CN105178196B - A kind of multinode linkage type ring is wet to connect section integral mold plate and method - Google Patents

A kind of multinode linkage type ring is wet to connect section integral mold plate and method Download PDF

Info

Publication number
CN105178196B
CN105178196B CN201510626393.1A CN201510626393A CN105178196B CN 105178196 B CN105178196 B CN 105178196B CN 201510626393 A CN201510626393 A CN 201510626393A CN 105178196 B CN105178196 B CN 105178196B
Authority
CN
China
Prior art keywords
template
wet
tab
suspention
multinode
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510626393.1A
Other languages
Chinese (zh)
Other versions
CN105178196A (en
Inventor
孙维轩
邓永驰
吴红兵
尹跃国
王靖
程士洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
Municipal Environmental Construction Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
Municipal Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, Municipal Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201510626393.1A priority Critical patent/CN105178196B/en
Publication of CN105178196A publication Critical patent/CN105178196A/en
Application granted granted Critical
Publication of CN105178196B publication Critical patent/CN105178196B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Moulds, Cores, Or Mandrels (AREA)

Abstract

The present invention relates to Construction Technology field, specifically a kind of multinode linkage type ring is wet connects section integral mold plate and method, including template and rotary shaft, described template is by first side template, second side template and bottom surface template composition, first side template and second side template are connected with bottom surface template by rotary shaft respectively, make first side template, second side template and bottom surface template are rotated around rotary shaft, first side template, second side die head is respectively equipped with suspention tab, movable pulley is provided with suspention tab, movable pulley is along middle cross beam, sliding rail at the top of binder slides.Template is divided into three planes by the present invention, and each two interplanar is attached using the foldable rotation moving axis of similar hinge shape, makes energy pivoting between plane template, so that template has, ring is wet to connect a section effect, convenient installation, the template of dismounting are constructed, quality controllable, and turnover is convenient.

