrying structural sections;Described standard paragraphs and stake End section is prefabricated prestressed reinforced concrete pipe pile, the bottom of section at the bottom of described stake be ring-type tiltedly Cutting body, one end of section at the bottom of described stake is connected with described standard paragraphs by joint, and the other end passes through ring Shape bevel body coordinates with described variable section structure section;
Upper pile is sheathed on the outside of described force transferring structure section, and upper pile and described power transmission Structural sections and variable section structure is intersegmental is provided with partition template;The top of upper pile by joint bar with Cushion cap, beam or post pour anchor connection;The top of lower pile is by upwardly extending lower stake master Muscle pours with described cushion cap, beam or post and is connected.
Wherein, multiple described standard paragraphs are sequentially connected with by joint.
Wherein, it is provided with in upper pile and sequentially passes through section at the bottom of described standard paragraphs, joint and stake Orientation grouting pipe.
Wherein, in section at the bottom of described standard paragraphs and stake, be provided with lateral grouting pipe, described laterally The entrance point of grouting pipe connects with described orientation grouting pipe, and the port of export points to described standard paragraphs With the outside of section at the bottom of stake and be provided with unidirectional shutoff valve at the port of export.
Wherein, described standard paragraphs is connected with described orientation grouting pipe with being additionally provided with in section at the bottom of stake Logical hoop grouting pipe.
Wherein, Concrete Filled section, the one of described Concrete Filled section it are provided with in upper pile End is connected with the top of described force transferring structure section, and the other end passes through joint bar and the main muscle of lower stake with described Cushion cap, beam or post anchor connection.
Wherein, described partition template has the bending part of outwards bending, and described bending part is in institute State between ring-type bevel body and the variable section structure section bottom section at the bottom of stake king-pile.
Wherein, ring-type bevel body bottom section at the bottom of upper pile king-pile, the folding of described partition template The gradient of turn of bilge and described variable section structure section is consistent.
Wherein, described partition template is set around outside described force transferring structure section and variable section structure section Side.
Wherein, top standard paragraphs and Concrete Filled section are provided with joint bar.
Wherein, the upwardly extending lower stake of the upwardly extending joint bar in upper pile top and lower stake top Main muscle is toroidal inwardly or outwardly;The diameter of described carrying structural sections and upper pile External diameter identical.
On the other hand, present invention also offers the construction method of the friction pile of a kind of partial precast, Including following operating procedure:
S1, according to force transferring structure section, variable section structure section and carrying structural sections version system Make lower pile cages;
S2, by polylith strip board successively colligation in the force transferring structure section of lower stake, variable section structure section Steel reinforcement cage on to surround partition template;
S3, make section at the bottom of prefabricated prestressed reinforced concrete pipe pile standard paragraphs and stake, wherein, Pre-buried orientation grouting pipe, band in section at the bottom of prefabricated standard paragraphs and stake respectively is required according to slip casting There are lateral grouting pipe and the hoop grouting pipe of unidirectional shutoff valve;
S4, by method for constructing foundation pile foundation soil carried out friction pile pore-forming and clear hole operation obtains To stake holes;
S5, first by with cut off template the fixedly secured stake in step s 4 of lower pile cages Secondly Kong Zhong, lifts by crane section and standard paragraphs at the bottom of the stake in upper stake, pile sinking and pile extension are executed successively Work industry, between each standard paragraphs and the top of section at the bottom of bottom and the stake of bottom standard paragraphs is all passed through Joint connects, and the orientation grouting pipe in section at the bottom of the orientation grouting pipe in standard paragraphs and stake is the most logical Cross interface arrangement connect, make pile protection be located on lower pile cages, section at the bottom of standard paragraphs and stake with every Disconnected template is connected;
S6, by foundation pile concreting method to the carrying structural sections of lower stake, variable section structure Section and force transferring structure section carry out pouring operation, until the top side location poured to lower stake.
Wherein, in step s 6, described foundation pile concreting method is that dry hole pours or under water Pour;The speed the poured sectional dimension according to upper and lower stake and the line size of delivering concrete It is determined.
Wherein, the construction method of the friction pile of partial precast also includes step S7, by upper stake top The top main muscle of upwardly extending lower stake of upwardly extending joint bar and lower stake is bent into toroidal, To pour anchor connection with cushion cap, beam or post.
Wherein, the construction method of the friction pile of partial precast also includes step S8, at upper stake pile By orientation grouting pipe, lateral grouting pipe and hoop grouting pipe, upper stake stake side is carried out afterwards High-pressure slip-casting operation so that serosity is combined with pile body and the soil body about.
Wherein, use pile quality control method that described friction pile is carried out quality control on construction, The pile quality control method of upper pile is sound wave transmission method;The pile quality control of lower pile Method processed is core drilling method, low strain dynamic method, Large strain method and sound wave transmission method.
(3) beneficial effect
The technique scheme of the present invention has the advantage that and the invention provides a kind of part in advance The friction pile of system, the friction pile of this partial precast includes upper piles and lower piles and is located at upper piles and lower piles Between partition template, upper stake includes that section at the bottom of standard paragraphs and stake, lower stake include the most successively Force transferring structure section, variable section structure section and carrying structural sections, the Duan Jun at the bottom of standard paragraphs and stake connected For prefabricated prestressed reinforced concrete pipe pile, it is achieved that the standardized production of friction pile, reduce The labor intensity of workmen and cost of manufacture, also save construction period, and upper pile protection is located at The outside of force transferring structure section, and upper stake and force transferring structure section and variable section structure is intersegmental is provided with partition Template, the split-type design of this upper and lower stake make foundation pile top settling amount meet engineering want When asking, the pile-soil relative displacement of friction pile upper and lower part can be given full play to, play full stake long stake side Frictional resistance and the load-carrying properties of end resistance, thus improve the total bearing capacity of friction pile, and Under identical upper load effect, by the force transferring structure section of upper piles and lower piles, variable section structure section And carrying structural sections so that required stake is long or stake footpath is less and can efficiently control foundation pile top Sedimentation and deformation, and then reduce the construction costs of friction pile, save social resources.
