CN105173980A - Construction hoist in bridge tower cavity - Google Patents

Construction hoist in bridge tower cavity Download PDF

Info

Publication number
CN105173980A
CN105173980A CN201510542805.3A CN201510542805A CN105173980A CN 105173980 A CN105173980 A CN 105173980A CN 201510542805 A CN201510542805 A CN 201510542805A CN 105173980 A CN105173980 A CN 105173980A
Authority
CN
China
Prior art keywords
guide rail
cage
stem
bridge tower
escape door
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510542805.3A
Other languages
Chinese (zh)
Inventor
腾志理
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510542805.3A priority Critical patent/CN105173980A/en
Publication of CN105173980A publication Critical patent/CN105173980A/en
Pending legal-status Critical Current

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The invention relates to a construction hoist in a bridge tower cavity, which comprises a dragging device, a suspension cage, a guide rail rack, a counterweight and a counterweight guide rail, wherein the guide rail rack is mounted on the side, near to a bridge deck, in the bridge tower cavity; the suspension cage is mounted on the guide rail rack via a gear rack; the dragging device is mounted at the top of the guide rail rack, and drags and drives the suspension cage via a steel wire rope; the counterweight guide rail is mounted on the inner wall, corresponding to the moving track of the suspension cage, of the tower cavity; the counterweight is mounted on the counterweight guide rail and is connected with the dragging device through the steel wire rope; and an escape door is arranged at the top of a driving cab of the suspension cage. Through the adoption of the structure, the use of the hoist can be satisfied very well without the arrangement of a machine room; since the guide rail rack is mounted on the side, near the bridge deck, in the bridge tower cavity to serve as a track for the suspension cage of the construction hoist to move up and down, the problem that guide rails of common construction hoists and elevators are difficult to mount in the inner cavities of main towers of large-size and over-size bridges is avoided; and through the arrangement of the escape door, a driver in the driving cab can escape smoothly.