Description

A kind of multinode linkage type ring is wet to connect section integral mold plate and method
[technical field]
The present invention relates to Construction Technology field, specifically a kind of multinode linkage type ring is wet connects a section integral mold plate And method.
[background technology]
Crossbeam, constructing tie beam belong to high-altitude large-tonnage suspention construction waterborne, easily by operation side, working place, high-altitude Operation, operation at sea etc. are limited, and difficulty of construction is larger, and is limited by navigation, and conventional construction method is to build water project construction Platform, water project operation platform are the auxiliary equipment for bored concrete pile pile foundation construction, are generally arranged at bored concrete pile pile foundation side, And on the water on engineering construction platform, place filling pile construction equipment and stack construction equipment and material, pile foundation base need to be adopted The steel construction of plinth, platform construction high cost, long construction period, overall economic efficiency are poor;Also have using engineering ship as water The floating platform of upper engineering construction, but, floating platform is difficult to precise positioning, and the swing of hull influences whether applying for bored concrete pile Working medium amount;Separately have and large-scale hanging basket be set used as operation platform in binder both sides and bottom, but this form of construction work affect navigation and Hanging basket itself is moved and installation difficulty is larger, and template itself is installed because conducting oneself with dignity and turnover difficulty is larger.
As existing template is typified form, flange bolt connection, steel form corner between template and template, are connected by Place is connected using flange bolt or punching block corner directly arranges chamfering, connect difficulty to reduce, when in the number of turnover between template When few, template may also be employed plank sheathing, and the corner of plank sheathing is connected by the lumps of wood, external scaffolding steel pipe etc..Connected with existing template Connect, install, construction process for removing, be essentially all by flange bolt connection construction, it is desirable to have fixed human users space, Also have to create necessary working place in the case of without working place, otherwise template construction cannot be carried out, this is to applying Work difficulty, template transhipment, navigational clearance restriction, working place condition etc. require reach, otherwise cannot normal construction.
[content of the invention]
The present invention be relatively fixed to solve the medium-and-large-sized suspention prefabricated components of waterborne, work high above the ground, it is pre-buried in wet seam Duct such as is accurately positioned at the difficult problem, is entered using horizontal slip, the wet section integral mold plate that connects of longitudinal folding multinode linkage type ring Row is wet to connect section construction, ensures a kind of wet multinode linkage type ring for connecing section concrete pouring quality wet to connect section whole so as to be finally reached Body template and method.
To achieve these goals, a kind of multinode linkage type ring of design is wet connects a section integral mold plate, including template and rotation Axle, described template are made up of first side template, second side template and bottom surface template, first side template and second side Template is connected with bottom surface template by rotary shaft respectively, makes first side template, second side template and bottom surface template around rotation Axle is rotated, and first side template, second side die head are respectively equipped with suspention tab, are provided with cunning in suspention tab Driving wheel, sliding rail of the movable pulley at the top of middle cross beam, binder slide.
Parallel to rotating shaft direction equipped with some to fasten between described first side template and second side template Template to pull bar.
A kind of wet method for connecing section integral mold plate of multinode linkage type ring, described concrete grammar are as follows:
A. having carried out mounting slip track on Cast-in-Situ Segment middle cross beam, binder and the middle cross beam for having lifted, binder, Using I-steel as sliding rail;
B. the preliminary Suspending fixation of template is carried out using the suspention tab of first side die head, in suspention tab Movable pulley can along sliding rail slide and latched position, segmental construction be slid onto after finishing next sections it is wet connect section construction;
C. after the preliminary Suspending fixation of template is carried out using the suspention tab of first side die head, by the second side Suspention tab and suspension traction tubing sections at the top of face die plate makes template fit with prefabricated subsection works, and reinforces, locks Solid plate, can casting concrete after passed examination.
Described method also includes the wet reinforcing for connecing section integral mold plate of multinode linkage type ring and locking means:
A. it is that the quality and size for guaranteeing model sheetinstallat meets design requirement, first has to enter two adjacent middle cross beams, binder Row exact position is fixed, the state deviation caused under adjusting because suspending in midair naturally so as to be adjusted to design space coordinate and elevation, so Outside middle cross beam, binder shaped steel and scaffolding steel pipe locking is adopted to buckle afterwards, it is ensured that two pieces of adjacent middle cross beams, binders are relatively steady It is fixed;
B., after the preliminary installation of template, template physical dimension is checked, the sealing of calibration template size and template Property, the suspention tab of fixed first side template and second side die head is installed to pull bar and is fastened.
Described method also includes the wet method for dismounting for connecing section integral mold plate of multinode linkage type ring:
A. connect after section concrete pours and complete and conserve wet, go in form removal week and next wet connect section construction;
B. form removal first releases the suspention tab of second side die head, the second side of slow release to pull bar Suspension traction rope at the top of face die plate, makes template fall because deadweight is slow, drops down onto below binder bottom, suspension traction up under Rope moves the next section of wet suspention tab for connecing a section operating position, releasing first side die head to by middle cross beam bottom, Adjustment sliding system, traction first side die head make template be slid onto next section and wet connect a section operating position.