Accompanying drawing explanation
Fig. 1 is the structural representation of the prefabricated friction pile of the embodiment of the present invention;
Fig. 2 is the profile of I-I in Fig. 1;
Fig. 3 is the profile of II-II in Fig. 1;
Fig. 4 is the profile of III-III in Fig. 1;
Fig. 5 is the profile of IV-IV in Fig. 1;
Fig. 6 is the pile side friction distribution curve of test pile Z1 and test pile Z2;
Fig. 7 is actual measurement and the calculated curve of the stake top immediate settlement of test pile Z1 and test pile Z2.
In figure: 1-1: standard paragraphs;1-2: section at the bottom of stake;2: cut off template;3: force transferring structure section; 4: variable section structure section;5: the main muscle of lower stake;6: orientation grouting pipe;7: carrying structural sections; 8: joint;9: unidirectional shutoff valve;10: Concrete Filled section;11: joint bar;12: lateral Grouting pipe;15: hoop grouting pipe;18: the shaft resistance of traditional structure forms test pile Z1 Power distribution curve;19: the pile side friction distribution curve of new structure form test pile Z2;20: examination The stake top immediate settlement calculated curve of stake Z2;The stake top immediate settlement of 21: test pile Z2 is real Survey curve;The stake top immediate settlement measured curve of 22: test pile Z1;23: the stake of test pile Z1 Top immediate settlement calculated curve.
Detailed description of the invention
For making the purpose of the embodiment of the present invention, technical scheme and advantage clearer, below will knot Close the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, It is fully described by, it is clear that described embodiment is a part of embodiment of the present invention, and not It it is whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not having There is on the premise of making creative work the every other embodiment obtained, broadly fall into the present invention The scope of protection.
In the present embodiment, as a example by certain engineering pile foundation, the construction method of friction pile is illustrated. The major parameter of certain engineering pile is: former basic engineering uses cast-in-situ bored pile, design to require single pile Vertical bearing capacity is 4000kN, test pile Z1 stake footpath 1.5m, the long 50m of stake;Foundation soil body is divided into Two-layer, upper strata clay is silt clay, and thick 15m, cohesive strength is 16.8kPa, and angle of friction is 8.6 °, modulus of compressibility is 6.1MPa, and side friction eigenvalue is 20kPa;Lower floor's clay is powder Matter clay, thick 75m, cohesive strength is 44.8kPa, and angle of friction is 12.6 °, and modulus of compressibility is 8.8MPa, side friction eigenvalue is 48kPa, and end resistance eigenvalue is 1000kPa;Pile side soil Body Poisson's ratio is 0.35, and concrete strength of pile grade is C40, pile concrete initial elasticity Modulus E0For 30GPa.
The large diameter friction piles structure that upper and lower part according to the present invention carries jointly, and pass through phase The method for designing answered can obtain the pile body geometric parameter of test pile Z2: upper stake Plays section 1-1 amounts to 3 sections and every section of a length of 5m of stake;The a length of 3m of stake of section 1-2 at the bottom of upper stake king-pile;Total stake of upper stake is long lOn=3 × 5m+3m=18m;Lower pile carries length l of structural sections 7UnderFor 25.5m;Lower stake passes The a length of 17.5m of power structural sections 3;Upper stake outer diameter DOutwardFor 1.5m, internal diameter DInFor 1.0m, The diameter D of lower stake force transferring structure section 3Power transmissionFor 0.98m.
Concrete method for designing is as follows: under the conditions of being primarily characterized in that according to different engineering geological Pile side friction and the character of end resistance, determine pile side friction transmission between upper and lower stake stake soil Function, sets up equation group according to the principle that upper and lower stake carries jointly with compatibility of deformation, by excellent The parameters of engineering designs such as fractional analysis determines that a footpath, stake be long, wall thickness and arrangement of reinforcement.
(1) the common bearing relation of upper and lower stake is determined
Upper and lower stake pours with cushion cap, beam or post and is connected, and it is perpendicular that shared superstructure produces To load F, according to the equilibrium relation of power:
F=FOn+FUnder
In formula, FOnThe vertical load shared for upper stake;FUnderThe vertical load shared for lower stake.
FOnFunction τ is transmitted with upper stake pile side friction1Z () is relevant, it should be with lOnInterior shaft resistance Power sum is equal, it may be assumed that
In formula, lOnLong for upper stake stake, count section 1-2 bottom annular bevel body at the bottom of upper stake king-pile Length;uOnFor the external diameter girth of upper stake, uOn=π DOutward, DOutwardExternal diameter for upper stake;On having counted The pile side friction that section 1-2 bottom annular bevel body at the bottom of stake king-pile bears.