Description

Building hoist in a kind of bridge tower chamber
Technical field
The present invention relates to a kind of elevator, particularly relate to the building hoist in a kind of bridge tower chamber, belong to elevator technology field.
Background technology
At present, the jacking equipment used in tower chamber on bridge is building hoist and elevator, because tower cavity space is narrow and small, particularly large-scale and extra-large bridge king-tower intracavity section not relates to by standard hoistway, thus cause the installation of building hoist or elevator very complicated, waste time and energy, cost is very high.In addition, in general in order to coordinate the use of elevator, all machine room can be configured, but space is too little in bridge main tower can not arrange machine room; In addition, construction elevator cage operator's compartment in the market does not all arrange escape door, only arranges the window for life-saving at cage top, and the goods stacked in cage when there is unforeseen circumstances may hinder the driver in operator's compartment to escape.
Summary of the invention
Technical matters to be solved by this invention is for the deficiencies in the prior art, provides building hoist in a kind of bridge tower chamber.
The technical scheme that the present invention solves the problems of the technologies described above is as follows: building hoist in a kind of bridge tower chamber, comprise drag device, cage, guide rail bracket, counterweight and counter weight guide track, described guide rail bracket is arranged in bridge tower chamber by bridge floor side, described cage is arranged on described guide rail bracket by rack-and-gear, described drag device is arranged on guide rail bracket top, described drag device is by cage described in steel rope tractive driving, the tower cavity wall corresponding with described cage running orbit installs counter weight guide track, described counter weight guide track installs counterweight, described counterweight is connected with drag device by steel rope, the operator's compartment top of described cage is provided with escape door.
The invention has the beneficial effects as follows: structure of the present invention does not need to arrange the use that machine room is also well positioned to meet elevator; And guide rail bracket is arranged on by bridge floor side in bridge tower chamber, in this, as the track that construction elevator cage runs up and down, avoid general building hoist with elevator in the large-scale problem with mounting guide rail difficulty in extra-large bridge king-tower inner chamber; By arranging escape door, the driver in operator's compartment is escaped smoothly.
On the basis of technique scheme, the present invention can also do following improvement.
Further, described escape door hinged with cage, is provided with handle inside relative another side; Described escape door inner surface is provided with waterproof and goes along with sb. to guard him layer.
The beneficial effect of above-mentioned further scheme is adopted to be: waterproof to be set and to go along with sb. to guard him layer and can prevent rainwater from entering in operator's compartment.
Further, protective fence is provided with bottom described guide rail bracket.
Further, described escape door is connected by closing appliance with cage.
The beneficial effect of above-mentioned further scheme is adopted to be: by arranging latching device, escape door and cage body to be locked completely, avoiding elevator and send noise in the process of moving.
Further, described closing appliance comprises stem stem, and stem stem outside is provided with contract plate, be flexibly connected between described stem stem with contract plate, contract plate is socketed in the outside of stem stem by a tubular structure, can along stem stem axial rotation, and described closing appliance is arranged on escape door and cage contact position.
The beneficial effect of above-mentioned further scheme is adopted to be: latching device adopts triangle wedge structure, can adjust the position of latching device and cage body contact point as required, effectively can eliminate the gap between escape door and doorframe, escape door effectively can be locked.
Accompanying drawing explanation
Fig. 1 is the inner structure schematic diagram of compound type building hoist in embodiment of the present invention Bridge tower chamber;
Fig. 2 is A-A cross-sectional view in this Fig. 1;
Fig. 3 is that the present invention escapes the structural representation of door closure state;
Fig. 4 is that the present invention escapes the structural representation of an opening;
Fig. 5 is that the present invention escapes the structural representation of door locking device.
In accompanying drawing, the list of parts representated by each label is as follows:
1, leading-in device is dragged; 2, cage; 21, operator's compartment; 22, escape door; 221, stem stem; 222, contract plate; 23, shake hands; 3, guide rail bracket; 4, counterweight; 5, counter weight guide track; 6, drag and draw machine erecting frame; 7, protective fence; 8, illuminating lamp; 9, tower chamber.
Detailed description of the invention
Be described principle of the present invention and feature below in conjunction with accompanying drawing, example, only for explaining the present invention, is not intended to limit scope of the present invention.
As depicted in figs. 1 and 2, building hoist in a kind of bridge tower chamber of the present embodiment, comprise drag device 1, cage 2, guide rail bracket 3, counterweight 4 and counter weight guide track 5, guide rail bracket 2 is arranged in bridge tower chamber by bridge floor side, cage 2 is arranged on described guide rail bracket 3 by rack-and-gear, drag device 1 is arranged on guide rail bracket 3 top, as shown in Figure 2, is provided with protective fence 7 bottom guide rail bracket 3.Drag device 1 is by cage 2 described in steel rope tractive driving, and the tower cavity wall corresponding with cage 2 running orbit installs counter weight guide track 5, counter weight guide track 5 is installed counterweight 4, counterweight 4 is connected with drag device 1 by steel rope; Structure of the present invention does not need to arrange the use that machine room is also well positioned to meet elevator; And guide rail bracket is arranged on by bridge floor side in bridge tower chamber, in this, as the track that construction elevator cage runs up and down, avoid general building hoist with elevator in the large-scale problem with mounting guide rail difficulty in extra-large bridge king-tower inner chamber.
As shown in Figure 3 and Figure 4, operator's compartment 21 top of the cage 2 of the present embodiment is provided with escape door 22, by arranging escape door, the driver in operator's compartment is escaped smoothly.Escape door 22 while hinged with cage 2, be provided with inside relative another side and draw 23 hands; Escape door 22 inner surface is provided with waterproof and goes along with sb. to guard him layer, arranges waterproof and goes along with sb. to guard him layer and can prevent rainwater from entering in operator's compartment.
As shown in Figure 5, the escape door 22 of the present embodiment is connected by closing appliance with cage 2, by arranging latching device, escape door and cage body being locked completely, avoiding elevator and send noise in the process of moving.Closing appliance comprises stem stem 221, stem stem 221 outside is provided with contract plate 222, is flexibly connected between stem stem 221 with contract plate 222, and contract plate 222 is socketed in the outside of stem stem 221 by a tubular structure, can along stem stem 221 axial rotation, latching device is arranged on escape door 22 and cage 2 contact position.Latching device adopts triangle wedge structure, can adjust the position of latching device and cage body contact point as required, effectively can eliminate the gap between escape door and doorframe, escape door effectively can be locked.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (5)

1. building hoist in a bridge tower chamber, comprise drag device (1), cage (2), guide rail bracket (3), counterweight (4) and counter weight guide track (5), it is characterized in that, described guide rail bracket (3) is arranged in bridge tower chamber by bridge floor side, described cage (2) is arranged on described guide rail bracket (3) by rack-and-gear, described drag device (1) is arranged on guide rail bracket (3) top, described drag device (1) is by cage (2) described in steel rope tractive driving, the tower cavity wall corresponding with described cage (2) running orbit is installed counter weight guide track (5), described counter weight guide track (5) is installed counterweight (4), described counterweight (4) is connected with drag device (1) by steel rope, the operator's compartment top of described cage (2) is provided with escape door (22).
2. building hoist in a kind of bridge tower chamber according to claim 1, is characterized in that, described escape door (22) hinged with cage (2), is provided with handle (23) inside relative another side; Described escape door (22) inner surface is provided with waterproof and goes along with sb. to guard him layer.
3. building hoist in a kind of bridge tower chamber according to claim 1, it is characterized in that, described guide rail bracket (3) bottom is provided with protective fence (7).
4. building hoist in a kind of bridge tower chamber according to claim 2, it is characterized in that, described escape door (22) is connected by closing appliance with cage (2).
5. building hoist in a kind of bridge tower chamber according to claim 4, it is characterized in that, described closing appliance comprises stem stem (221), stem stem (221) outside is provided with contract plate (222), be flexibly connected between described stem stem (221) with contract plate (222), contract plate (222) is socketed in the outside of stem stem (221) by a tubular structure, can along stem stem (221) axial rotation, described closing appliance is arranged on escape door (22) and cage (2) contact position.
CN201510542805.3A 2015-08-31 2015-08-31 Construction hoist in bridge tower cavity Pending CN105173980A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510542805.3A CN105173980A (en) 2015-08-31 2015-08-31 Construction hoist in bridge tower cavity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510542805.3A CN105173980A (en) 2015-08-31 2015-08-31 Construction hoist in bridge tower cavity