Template is divided into three planes by the present invention, and each two interplanar is entered using the foldable rotation moving axis of similar hinge shape Row connection, makes energy pivoting between plane template, so that template has, ring is wet to connect a section effect, convenient installation, the template of dismounting Constructed, and sliding rail be set in continuous polylith large-scale suspention prefabricated components top surface, make template by slip track from First segment slides onto installation sections, the problems such as solve operation platform and human users' platform, is easy to operation, quality controllable, Turnover is convenient.
[description of the drawings]
Fig. 1 is the wet side view for connecing section integral mold plate of multinode linkage type ring;
Fig. 2 is the wet profile for connecing section integral mold plate of multinode linkage type ring;
Fig. 3 is the wet scheme of installation for connecing section integral mold plate of multinode linkage type ring;
In figure:1. 2. second side template of first side template, 3. bottom surface template 4. suspends tab in midair to pull bar 5. 6. 7. sliding rail of movable pulley, 8. 9. suspension traction rope of pad lumps of wood wedge, 10. rotary shaft;
Figure of abstract of the specified Fig. 1 as the present invention.
[specific embodiment]
The invention will be further described below in conjunction with the accompanying drawings, for the structure and principle of this device people professional to this It is very clearly.It should be appreciated that specific embodiment described herein is not used to limit this only to explain the present invention Invention.
The present invention is that the large-scale suspention prefabricated components connection in high-altitude waterborne is wet to connect section concrete pouring construction in order to solve, and is overcome Work high above the ground waterborne, template turnover is mobile, large-scale suspention prefabricated components are relatively fixed, pre-buried duct is accurately positioned in wet seam A difficult problem, carries out wet connecing section construction using the wet section integral mold plate that connects of horizontal slip, longitudinal folding multinode linkage type ring.It is horizontal Refer to slip and sliding rail is set in continuous polylith large-scale suspention prefabricated components top surface, make template by sliding rail from the One sections slides onto second section, by that analogy.Longitudinal direction is foldable to refer to that it is critical only that for multi-segmental gearing is set at template knuckle The foldable rotation moving axis of similar hinge form is put, energy pivoting between plane template is made, to reach design template size.
Referring to Fig. 1 and Fig. 2, which specifically includes template and rotary shaft to the structure chart of this device, template by first side template, Second side template and bottom surface template composition, first side template and second side template are respectively by rotary shaft and bottom surface template Connection, makes first side template, second side template and bottom surface template be rotated around rotary shaft, first side template, second Suspention tab is respectively equipped with the top of Side shuttering, in suspention tab, movable pulley is provided with, movable pulley is at the top of middle cross beam, binder Sliding rail slide.Parallel to rotating shaft direction equipped with some to fasten between first side template and second side template Template to pull bar.
The concrete operation method of this device is as follows, referring to Fig. 3:
(1). the wet installation for connecing section integral mold plate of multinode linkage type ring:
A. having carried out mounting slip track on Cast-in-Situ Segment middle cross beam, binder and the middle cross beam for having lifted, binder, Using I-steel as sliding rail;
B. the preliminary Suspending fixation of template is carried out using the suspention tab of first side die head, in suspention tab Movable pulley can slide along sliding rail, segmental construction be slid onto after finishing next sections it is wet connect section construction;
C. after the preliminary Suspending fixation of template is carried out using the suspention tab of first side die head, by the second side Suspention tab and suspension traction tubing sections at the top of face die plate makes template fit with prefabricated subsection works, reaches template Design form, requires to reinforce, locks template according to scheme, can casting concrete after passed examination;
(2). the wet section integral mold plate that connects of multinode linkage type ring is reinforced and is locked:
A. it is that the quality and size for guaranteeing model sheetinstallat meets design requirement, first has to enter two adjacent middle cross beams, binder Row exact position is fixed, the state deviation caused under adjusting because suspending in midair naturally so as to be adjusted to design space coordinate and elevation, so Outside middle cross beam, binder shaped steel and scaffolding steel pipe locking is adopted to buckle afterwards, it is ensured that two pieces of adjacent middle cross beams, binders are relatively steady It is fixed;
B., after the preliminary installation of template, template physical dimension is checked, the sealing of calibration template size and template Property, the suspention tab of fixed first side template and second side die head is installed to pull bar and is fastened;
(3). the wet section integral mold plate that connects of multinode linkage type ring is removed:
A. connect after section concrete pours and complete and conserve wet, go in form removal week and next wet connect section construction;
B. form removal first releases the suspention tab of second side die head, the second side of slow release to pull bar Suspension traction rope at the top of face die plate, makes template fall because deadweight is slow, drops down onto below binder bottom, suspension traction up under Rope moves the next section of wet suspention tab for connecing a section operating position, releasing first side die head to by middle cross beam bottom, Adjustment sliding system, traction first side die head make template be slid onto next section and wet connect a section operating position.
Because template repeatedly need to be used in turn in this device, finish in each concreting and go to next section template week and wet connect During section construction, rotary shaft need to be cleared up and brush lubricating oil, to ensure that rotary shaft is working properly, template not affected because of rotary shaft Operating harmful effect design form.This device is applied to engineering middle cross beam, constructing tie beam, belongs to large-tonnage suspention in high-altitude waterborne and applies Work, can with effectively solving operation platform and human users' platform the problems such as, be easy to operation, quality controllable, turnover is convenient.