FUnderWith the pile side friction transmission function τ that lower pile carries structural sections 72Z () and pile-end soil body hold Load deformation characteristic is relevant, and it should be with lUnderIn the range of sum under pile side friction and end resistance P It is equal, it may be assumed that
In formula, lUnderThe length of structural sections 7 is carried for lower pile;uUnderStructural sections 7 is carried for lower pile External diameter girth, carries external diameter and the D of structural sections 7 in lower stakeOutwardIdentical;L is whole friction pile Length and ignore cut off template bending part thickness;PUnderFor lower stake end resistance, meet:
PUnder=α π (DOutward/2)2fa(sLower end)
In formula, α is lower modification factor of pile tip resistance, it is considered to friction pile clear end degree, end resistance The combined factors such as performance degree determine;fa(sLower end) be lower stake end resistance transmit function, its with under Stake peg end settlement sLower endRelevant, comprehensively can determine according to exploration report;DOutwardExternal diameter for upper stake.
Pile side friction transmission function τ1(z)、τ2Z () transmits function f with end resistancea(sLower end) should basis Stake side comprehensively determines with the physico-mechanical properties of pile-end soil body, it is thus achieved that each self-corresponding function Distribution form and the value of key parameter, in order to carry out computational analysis.
(2) the compatibility of deformation relation of upper and lower stake is determined
If known friction pile Pile side soil body and the mechanics parameters of pile-end soil body: pile side friction Transmission function τ (z) transmits function f with end resistanceaS the physical quantity such as (), column rigidity EI, then rub The pile head settlement deflection S wiping stake can be illustrated as having stake top vertical load F, the long l of stake, stake footpath The isoparametric function of D, it may be assumed that
S=f (F, l, D, EI, τ (z), fa(s) ...)
The great diameter and long friction pile that upper and lower stake is carried jointly, under the effect of load F, The pile head settlement deflection S of upper stakeOnFor the long l of stakeOnIn the range of the aggregate-value of pile-soil relative displacement with upper Stake elastic compression deformation sum, it may be assumed that
SOn=f (FOn, lOn, DIn, DOutward, EI, τ1(z) ...)
Upper stake pile-soil relative displacement refers to existing with the specific formula for calculation of pile body Elastic penetration Large diameter friction piles capability and deformation computational methods.
In load FUnderUnder effect, lower stake pile head settlement deflection SUnderStructure l is carried for lower pileUnderModel Enclose the aggregate-value of interior pile-soil relative displacement and lower stake lUnderIn the range of pile body elastic compression deformation and stake End sedimentation and deformation sum, it may be assumed that
SUnder=f (FUnder, lUnder, lOn, lBecome, DOutward, DPower transmission, EI, τ2(z), fa(sLower end) ...)
In formula, lBecomeFor the length of variable section structure section 4 in lower stake;DPower transmissionTie for power transmission in lower stake The diameter of structure section 3.
Lower pile carries structure pile-soil relative displacement, lower stake Elastic penetration and peg end settlement Specific formula for calculation refers to existing major diameter friction pile bearing capacity and deformation calculating side equally Method.
The great diameter and long friction pile jointly carried for upper and lower stake, makees in top vertical load Under with, the compatibility of deformation relation of upper and lower stake is:
SOn=SUnder
The relation set up with compatibility of deformation is jointly carried according to the upper and lower stake of great diameter and long friction pile Formula carries out friction pile design and calculates, and is obtaining soil body physical and mechanical parameter basis by engineering investigation On still need and determine upper stake outer diameter DOutward, internal diameter DIn, the long l of total stake of upper stakeOn, lower stake variable cross-section knot Length l of structure sectionBecome, lower pile carry structural sections 7 length lUnder, lower stake force transferring structure section 3 straight Footpath DPower transmissionDeng friction pile geometric parameter, before ensureing that friction pile load metamorphism characteristic meets requirement Putting, construction cost should be made minimum, the Optimization Solution function of its correspondence is:
minCost(DOutward,DIn,DPower transmission,lOn,lUnder,…)
SOn=SUnder
L=lOn+lUnder
DOutward-DIn=40cm~80cm
DIn-DPower transmission=2cm
It is optimized according to above-mentioned formula and solves the geometric parameter that can obtain friction pile, including lOn、lUnder、 DIn、DOutward、DPower transmissionAnd load F of upper and lower pile loadOnWith FUnder;Then, mix based on reinforcing bar Solidifying soil design basic theories can determine that the arrangement of reinforcement quantity of upper and lower stake.
According to above-mentioned analysis, according to the new structure form test pile Z2 in the present invention, its tool Body design parameter is:
Upper stake is prefabricated prestressed reinforced concrete pipe pile, a length of 18m of stake, and its external diameter is 1.5m, internal diameter is 1.0m, wall thickness 25cm;At the bottom of upper stake king-pile, the bottom of section 1-2 is high 50cm Ring-type bevel body, and the partition template contacts that thickness is 1cm, and then touch with lower staking, its top Portion enters cushion cap and pours 10cm, and by joint bar method by the long 100cm's of outward expansion 15 ° Toroidal joint bar 11 anchors into cushion cap.
Lower stake is non-uniform pile, and it is by force transferring structure section 3, variable section structure section 4 and carrying structure Section 7 composition, wherein, a diameter of 0.98m of force transferring structure section 3, long 17.5m, it is placed in stake Inside, is cut off by the template that thickness is 1cm with upper stake, and its top is by outward expansion 15 ° The joint bar 11 of the main muscle of stake 5 and Concrete Filled section and cushion cap phase under the toroidal of long 100cm Even, it is connected with carrying structural sections 7 by variable section structure section 4 high for 50cm bottom it;Lower stake Variable section structure section 4 be outwards by 45 ° of high 50cm extended bottom power transmission structural sections 3 Armored concrete round platform;Lower pile carries a diameter of 1.5m, a length of 25.5m of structural sections 7.
