CN102912780A - Sandy soil water-immersion testing method for loess collapsible deformation - Google Patents

Sandy soil water-immersion testing method for loess collapsible deformation Download PDF

Info

Publication number
CN102912780A
CN102912780A CN2012104254169A CN201210425416A CN102912780A CN 102912780 A CN102912780 A CN 102912780A CN 2012104254169 A CN2012104254169 A CN 2012104254169A CN 201210425416 A CN201210425416 A CN 201210425416A CN 102912780 A CN102912780 A CN 102912780A
Authority
CN
China
Prior art keywords
loess
sand
testing
pressure gauge
prospect pit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012104254169A
Other languages
Chinese (zh)
Other versions
CN102912780B (en
Inventor
邵生俊
焦阳阳
陈菲
邓国华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Railway Group Co Ltd
Original Assignee
Xian University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Technology filed Critical Xian University of Technology
Priority to CN201210425416.9A priority Critical patent/CN102912780B/en
Publication of CN102912780A publication Critical patent/CN102912780A/en
Application granted granted Critical
Publication of CN102912780B publication Critical patent/CN102912780B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention discloses a sandy soil water-immersion testing method for loess collapsible deformation. The method includes the steps: digging an exploratory well on the stratum surface, and taking collapsible loess below the exploratory well as to-be-tested soil mass; selecting a bearing plate, fixing a sedimentation rod above the bearing plate, and mounting a soil pressure gauge on the bearing plate; removing dig fictitious soil at the bottom of the exploratory well, laying a sand bed, placing the bearing plate on the sand bed, and enabling the measuring signal line of the soil pressure gauge to extend out of the stratum surface upwards; and filling sand gravels in the exploratory well, filling water after sufficient sand gravels are filled, and measuring the earth pillar pressure formed by the sand gravels by the soil pressure gauge, wherein sedimentation displacement change of the sedimentation rod refers to collapsible deformation of the collapsible loess. By the sandy soil water-immersion testing method for loess collapsible deformation, the defects of disturbance of soil sample obtaining and sample preparation on loess structuredness in indoor collapsibility tests, high on-site water-immersion test pit testing cost and limited testing points are overcome.