Publications (1)

Publication Number Publication Date
CN105173980A true CN105173980A (en) 2015-12-23

Family

ID=54896532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510542805.3A Pending CN105173980A (en) 2015-08-31 2015-08-31 Construction hoist in bridge tower cavity

Country Status (1)

Country Link
CN (1) CN105173980A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3878916A (en) * 1973-02-07 1975-04-22 Jr Gerome R White Rack and pinion drive counterbalanced hoist systems
CN202465001U (en) * 2012-02-01 2012-10-03 广西建工集团建筑机械制造有限责任公司 Construction elevator transmission device with auxiliary restriction gear pair
CN204138074U (en) * 2014-10-15 2015-02-04 重庆红岩建设机械制造有限责任公司 A kind of building hoist operator's compartment escape door locking device
CN204251144U (en) * 2014-10-20 2015-04-08 重庆红岩建设机械制造有限责任公司 Compound type building hoist in a kind of bridge tower chamber
CN204251130U (en) * 2014-10-21 2015-04-08 重庆红岩建设机械制造有限责任公司 A kind of elevator standard knot
CN204400396U (en) * 2014-10-20 2015-06-17 重庆红岩建设机械制造有限责任公司 A kind of construction elevator cage with escape door

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3878916A (en) * 1973-02-07 1975-04-22 Jr Gerome R White Rack and pinion drive counterbalanced hoist systems
CN202465001U (en) * 2012-02-01 2012-10-03 广西建工集团建筑机械制造有限责任公司 Construction elevator transmission device with auxiliary restriction gear pair
CN204138074U (en) * 2014-10-15 2015-02-04 重庆红岩建设机械制造有限责任公司 A kind of building hoist operator's compartment escape door locking device
CN204251144U (en) * 2014-10-20 2015-04-08 重庆红岩建设机械制造有限责任公司 Compound type building hoist in a kind of bridge tower chamber
CN204400396U (en) * 2014-10-20 2015-06-17 重庆红岩建设机械制造有限责任公司 A kind of construction elevator cage with escape door
CN204251130U (en) * 2014-10-21 2015-04-08 重庆红岩建设机械制造有限责任公司 A kind of elevator standard knot

Similar Documents

Publication Publication Date Title
KR101923924B1 (en) Rope type elevator of high speed and heavy road and mast structure for constructing high-rise building
RU2581788C1 (en) Lifting platform of shaft hoist and method of lifting
JP2006348691A (en) System for working on exterior wall part of building
RU2007132738A (en) LIFT WITH A CAB AND A COUNTERBALANCE AND A METHOD FOR PLACING A LIFT
JP5571130B2 (en) Elevator equipment
CN106082042A (en) A kind of scalable hanging basket
JP2016079010A (en) Method for repairing elevator without machinery room
CN101830385A (en) The cage door device of elevator
JPWO2013186890A1 (en) Elevator equipment
CN102718109A (en) Method for transforming construction elevator into passenger-goods elevator
CN105173980A (en) Construction hoist in bridge tower cavity
CN205471157U (en) Factory building transmission system's lifting machine is striden to product
CN206109992U (en) Bridge bottom surface construction platform
CN209412328U (en) It is a kind of that guide locating device provided zinc-plated bucket descaling bath is installed
JP2014144854A (en) Elevator device
CN203320415U (en) Novel large-scale pier coating operation hanging basket
CN107804770B (en) Turnover construction elevator turning plate tool
KR100941955B1 (en) Traction machine structure for an elevator and cage assembly
CN108190688A (en) A kind of automatic external climbing construction platform
JP6676386B2 (en) Door opening and closing device for elevator
CN205328410U (en) Perpendicular elevator guide rail does not have scaffold installation device
WO2017168695A1 (en) Elevator device
JP2020055660A (en) Doorsill provided at elevator doorway and replacement method of doorsill
IT201800004466A1 (en) LIFTING SYSTEM WITH COUNTERWEIGHT AND CAB PULLEYS ALIGNED ON THE SAME SYMMETRY AXIS
CN205662187U (en) Elevator shaft

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151223