As shown in Fig. 1-Fig. 7, embodiments provide the friction pile of a kind of partial precast, The friction pile of this partial precast includes upper piles and lower piles and the partition mould being located between upper piles and lower piles Plate 2, upper stake includes that section 1-2 at the bottom of standard paragraphs 1-1 and stake, lower stake are non-uniform pile, and lower stake includes Force transferring structure section 3, variable section structure section 4 and the carrying structural sections 7 being from top to bottom sequentially connected with, Wherein, force transferring structure section 3 is positioned at the top of variable section structure section 4 (such as Section A-A in Fig. 1 Above section), and top 1m~2m lower than the top of upper stake of force transferring structure section 3;Standard Section 1-2 at the bottom of section 1-1 and stake is prefabricated prestressed reinforced concrete pipe pile, section 1-2 at the bottom of stake Bottom is ring-type bevel body, and the upper end of section 1-2 at the bottom of stake is connected with standard paragraphs 1-1 by joint 8, The other end is coordinated with variable section structure section 4 by ring-type bevel body;
Upper pile protection is located at the outside of force transferring structure section 3, the structure shape that this upper and lower stake is split type Formula can give full play to pile side friction and the end resistance of foundation pile upper and lower part stake, and upper stake and biography Partition template 2 it is provided with between power structural sections 3 and variable section structure section 4;Joint bar is passed through at the top of upper stake 11 with cushion cap anchor connection;The top of lower stake is by the upwardly extending main muscle of lower stake 5 and concrete The joint bar 11 of filled section pours with cushion cap and is connected, and the force transferring structure section 3 of upper pile and lower pile is led to respectively Cross main muscle to be connected with cushion cap, it is ensured that foundation pile both deformation in load bearing process are identical.
By the version that upper and lower stake is split type, at friction pile top, settling amount meets top On the premise of structural requirement, the pile-soil relative displacement of friction pile upper and lower part can be given full play to, send out Wave the long pile side friction of full stake and end resistance load-carrying properties, thus improve the entirety of friction pile Bearing capacity, and under identical upper load effect, required stake is long or stake footpath is less and can be effectively Control the sedimentation and deformation at foundation pile top, and then the construction costs of reduction friction pile, save society Resource.
Specifically, standard paragraphs 1-1 includes multiple pile cutoff being sequentially connected with, the quantity of standard paragraphs 1-1 Condition according to the friction stake holes in practical situation is determined.In the present embodiment, standard paragraphs The quantity of 1-1 is 3 sections.
Further, it is provided with in upper stake and sequentially passes through section 1-2 at the bottom of standard paragraphs 1-1, joint 8 and stake Orientation grouting pipe 6, it is preferable that in the present embodiment, orientation grouting pipe 6 quantity be At the bottom of 3, and standard paragraphs 1-1 and stake, the orientation grouting pipe 6 between section 1-2 can by joint 8 even Leading to and ensure to orient the sealing of grouting pipe 6, joint 8 selects end plate weldering according to practical situation Connect mode.
Further, in section 1-2 at the bottom of standard paragraphs 1-1 and stake, it is provided with lateral grouting pipe 12, The entrance point of lateral grouting pipe 12 connects with orientation grouting pipe 6, in the present embodiment, and mark Orientation grouting pipe 6 in section 1-2 at the bottom of quasi-section 1-1 and stake is both provided with 8 bifurcation ostium and makes Lateral grouting pipe 12 is connected with orientation grouting pipe 6, the port of export point to standard paragraphs 1-1 with The stake outside of end section 1-2 and be provided with unidirectional shutoff valve 9 at the port of export, arranges unidirectional shutoff valve 9 to reach to avoid the purpose of slurry reflux.
For ensure cement paste around pile uniformity, be additionally provided with in section 1-2 at the bottom of standard paragraphs 1-1 and stake with The hoop grouting pipe 15 that orientation grouting pipe 6 is connected, hoop grouting pipe 15 is arranged on mark The middle position of section 1-2 at the bottom of quasi-section 1-1 and stake.
When friction pile carries out slip casting operation, each orientation grouting pipe 6 at stake top is simultaneously Inject serosity, by each orientation grouting pipe 6 serosity introduced at stake week different depth each Individual lateral grouting pipe 12, and make each by the hoop grouting pipe 15 at stake week different depth The grouting pressure of lateral grouting pipe 12 is identical, eventually through each side at stake week different depth To grouting pipe 12 serosity filled in the space between foundation pile and pile peripheral earth with improve foundation pile with The shear strength of pile peripheral earth, and then strengthen the pile side friction of upper stake.
Further, Concrete Filled section 10, the one of Concrete Filled section 10 it are provided with in upper stake End is connected with the top of force transferring structure section 3, and the other end is connected to cushion cap by the main muscle of lower stake 5. In the present embodiment, upper stake pile body embeds 10cm in cushion cap, and Concrete Filled section 10 is in upper stake At inner distance stake top 1.5m.
Cutting off template 2 and have the bending part of outwards bending, bending part is in section 1-2 at the bottom of upper stake king-pile Between ring-type bevel body and the variable section structure section 4 of bottom.In the present embodiment, template 2 is cut off Thickness be 1cm.