Claims (5)

1. a kind of multinode linkage type ring is wet connects a section integral mold plate, including template and rotary shaft, it is characterised in that described template It is made up of first side template, second side template and bottom surface template, first side template and second side template pass through respectively Rotary shaft is connected with bottom surface template, first side template, second side template and bottom surface template is rotated around rotary shaft, the Side face die plate, second side die head are respectively equipped with suspention tab, are provided with movable pulley, movable pulley edge in suspention tab Sliding rail at the top of middle cross beam, binder slides.
2. a kind of multinode linkage type ring is wet as claimed in claim 1 connects a section integral mold plate, it is characterised in that described first Between Side shuttering and second side template parallel to rotating shaft direction equipped with it is some to formboard fastening to pull bar.
3. the wet installation method for connecing section integral mold plate of a kind of multinode linkage type ring as claimed in claim 1, it is characterised in that Concrete grammar is as follows:
A. mounting slip track on Cast-in-Situ Segment middle cross beam, binder and the middle cross beam for having lifted, binder is being carried out, is being adopted I-steel is used as sliding rail;
B. first side template, second side die head are respectively equipped with suspention tab, are provided with movable pulley in suspention tab, The preliminary Suspending fixation of template is carried out using the suspention tab of first side die head, the movable pulley suspended in midair in tab can Slide along sliding rail and latched position, segmental construction is slid onto the wet of next sections and connects section construction after finishing;
C. after the preliminary Suspending fixation of template is carried out using the suspention tab of first side die head, by second side mould The suspention tab and suspension traction tubing sections in top of the plate portion makes template fit with prefabricated subsection works, and reinforces, locks mould Plate, can casting concrete after passed examination.
4. the wet installation method for connecing section integral mold plate of multinode linkage type ring as claimed in claim 3, it is characterised in that described Method also include the wet reinforcing for connecing section integral mold plate of multinode linkage type ring and locking means:
A. be that the quality and size for guaranteeing model sheetinstallat meets design requirement, first have to essence be carried out to two adjacent middle cross beams, binder Really position is fixed, the state deviation caused under adjusting because suspending in midair naturally so as to be adjusted to design space coordinate and elevation, Ran Hou Shaped steel and scaffolding steel pipe locking is adopted to buckle outside middle cross beam, binder, it is ensured that two pieces of adjacent middle cross beams, binders are relatively stable;
B., after the preliminary installation of template, template physical dimension is checked, the sealing of calibration template size and template, Gu Determine the suspention tab of first side template and second side die head, install to pull bar and fasten.
5. the wet installation method for connecing section integral mold plate of multinode linkage type ring as claimed in claim 3, it is characterised in that described Method also include the wet method for dismounting for connecing section integral mold plate of multinode linkage type ring:
A. connect after section concrete pours and complete and conserve wet, go in form removal week and next wet connect section construction;
B. form removal first releases the suspention tab of second side die head, slow release second side mould to pull bar The suspension traction rope in top of the plate portion, makes template fall because deadweight is slow, drops down onto below binder bottom, suspension traction rope up under The next section of wet suspention tab for connecing a section operating position, releasing first side die head, adjustment are moved to by middle cross beam bottom Sliding system, traction first side die head make template be slid onto next section and wet connect a section operating position.
CN201510626393.1A 2015-09-28 2015-09-28 A kind of multinode linkage type ring is wet to connect section integral mold plate and method Active CN105178196B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510626393.1A CN105178196B (en) 2015-09-28 2015-09-28 A kind of multinode linkage type ring is wet to connect section integral mold plate and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510626393.1A CN105178196B (en) 2015-09-28 2015-09-28 A kind of multinode linkage type ring is wet to connect section integral mold plate and method

Publications (2)

Publication Number Publication Date
CN105178196A CN105178196A (en) 2015-12-23
CN105178196B true CN105178196B (en) 2017-03-29

Family

ID=54900586

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510626393.1A Active CN105178196B (en) 2015-09-28 2015-09-28 A kind of multinode linkage type ring is wet to connect section integral mold plate and method

Country Status (1)

Country Link
CN (1) CN105178196B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106836797A (en) * 2017-02-18 2017-06-13 荆门创佳机械科技有限公司 A kind of fast and easily side construction column template
CN113338168B (en) * 2021-06-24 2023-01-10 中交二航局第四工程有限公司 Hanging basket with high safety for cantilever beam construction