Description

The sand immersion method of testing of collapsibility of loess distortion
Technical field
The invention belongs to Canal in Loess Area ground field tests technical field, be specifically related to a kind of sand immersion method of testing of collapsibility of loess distortion.
Background technology
The settlement by soaking of loess and evaluation method thereof are the technical barriers that Canal in Loess Area geotechnical engineering field is concerned and studies always.The settlement by soaking of test and evaluation loess and the Collapsing Deformation method of ground mainly contain two kinds: the one, and on-site layering is taked intact loess, immersion settlement by soaking experimental test coefficient of collapsibility based on loess sample under the indoor uniaxial compression lateral confinement distortional stress condition, the Collapsing Deformation of each soil layer with identical settlement by soaking is calculated in elder generation's layering, then, ask summation to estimate the Collapsing Deformation of place ground; The 2nd, the digging in-situ diameter is not less than testing pits of collapsible soil layer thickness, in the internal drilling back-up sand of testing pits, vertical water guide prospect pit is set.The interior direct water filling of testing pits, prospect pit can be accelerated the Deep Loess immersion.Sedimentation and deformation according to directly testing earth's surface and each soil layer of different buried depth carries out collapsibility of loess analysis and Collapsing Deformation evaluation.
For the former indoor settlement by soaking test method, the yardstick of sample is little, is the thick thin sample of 2cm, the lateral deformation of restriction sample.The problem one that exists is that soil sample is thin, may destroy the structural of soil when sample prepares, can not reflect structure on the impact of settlement by soaking; The 2nd, sample is under the lateral confinement distortion compressive stress condition all the time, and the variation of stress condition there are differences during with the actual formation Collapsing Deformation; The 3rd, when being applied to the damp sink of foundation evaluation, can not reflect continuously that earth formation is on the impact of ground Collapsing Deformation.For test pits settlement by soaking test of the immersion at latter scene, vertical water guide prospect pit is set in the immersion hole can very fast saturated Loess Layer, immersion Collapsing Deformation process has reflected the impact of structural behavior of loess and earth formation, also can reflect the stress condition of actual immersion Collapsing Deformation process.But, for deep collapsible loess stratum, test and analytical method about the settlement by soaking of shallow-layer loess if continue to continue to use at present, on the one hand, the not enough error accumulation meeting that causes of indoor settlement by soaking test is increasing; The expense of on-the-spot submerging test is large on the other hand, and especially for linear engineering, test pits settlement by soaking test of the immersion in a place is difficult to reflect variation along the line.And, for the building on the large thickness collapsible loess foundation, excavation structure, and loess tunnel, tunnel engineering, mainly be the harm that the Collapsing Deformation of the following loess of they substrates has consisted of engineering, more need the Collapsing Deformation of Deep Loess is made correct evaluation.
Summary of the invention
The sand immersion method of testing that the purpose of this invention is to provide a kind of collapsibility of loess distortion, can embody the original position structure of loess, can realize again the multiple spot test, overcome the test of indoor settlement by soaking and taked soil sample and preparation sample to the disturbance of structural characteristic of loess, and on-the-spot the immersion large and limited deficiency in testing site of testing expenses of testing pits.
The technical solution adopted in the present invention is that a kind of sand immersion method of testing of collapsibility of loess distortion is characterized in that, carries out according to following steps:
Step 1, excavate straight down prospect pit at surface of stratum, the collapsible loess of prospect pit below is the soil body to be tested; Choose superficial area less than the loaded plate of prospect pit cross-sectional area, loaded plate is evenly to have opened a plurality of vertical permeable holes on rigid slab and the plate body, and the top of loaded plate is fixed with vertical sedimentation bar, and earth pressure gauge is installed on the loaded plate;
Step 2, the excavation loosened soil is removed in prospect pit bottom, and lay sand cushion, loaded plate is lain in a horizontal plane on the sand cushion by the sedimentation bar, make on the earth pressure gauge measurement signal alignment of earth pressure gauge and stretch out surface of stratum;
Step 3, in prospect pit, fill sand gravel after, pour into water in the prospect pit again until water to collapsible loess, finishes test behind sedimentation bar sinking stabilization; The sedimentation deformation of sedimentation bar changes the Collapsing Deformation that is collapsible loess, records the earth pillar pressure that sand gravel forms by earth pressure gauge.
Step 2 also comprises: at the outside suit of sedimentation bar sedimentation bar casing.
Step 3 also comprises: after filling sand gravel, lay prospect pit borehole wall casing first in not filling the prospect pit section of sand gravel, begin to pour water again.
The sedimentation bar is installed in the quadrature place, center of loaded plate.
The multi-segment structure of sedimentation bar for connecting successively by screw shell.
The sedimentation bar is hollow structure, and earth pressure gauge measurement signal line is arranged in the inner chamber of sedimentation bar.
The bottom opening of loaded plate, earth pressure gauge are installed in this hole.
The invention has the beneficial effects as follows: (1) the method is easy and simple to handle, only needs the prospect pit of excavation rule, buries loaded plate and sedimentation bar etc. underground, on be covered with the effect load and fill sand gravel, do not need complicated especially equipment and operating technology just can carry out.(2) test result accurately and reliably, the method is different from laboratory test, can be because of not fetching earth disturbed soil structural, can be because of the limitation of the position of soil sample and so that test structure have suitable discreteness yet, and the principle that is based on large-scale submerging test Collapsing Deformation is carried out in-situ test, has guaranteed that test structure has reflected the actual settlement by soaking of soil layer accurately and reliably.(3) testing cost is cheap, and the water source, relative complex and loaded down with trivial details testing equipment, a large amount of manpowers that are different from the large-scale place of large-scale submerging test needs, a large amount of abundances carry out long-term observation.(4) the method principle is simple and clear, device simple and very strong applicability is arranged, operating technology is easy, do not need especially that the operating personnel of specialty just can finish, not high to site requirements, as long as the zone of less than one square meter just can be finished, therefore because little a large amount of testing times and the human and material resources saved in influence area.
Description of drawings
Fig. 1 is the operating principle schematic diagram of the sand immersion method of testing of collapsibility of loess distortion of the present invention;
Fig. 2 is the structural representation of the loaded plate among the present invention;
Fig. 3 is the structural representation of the sniffer among the present invention;
Fig. 4 is the sectional drawing of the sniffer among the present invention;
Wherein, 1. prospect pit, 2. sand gravel, 3. sedimentation bar, 4. loaded plate, 5. vertical permeable hole, 6. sand cushion, 7. sedimentation bar casing, 8. earth pressure gauge measurement signal line, 9. prospect pit borehole wall casing, 10. earth pressure gauge, 11. collapsible loesses, 12. screw shells.
The specific embodiment
As shown in Figure 1, the sand immersion method of testing of collapsibility of loess distortion of the present invention, carry out according to following steps:
Step 1, excavate straight down cross section at surface of stratum and be circular prospect pit 1, prospect pit 1 vertically and to be rule circular when requiring excavation, so that transfer loaded plate 4.The collapsible loess 11 of prospect pit 1 below is the soil body to be tested.
To shown in Figure 4, sedimentation bar 3 and loaded plate 4 form the sniffer that the inventive method is used such as Fig. 2.Choose diameter less than the loaded plate 4 of prospect pit 1 diameter, loaded plate 4 is for evenly having opened a plurality of vertical permeable holes 5 on Circular Rigid Plate and the plate body, and vertical permeable hole 5 can guarantee collapsible loess 11 stratum of prospect pit 1 interior immersion infiltration loaded plate 4 belows.The top of loaded plate 4 is fixed with vertical sedimentation bar 3, and sedimentation bar 3 is installed in the quadrature place, center of loaded plate 4.The multi-segment structure of sedimentation bar 3 for connecting successively by screw shell 12, the length of sedimentation bar 3 can change according to the variation of measuring soil depth, so that this method has the very large scope of application.The bottom opening of loaded plate 4 also is equipped with earth pressure gauge 10 in the hole.
Loaded plate 4 can also be square, and its size should less than the cross-sectional area of excavation prospect pit 1, be convenient to sink at the bottom of the prospect pit.
Step 2, the excavation loosened soil is removed in prospect pit 1 bottom, and use sandstone to lay sand cushion 6, because the water permeability of sand cushion 6 is strong, has ensured and promptly to have infiltrated prospect pit 1 following soil layer in the immersion process.Loaded plate 4 is lain in a horizontal plane on the sand cushion 6 by sedimentation bar 3, make the earth pressure gauge measurement signal line 8 of earth pressure gauge 10 protrude upward surface of stratum.Wherein, sedimentation bar 3 is hollow structure, and earth pressure gauge measurement signal line 8 is arranged in the inner chamber of sedimentation bar 3.
At the sedimentation bar casing 7 of sedimentation bar 3 outside suit PVC materials, fill 2 pairs of sedimentation bars of sand gravel sedimentation, 3 displacements generation constraint in order to eliminate.
Step 3, in prospect pit 1, fill sand gravel 2, with saturated earth pillar gravity or base substrate pressure more than the simulation test soil layer.Wherein, determine to test the effective pressure of covering on collapsible loess 11 stratum according to different engineering specifications; Determine to fill in the prospect pit sand gravel 2 saturated earth pillar weight according to the effective pressure more than the test Loess Layer; According to banketing dry density and saturated sand gravel 2 earth pillar weight, determine prospect pit 1 interior sand gravel 2 filled height.
After sand gravel 2 reaches the amount of filling, do not cave in for fear of filling sand gravel section prospect pit wall, in not filling the prospect pit section of sand gravel 2, lay the prospect pit borehole wall casing 9 of PVC material; Pour into water in prospect pit 1, until water is to collapsible loess 11, water injection rate can with the flowmeter survey that connects on the water injection pipe, finish test to sedimentation bar 3 sinking stabilizations.Collapsing Deformations occur in collapsible loess 11 under sand gravel 2 effect, measure to such an extent that the sedimentation deformation of sedimentation bar 3 changes by high-precision level, are the Collapsing Deformation of collapsible loess 11, record the earth pillar pressure that sand gravel 2 forms by earth pressure gauge 10.
The present invention excavates prospect pit 1 to the collapsible loess 11 of certain buried depth when carrying out the Loess Collapsibility property testing, immersion infiltrates into collapsible loess 11, therefore compare with large-scale submerging test, reduced significantly the requirement of test to site area, reduced the impact that test causes the place.In addition, in prospect pit 1, fill the sand gravel 2 of certain density, can simulate saturated earth pillar useful load and underground chamber base pressure etc. under the above saturated earth pillar useful load in 1 end of prospect pit, the excavation condition, thereby so that the method has very strong applicability, can be used for the measurement of the settlement by soaking of different buried depth collapsible loess.

Claims (7)

1. the sand immersion method of testing of a collapsibility of loess distortion is characterized in that, carries out according to following steps:
Step 1, excavate straight down prospect pit (1) at surface of stratum, the collapsible loess (11) of prospect pit (1) below is the soil body to be tested; Choose superficial area less than the loaded plate (4) of described prospect pit (1) cross-sectional area, described loaded plate (4) is for evenly having opened a plurality of vertical permeable holes (5) on rigid slab and the plate body, the top of described loaded plate (4) is fixed with vertical sedimentation bar (3), and earth pressure gauge (10) is installed on the described loaded plate (4);
Step 2, the excavation loosened soil is removed in prospect pit (1) bottom, and laying sand cushion (6), loaded plate (4) is lain in a horizontal plane on the sand cushion (6) by sedimentation bar (3), make the earth pressure gauge measurement signal line (8) of described earth pressure gauge (10) protrude upward surface of stratum;
Step 3, in prospect pit (1), fill sand gravel (2) after, pour into water in the prospect pit (1) again until water to collapsible loess (11), finishes test behind sedimentation bar (3) sinking stabilization; The sedimentation deformation of sedimentation bar (3) changes the Collapsing Deformation that is collapsible loess (11), records the earth pillar pressure that sand gravel (2) forms by earth pressure gauge (10).
2. according to the sand immersion method of testing of collapsibility of loess distortion claimed in claim 1, it is characterized in that, described step 2 also comprises: at the outside suit of described sedimentation bar sedimentation bar casing (7).
3. the sand immersion method of testing of being out of shape according to claim 1 or 2 described collapsibility of loess, it is characterized in that, described step 3 also comprises: after filling sand gravel (2), lay prospect pit borehole wall casing (9) first in the prospect pit section of not filling sand gravel (2), begin to pour water again.
4. according to the sand immersion method of testing of collapsibility of loess distortion claimed in claim 1, it is characterized in that, described sedimentation bar (3) is installed in the quadrature place, center of loaded plate (4).
5. according to the sand immersion method of testing of claim 1 or 4 described collapsibility of loess distortion, it is characterized in that the multi-segment structure of described sedimentation bar (3) for connecting successively by screw shell (12).
6. according to the sand immersion method of testing of collapsibility of loess distortion claimed in claim 1, it is characterized in that, described sedimentation bar (3) is hollow structure, and described earth pressure gauge measurement signal line (8) is arranged in the inner chamber of sedimentation bar (3).
7. according to the sand immersion method of testing of collapsibility of loess distortion claimed in claim 1, it is characterized in that, the bottom opening of described loaded plate (4), described earth pressure gauge (10) is installed in this hole.
CN201210425416.9A 2012-10-30 2012-10-30 Sandy soil water-immersion testing method for loess collapsible deformation Expired - Fee Related CN102912780B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210425416.9A CN102912780B (en) 2012-10-30 2012-10-30 Sandy soil water-immersion testing method for loess collapsible deformation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210425416.9A CN102912780B (en) 2012-10-30 2012-10-30 Sandy soil water-immersion testing method for loess collapsible deformation

Publications (2)

Publication Number Publication Date
CN102912780A true CN102912780A (en) 2013-02-06
CN102912780B CN102912780B (en) 2014-10-01

Family

ID=47611330

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210425416.9A Expired - Fee Related CN102912780B (en) 2012-10-30 2012-10-30 Sandy soil water-immersion testing method for loess collapsible deformation

Country Status (1)

Country Link
CN (1) CN102912780B (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103994753A (en) * 2014-06-13 2014-08-20 太原理工大学 Layered settlement device and layered settlement measuring method for loess filler high fill embankment
CN104060598A (en) * 2014-06-27 2014-09-24 西南交通大学 Fixing device of vertically arranged soil pressure cell
CN104296721A (en) * 2014-11-01 2015-01-21 机械工业勘察设计研究院 Satellite positioning and static leveling-based layered settlement monitoring system and method
CN105667541A (en) * 2016-01-21 2016-06-15 中铁第四勘察设计院集团有限公司 Monitoring device for settlement cavity value of medium-low-speed magnetic suspension low track bearing-rail beam and roadbed
CN105954499A (en) * 2016-06-26 2016-09-21 兰州理工大学 Method and device for evaluating collapsible site after carrying out fracturing grouting reinforcement on collapsible loess site
CN106400768A (en) * 2016-09-12 2017-02-15 中铁第勘察设计院集团有限公司 Submerging test method for collapsible loess tunnel
CN106556376A (en) * 2015-09-25 2017-04-05 上海凯盾工程技术有限公司 A kind of monitoring underground space and the device and its measuring method of underground utilities deformation
CN106702997A (en) * 2017-03-16 2017-05-24 中铁西北科学研究院有限公司 Method of testing deadweight collapse settlement of soil layers at different depths of loess
CN106989993A (en) * 2017-05-22 2017-07-28 中铁西北科学研究院有限公司 A kind of coefficient of collapsibility of loess layering in-situ testing device and method of testing
CN108020460A (en) * 2018-02-05 2018-05-11 安徽理工大学 A kind of coefficient of collapsibility of loess measuring apparatus and its measuring method
CN108225261A (en) * 2017-12-13 2018-06-29 山东大学 For the stake top and pile tip settlement while observation device and method of pile foundation model test
CN109238867A (en) * 2018-11-02 2019-01-18 湖北省路桥集团有限公司 Coefficient of collapsibility measuring device in place in situ and Double-Line Method coefficient of collapsibility test method
CN109631837A (en) * 2019-01-21 2019-04-16 中铁隧道勘察设计研究院有限公司 A kind of method for embedding for subway work surface subsidence monitoring point
CN110080195A (en) * 2019-06-05 2019-08-02 信息产业部电子综合勘察研究院 A kind of loess fill foundation immersion water test equipment and method
CN113322933A (en) * 2021-06-15 2021-08-31 甘肃恒捷路桥养护科技有限公司 Layered water immersion method for treating deep collapsible loess foundation
CN114859016A (en) * 2022-06-21 2022-08-05 西安理工大学 Loess collapsibility test method
CN115419042A (en) * 2022-09-28 2022-12-02 山东省路桥集团有限公司 Device capable of simultaneously monitoring pile tip soil pressure and displacement and monitoring method

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000050696A1 (en) * 1999-02-25 2000-08-31 Menard Soltraitement An equipment and a method for partially drying a zone of ground containing a liquid
CN1851145A (en) * 2006-05-18 2006-10-25 贵阳铝镁设计研究院 Wet-fall loess foundation submerging consolidation method
CN101319495A (en) * 2008-07-12 2008-12-10 中铁西北科学研究院有限公司 Layered deformation observation method and apparatus for deep part of groundwork
CN101706270A (en) * 2009-11-05 2010-05-12 河海大学 Device for measuring embankment settlement and measuring method
CN201681023U (en) * 2010-05-07 2010-12-22 中国科学院武汉岩土力学研究所 Tester for testing bearing capacity and deformation characteristics of foundation soil in room
CN102312422A (en) * 2011-07-15 2012-01-11 宁夏回族自治区电力设计院 Test device for collapsibility coefficient of soil among collapsible loess compaction piles and test method
CN102507307A (en) * 2011-10-28 2012-06-20 西安理工大学 Sealing device for pressure chamber of true triaxial apparatus
CN202339198U (en) * 2011-11-15 2012-07-18 成都市市政工程(集团)有限责任公司 Enhanced physical settlement meter used for measuring crevice value of rigid pavement and road bed
JP5014389B2 (en) * 2009-08-27 2012-08-29 日本工営株式会社 Soil tensile strength measuring device and soil tensile strength measuring method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000050696A1 (en) * 1999-02-25 2000-08-31 Menard Soltraitement An equipment and a method for partially drying a zone of ground containing a liquid
CN1851145A (en) * 2006-05-18 2006-10-25 贵阳铝镁设计研究院 Wet-fall loess foundation submerging consolidation method
CN101319495A (en) * 2008-07-12 2008-12-10 中铁西北科学研究院有限公司 Layered deformation observation method and apparatus for deep part of groundwork
JP5014389B2 (en) * 2009-08-27 2012-08-29 日本工営株式会社 Soil tensile strength measuring device and soil tensile strength measuring method
CN101706270A (en) * 2009-11-05 2010-05-12 河海大学 Device for measuring embankment settlement and measuring method
CN201681023U (en) * 2010-05-07 2010-12-22 中国科学院武汉岩土力学研究所 Tester for testing bearing capacity and deformation characteristics of foundation soil in room
CN102312422A (en) * 2011-07-15 2012-01-11 宁夏回族自治区电力设计院 Test device for collapsibility coefficient of soil among collapsible loess compaction piles and test method
CN102507307A (en) * 2011-10-28 2012-06-20 西安理工大学 Sealing device for pressure chamber of true triaxial apparatus
CN202339198U (en) * 2011-11-15 2012-07-18 成都市市政工程(集团)有限责任公司 Enhanced physical settlement meter used for measuring crevice value of rigid pavement and road bed

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103994753B (en) * 2014-06-13 2016-06-29 太原理工大学 Delaminating deposition device and measuring method for Loess Filling high-filled embankment
CN103994753A (en) * 2014-06-13 2014-08-20 太原理工大学 Layered settlement device and layered settlement measuring method for loess filler high fill embankment
CN104060598A (en) * 2014-06-27 2014-09-24 西南交通大学 Fixing device of vertically arranged soil pressure cell
CN104060598B (en) * 2014-06-27 2015-11-25 西南交通大学 A kind of fastening devices of vertical layout earth pressure cell
CN104296721A (en) * 2014-11-01 2015-01-21 机械工业勘察设计研究院 Satellite positioning and static leveling-based layered settlement monitoring system and method
CN104296721B (en) * 2014-11-01 2016-06-08 机械工业勘察设计研究院有限公司 Utilize the method that the deep soil settlement survey system based on satellite fix Yu hydrostatic leveling carries out deep soil settlement survey
CN106556376A (en) * 2015-09-25 2017-04-05 上海凯盾工程技术有限公司 A kind of monitoring underground space and the device and its measuring method of underground utilities deformation
CN106556376B (en) * 2015-09-25 2020-06-05 上海凯盾工程技术有限公司 Device for monitoring deformation of underground space and underground pipeline and measuring method thereof
CN105667541B (en) * 2016-01-21 2018-01-26 中铁第四勘察设计院集团有限公司 Medium-and low-speed maglev is low to be put circuit support rail beam and subgrade settlement and comes to nothing value monitoring device
CN105667541A (en) * 2016-01-21 2016-06-15 中铁第四勘察设计院集团有限公司 Monitoring device for settlement cavity value of medium-low-speed magnetic suspension low track bearing-rail beam and roadbed
CN105954499A (en) * 2016-06-26 2016-09-21 兰州理工大学 Method and device for evaluating collapsible site after carrying out fracturing grouting reinforcement on collapsible loess site
CN106400768B (en) * 2016-09-12 2019-01-11 中铁第一勘察设计院集团有限公司 Collapsible loess tunnel submerging test method
CN106400768A (en) * 2016-09-12 2017-02-15 中铁第勘察设计院集团有限公司 Submerging test method for collapsible loess tunnel
CN106702997A (en) * 2017-03-16 2017-05-24 中铁西北科学研究院有限公司 Method of testing deadweight collapse settlement of soil layers at different depths of loess
CN106989993B (en) * 2017-05-22 2023-08-11 嘉兴学院 Loess collapse coefficient layering in-situ test device and test method
CN106989993A (en) * 2017-05-22 2017-07-28 中铁西北科学研究院有限公司 A kind of coefficient of collapsibility of loess layering in-situ testing device and method of testing
CN108225261A (en) * 2017-12-13 2018-06-29 山东大学 For the stake top and pile tip settlement while observation device and method of pile foundation model test
CN108020460A (en) * 2018-02-05 2018-05-11 安徽理工大学 A kind of coefficient of collapsibility of loess measuring apparatus and its measuring method
CN109238867A (en) * 2018-11-02 2019-01-18 湖北省路桥集团有限公司 Coefficient of collapsibility measuring device in place in situ and Double-Line Method coefficient of collapsibility test method
CN109238867B (en) * 2018-11-02 2023-08-11 湖北省路桥集团有限公司 In-situ field collapse coefficient measuring device and two-wire method collapse coefficient test method
CN109631837A (en) * 2019-01-21 2019-04-16 中铁隧道勘察设计研究院有限公司 A kind of method for embedding for subway work surface subsidence monitoring point
CN110080195A (en) * 2019-06-05 2019-08-02 信息产业部电子综合勘察研究院 A kind of loess fill foundation immersion water test equipment and method
CN110080195B (en) * 2019-06-05 2024-02-02 信息产业部电子综合勘察研究院 Loess filled foundation soaking test device and method
CN113322933A (en) * 2021-06-15 2021-08-31 甘肃恒捷路桥养护科技有限公司 Layered water immersion method for treating deep collapsible loess foundation
CN114859016A (en) * 2022-06-21 2022-08-05 西安理工大学 Loess collapsibility test method
CN115419042A (en) * 2022-09-28 2022-12-02 山东省路桥集团有限公司 Device capable of simultaneously monitoring pile tip soil pressure and displacement and monitoring method
CN115419042B (en) * 2022-09-28 2023-10-27 山东省路桥集团有限公司 Device capable of simultaneously monitoring pile tip soil pressure and displacement and monitoring method

Also Published As

Publication number Publication date
CN102912780B (en) 2014-10-01

Similar Documents

Publication Publication Date Title
CN102912780B (en) Sandy soil water-immersion testing method for loess collapsible deformation
Shen et al. Evaluation of hydraulic conductivity for both marine and deltaic deposits based on piezocone testing
CN102094432B (en) Model for causing ground setting due to engineering environment effect and test method thereof
Lu et al. A typical Earth fissure resulting from loess collapse on the loess plateau in the Weihe Basin, China
CN105386474B (en) Method for determining influences of leakage of waterproof curtain above foundation pit excavation face on surrounding environment
CN106400768B (en) Collapsible loess tunnel submerging test method
CN107761708A (en) The processing method that big thickness Collapsible Loess District Subway station groundwork is reinforced
CN104060637B (en) A kind of centrifuge model test method that gravel pile reinforcing is soft soil roadbed
CN105239611A (en) Method for determining influence of waterproof curtain leakage below foundation pit excavation surface on surroundings
Karlovsek et al. Investigation of voids and cavities in bored tunnels using GPR
CN102312422A (en) Test device for collapsibility coefficient of soil among collapsible loess compaction piles and test method
CN108169456A (en) A kind of collapsible loess estimates big pressure evaluation method
Lai et al. A new method based on centrifuge model test for evaluating ground settlement induced by tunneling
Yao et al. Study on permeability and collapsibility characteristics of sandy loess in northern Loess Plateau, China
Sienko et al. Application of distributed optical fibre sensor for strain and temperature monitoring within continuous flight auger columns
Su Laboratory pull-out testing study on soil nails in compacted completely decomposed granite fill
Shao et al. Collapsible deformation evaluation of loess under tunnels tested by in situ sand well immersion experiments
He et al. Experimental study on the vertical deformation of soils due to groundwater withdrawal
CN105257318B (en) A kind of lining cutting localized seepage causes the method for security protection that tunnel structure is deformed
CN101319894A (en) Method for testing land subsidence caused by underground spacing
CN104123433A (en) Method for determining soil deformation caused by high-pressure horizontal rotary jet grouting construction
ZENG et al. Mechanism of foundation pit deformation caused by dewatering before soil excavation: an experimental study
LU et al. Study on the disturbance and recompression settlement of soft soil induced by foundation pit excavation
Tai-shan et al. Study on the disturbance and recompression settlement of soft soil induced by foundation pit excavation
Viana da Fonseca et al. Improved laboratory techniques for advanced geotechnical characterization towards matching in situ properties

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Shao Shengjun

Inventor after: Li Jun

Inventor after: Li Guoliang

Inventor after: Deng Guohua

Inventor after: Shao Shuai

Inventor before: Shao Shengjun

Inventor before: Jiao Yangyang

Inventor before: Chen Fei

Inventor before: Deng Guohua

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: SHAO SHENGJUN JIAO YANGYANG CHEN FEI DENG GUOHUA TO: SHAO SHENGJUN LI JUN LI GUOLIANG DENG GUOHUA SHAO SHUAI

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180514

Address after: 710048 No. 5 Jinhua South Road, Shaanxi, Xi'an

Co-patentee after: CHINA RAILWAY CORPORATION

Patentee after: Xi'an University of Technology

Address before: 710048 No. 5 Jinhua South Road, Shaanxi, Xi'an

Patentee before: Xi'an University of Technology

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141001

Termination date: 20181030

CF01 Termination of patent right due to non-payment of annual fee