Ring-type bevel body bottom section 1-2 at the bottom of upper stake king-pile, the bending part cutting off template 2 and change cut The gradient of face structural sections 4 is consistent, and gradient is 45 °, i.e. goes up the bottom of section 1-2 at the bottom of stake king-pile It is connected with the bending part cutting off template 2.
Cut off template 2 and be set around force transferring structure section 3 and the outside of variable section structure section 4.Preferably Ground, in the present embodiment, lower stake needs to cut off template 2 when pouring, and cuts off the height of template 2 Equal with the height of the force transferring structure section 3 in lower stake, further, cut off the outer layer of template 2 Pasting lubricious material, to reduce the frictional resistance between itself and upper stake inwall.
Top standard paragraphs 1-1 and Concrete Filled section 10 are provided with joint bar 11, at the present embodiment In, upper stake anchors into cushion cap by joint bar 11, and lower stake is by irrigating in Concrete Filled section 10 Wadding weft variation, and use joint bar 11 to be anchored into cushion cap, meanwhile, the lower main muscle of stake 5 is through mixed Cushion cap is stretched in solidifying soil filled section 10, and wherein, abducent loudspeaker all made by joint bar and longitudinal reinforcement The degree of lip-rounding, it is about 15 ° with vertical curve angle.
Upper stake top upwardly extends (i.e.Part on baseline) joint bar 11 and lower stake top Portion upwardly extends (i.e.Part on baseline) the main muscle of lower stake 5 be outside loudspeaker The degree of lip-rounding, arranges toroidal and is conducive to cushion cap to transmit load to foundation pile;The end of carrying structural sections 7 Portion is the bearing course at pile end of friction pile, and the diameter of carrying structural sections 7 is identical with the external diameter of upper stake, So be conducive to the excavation construction of foundation pile, and be conducive to lower stake by force transferring structure section 3 transfer part Divide upper load, make the carrying structural sections 7 of lower stake that pile-soil relative displacement to occur, and then make its side Frictional resistance reaches capacity state, so reaches to give full play to the purpose of end resistance.
On the other hand, present invention also offers the construction method of the friction pile of a kind of partial precast, Including following operating procedure:
S1, according to force transferring structure section 3, variable section structure section 4 and carrying structural sections 7 structure shape Formula makes lower pile cages;Force transferring structure section 3 in lower pile cages, variable section structure section 4 And the main muscle quantity of carrying structural sections 7 is identical, main muscle should be by 45° angle at variable section structure position Bending laterally, interval 2m lays reinforcement and stirrup, between the reinforcement at variable section structure position Away from encrypting to 0.5m, the lower stake desirable 6cm of main tendon protective layer thickness, steel reinforcement cage uses existing side Method carries out colligation.
S2, by polylith strip board successively colligation in the force transferring structure section 3 of lower stake, variable section structure section To surround partition template 2 on the steel reinforcement cage of 4;Preferably, in the present embodiment, template 2 is cut off Use adhesive sheet thick for 1cm or bamboo slab rubber, after being cut to bar, use the reinforcing bar of Φ 6 to fix On lower pile cages, and at a certain distance cushion block is set between partition template and the lower main muscle of stake 5, The outside cutting off template 2 is smeared lubriation material or pastes lubricious material, cuts off template 2 to reduce And the frictional force between upper stake inwall.
S3, make section 1-2 at the bottom of prefabricated prestressed reinforced concrete pipe pile standard paragraphs 1-1 and stake. Wherein, pre-buried orientation in section 1-2 at the bottom of prefabricated standard paragraphs 1-1 and stake respectively is required according to slip casting Grouting pipe 6, with the lateral grouting pipe 12 of unidirectional shutoff valve 9 and hoop grouting pipe 15, The bottom of standard paragraphs 1-1 is connected, in standard paragraphs 1-1 by joint 8 with the top of section 1-2 at the bottom of stake Orientation grouting pipe 6 and stake at the bottom of orientation grouting pipe 6 in section 1-2 by interface arrangement even Connect.
Specifically, in the present embodiment, should require in section at the bottom of standard paragraphs 1-1 and stake according to slip casting Pre-buried 3 vertical orientation grouting pipe 6 in 1-2, in section 1-2 at the bottom of criterion distance section 1-1 or stake Each at upper lower interface 1/4 length of pipe section equidistant bury 3 lateral notes with unidirectional shutoff valve 9 underground Slurry conduit 12, and it is fixed to bury connection at 1/2 length of pipe section of section 1-2 at the bottom of standard paragraphs 1-1 or stake underground To the hoop grouting pipe 15 of grouting pipe 6, orient grouting pipe 6, lateral grouting pipe 12 And the diameter of hoop grouting pipe 15 is identical, a diameter of 20mm.
S4, by method for constructing foundation pile foundation soil carried out friction pile pore-forming and clear hole operation obtains To stake holes;In the present embodiment, rotary drill rig is used to carry out foundation pile pore-forming, the operation of clear hole.
S5, first by fixedly secured in step s 4 with the lower pile cages cutting off template 2 In stake holes, section 1-2 at the bottom of the stake in upper stake and standard paragraphs 1-1 are lifted by crane by successively, pile sinking And pile connection construction operation, finally upper pile protection is located on lower pile cages so that standard paragraphs 1-1 It is connected with cutting off template 2 with section 1-2 at the bottom of stake;
In the present embodiment, use existing steel reinforcement cage setting method first to place top colligation to cut off The lower pile cages of template 2, and be fixed, the concrete construction method of steel reinforcement cage and control mark Accurate and conventional foundation pile is identical;By existing construction of prefabricated piles technology to section 1-2 and mark at the bottom of the stake in upper stake Quasi-section 1-1 carries out lifting by crane successively, pile sinking, pile connection construction.Wherein, should be by upper when pile connection construction The interface of lower two sections of orientation grouting pipe 6 aligns and ensures its seal.