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1717368A1 (en) * 1990-06-27 1992-03-07 В.В.Пушкарев, В.Я.Фофанов, ААДульзон и Ю.В.Максимов Plant for manufacturing monolith volumetric products
CN2364076Y (en) * 1999-04-21 2000-02-16 北京市第三市政工程公司构件厂 Accessories of monolithic T-beam steel form for seal of mortar
CN101412262A (en) * 2004-01-20 2009-04-22 邱则有 Shuttering component mould
ES2330911B1 (en) * 2008-02-01 2010-09-22 Compact-Habit, S.L. PROCEDURE AND INSTALLATION FOR THE MANUFACTURE OF PRISMATIC MODULAR ELEMENTS HOLLOW CONCRETE CONCRETE AND ELEMENT OBTAINED THROUGH THESE.
CN201669773U (en) * 2010-05-04 2010-12-15 杨秋利 Mobile T-beam and I-beam template system
CN102587295B (en) * 2012-03-30 2014-06-11 中铁四局集团第一工程有限公司 Under-supported basket form fine-adjustment system and under-supported basket form adjustment method
CN103074854B (en) * 2013-01-23 2014-12-17 中交四航局第一工程有限公司 Rear supporting point triangular bracket hanging basket and bridge construction method using same
CN103711065B (en) * 2013-12-30 2015-11-18 江苏省交通科学研究院股份有限公司 Cantilever construction Composite Steel-Concrete Bridges and construction method thereof
CN104674670A (en) * 2015-03-03 2015-06-03 北京地圣科创建设工程有限公司 Steel moulding plate with adjustable curvature for manufacturing curvilinear PSC (Pre-Stressed Concrete) beam and manufacturing method of beam
CN204959616U (en) * 2015-09-28 2016-01-13 中铁上海工程局集团有限公司 Wet whole template of section of connecing of multinode interlock formula ring

Also Published As

Publication number Publication date
CN105178196A (en) 2015-12-23

Similar Documents

Publication Publication Date Title
CN106223360B (en) Using the open cut cast in place and precast construction subway station construction method of stake supporting system
CN101818482B (en) Method for constructing road swivel bridge and railway swivel bridge by using turnplate spherical hinge
CN105370298B (en) Loess tunnel once lining hydraulic template trolley
CN102704949A (en) No-pull rod side wall construction method for underground tunnel and formwork trolley for construction
CN102146796B (en) Construction technology for inverted arch of two-track tunnel of high-speed railway
CN100476076C (en) Mobile integral construction platform, construction method thereof and special sling for the same
CN109538238A (en) A kind of tunnel arch prefabricated pipe section constructing device and control method
CN202596743U (en) Formwork trolley for underground tunnel pull-rod-free side wall construction
CN106192766B (en) A kind of girder steel pier coping portion rotary body device
CN102296542A (en) Method for constructing high pier capping beams
CN101845793A (en) Construction method of small-angle skew multi-span portal frame pier cast-in-situ beam for crossing highway or railway line
CN106640138A (en) Gallery separating type steel formwork trolley
CN105178196B (en) A kind of multinode linkage type ring is wet to connect section integral mold plate and method
CN103526697B (en) Self-propelled movable formwork for construction of double-rectangle water conservancy aqueduct
CN102268858B (en) Cradle for suspension pouring of arch-type bridge
CN201087323Y (en) Mobile integral construction platform
CN102286931B (en) Deck moving support system (MSS) bridge fabrication machine specially for construction of double-T-shaped bridge
CN103388305A (en) Railway T-beam cast-in-site bridge deck forming machine
CN206016835U (en) Tunnel and subway engineering diameter Changeable Model chassis
CN110130937A (en) A kind of tunnel construction trolley
CN202017493U (en) Construction equipment for inverted arch of high-speed railway double-track tunnel
CN204959616U (en) Wet whole template of section of connecing of multinode interlock formula ring
CN106050268A (en) Steel mould trolley for concrete lining of rounded rectangle cross section tunnel
CN203889938U (en) Synchronous construction equipment for upper-layer precast carriageway plate of double-layer tunnel
CN205778929U (en) A kind of for arch form culvert, the sleiding form device of passage construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No.278, JIANGCHANG Third Road, Zhabei District, Shanghai 200436

Patentee after: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

Patentee after: China Railway Municipal Environmental Construction Co.,Ltd.

Address before: No.278, JIANGCHANG Third Road, Zhabei District, Shanghai 200436

Patentee before: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

Patentee before: China Railway Shanghai Engineering Bureau Group Municipal Engineering Co.,Ltd.