CN105171932B - A kind of full-automatic glass drilling machine applied to glass production processing - Google Patents

A kind of full-automatic glass drilling machine applied to glass production processing Download PDF

Info

Publication number
CN105171932B
CN105171932B CN201510615825.9A CN201510615825A CN105171932B CN 105171932 B CN105171932 B CN 105171932B CN 201510615825 A CN201510615825 A CN 201510615825A CN 105171932 B CN105171932 B CN 105171932B
Authority
CN
China
Prior art keywords
drilling
drive
guide rail
seat
conveying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510615825.9A
Other languages
Chinese (zh)
Other versions
CN105171932A (en
Inventor
应伟苹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Jin Yaohua Glass Co., Ltd.
Original Assignee
Foshan Jin Yaohua Glass Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Jin Yaohua Glass Co Ltd filed Critical Foshan Jin Yaohua Glass Co Ltd
Priority to CN201510615825.9A priority Critical patent/CN105171932B/en
Publication of CN105171932A publication Critical patent/CN105171932A/en
Application granted granted Critical
Publication of CN105171932B publication Critical patent/CN105171932B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Processing Of Stones Or Stones Resemblance Materials (AREA)

Abstract

The invention discloses a kind of full-automatic glass drilling machines applied to glass production processing, including base and conveying device, conveying device is located on base, the two sides of conveying device are equipped with vertical support frame, the upper end of vertical support frame is equipped with upper crossbearer, the lower end of vertical support frame is equipped with lower cross frame, upper crossbearer is equipped with the first guide rail, borehole drill construction is connected on first guide rail, upper borehole drill construction includes upper drilling seat and upper drilling frame, lower cross frame is equipped with the second guide rail, is connected with lower borehole drill construction on the second guide rail, lower borehole drill construction includes lower drilling seat and lower drilling frame.Glass pieces are inputted from the front end of machine, bore operation is then carried out by upper borehole drill construction and lower borehole drill construction in the centre of machine, finally export hole-drilled glass pieces in the rear end of machine by conveying device.Upper borehole drill construction is installed on crossbearer, and lower borehole drill construction is installed on lower cross frame, and borehole space is equipped between upper borehole drill construction and lower borehole drill construction, carries out bore operation.

Description

A kind of full-automatic glass drilling machine applied to glass production processing
Technical field
The present invention relates to glass production processing technique field, refer specifically to it is a kind of applied to glass production processing it is complete from Dynamic glass drilling machine.
Background technique
Glass drilling machine is used exclusively for the machine of glass drilling.The bore diameter of glass drilling machine is big, and base overhangs empty Position is big, and large-size glass can be processed, and is indispensable mechanical equipment in glass processing production.But the drilling machine of the prior art Be with single machine it is more, this equipment operation is more complicated, cannot be fully automated complete assembly line drilling operation, be by several workers By on machine, the position that glass needs drill, which is moved to below drill bit to fix, can just carry out glass drilling, brill on glass platform Behind a complete hole, other holes are bored if necessary, and need to lift glass again, retighten glass, then carry out drilling behaviour again Make, until completing all drilling according to above-mentioned step.It finally also needs manually by hole-drilled glass again from rack It carries off to be stored, can not be transmitted and be positioned automatically, pile line operation can not be carried out, it is extremely inconvenient, and working efficiency Low, process velocity and precision can not meet the needs of people.
Summary of the invention
The purpose of the present invention is to provide a kind of full-automatic glass drilling machine applied to glass production processing, the machine knots Structure is simple, scientific convenient, with strong points, high degree of automation, and processing registration is convenient and efficient, and work is greatly improved Efficiency has well solved the drilling problems of glass production processing.Conveying device is used for transporting glass workpiece, and glass pieces are transported It transports between borehole drill construction and lower borehole drill construction, carries out bore operation.Conveying device is longitudinally disposed, and upper crossbearer and lower cross frame are horizontal To setting, upper borehole drill construction and lower borehole drill construction can be for linear motion on upper crossbearer and lower cross frame, in this way before machine End input glass pieces, then carry out bore operation by upper borehole drill construction and lower borehole drill construction in the centre of machine, finally will Hole-drilled glass pieces are exported by conveying device in the rear end of machine.Upper borehole drill construction is installed on crossbearer, lower drilling Mechanism is installed on lower cross frame, and borehole space is equipped between upper borehole drill construction and lower borehole drill construction, carries out bore operation.
In order to solve the above-mentioned technical problem, it adopts the following technical scheme that
A kind of full-automatic glass drilling machine applied to glass production processing, including base and conveying device, conveying device On base, the two sides of conveying device are equipped with vertical support frame, and the upper end of vertical support frame is equipped with upper crossbearer, and upper crossbearer is fixed Be installed in vertical support frame, the lower end of vertical support frame is equipped with lower cross frame, and lower cross frame is fixedly installed in base, upper crossbearer and Lower cross frame is laterally arranged, and conveying device is longitudinally disposed, and upper crossbearer is equipped with the first guide rail, and the first guide rail is equipped with the first sliding block, First guide rail matches with the first sliding block, is connected with borehole drill construction on the first sliding block, upper borehole drill construction include upper drilling seat and Upper drilling frame, upper drilling seat connect the first sliding block, and upper drilling frame is movably installed on drilling seat, and lower cross frame is equipped with second and leads Rail, the second guide rail are equipped with the second sliding block, and the second guide rail matches with the second sliding block, and lower drilling machine is connected on the second sliding block Structure, lower borehole drill construction include lower drilling seat and lower drilling frame, and lower drilling seat connects the second sliding block, and lower drilling frame is movably installed in It drills on seat, horizontal mobile device is equipped between upper borehole drill construction and lower borehole drill construction.Conveying device is used for transporting glass workpiece, Glass pieces are transported between supreme borehole drill construction and lower borehole drill construction, bore operation is carried out.Conveying device is longitudinally disposed, upper cross Frame and lower cross frame are laterally arranged, and upper borehole drill construction and lower borehole drill construction can be for linear motion on upper crossbearer and lower cross frame, this Sample inputs glass pieces from the front end of machine, is then drilled in the centre of machine by upper borehole drill construction and lower borehole drill construction Operation is finally exported hole-drilled glass pieces by conveying device in the rear end of machine.Upper borehole drill construction is installed on cross On frame, lower borehole drill construction is installed on lower cross frame, and borehole space is equipped between upper borehole drill construction and lower borehole drill construction, is drilled Operation.
Further, upper drilling frame is connected with crankshaft, and one end of upper crankshaft is connected with the first lever, the first lever it is another End is connected with the first cylinder, and the other end of upper crankshaft is connected with upper connecting rod, and the other end of upper connecting rod is connected with connecting shaft, The other end of upper connecting shaft is connected with upper connecting base, and upper connecting base is connected with third sliding block, and third sliding block is connected with third guide rail, Third sliding block matches with third guide rail, and third guide rail is fixedly installed on drilling seat, and the lower end of upper connecting base is equipped with upper brill Hole motor, upper bore motor are connected with auger spindle, and the other end of upper auger spindle is connected with drill bit.When upper drill bit is needed in vertical side To when moving up and down linearly, by starting the first cylinder, the first cylinder makees flexible linear motion, the first lever is driven to agitate Crankshaft rotation.Upper drilling frame is equipped with the through hole (not marking in figure) for making upper connecting rod make linear slide up and down, finally upper Under the linkage effect of connecting shaft, upper connecting base is driven to move up and down linearly in the vertical direction.Is fixed on upper drilling seat Three sliding blocks and third guide rail, during such upper connecting base moves up and down linearly in the vertical direction, pass through third sliding block With the mutual cooperation of third guide rail, preferably drive upper connecting base moves up and down linearly in the vertical direction.Using cylinder The mode that driving upper connecting base moves up and down linearly in the vertical direction, energy conservation and environmental protection, transmission fast with operating rate is surely It is fixed, maintenance is convenient, it is cheap, occupy little space, action noise is small, power resources are convenient and low power consumption and other advantages.On The lower end of attachment base is equipped with upper bore motor, drives upper drill bit to make high speed rotary motion by upper bore motor, completes drilling and make Industry.
Further, lower drilling frame is connected with lower crankshaft, and one end of lower crankshaft is connected with the second lever, the second lever it is another End is connected with the second cylinder, and the other end of lower crankshaft is connected with lower connecting rod, and the other end of lower connecting rod is connected with lower connecting shaft, The other end of lower connecting shaft is connected with lower connecting base, and lower connecting base is connected with Four-slider, and Four-slider is connected with the 4th guide rail, Four-slider matches with the 4th guide rail, and the 4th guide rail is fixedly installed on lower drilling seat, and the upper end of lower connecting base is equipped with lower brill Hole motor, lower bore motor are connected with lower auger spindle, and the other end of lower auger spindle is connected with lower drill bit.Instantly drill bit is needed in vertical side To when moving up and down linearly, by starting the second cylinder, the second cylinder makees flexible linear motion, the second lever is driven to agitate down Crankshaft rotation.Lower drilling frame is equipped with the through hole (not marking in figure) for making lower connecting rod make linear slide up and down, finally under Under the linkage effect of connecting shaft, lower connecting base is driven to move up and down linearly in the vertical direction.Is fixed on lower drilling seat Four-slider and the 4th guide rail pass through Four-slider during such lower connecting base moves up and down linearly in the vertical direction With the mutual cooperation of the 4th guide rail, preferably drive lower connecting base moves up and down linearly in the vertical direction.Using cylinder The mode that driving lower connecting base moves up and down linearly in the vertical direction, energy conservation and environmental protection, transmission fast with operating rate is surely It is fixed, maintenance is convenient, it is cheap, occupy little space, action noise is small, power resources are convenient and low power consumption and other advantages.Under The lower end of attachment base is equipped with lower bore motor, drives lower drill bit to make high speed rotary motion by lower bore motor, completes drilling and make Industry.
Further, horizontal mobile device includes horizontal drive motor, drive shaft, transmission shaft and drive lead screw, transmission shaft packet Transmission shaft and lower drive shaft are included, drive lead screw includes upper drive lead screw and underdrive screw rod, and horizontal drive motor is fixedly mounted In in base, upper transmission shaft and lower drive shaft are vertically arranged, and drive shaft, upper drive lead screw and underdrive screw rod are laterally arranged, on The centre of drive lead screw is equipped with upper transmission nut, and upper transmission nut is connected with transmission nut seat, on upper transmission nut seat connects Drill seat, and the both ends of upper drive lead screw are equipped with upper drive lead screw fixing seat, and the centre of underdrive screw rod is equipped with underdrive nut, under Transmission nut is connected with underdrive nut seat, and the lower seat that drills of underdrive nut seat connection, the both ends of underdrive screw rod pass under being equipped with Dynamic screw rod fixing seat.
Further, horizontal drive motor is connected with horizontal drive motor output shaft, and horizontal drive motor output shaft is equipped with Drive pulley, drive shaft are equipped with driven pulley, and transmission belt is equipped between drive pulley and driven pulley.
Further, drive shaft is equipped with active drive wheel, and the lower end of upper transmission shaft is equipped with upper driven driving wheel, active drive Wheel is meshed with upper driven driving wheel, and the upper end of lower drive shaft is equipped with down driven driving wheel, the driven driving under of active drive wheel Wheel is meshed.
Further, the upper end of upper transmission shaft is equipped with upper initiative driver, and the left end of upper drive lead screw is equipped with upper slave drive Wheel, upper initiative driver are meshed with upper driven transmission wheel, and the lower end of lower drive shaft is equipped with lower initiative driver, underdrive screw rod Left end be equipped with lower driven transmission wheel, lower initiative driver is meshed with lower driven transmission wheel.Horizontal mobile device first passes through cross Driving force is provided to driving motor, horizontal drive motor output shaft is driven to make high speed rotary motion.Then lateral drive will be installed on The drive pulley of dynamic motor output shaft is linked together with the driven pulley for being installed on drive shaft by transmission belt, is existed in this way Under the action of conveyer belt, transfer a driving force in drive shaft.Then work is engaged in active drive wheel and upper driven driving wheel Under the engagement of driven driving wheel, driving force is transferred to the upper and lower biography of upper transmission shaft respectively under with lower and active drive wheel On moving axis.Finally under the engagement of upper initiative driver and upper driven transmission wheel and lower initiative driver and lower slave drive Under the engagement of wheel, driving force is transferred to respectively on upper drive lead screw and underdrive screw rod, in this way in upper transmission nut and Under the action of underdrive nut, so that it may which drilling seat and lower drilling seat are made on the first guide rail and the second guide rail respectively in drive Laterally move along a straight line, the relative position in adjusting in the transverse direction of drill bit and lower drill bit, to help upper drill bit and lower drill bit Complete bore operation.Such driving mounting means only needs to install a motor in a lateral direction, so that it may bore in realization Hole seat and lower drilling seat make laterally linear motion on the first guide rail and the second guide rail respectively, while adjusting upper drill bit and lower drill bit In a lateral direction, working efficiency is not only greatly increased, but also reduces a driving equipment, is realizing identical work Meanwhile reducing the part of machine, save the energy.
Further, conveying device includes guide rails fixing support, conveys truss and table top lath, is equipped with and leads between guide rails fixing support Rail support, guide rails fixing support are equipped with conveying, and conveying is equipped with conveying truss, and conveying truss is equipped with deck plate Item, table top lath are fixedly installed on conveying truss.Conveying device is equipped with by conveying truss and table top lath, table top lath The fixture (being not drawn into figure) of glass is placed, glass pieces are clamped.The lower end for conveying truss is equipped with conveying, and conveying makes Conveying truss can slide above it, help transporting glass workpiece.
Further, the side for conveying truss is equipped with feed drive device, and feed drive device includes feed drive motor, Feed drive motor is connected with conveyance screw rod, and conveyance screw rod is equipped with conveyance nut, on conveyance nut Equipped with conveying attachment base is equipped with, conveying attachment base connection conveys truss.It is driven by feed drive device feed drive motor defeated It send drive lead screw to make high speed rotary motion, under the action of conveyance nut, slides conveying truss on conveying, help Help transporting glass workpiece.
Further, the lower end of lower cross frame is equipped with the first support, and the lower end of vertical support frame is equipped with the second support, the first support It is fixedly installed in base with the second support.By the first support and the second support, lower cross frame and vertical support are supported respectively Frame keeps the structure of body stronger.
As a result of the above technical solution, the following beneficial effects are obtained:
The present invention is a kind of full-automatic glass drilling machine applied to glass production processing, and the machine construction is simple, scientific Convenient, with strong points, high degree of automation processes registration, convenient and efficient, working efficiency is greatly improved, well Solve the drilling problems of glass production processing.Conveying device is used for transporting glass workpiece, and glass pieces are transported supreme drilling Between mechanism and lower borehole drill construction, bore operation is carried out.Conveying device is longitudinally disposed, and upper crossbearer and lower cross frame are laterally arranged, on Borehole drill construction and lower borehole drill construction can be for linear motion on upper crossbearer and lower cross frame, input glass from the front end of machine in this way Then workpiece carries out bore operation by upper borehole drill construction and lower borehole drill construction in the centre of machine, finally by hole-drilled glass Glass workpiece is exported by conveying device in the rear end of machine.Upper borehole drill construction is installed on crossbearer, and lower borehole drill construction is installed on On lower cross frame, it is equipped with borehole space between upper borehole drill construction and lower borehole drill construction, carries out bore operation.
When upper drill bit is needed when vertical direction moves up and down linearly, by starting the first cylinder, the first cylinder is stretched Contracting linear motion drives the first lever to agitate crankshaft rotation.Upper drilling frame, which is equipped with, makes upper connecting rod make linear slide up and down Through hole (not marked in figure) driven on upper connecting base makees in the vertical direction finally under the linkage effect of upper connecting shaft Lower linear motion.Third sliding block and third guide rail are fixed on upper drilling seat, such upper connecting base is made up and down in the vertical direction During linear motion, by the mutual cooperation of third sliding block and third guide rail, preferably drive upper connecting base is in vertical side It moves up and down linearly upwards.In such a way that the driving upper connecting base of cylinder moves up and down linearly in the vertical direction, section Can environmental protection, have operating rate fast, stable transmission, maintenance it is convenient, it is cheap, occupy little space, action noise is small, dynamic Power convenient sources and low power consumption and other advantages.The lower end of upper connecting base is equipped with upper bore motor, is driven and is bored by upper bore motor Head makees high speed rotary motion, completes bore operation.Instantly drill bit is needed when vertical direction moves up and down linearly, and passes through starting Second cylinder, the second cylinder make flexible linear motion, and the second lever is driven to agitate lower crankshaft rotation.Lower drilling frame is equipped under making Connecting rod makees the through hole (not marking in figure) of linear slide up and down, finally under the linkage effect of lower connecting shaft, connects under drive Joint chair moves up and down linearly in the vertical direction.It is fixed with Four-slider and the 4th guide rail on lower drilling seat, connection lower in this way During seat moves up and down linearly in the vertical direction, by the mutual cooperation of Four-slider and the 4th guide rail, preferably Lower connecting base is driven to move up and down linearly in the vertical direction.On being made in the vertical direction using the driving lower connecting base of cylinder The mode of lower linear motion, energy conservation and environmental protection have that operating rate fast, stable transmission, maintenance be convenient, cheap, occupancy Space is small, action noise is small, power resources are convenient and low power consumption and other advantages.The lower end of lower connecting base is equipped with lower bore motor, leads to Crossing down bore motor drives lower drill bit to make high speed rotary motion, completes bore operation.
Horizontal mobile device first passes through horizontal drive motor and provides driving force, and horizontal drive motor output shaft is driven to make high speed Rotary motion.Then the drive pulley of horizontal drive motor output shaft will be installed on and be installed on the driven pulley of drive shaft It is linked together by transmission belt, in this way under the action of conveyer belt, is transferred a driving force in drive shaft.Then it is driven in active Under the engagement of driving wheel and upper driven driving wheel and active drive wheel and under driven driving wheel engagement under, by driving force It is transferred on the upper and lower transmission shaft of transmission shaft respectively.Finally under the engagement of upper initiative driver and upper driven transmission wheel With under the engagement of lower initiative driver and lower driven transmission wheel, driving force is transferred to upper drive lead screw and underdrive respectively On screw rod, in this way in upper transmission nut and under the action of with underdrive nut, so that it may drill seat in drive and lower drilling seat divides Make laterally linear motion, the opposite position in adjusting in the transverse direction of drill bit and lower drill bit not on the first guide rail and the second guide rail It sets, so that upper drill bit and lower drill bit be helped to complete bore operation.Such driving mounting means only needs to pacify in a lateral direction Fill a motor, so that it may which drilling seat and lower drilling seat make lateral straight line fortune on the first guide rail and the second guide rail respectively in realization It is dynamic, while adjusting upper drill bit and lower drill bit in a lateral direction, working efficiency is not only greatly increased, but also reduce one Driving equipment reduces the part of machine, has saved the energy while realizing identical work.
Conveying device by conveying truss and table top lath, (do not draw in figure by the fixture that table top lath is equipped with placement glass Out), glass pieces are clamped.The lower end for conveying truss is equipped with conveying, and conveying slides conveying truss above it It is dynamic, help transporting glass workpiece.Conveyance screw rod is driven to make high speed rotation fortune by feed drive device feed drive motor It is dynamic, under the action of conveyance nut, slides conveying truss on conveying, help transporting glass workpiece.Pass through One support and the second support, support lower cross frame and vertical support frame respectively, keep the structure of body stronger.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings:
Fig. 1 is a kind of structural schematic diagram of the full-automatic glass drilling machine applied to glass production processing in the present invention;
Fig. 2 is that upper borehole drill construction is installed on the schematic perspective view on crossbearer in the present invention;
Fig. 3 is that the first guide rail and upper drive lead screw are installed on the schematic perspective view on crossbearer in the present invention;
Fig. 4 is that the second guide rail and underdrive screw rod are installed on the schematic perspective view on lower cross frame in the present invention;
Fig. 5 is the schematic perspective view of conveying device in the present invention;
Fig. 6 is the structural schematic diagram of upper borehole drill construction in the present invention;
Fig. 7 is the structural schematic diagram of lower borehole drill construction in the present invention;
Fig. 8 is that upper connecting base is installed on the structural schematic diagram on drilling seat in the present invention;
Fig. 9 be in the present invention in Fig. 8 A to structural schematic diagram;
Figure 10 is that lower connecting base is installed on the structural schematic diagram on lower drilling seat in the present invention;
Figure 11 be in the present invention in Figure 10 B to structural schematic diagram;
Figure 12 is the structural schematic diagram of upper drilling frame in the present invention;
Figure 13 is the structural schematic diagram of upper crankshaft in the present invention;
Figure 14 is the structural schematic diagram of horizontal mobile device in the present invention.
Specific embodiment
As shown in figs. 1 to 14, a kind of full-automatic glass drilling machine applied to glass production processing, including 1 He of base Conveying device 3, conveying device 3 are located on base 1.The two sides of conveying device 3 be equipped with vertical support frame 2, vertical support frame 2 it is upper End is equipped with upper crossbearer 9, and upper crossbearer 9 is fixedly installed in vertical support frame 2, and the lower end of vertical support frame 2 is equipped with lower cross frame 10, under Crossbearer 10 is fixedly installed in base 1.The lower end of lower cross frame 10 is equipped with the first support 8, and the lower end of vertical support frame 2 is equipped with second Support 5, the first support 8 and the second support 5 are fixedly installed in base 1.By the first support 8 and the second support 5, prop up respectively Lower cross frame 10 and vertical support frame 2 are supportted, keeps the structure of body stronger.Upper crossbearer 9 and the laterally setting of lower cross frame 10, conveying dress It is longitudinally disposed to set 3.Upper crossbearer 9 is equipped with the first guide rail 11, and the first guide rail 11 is equipped with the first sliding block 13, the first guide rail 11 and the One sliding block 13 matches, and is connected with borehole drill construction 4 on the first sliding block 13.Lower cross frame 10 is equipped with the second guide rail 12, and second leads Rail 12 is equipped with the second sliding block 14, and the second guide rail 12 matches with the second sliding block 14, is connected with lower drilling machine on the second sliding block 14 Structure 6.Conveying device 3 is used for transporting glass workpiece, and glass pieces are transported between supreme borehole drill construction 4 and lower borehole drill construction 6, into Row bore operation.Conveying device 3 is longitudinally disposed, upper crossbearer 9 and the laterally setting of lower cross frame 10, upper borehole drill construction 4 and lower drilling machine Structure 6 can be for linear motion on upper crossbearer 9 and lower cross frame 10, glass pieces is inputted from the front end of machine in this way, then in machine The centre of device carries out bore operation by upper borehole drill construction 4 and lower borehole drill construction 6, finally passes through hole-drilled glass pieces defeated Device 3 is sent, is exported in the rear end of machine.Upper borehole drill construction 4 is installed on crossbearer 9, and lower borehole drill construction 6 is installed on lower cross frame 10 On, it is equipped with borehole space between upper borehole drill construction 4 and lower borehole drill construction 6, carries out bore operation.
Upper borehole drill construction 4 includes upper drilling seat 41 and upper drilling frame 42, and upper drilling seat 41 connects the first sliding block 13, upper drilling Frame 42 is movably installed on drilling seat 41.Upper drilling frame 42 is connected with crankshaft 43, and one end of upper crankshaft 43 is connected with first Lever 45, the other end of the first lever 45 are connected with the first cylinder 46, and the other end of upper crankshaft 43 is connected with upper connecting rod 44, on The other end of connecting rod 44 is connected with connecting shaft 47, and the other end of upper connecting shaft 47 is connected with upper connecting base 48, upper connecting base 48 are connected with third sliding block 53, and third sliding block 53 is connected with third guide rail 52, and third sliding block 53 matches with third guide rail 52, the Three guide rails 52 are fixedly installed on drilling seat 41, and the lower end of upper connecting base 48 is equipped with upper bore motor 49, upper bore motor 49 It is connected with auger spindle 50, the other end of upper auger spindle 50 is connected with drill bit 51.When upper drill bit 51 needs to make up and down in vertical direction When linear motion, by starting the first cylinder 46, the first cylinder 46 makees flexible linear motion, the first lever 45 is driven to agitate song Axis 43 rotates.Upper drilling frame 42 is equipped with the through hole (not marking in figure) for making upper connecting rod 44 make upper and lower linear slide, finally Under the linkage effect of upper connecting shaft 47, upper connecting base 48 is driven to move up and down linearly in the vertical direction.Upper drilling seat 41 On be fixed with third sliding block 53 and third guide rail 52, the process that such upper connecting base 48 moves up and down linearly in the vertical direction In, by the mutual cooperation of third sliding block 53 and third guide rail 52, on preferably drive upper connecting base 48 is made in the vertical direction Lower linear motion.In such a way that the driving upper connecting base 48 of cylinder moves up and down linearly in the vertical direction, energy conservation and environmental protection, With operating rate fast, stable transmission, maintenance it is convenient, it is cheap, occupy little space, action noise is small, power resources Convenient and low power consumption and other advantages.The lower end of upper connecting base 48 is equipped with upper bore motor 49, is driven and is bored by upper bore motor 49 First 51 make high speed rotary motion, complete bore operation.
Lower borehole drill construction 6 includes lower drilling seat 61 and lower drilling frame 62, and lower drilling seat 61 connects the second sliding block 14, lower drilling Frame 62 is movably installed on drilling seat 41.Lower drilling frame 62 is connected with lower crankshaft 63, and one end of lower crankshaft 63 is connected with second Lever 65, the other end of the second lever 65 are connected with the second cylinder 66, and the other end of lower crankshaft 63 is connected with lower connecting rod 64, under The other end of connecting rod 64 is connected with lower connecting shaft 67, and the other end of lower connecting shaft 67 is connected with lower connecting base 68, lower connecting base 68 are connected with Four-slider 93, and Four-slider 93 is connected with the 4th guide rail 92, and Four-slider 93 matches with the 4th guide rail 92, the Four guide rails 92 are fixedly installed on lower drilling seat 61, and the upper end of lower connecting base 68 is equipped with lower bore motor 69, lower bore motor 69 It is connected with lower auger spindle 70, the other end of lower auger spindle 70 is connected with lower drill bit 91.Instantly drill bit 91 needs to make up and down in vertical direction When linear motion, by starting the second cylinder 66, the second cylinder 66 makees flexible linear motion, the second lever 65 is driven to agitate lower song Axis 63 rotates.Lower drilling frame 62 is equipped with the through hole (not marking in figure) for making lower connecting rod 64 make upper and lower linear slide, finally Under the linkage effect of lower connecting shaft 67, lower connecting base 68 is driven to move up and down linearly in the vertical direction.Lower drilling seat 61 On be fixed with Four-slider 93 and the 4th guide rail 92, the process that such lower connecting base 68 moves up and down linearly in the vertical direction In, by the mutual cooperation of Four-slider 93 and the 4th guide rail 92, on preferably drive lower connecting base 68 is made in the vertical direction Lower linear motion.In such a way that the driving lower connecting base 68 of cylinder moves up and down linearly in the vertical direction, energy conservation and environmental protection, With operating rate fast, stable transmission, maintenance it is convenient, it is cheap, occupy little space, action noise is small, power resources Convenient and low power consumption and other advantages.The lower end of lower connecting base 68 is equipped with lower bore motor 69, drives lower bore by lower bore motor 69 First 91 make high speed rotary motion, complete bore operation.
Horizontal mobile device 7 is equipped between upper borehole drill construction 4 and lower borehole drill construction 6.Horizontal mobile device 7 includes laterally driving Dynamic motor 71, drive shaft 76, transmission shaft and drive lead screw, transmission shaft include upper transmission shaft 77 and lower drive shaft 78, drive lead screw Including upper drive lead screw 79 and underdrive screw rod 80, horizontal drive motor 71 is fixedly installed in base 1, and upper transmission shaft 77 is under Transmission shaft 78 is vertically arranged, the laterally setting of drive shaft 76, upper drive lead screw 79 and underdrive screw rod 80, in upper drive lead screw 79 Between be equipped with upper transmission nut 83, upper transmission nut 83 is connected with transmission nut seat 85, and upper transmission nut seat 85 is connected and drilled Seat 41, the both ends of upper drive lead screw 79 are equipped with upper drive lead screw fixing seat 81, and the centre of underdrive screw rod 80 is equipped with underdrive spiral shell Mother 84, underdrive nut 84 are connected with underdrive nut seat 86, the lower seat 61 that drills of the connection of underdrive nut seat 86, underdrive screw rod 80 both ends are equipped with underdrive screw rod fixing seat 82.Horizontal drive motor 71 is connected with horizontal drive motor output shaft 72, laterally Driving motor output shaft 72 is equipped with drive pulley 73, and drive shaft 76 is equipped with driven pulley 75,73 He of drive pulley Transmission belt 74 is equipped between driven pulley 75.Drive shaft 76 is equipped with active drive wheel 95, and the lower end of upper transmission shaft 77 is equipped with Upper driven driving wheel 96, active drive wheel 95 are meshed with upper driven driving wheel 96, and the upper end of lower drive shaft 78 is equipped with down driven Driving wheel 87, the driven driving wheel 87 under of active drive wheel 95 are meshed.The upper end of upper transmission shaft 77 is equipped with upper initiative driver 88, the left end of upper drive lead screw 79 is equipped with upper driven transmission wheel 89, and upper initiative driver 88 is meshed with upper driven transmission wheel 89, The lower end of lower drive shaft 78 is equipped with lower initiative driver 97, and the left end of underdrive screw rod 80 is equipped with lower driven transmission wheel 98, lower master Dynamic driving wheel 97 is meshed with lower driven transmission wheel 98.Horizontal mobile device 7 first passes through horizontal drive motor 71 and provides driving force, Horizontal drive motor output shaft 72 is driven to make high speed rotary motion.Then the active of horizontal drive motor output shaft 72 will be installed on Belt pulley 73 is linked together with the driven pulley 75 for being installed on drive shaft 76 by transmission belt 74, in this way in the work of conveyer belt Under, transfer a driving force in drive shaft 76.Then under the engagement of active drive wheel 95 and upper driven driving wheel 96 Under the engagement of driven driving wheel 87, it is upper and lower that driving force is transferred to upper transmission shaft 77 respectively under with active drive wheel 95 On transmission shaft 78.Finally under the engagement of upper initiative driver 88 and upper driven transmission wheel 89 and lower initiative driver 97 and Under the engagement of lower driven transmission wheel 98, driving force is transferred to respectively on upper drive lead screw 79 and underdrive screw rod 80, this Sample is in upper transmission nut 83 and under the action of with underdrive nut 84, so that it may drill seat 41 in drive and lower drilling seat 61 is distinguished Make laterally linear motion on the first guide rail 11 and the second guide rail 12, in adjusting in the transverse direction of drill bit 51 and lower drill bit 91 Relative position, so that upper drill bit 51 and lower drill bit 91 be helped to complete bore operation.Such driving mounting means is only needed in cross One motor is installed on direction, so that it may which drilling seat 41 and lower drilling seat 61 are led in the first guide rail 11 and second respectively in realization Make laterally linear motion on rail 12, while adjusting upper drill bit 51 and lower drill bit 91 in a lateral direction, not only greatly increases Working efficiency, and reduce a driving equipment, while realizing identical work, reduce the part of machine, saves The energy.
Conveying device 3 includes guide rails fixing support 31, conveys truss 33 and table top lath 34, is equipped between guide rails fixing support 31 Guide supporting 38, guide rails fixing support 31 are equipped with conveying 32, and conveying 32 is equipped with conveying truss 33, conveys truss 33 It is equipped with table top lath 34, table top lath 34 is fixedly installed on conveying truss 33.Conveying device 3 passes through conveying truss 33 and platform Panel item 34, table top lath 34 are equipped with the fixture (being not drawn into figure) for placing glass, clamp glass pieces.Convey truss 33 Lower end is equipped with conveying 32, and conveying 32 slides conveying truss 33 above it, helps transporting glass workpiece.It is defeated Send the side of truss 33 that feed drive device is installed, feed drive device includes feed drive motor 39, feed drive motor 39 are connected with conveyance screw rod 37, and conveyance screw rod 37 is equipped with conveyance nut 35, sets on conveyance nut 35 Have and is equipped with conveying attachment base 36, the conveying connection conveying truss 33 of attachment base 36.Pass through feed drive device feed drive motor 39 It drives conveyance screw rod 37 to make high speed rotary motion, under the action of conveyance nut 35, is conveying conveying truss 33 It is slided on guide rail 32, helps transporting glass workpiece.
The present invention it is a kind of applied to glass production processing full-automatic glass drilling machine working principle: when start carry out glass When glass bore operation, first glass pieces are fixed on conveying truss 33, starts feed drive motor 39, glass pieces is passed through Conveying device 3 is transported from the front end of machine to upper borehole drill construction 4 and lower borehole drill construction 6, and horizontal mobile device is then passed through 7, so that borehole drill construction 4 and lower borehole drill construction 6 is made laterally linear motion on the first guide rail 11 and the second guide rail 12 respectively, adjusts Relative position in the horizontal direction of upper drill bit 51 and lower drill bit 91 and glass pieces.Then the first cylinder 46 and is respectively started Two cylinders 66 drive upper borehole drill construction 4 and lower the borehole drill construction 6 vertical side on upper drilling seat 41 and lower drilling seat 61 respectively Upward linear motion, the relative position in adjusting on drill bit 51 and lower drill bit 91 and the vertical direction of glass pieces.It is to be regulated Well when the relative position of upper drill bit 51 and lower drill bit 91 and glass pieces, bore motor 49 and lower bore motor 69 in starting, into Row bore operation completes a drilling operation.Above-mentioned method is finally installed, the other positions in glass pieces are respectively completed Bore operation.After all drilling operations to be done, by conveying device 3, after the glass pieces that completion is drilled are by machine End output, to complete entire bore operation.
The above is only specific embodiments of the present invention, but technical characteristic of the invention is not limited thereto.It is any with this hair Based on bright, to solve essentially identical technical problem, essentially identical technical effect is realized, made ground simple change, etc. With replacement or modification etc., all it is covered by among protection scope of the present invention.