S6, by foundation pile concreting method to the carrying structural sections 7 of lower stake, variable section structure Section 4 and force transferring structure section 3 carry out pouring operation, until the top side location poured to lower stake, In the present embodiment, use traditional foundation pile concreting method pour lower stake concrete until Foundation pile end face.
Specifically, in step s 6, foundation pile concreting method is that dry hole pours or waters under water Build;The speed poured is entered with the line size of delivering concrete according to the sectional dimension of upper and lower stake Row determines, for making slip casting uniform, uses 1 diameter 10cm conduit to water in the present embodiment Build.
Further, the construction method of the friction pile of this partial precast also includes step S7, by upper The upwardly extending joint bar in top 11 of stake and the main muscle of the upwardly extending lower stake in top 5 of lower stake bend Become toroidal, in the present embodiment, also include that the upwardly extending joint bar in lower stake top 11 bends Become toroidal, be connected to pour with cushion cap, wherein, toroidal be outwards bend so as with Cushion cap pours connection.
Further, the construction method of the friction pile of this partial precast also includes step S8, upper By orientation grouting pipe 6 and lateral grouting pipe 12, upper stake stake side is carried out high pressure after stake pile Slip casting operation, makes serosity be combined with pile body and the soil body about.Wherein, after upper stake pile 2~ Carry out high-pressure slip-casting in 30 days, effects such as making serosity pass through to penetrate into, cleave, fill, be compacted with Pile body and surrounding soil thereof combine.
Use pile quality control method that friction pile carries out quality control on construction, the pile of upper stake Method of quality control is sound wave transmission method;The pile quality control method of lower stake is core drilling method, low Strain Method, Large strain method and sound wave transmission method.Wherein it is desired to it is to be noted that: to friction pile Respectively upper piles and lower piles should be tested when pile quality detects, the quality testing of upper stake Completing in precast plant, the quality testing of lower stake is carried out the most at the construction field (site), above-mentioned detection method Rule of operation refer to existing related specifications.
Foundation pile construction carries out static test to Z1 test pile, Z2 test pile, respectively according to quiet after completing Carry test to understand with Calculation results, the pile side friction distribution of traditional structure forms test pile Z1 The pile side friction distribution curve 19 of curve 18 and new structure form test pile Z2 as shown in Figure 6, In Fig. 6, X-axis is pile side friction τ (unit is kPa), and Y-axis is that length l of friction pile is (single Position is m).lOnThe stake referring to stake is long, when the top pile side friction of Z1 test pile reaches capacity Value τsuTime, the pile side friction of bottom soil layer plays delayed because pile-soil relative displacement is less, stake Side friction successively decreases with the degree of depth, the pile side friction τ of foundation pile endrLess;And Z2 test pile due to Pile body upper and lower part carries jointly, can give full play to the pile side friction of pile body bottom, make pile body Upper and lower part collateral resistance is close to the pile side friction that simultaneously reaches capacity, and improves foundation pile end simultaneously Pile side friction τr', it is effectively improved foundation pile integrated carrying ability, it is to avoid the wave of resource Take.
Z1 test pile, Z2 test pile stake top immediate settlement actual measurement and calculated curve as it is shown in fig. 7, X-axis in Fig. 7 is stake top load (unit is kN), and Y-axis is that (unit is pile head settlement amount Mm), Fig. 7 is respectively the stake top immediate settlement calculated curve 20 of test pile Z2, test pile Z2 Stake top immediate settlement measured curve 21, the stake top immediate settlement measured curve of test pile Z1 22, the stake top immediate settlement calculated curve 23 of test pile Z1, by the analysis to curve, it is known that The pile bearing capacity of the great diameter and long friction pile that upper and lower part carries jointly is apparently higher than common stake.
In the above-described embodiments, joint bar 11 and the lower main muscle of stake 5 of being located at stake top can also roots Carry out pouring being connected with beam or post according to practical situation.
In sum, the invention provides the friction pile of a kind of partial precast, this partial precast Friction pile includes upper piles and lower piles and the partition template being located between upper piles and lower piles, and upper stake includes Section at the bottom of standard paragraphs and stake, lower stake includes force transferring structure section, the variable cross-section being from top to bottom sequentially connected with Structural sections and carrying structural sections, section at the bottom of standard paragraphs and stake is prefabricated prestressed reinforced concrete Pile tube, it is achieved that the standardized production of friction pile, reduces labor intensity and the system of workmen Making cost, also save construction period, upper pile protection is located at the outside of force transferring structure section, and upper stake Be provided with partition template intersegmental with force transferring structure section and variable section structure, the split of this upper and lower stake Formula design make foundation pile top settling amount when meeting engine request, can give full play on friction pile, The pile-soil relative displacement of bottom, plays the load-carrying properties of the long pile side friction of full stake and end resistance, Thus improve the total bearing capacity of friction pile, and under identical upper load effect, by upper stake With the force transferring structure section of lower stake, variable section structure section and carrying structural sections so that required stake long or Stake footpath is less and can efficiently control the sedimentation and deformation at its top, and then reduces the work of friction pile Journey cost, has saved social resources.
