CN105160144B - A kind of monitoring method suitable for soft-medium explosion bulge and blast chamber motion - Google Patents

A kind of monitoring method suitable for soft-medium explosion bulge and blast chamber motion Download PDF

Info

Publication number
CN105160144B
CN105160144B CN201510341385.2A CN201510341385A CN105160144B CN 105160144 B CN105160144 B CN 105160144B CN 201510341385 A CN201510341385 A CN 201510341385A CN 105160144 B CN105160144 B CN 105160144B
Authority
CN
China
Prior art keywords
medium
soft
mentioned
blast chamber
fried
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510341385.2A
Other languages
Chinese (zh)
Other versions
CN105160144A (en
Inventor
吴亮
鲁帅
许锋
李凤
陈沛
蔡路军
曾国伟
司剑峰
蒋培
张鹏泉
张曾
刘滔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan University of Science and Engineering WUSE
Original Assignee
Wuhan University of Science and Engineering WUSE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan University of Science and Engineering WUSE filed Critical Wuhan University of Science and Engineering WUSE
Priority to CN201510341385.2A priority Critical patent/CN105160144B/en
Publication of CN105160144A publication Critical patent/CN105160144A/en
Application granted granted Critical
Publication of CN105160144B publication Critical patent/CN105160144B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to explosion field, relates generally to a kind of monitoring method suitable for soft-medium explosion bulge and blast chamber motion, including:The first step:Blasting simulation medium moulding;Second step:Treat that quick-fried simulation medium side sets observation window what the above-mentioned first step obtained, and monitoring record equipment is arranged before observation window;3rd step:Medicine is buried in drilling;4th step:Blast monitoring;5th step:Data processing.The monitoring method construction is simple, short time limit, cost saving that are applied to soft-medium explosion bulge and blast chamber motion of the present invention, effectively can be monitored to blast chamber motion.