Claims (8)

1. a kind of full-automatic glass drilling machine applied to glass production processing, including base and conveying device, the conveying dress Setting on the base, it is characterised in that: the two sides of the conveying device are equipped with vertical support frame, the vertical support frame Upper end is equipped with upper crossbearer, and the upper crossbearer is fixedly installed in the vertical support frame, and the lower end of the vertical support frame is equipped with Lower cross frame, the lower cross frame are fixedly installed in the base, and the upper crossbearer and the lower cross frame are laterally arranged, the conveying Device is longitudinally disposed, and the upper crossbearer is equipped with the first guide rail, and first guide rail is equipped with the first sliding block, first guide rail Match with first sliding block, be connected with borehole drill construction on first sliding block, upper borehole drill construction include upper drilling seat and Upper drilling frame, the upper drilling seat connect first sliding block, and the upper drilling frame is movably installed on the upper drilling seat, institute It states drilling frame and is connected with crankshaft, one end of the upper crankshaft is connected with the first lever, and the other end of first lever connects It is connected to the first cylinder, the other end of the upper crankshaft is connected with upper connecting rod, and the other end of the upper connecting rod is connected with company Spindle, the other end of the upper connecting shaft are connected with upper connecting base, and the upper connecting base is connected with third sliding block, and the third is sliding Block is connected with third guide rail, and the third sliding block matches with the third guide rail, and the third guide rail is fixedly installed in described On upper drilling seat, the lower end of the upper connecting base is equipped with upper bore motor, and the upper bore motor is connected with auger spindle, it is described on The other end of auger spindle is connected with drill bit, and the lower cross frame is equipped with the second guide rail, and second guide rail is equipped with the second sliding block, Second guide rail matches with second sliding block, and lower borehole drill construction, the lower drilling machine are connected on second sliding block Structure includes lower drilling seat and lower drilling frame, and the lower drilling seat connects second sliding block, and the lower drilling frame is movably installed in On the upper drilling seat, the lower drilling frame is connected with lower crankshaft, and one end of the lower crankshaft is connected with the second lever, and described The other end of two levers is connected with the second cylinder, and the other end of the lower crankshaft is connected with lower connecting rod, the lower connecting rod The other end is connected with lower connecting shaft, and the other end of the lower connecting shaft is connected with lower connecting base, and the lower connecting base is connected with Four-slider, the Four-slider are connected with the 4th guide rail, and the Four-slider matches with the 4th guide rail, and the described 4th leads Rail is fixedly installed on the lower drilling seat, and the upper end of the lower connecting base is equipped with lower bore motor, and the lower bore motor connects It is connected to lower auger spindle, the other end of the lower auger spindle is connected with drill bit, between the upper borehole drill construction and the lower borehole drill construction Equipped with horizontal mobile device.
2. a kind of full-automatic glass drilling machine applied to glass production processing according to claim 1, it is characterised in that: institute Stating horizontal mobile device includes horizontal drive motor, drive shaft, transmission shaft and drive lead screw, and the transmission shaft includes upper transmission shaft And lower drive shaft, the drive lead screw include upper drive lead screw and underdrive screw rod, the horizontal drive motor is fixedly installed in In the base, the upper transmission shaft and the lower drive shaft are vertically arranged, the drive shaft, the upper drive lead screw and described Underdrive screw rod is laterally arranged, and the centre of the upper drive lead screw is equipped with upper transmission nut, and the upper transmission nut is connected with Transmission nut seat, the upper transmission nut seat connect the upper drilling seat, and the both ends of the upper drive lead screw are equipped with upper driving wire The centre of bar fixing seat, the underdrive screw rod is equipped with underdrive nut, and the underdrive nut is connected with underdrive nut seat, The underdrive nut seat connects the lower drilling seat, and the both ends of the underdrive screw rod are equipped with underdrive screw rod fixing seat.
3. a kind of full-automatic glass drilling machine applied to glass production processing according to claim 2, it is characterised in that: institute It states horizontal drive motor and is connected with horizontal drive motor output shaft, the horizontal drive motor output shaft is equipped with drive pulley Wheel, the drive shaft are equipped with driven pulley, and transmission belt is equipped between the drive pulley and the driven pulley.
4. a kind of full-automatic glass drilling machine applied to glass production processing according to claim 2, it is characterised in that: institute Drive shaft is stated equipped with active drive wheel, the lower end of the upper transmission shaft is equipped with upper driven driving wheel, the active drive wheel with The upper driven driving wheel is meshed, and the upper end of the lower drive shaft is equipped with down driven driving wheel, the active drive wheel and institute Driven driving wheel is stated down to be meshed.
5. a kind of full-automatic glass drilling machine applied to glass production processing according to claim 2, it is characterised in that: institute The upper end for stating transmission shaft is equipped with upper initiative driver, and the left end of the upper drive lead screw is equipped with upper driven transmission wheel, it is described on Initiative driver is meshed with the upper driven transmission wheel, and the lower end of the lower drive shaft is equipped with lower initiative driver, under described The left end of drive lead screw is equipped with lower driven transmission wheel, and the lower initiative driver is meshed with the lower driven transmission wheel.
6. a kind of full-automatic glass drilling machine applied to glass production processing according to claim 1, it is characterised in that: institute Stating conveying device includes guide rails fixing support, conveys truss and table top lath, is equipped with guide supporting, institute between the guide rails fixing support Guide rails fixing support is stated equipped with conveying, the conveying is equipped with the conveying truss, and the conveying truss is equipped with The table top lath, the table top lath are fixedly installed on the conveying truss.
7. a kind of full-automatic glass drilling machine applied to glass production processing according to claim 6, it is characterised in that: institute The side for stating conveying truss is equipped with feed drive device, and the feed drive device includes feed drive motor, the conveying Driving motor is connected with conveyance screw rod, and the conveyance screw rod is equipped with conveyance nut, the conveyance spiral shell Mother is equipped with conveying attachment base, and the conveying attachment base connects the conveying truss.
8. a kind of full-automatic glass drilling machine applied to glass production processing according to claim 1, it is characterised in that: institute The lower end for stating lower cross frame is equipped with the first support, and the lower end of the vertical support frame is equipped with the second support, first support and institute The second support is stated to be fixedly installed in the base.
CN201510615825.9A 2015-09-23 2015-09-23 A kind of full-automatic glass drilling machine applied to glass production processing Active CN105171932B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510615825.9A CN105171932B (en) 2015-09-23 2015-09-23 A kind of full-automatic glass drilling machine applied to glass production processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510615825.9A CN105171932B (en) 2015-09-23 2015-09-23 A kind of full-automatic glass drilling machine applied to glass production processing

Publications (2)

Publication Number Publication Date
CN105171932A CN105171932A (en) 2015-12-23
CN105171932B true CN105171932B (en) 2019-09-20

Family

ID=54894593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510615825.9A Active CN105171932B (en) 2015-09-23 2015-09-23 A kind of full-automatic glass drilling machine applied to glass production processing

Country Status (1)

Country Link
CN (1) CN105171932B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107186896B (en) * 2017-07-25 2019-02-12 重庆华瑞玻璃有限公司 A kind of automatic drilling machine for glass
CN107322817B (en) * 2017-07-25 2019-02-05 重庆华瑞玻璃有限公司 A kind of glass automatic drilling machine with deceleration
CN107856200A (en) * 2017-12-19 2018-03-30 芜湖金三氏数控科技有限公司 A kind of glass drilling machine positioning conveyer structure

Family Cites Families (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203779703U (en) * 2014-01-03 2014-08-20 新昌县奇鹏自动化设备有限公司 Automatic stone punching device
CN103802221B (en) * 2014-02-27 2016-01-06 董君良 The movable table structure of two-way digital control glass automatic drilling machine
CN203818344U (en) * 2014-03-19 2014-09-10 湖南三星磊洋玻璃机械有限公司 Horizontal glass-drilling machine
CN103862582B (en) * 2014-03-19 2015-10-28 湖南三星玻璃机械有限公司 Glass drilling machine transport unit and glass drilling machine thereof
CN203844018U (en) * 2014-05-12 2014-09-24 黄光明 Full-automatic bridge cutting machine
CN204123535U (en) * 2014-09-15 2015-01-28 吴永评 Full automatic stone slab side pin all-in-one
CN104369044A (en) * 2014-11-12 2015-02-25 桐乡胜辉精密机械有限公司 Vertical machining device
CN104669364B (en) * 2015-02-15 2016-09-28 合肥国源展览展示有限公司 A kind of all automatic borehole device and processing method thereof
CN104647479B (en) * 2015-02-16 2016-08-24 陈菁菁 A kind of full-automatic board two dimension drilling equipment and processing method thereof
CN104626285B (en) * 2015-02-16 2016-08-24 陈明辉 A kind of hypotenuse sheet material automatically two dimension drilling equipment and processing method thereof
CN205009411U (en) * 2015-09-23 2016-02-03 嵊州市寰鼎玻璃科技有限公司 Be applied to full -automatic glass drilling machine of glass production and processing

Also Published As

Publication number Publication date
CN105171932A (en) 2015-12-23

Similar Documents

Publication Publication Date Title
CN105171932B (en) A kind of full-automatic glass drilling machine applied to glass production processing
CN203471333U (en) Full-automatic double-end drilling and cutting integrated machine
CN107826716A (en) A kind of vibrating disk spring leaf process units
CN112222449A (en) Profile drilling system and method
CN205009411U (en) Be applied to full -automatic glass drilling machine of glass production and processing
CN207223517U (en) The feed device of valve rod head chamfer machining equipment
CN205386642U (en) Diplopore deep -hole drilling machine
CN203343473U (en) Bidirectional center drilling machine
CN103447577B (en) Drilling device for tiny hole at needle end of medical suture needle with thread
CN209812794U (en) Vertical multi-station multi-cutter-head glass numerical control drilling and milling machining center
CN106042103A (en) Processing equipment of bamboo block and processing method thereof
CN107775034B (en) A kind of Multi-hole drill carrying out spacing adjustment
CN112081541B (en) Drill rod conveying device for geological exploration
CN205870756U (en) Timber drilling device
CN214263996U (en) Multi-hole-site drilling tool for ultra-precise motor flange
CN205386643U (en) Diplopore deep hole rig
CN208231390U (en) A kind of multi-hole drill automatic feeding
CN109108664A (en) A kind of automatic manufacturing device of the reinforcing machine accessory of bar tacking machine
CN107855560A (en) A kind of novel multi-station rig
CN208497359U (en) Jewelry efficient drilling device
CN208929687U (en) A kind of automatic manufacturing device of the reinforcing machine accessory of bar tacking machine
CN113843625A (en) Split type gear box machining and assembling tool and assembling method thereof
CN206811585U (en) A kind of lathe lowering or hoisting gear
CN205057511U (en) Valve rod automatic processing flowing water car
CN205967468U (en) Boring mill

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190826

Address after: 528226 Warehouse of Intermodal Transport Corporation in Zhangchaicheng West Industrial Development Zone, Chancheng District, Foshan City, Guangdong Province

Applicant after: Foshan Jin Yaohua Glass Co., Ltd.

Address before: 312400 Shengzhou, Zhejiang, Sanjiang city street, the new village water separation

Applicant before: SHENGZHOU HUANDING GLASS SCIENCE & TECHNOLOGY CO., LTD.

GR01 Patent grant
GR01 Patent grant