Last it is noted that above example is only in order to illustrate technical scheme, and Non-to its restriction;Although the present invention being described in detail with reference to previous embodiment, ability The those of ordinary skill in territory is it is understood that it still can be to the skill described in foregoing embodiments Art scheme is modified, or wherein portion of techniques feature is carried out equivalent;And these are repaiied Change or replace, not making the essence of appropriate technical solution depart from various embodiments of the present invention technical side The spirit and scope of case.

Claims (16)

1. the friction pile of a partial precast, it is characterised in that: include upper piles and lower piles and be located at Partition template (2) between upper piles and lower piles, upper pile includes at the bottom of standard paragraphs (1-1) and stake Section (1-2), lower pile includes force transferring structure section (3), the variable cross-section being from top to bottom sequentially connected with Structural sections (4) and carrying structural sections (7);Section (1-2) at the bottom of described standard paragraphs (1-1) and stake Being prefabricated prestressed reinforced concrete pipe pile, at the bottom of described stake, the bottom of section (1-2) is ring-type Bevel body, one end of section (1-2) at the bottom of described stake is by joint (8) and described standard paragraphs (1-1) Connecting, the other end is coordinated with described variable section structure section (4) by ring-type bevel body;
Upper pile is sheathed on the outside of described force transferring structure section (3), and upper pile is with described Partition template (2) it is provided with between force transferring structure section (3) and variable section structure section (4);On described The top of stake pours anchor connection by joint bar (11) with cushion cap, beam or post;Lower pile Top is poured with described cushion cap, beam or post by the main muscle of upwardly extending lower stake (5) and is connected.
The friction pile of partial precast the most according to claim 1, it is characterised in that: multiple Described standard paragraphs (1-1) is sequentially connected with by joint.
The friction pile of partial precast the most according to claim 1, it is characterised in that: described It is provided with in upper stake and sequentially passes through section (1-2) at the bottom of described standard paragraphs (1-1), joint (8) and stake Orientation grouting pipe (6).
The friction pile of partial precast the most according to claim 3, it is characterised in that: described Lateral grouting pipe (12) it is provided with in section (1-2) at the bottom of standard paragraphs (1-1) and stake, described The entrance point of lateral grouting pipe (12) connects with described orientation grouting pipe (6), the port of export Point to the outside of section (1-2) at the bottom of described standard paragraphs (1-1) and stake and at the port of export, be provided with list To shutoff valve (9).
The friction pile of partial precast the most according to claim 3, it is characterised in that: described It is additionally provided with in section (1-2) at the bottom of standard paragraphs (1-1) and stake and described orientation grouting pipe (6) The hoop grouting pipe (15) being connected.
The friction pile of partial precast the most according to claim 1, it is characterised in that: described Be provided with Concrete Filled section (10) in upper stake, one end of described Concrete Filled section (10) with The top of described force transferring structure section (3) connects, and the other end passes through joint bar (11) and the main muscle of lower stake (5) with described cushion cap, beam or post anchor connection.
The friction pile of partial precast the most according to claim 1, it is characterised in that: described Cutting off template (2) and have the bending part of outwards bending, described bending part is in upper pile king-pile Between ring-type bevel body and the variable section structure section (4) of end section (1-2) bottom.
The friction pile of partial precast the most according to claim 7, it is characterised in that: described The ring-type bevel body of section (1-2) bottom, the bending part of described partition template (2) at the bottom of upper stake king-pile And the gradient of described variable section structure section (4) is consistent.
The friction pile of partial precast the most according to claim 8, it is characterised in that: described Cut off template (2) to be set around outside described force transferring structure section (3) and variable section structure section (4) Side.
The friction pile of partial precast the most according to claim 6, it is characterised in that: top Ministerial standard section (1-1) and Concrete Filled section (10) are provided with joint bar (11).
The friction pile of 11. partial precasts according to claim 1, it is characterised in that: institute State the upwardly extending joint bar in stake top (11) and the lower stake top main muscle of upwardly extending lower stake (5) It is toroidal inwardly or outwardly;The diameter of described carrying structural sections (7) and upper pile External diameter identical.
The construction of the friction pile of the partial precast according to any one of 12. 1 kinds of claim 1-11 Method, it is characterised in that: include following operating procedure:
S1, according to force transferring structure section (3), variable section structure section (4) and carrying structural sections (7) Version make lower pile cages;
S2, by polylith strip board successively colligation lower stake force transferring structure section (3), variable cross-section knot To surround partition template (2) on the steel reinforcement cage of structure section (4);
S3, make section at the bottom of prefabricated prestressed reinforced concrete pipe pile standard paragraphs (1-1) and stake (1-2), wherein, require respectively in section (1-2) at the bottom of prefabricated standard paragraphs (1-1) and stake according to slip casting In pre-buried orientation grouting pipe (6), lateral grouting pipe (12) with unidirectional shutoff valve (9) And hoop grouting pipe (15), between each standard paragraphs (1-1) and bottom standard paragraphs (1-1) Bottom be all connected by joint (8) with the top of section at the bottom of stake (1-2), standard paragraphs (1-1) In orientation grouting pipe (6) and stake at the bottom of orientation grouting pipe (6) in section (1-2) the most logical Cross interface arrangement to connect;
S4, by method for constructing foundation pile foundation soil carried out friction pile pore-forming and clear hole operation obtains To stake holes;
S5, first will with cut off template (2) lower pile cages be fixedly placed in step S4 In stake holes in, secondly section (1-2) at the bottom of the stake in upper stake and standard paragraphs (1-1) are carried out successively Lifting, pile sinking and pile connection construction operation, be finally located at upper pile protection on lower pile cages so that Section (1-2) at the bottom of standard paragraphs (1-1) and stake is connected with cutting off template (2);
S6, by foundation pile concreting method to the carrying structural sections (7) of lower stake, variable cross-section Structural sections (4) and force transferring structure section (3) carry out pouring operation, until the top poured to lower stake Position, face.