Description

A kind of monitoring method suitable for soft-medium explosion bulge and blast chamber motion
Technical field
The invention belongs to explosion field, relates generally to a kind of monitoring side suitable for soft-medium explosion bulge and blast chamber motion Method.
Background technology
In basement process, chamber is expanded in the explosion of underground pile, plays dense extrusion pile foundation surrounding medium, increase stake hole size, subtracts The purpose of small excacation amount;In slope blasting Shape correction technology during the bench blasting of gentle slope, expand chamber increase using more separate explosions The explosive payload of blasthole bottom, make the Explosive Energy of explosive treat to be evenly distributed in quick-fried rock mass, disposably carry out stripping and cut top;
The one kind of explosive replacement technology as removing silt for replacement method, has obtained rapid development in recent years.Explosive replacement technology It is initially known as " Toe shooting method ", is exactly buried in stone riprap outer rim certain distance and the Muddy Soft Foundations of depth and put pack Group, detonation moment form cavity in mud, and stone riprap caves in immediately fills cavity formation " stone tongue ", reaches the mesh of displacement mud 's.Through repeatedly promoting explosion, you can reach final displacement and require.This method can be used for breakwater, shore protection, coastal ash disposal area to enclose Dike, reclaim fields from the sea and the Muddy Soft Foundations processing of the coastal cultivation hydraulic engineering such as embankment.Due to the technology and conventional construction work Skill is compared, it is not necessary to which large-scale construction equipment and complicated construction technology, consumption manpower is few, can shorten duration and can saving throwing Money, its application is more and more wider, and important work has all been played in the construction such as railway, highway, harbour, airport, nuclear power station With.To the study mechanism of explosive replacement, unified understanding is there is no at present, it is necessary to further study.
Blast chamber is widely used in pot hole blasting and expands chamber, mud tight-face blasting, weak soil explosion densification and build building Basis, underground storehouse, defence blindage etc..Because blast chamber application value is big, existing formation of many scholars to blast chamber has been carried out greatly Quantifier elimination.Blast forms cavity in using explosive as the soil of the energy, and its forming model is more.Because soil is mineral A kind of three-phase medium of grain, water and air composition, native structure is very complicated, and species is also very more, and respectively has from corresponding blast Deformation rule.Even for same soil property, under different condition (such as hole reclaimed water and gas content), also in compliance with different Deformation rule.Therefore, different geological conditions, blast chamber forming process it is widely different.At present, using blast chamber volume profile method Measured with two methods of water flood, its error is larger, does not observe the dynamic process for expanding chamber, and be unfavorable for blasting experiment data Collection.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of prison suitable for soft-medium explosion bulge and blast chamber motion Survey method, effectively solve and be difficult to observe by the dynamic process that chamber is expanded in explosion in the prior art, and measurement error is big, is unfavorable for The defects of collection of blasting experiment data.
The technical scheme that the present invention solves above-mentioned technical problem is as follows:One kind is applied to soft-medium explosion bulge and transported with blast chamber Dynamic monitoring method, comprises the following steps:
The first step:Blasting medium moulding, specifically, being tamped using soft-medium accumulation, moulding, obtain treating that quick-fried simulation is situated between Matter, and the compactness for treating quick-fried simulation medium is tested using standard penetration test (SPT) so that this treats the compactness of quick-fried medium with actually treating The density of the soft-medium of survey matches (as equal), wherein soft-medium to be measured is the geologic structures such as mud, weak soil;
Second step:What is obtained in the above-mentioned first step treats that quick-fried simulation medium side sets observation window, and the cloth before observation window Put monitoring record equipment;
3rd step:Medicine is buried in drilling, is specially:
Step s1:Drilled vertically downward on the surface for treating quick-fried simulation medium;
Step s2:From step s1 drilling to treating explosive inside quick-fried simulation medium, synchro measure bury medicine depth W and Horizontal range d of the explosive away from observation window in above-mentioned second step;
Step s3:Fill above-mentioned drilling and tamp;
4th step:Blast monitoring, it is specially:Explosive in above-mentioned 3rd step of detonating, it is synchronous to pass through observation window in second step Preceding monitoring record equipment is monitored to blast springing, palliation care, throwing process, and measurement obtains space radius r, bulge half Footpath R1;
5th step:Data processing, it is specially:The data obtained according to above-mentioned 3rd step and the 4th step, are calculated reality Space radius R and burden decrement △ W, and obtain compression ratio I.
The beneficial effects of the invention are as follows:This method construction is simple, short time limit, cost saving, moved beneficial to observation blast chamber and quick-fried The process of broken bulge, measurement result is accurate, is easy to researcher to study blast chamber motion.
On the basis of above-mentioned technical proposal, the present invention can also do following improvement.
Further, above-mentioned soft-medium is sand.
It is easy for testing moulding and experiment using the beneficial effect of above-mentioned further scheme.
Further, in the calculating of above-mentioned actual space radius, formula is utilizedIt is determined that actual space radius R。
Beneficial effect using above-mentioned further scheme is to can accurately measure space radius.
Further, in the calculating of above-mentioned burden decrement, formula Δ W=W- (R are utilized1- R) determine resistance wire compression Measure △ W.
Beneficial effect using above-mentioned further scheme is to can accurately measure repellence decrement.
Further, in the calculating of above-mentioned compression ratio, compression ratio is determined using formula I=Δs W/W.
Beneficial effect using above-mentioned further scheme is to can accurately measure to obtain compression ratio.
Embodiment
The principles and features of the present invention are described below, and the given examples are served only to explain the present invention, is not intended to limit Determine the scope of the present invention.
Embodiment:The monitoring method for being applied to soft-medium explosion bulge and blast chamber motion of the present invention, comprises the following steps:
The first step:Blasting medium moulding, specifically, being tamped using soft-medium accumulation, moulding, obtain treating that quick-fried simulation is situated between Matter, and the compactness for treating quick-fried simulation medium is tested using standard penetration test (SPT) so that this treats the compactness of quick-fried medium with actually treating The density of the soft-medium of survey matches (as equal), wherein soft-medium to be measured is the geologic structures such as mud, weak soil;
Second step:What is obtained in the above-mentioned first step treats that quick-fried simulation medium side sets observation window, and the cloth before observation window Put monitoring record equipment;
3rd step:Medicine is buried in drilling, is specially:
Step s1:Drilled vertically downward on the surface for treating quick-fried simulation medium;
Step s2:From step s1 drilling to treating explosive inside quick-fried simulation medium, synchro measure bury medicine depth W and Horizontal range d of the explosive away from observation window in above-mentioned second step;
Step s3:Fill above-mentioned drilling and tamp;
4th step:Blast monitoring, it is specially:Explosive in above-mentioned 3rd step of detonating, it is synchronous to pass through observation window in second step Preceding monitoring record equipment is monitored to blast springing, palliation care, throwing process, and measurement obtains space radius r, bulge half Footpath R1;
5th step:Data processing, it is specially:The data obtained according to above-mentioned 3rd step and the 4th step, are calculated reality Space radius R and burden decrement △ W, and obtain compression ratio I.
Above-mentioned soft-medium is sand.
In the calculating of above-mentioned actual space radius, formula is utilizedIt is determined that actual space radius R.
In the calculating of above-mentioned burden decrement, formula Δ W=W- (R are utilized1- R) determine burden decrement △ W.
In the calculating of above-mentioned compression ratio, compression ratio is determined using formula I=Δs W/W.
The data of the blast chamber motion of the present invention are as follows:
Vertical range d=5cm of the quick-fried source away from glass
1st, quick-fried Depth w=12.5cm, time interval t=0.004s
Sequence number Space radius R (cm) R1-R(cm) Burden decrement △ W Compression ratio I
1 6 12 0.5 0.04
2 7.5 12 0.5 0.04
3 9 11 1.5 0.12
4 10 11 1.5 0.12
5 10 11 1.5 0.12
6 10.5 11 1.5 0.12
7 11 12 0.5 0.04
8 11.5 13 -0.5 -0.04
9 11.5 14 -1.5 -0.12
10 11.5 15 -2.5 -0.2
11 11.5 16 -3.5 -0.28
2nd, quick-fried Depth w=15cm, time interval t=0.004s
Above-mentioned middle burden decrement is the changing value of burden in testing, it is impossible to it is used as weighing compression degree, The amount of reflection compression degree should be compression ratio, i.e., the variable quantity of medium in unit length, be transported according to the bulge of compression ratio and monitoring Dynamic data, the value can be evaluated whether the change in size of blast chamber under the conditions of same media, identical compactness, can also pass through compression ratio Change curve reflects air work and the process of escape;When the decrement increase being calculated, show Jie in burden direction Matter is hit, and compression is upward to move, and when decrement is begun to decline, the medium for showing to compress starts dilatation of ftractureing, and gas will be escaped Ease.
The monitoring method construction is simple, short time limit, the expense that are applied to soft-medium explosion bulge and blast chamber motion of the present invention Save, effectively blast chamber motion can be monitored.
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit the invention, it is all the present invention spirit and Within principle, any modification, equivalent substitution and improvements made etc., it should be included in the scope of the protection.

Claims (3)

  1. A kind of 1. monitoring method suitable for soft-medium explosion bulge and blast chamber motion, it is characterised in that:Comprise the following steps:
    The first step:Blasting simulation medium moulding, it is specially:Tamped using soft-medium accumulation, moulding, obtain treating that quick-fried simulation is situated between Matter;
    Second step:Treat that quick-fried simulation medium side sets observation window what the above-mentioned first step obtained, and monitoring is arranged before observation window Recording equipment;
    3rd step:Medicine is buried in drilling, is specially:
    Step s1:Drilled vertically downward on the surface for treating quick-fried simulation medium;
    Step s2:From step s1 drilling to explosive inside quick-fried simulation medium is treated, synchro measure buries medicine depth W and explosive Horizontal range d away from observation window in above-mentioned second step;
    Step s3:Fill above-mentioned drilling and tamp;
    4th step:Blast monitoring, it is specially:Explosive in above-mentioned 3rd step of detonating, before synchronization is by observation window in second step Monitoring record equipment is monitored to blast springing, palliation care, throwing process, and measurement obtains space radius r, bulge radius R1;
    5th step:Data processing, it is specially:The data obtained according to above-mentioned 3rd step and the 4th step, are calculated actual blast chamber Radius R and burden decrement △ W, and obtain compression ratio I;
    Wherein, in the calculating of the actual space radius, formula is utilizedIt is determined that actual space radius R;
    In the calculating of the burden decrement, formula Δ W=W- (R are utilized1- R) determine burden decrement △ W.
  2. 2. the monitoring method according to claim 1 suitable for soft-medium explosion bulge and blast chamber motion, it is characterised in that: The soft-medium is sand.
  3. 3. the monitoring method according to claim 1 or 2 suitable for soft-medium explosion bulge and blast chamber motion, its feature exists In:In the calculating of the compression ratio, compression ratio is determined using formula I=Δs W/W.
CN201510341385.2A 2015-06-18 2015-06-18 A kind of monitoring method suitable for soft-medium explosion bulge and blast chamber motion Expired - Fee Related CN105160144B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510341385.2A CN105160144B (en) 2015-06-18 2015-06-18 A kind of monitoring method suitable for soft-medium explosion bulge and blast chamber motion

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510341385.2A CN105160144B (en) 2015-06-18 2015-06-18 A kind of monitoring method suitable for soft-medium explosion bulge and blast chamber motion

Publications (2)

Publication Number Publication Date
CN105160144A CN105160144A (en) 2015-12-16
CN105160144B true CN105160144B (en) 2017-12-05

Family

ID=54801000

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510341385.2A Expired - Fee Related CN105160144B (en) 2015-06-18 2015-06-18 A kind of monitoring method suitable for soft-medium explosion bulge and blast chamber motion

Country Status (1)

Country Link
CN (1) CN105160144B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106529016B (en) * 2016-11-07 2019-11-05 中国工程物理研究院化工材料研究所 A kind of calculation method of quick-fried thermoelastic explosion cavity radius
CN108332627B (en) * 2018-03-08 2019-07-09 武汉大学 The test method of multiple-row blasting section acting duration

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5724311A (en) * 1994-12-29 1998-03-03 Institut Francais Du Petrole Method and device for the long-term seismic monitoring of an underground area containing fluids
CN102635108A (en) * 2012-05-02 2012-08-15 天津大学 Process for treating valley silt soft foundation in mountain area by explosion method
CN104179525A (en) * 2013-05-23 2014-12-03 河南永华能源有限公司 Coal mine blasting blindage and application of coal mine blasting blindage

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20050066836A1 (en) * 2003-09-12 2005-03-31 Yigal Levi Method for controlling explosions in open mines

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5724311A (en) * 1994-12-29 1998-03-03 Institut Francais Du Petrole Method and device for the long-term seismic monitoring of an underground area containing fluids
CN102635108A (en) * 2012-05-02 2012-08-15 天津大学 Process for treating valley silt soft foundation in mountain area by explosion method
CN104179525A (en) * 2013-05-23 2014-12-03 河南永华能源有限公司 Coal mine blasting blindage and application of coal mine blasting blindage

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
《Blast response of a lined cavity in a porous saturated soil》;V.R.Feldgun 等;《International Journal of Impact Engineering》;20070714;第35卷;全文 *
《爆炸法处理软土地基的数值模拟》;王志鹏 等;《军事交通学院学报》;20150331;第17卷(第3期);全文 *

Also Published As

Publication number Publication date
CN105160144A (en) 2015-12-16

Similar Documents

Publication Publication Date Title
CN108286920B (en) Implementation method for tunnel blasting and excavation
CN108198498B (en) Simulation device and simulation method for underground water seepage of offshore shore zone under earthquake-sea tide action
CN103091229B (en) Variable water head sectional permeation coefficient measuring equipment and measuring method
CN108489601B (en) Blasting vibration monitoring and controlling method for tunnels passing through underground pipeline in short distance
Ng et al. A case study of hydraulic fracturing using finite element methods
CN104265365A (en) Simulation test device and test method of sand inrush
CN103487569B (en) Thick loose rock-soil layer bottom water injection sedimentation deformation analog device and method
CN102912780A (en) Sandy soil water-immersion testing method for loess collapsible deformation
CN104060637B (en) A kind of centrifuge model test method that gravel pile reinforcing is soft soil roadbed
CN112067788B (en) Model test device and method for drainage law of water-bearing stratum at bottom of thick surface soil and thin bedrock
Wang et al. The volume of settlement trough change with depth caused by tunneling in sands
CN103290836A (en) Vacuum decompression compacting and consolidating construction method for soft foundation treatment
CN105160144B (en) A kind of monitoring method suitable for soft-medium explosion bulge and blast chamber motion
CN103161150A (en) Seawall silt soft base blasting orienting sliding and moving method
Li et al. Towards an optimization design of seepage control: a case study in dam engineering
CN106707364B (en) A kind of construction method of radar logging standard well
CN104537195B (en) A kind of deep rock mass Blasting Excavation induced vibration forecasting procedure based on energy principle
Wu et al. The effect of pulse frequency on the acoustic emission characteristics in coal bed hydraulic fracturing
Li et al. Computer Simulation of Sequential Impoundment Process of Concrete-faced Rockfill Dam.
Nguyen et al. Proposed modification to CPT-based liquefaction method for post-vibratory ground improvement
CN104988900B (en) A kind of method of explosion drainage sunk well liquefied foundation
CN101538849B (en) Foundation treatment method combining vibration ramming compaction at shallow layer and blasting compaction at deep layer with well-point dewatering
Mahmutoğlu et al. Sinkholes Induced by Dewatering in an Open Pit MineCase Study from a Coal Basin in Eastern Turkey
CN103938606A (en) Vibration wire type pore water pressure measuring head device capable of working stably in vacuum state in long term
Guo et al. Surface movement characteristics caused by fully-mechanized top coal caving mining under thick collapsible loess

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171205

Termination date: 20180618