The construction method of the friction pile of 13. partial precasts according to claim 12, it is special Levying and be: in step s 6, described foundation pile concreting method is that dry hole pours or waters under water Build;The speed poured is entered with the line size of delivering concrete according to the sectional dimension of upper and lower stake Row determines.
The construction method of the friction pile of 14. partial precasts according to claim 13, it is special Levy and be: also include step S7, by the upwardly extending joint bar in upper stake top (11) and lower stake The top main muscle of upwardly extending lower stake (5) is bent into toroidal, to water with cushion cap, beam or post Build anchor connection.
The construction method of the friction pile of 15. partial precasts according to claim 14, it is special Levy and be: also include step S8, by orientation grouting pipe (6), lateral after upper stake pile Grouting pipe (12) and hoop grouting pipe (15) carry out high-pressure slip-casting operation to upper stake stake side, Serosity is combined with pile body and the soil body about.
The construction method of the friction pile of 16. partial precasts according to claim 15, it is special Levy and be: use pile quality control method that described friction pile carries out quality control on construction, institute The pile quality control method stating stake is sound wave transmission method;The pile quality of lower pile controls Method is core drilling method, low strain dynamic method, Large strain method and sound wave transmission method.
CN201510652573.7A 2015-10-10 2015-10-10 Partially prefabricated friction pile and construction method thereof Active CN105178311B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510652573.7A CN105178311B (en) 2015-10-10 2015-10-10 Partially prefabricated friction pile and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510652573.7A CN105178311B (en) 2015-10-10 2015-10-10 Partially prefabricated friction pile and construction method thereof

Publications (2)

Publication Number Publication Date
CN105178311A CN105178311A (en) 2015-12-23
CN105178311B true CN105178311B (en) 2016-11-30

Family

ID=54900701

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510652573.7A Active CN105178311B (en) 2015-10-10 2015-10-10 Partially prefabricated friction pile and construction method thereof

Country Status (1)

Country Link
CN (1) CN105178311B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116872347B (en) * 2023-08-25 2024-02-23 南通欧本建筑科技有限公司 Precast pile production device and structure with surface beating slurry

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110072814A (en) * 2009-12-23 2011-06-29 대림산업 주식회사 Constructing method of concrete pile having various cross-section
CN203475420U (en) * 2013-08-20 2014-03-12 长江勘测规划设计研究有限责任公司 Three-segment variable cross-section slide-resistant pile
CN204608757U (en) * 2014-11-13 2015-09-02 昆明理工大学 A kind of steel pipe pile pile splicing structure
CN204435368U (en) * 2015-01-19 2015-07-01 德翰智慧科技有限公司 Prestressed concrete pile
CN204456076U (en) * 2015-03-11 2015-07-08 馆陶县金隅太行混凝土有限公司 A kind of reinforced concrete pipe pile
CN205012327U (en) * 2015-10-10 2016-02-03 长沙理工大学 Partially prefabricated friction pile

Also Published As

Publication number Publication date
CN105178311A (en) 2015-12-23

Similar Documents

Publication Publication Date Title
CN112482359A (en) Carrier pile and hollow column hammer for construction
CN101544022B (en) Preparation method for preformed hole fender pile
CN101230570A (en) Layered multitime pressure regulating pulp conditioning casting method
CN209924998U (en) Shallow earthing shield tunnel is worn road reinforcement protection architecture down
CN208167713U (en) A kind of film bag grouting and reinforcing type filling pile structure
CN203213136U (en) Caisson and pile combined foundation of consolidated subsoil
CN109138011B (en) Foundation reinforcing and deviation rectifying method for existing building
CN105178310B (en) A kind of friction pile and construction method thereof
CN107246005A (en) Super-large diameter bores and buries steel pipe hollow foundation pile and its construction method
CN208219694U (en) A kind of prefabricated barricade
CN101333815B (en) Concrete anchor rod and its construction method
WO2021004007A1 (en) Foundation reinforcement method for conventional building
CN109162289A (en) The prefabricated carrying pier structure of one kind and its construction method
CN101255692A (en) Xenotype squeezing-close bottom-enlarging filling pile and construction method
CN101469533A (en) Pier top supportless temporary consolidation technique
CN107326898A (en) A kind of cement soil wall interpolation rigidity can adjust drum prefabricated pile supporting construction and its construction method
CN105178311B (en) Partially prefabricated friction pile and construction method thereof
CN207469230U (en) Drum prefabricated pile supporting construction is adjusted in a kind of cement soil wall interpolation rigidity
CN205012327U (en) Partially prefabricated friction pile
CN110889235A (en) Underground pile foundation construction engineering design method
CN217378870U (en) Major diameter prestressed steel pipe concrete friction pile
CN209538212U (en) A kind of anti-horizontal displacement radical combination soil-baffling structure
CN102116024B (en) Static pressure multilayer radial enlarging grouting pile and construction method thereof
CN110080314B (en) Method for reducing side friction resistance of pile foundation
CN207121898U (en) Super-large diameter bores and buries steel pipe hollow foundation pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant