CN105150131B - Assembling tool for connecting discs and vertical rods of pulley-clip scaffold and use method of assembling tool - Google Patents
Assembling tool for connecting discs and vertical rods of pulley-clip scaffold and use method of assembling tool Download PDFInfo
- Publication number
- CN105150131B CN105150131B CN201510424479.6A CN201510424479A CN105150131B CN 105150131 B CN105150131 B CN 105150131B CN 201510424479 A CN201510424479 A CN 201510424479A CN 105150131 B CN105150131 B CN 105150131B
- Authority
- CN
- China
- Prior art keywords
- pulley
- vertical rod
- assembling tool
- clip scaffold
- scaffold terminal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25B—TOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
- B25B11/00—Work holders not covered by any preceding group in the subclass, e.g. magnetic work holders, vacuum work holders
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/30—Scaffolding bars or members with non-detachably fixed coupling elements
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Connection Of Plates (AREA)
Abstract
The invention relates to an assembling tool for connecting discs and vertical rods of a pulley-clip scaffold and a use method of the assembling tool. The assembling tool comprises a pedestal, and a support device is fixedly connected to the pedestal and connected with a clamping sheet device in a combined mode; the support device comprises a support horizontal plate and a support vertical plate which are perpendicularly connected to form an L-shaped structure; a groove is formed in the support vertical plate, and rotary fixing sheets are arranged on the support horizontal plate; fixing holes are formed in the support horizontal plate and in the front side positions of the rotary fixing sheets; the two sides of the top of the support vertical plate are connected with plugs respectively. The clamping sheet device comprises a Y-shaped clamping sheet, one end of a rotating rod is connected with one end of a handrail, and the other end of the handrail is connected with a weight; the clamping sheet is perpendicularly connected to the support horizontal plate, and a pulley clip is arranged between the support vertical plate and the clamping sheet. By means of the assembling tool, the effect of temporary stable fixing can be achieved; and the perpendicularity of the pulley clip can be guaranteed without handholding through operators.
Description
Technical field
The invention belongs to construction engineering technical field, it is related to a kind of assembling tool, more particularly, to a kind of pulley-clip scaffold
The assembling tool of terminal pad and vertical rod and its using method.
Background technology
At present, in Building Construction, the wheel button card perpendicularity deviation orthogonal with vertical rod longitudinal axis should not be big
In 0.3mm, for this reason, it may be necessary to the assembling tool of a kind of pulley-clip scaffold terminal pad and vertical rod and its using method, solve wheel button
The card and steel pipe perpendicularity in assembling meets the problem requiring, and can obtain the effect temporarily steadily fixed simultaneously;And solve
Wheel button perpendicularity tolerance meet code requirement problem so that operator without hand steered it is also possible to ensure wheel button
Perpendicularity.
Application No. " cn201310533705.5 ", Publication No. " cn104594621a ", it is entitled that " scaffold connects machine
The Chinese invention patent application of structure ", discloses a kind of scaffold connecting mechanism, including for inserting the inserted link in vertical rod, welding
In plug and the lock sleeve of crossbar end, it is welded with terminal pad in the middle part of described inserted link, the card of described terminal pad is evenly equipped with
Four spliced eyes;It is vertically welded with connecting rod, described connecting rod is coordinated with described spliced eye, described lock sleeve on described plug
Side has locking slot, and described locking slot is in l shape.Although it can play the effect of connection to scaffold, it cannot solve
Certainly the wheel button card and steel pipe perpendicularity in assembling meets the problem requiring, and cannot obtain the effect temporarily steadily fixed simultaneously.
Application No. " cn201320781500.4 ", Publication No. " cn203669321u ", entitled " socket joint type disk button
The Chinese invention patent of steel pipe scaffold ", discloses a kind of socket joint type disk button steel pipe scaffold, including many cross bars, many
Vertical rod and the main frame of Duo Gen brace composition, the top of main frame is provided with scaffold board, and scaffold board is fixed with cross bar by mushroom head
Connect, also include carrying bevelled connecting pin, the periphery of described vertical rod is provided with terminal pad, and terminal pad is provided with multiple connecting holes,
The two ends of cross bar are equipped with inserting paragraph, and inserting paragraph is provided with patchhole, and connecting pin is sequentially inserted into connecting hole and patchhole, makes cross bar
It is fixedly connected with vertical rod, connecting pin is additionally provided with observation port.Although it can play the effect of scaffold, it equally exists
Cannot solve the problems, such as that the tolerance taking turns button perpendicularity meets code requirement so that operator without hand steered, then are difficult to protect
The perpendicularity of card wheel button.
On the whole, more some scaffolds existing and its attachment means, exist and cannot solve wheel button card and steel pipe and exist
During assembling, perpendicularity meets the problem requiring, and cannot obtain the effect temporarily steadily fixed simultaneously;And presence cannot solve wheel button
The tolerance of perpendicularity meets the problem of code requirement so that operator without hand steered, are then difficult to ensure that the vertical of wheel button
Degree.For this reason, it may be necessary to the assembling tool of a kind of pulley-clip scaffold terminal pad and vertical rod and its using method, solve wheel button card with
Steel pipe perpendicularity in assembling meets the problem requiring, and can obtain the effect temporarily steadily fixed simultaneously;And it is vertical to solve wheel button
The tolerance of straight degree meet code requirement problem so that operator without hand steered it is also possible to ensure the perpendicularity of wheel button.
Content of the invention
It is an object of the invention to provide the assembling tool of a kind of pulley-clip scaffold terminal pad and vertical rod and its user
Method, solves the problems, such as that the wheel button card and steel pipe perpendicularity in assembling meets and requires, and can obtain temporarily steadily fixing simultaneously
Effect;And solve the problems, such as the tolerance taking turns button perpendicularity meet code requirement so that operator without hand steered it is also possible to
Ensure the perpendicularity of wheel button.
For achieving the above object, one aspect of the present invention provides the assembling work of a kind of pulley-clip scaffold terminal pad and vertical rod
Tool, includings pedestal, pedestal is fixedly connected and is provided with stand apparatus, stand apparatus and the combined connection of clip device;Stand apparatus
Including the bearing flat board being mutually connected vertically formation l character form structure and bearing riser;Bearing riser is provided with groove;Bearing flat board
It is provided with rotation stator;On bearing flat board, at the forward position of rotation stator, it is provided with fixing hole;The top of bearing riser
Both sides are connected with plug respectively;Clip device includes the intermediate plate of y font, and the top of the intermediate plate of y font is set to arc-shaped structure,
The middle position of arc-shaped structure is connected with the bottom of the intermediate plate of y font, and the bottom of the intermediate plate of y font is set to linear knot
Structure;The lower end of the intermediate plate of y font and the perpendicular connection of bull stick, one end of bull stick is connected with one end of handrail, handrail
The other end is connected with weight;The vertical connect setting of intermediate plate on bearing flat board, between bearing riser and intermediate plate, detain by setting wheel;Wheel
Button includes the wheel buckle body of circle, is provided with centre bore at the inner hub location of wheel buckle body;Pedestal be respectively provided on two sides with limit
Position hole, spacing in the hole is respectively equipped with bolt, and bolt is provided with the nut of belt washer.
In above scheme preferably, the quantity of bearing flat board is one, being respectively arranged on the left side and the right side of bearing flat board
Rotation stator;On bearing flat board, at the forward position of rotation stator, it is equipped with fixing hole.
It may also be preferred that the quantity of bearing flat board is two in above scheme, two bearing flat boards are respectively perpendicular
It is connected to the both sides of bearing riser;It is equipped with rotation stator on each bearing flat board;On each bearing flat board, rotate stator
Forward position at be equipped with fixing hole.
In any of the above scheme preferably, the two ends at bearing riser top are respectively provided with the first depression of circular arc
Part, the middle position on the top of bearing riser is provided with the second female;First female and the second female shape
Become the hump shape structure of bearing riser.
In any of the above scheme preferably, plug respectively connect setting at two of bearing riser of hump shape structure
At the raised position of hump.
In any of the above scheme preferably, the first female and the second female are all set to circular arc.
In any of the above scheme preferably, groove is set to the cutting that depth is 1mm.
In any of the above scheme preferably, plug is set to the round steel perpendicular with bearing riser.
In any of the above scheme preferably, a diameter of 10mm of the round steel of plug.
In any of the above scheme preferably, the length of the round steel of plug is 14mm.
In any of the above scheme preferably, bearing flat board is set to the steel plate of rectangle.
In any of the above scheme preferably, the steel plate of bearing flat board is 10mm.
In any of the above scheme preferably, bearing riser is set to the steel plate that thickness is 10mm.
In any of the above scheme preferably, rotation stator is set to the semi-circular shape structure that steel plate is bent into.
In any of the above scheme preferably, the thickness of the steel plate of rotation stator is 2mm.
In any of the above scheme preferably, fixing hole is set to circular port.
In any of the above scheme preferably, a diameter of 7mm of circular fixing hole.
In any of the above scheme preferably, the lower end of the intermediate plate of y font bull stick middle position with turn
The perpendicular connection of bar.
In any of the above scheme preferably, the lower end of the intermediate plate of y font is connected by welding manner with bull stick
Connect, at the position being connected, be provided with filling wlding.
In any of the above scheme preferably, filling wlding is set to weld seam.
In any of the above scheme preferably, the size of weld seam is 2mm.
In any of the above scheme preferably, intermediate plate is set to steel plate.
In any of the above scheme preferably, the thickness of the steel plate of intermediate plate is 10mm.
In any of the above scheme preferably, bull stick is set to round steel.
In any of the above scheme preferably, a diameter of 6mm of the round steel of bull stick.
In any of the above scheme preferably, handrail is set to round steel.
In any of the above scheme preferably, a diameter of 6mm of the round steel of handrail.
In any of the above scheme preferably, weight is set to square steel.
In any of the above scheme preferably, the size of square steel is 10 × 10 × 26mm.
In any of the above scheme preferably, pedestal is set to H-shaped shaped steel.
In any of the above scheme preferably, spacing hole is separately positioned on the edge of a wing of the pedestal both sides of H-shaped formed steel construction
On plate.
In any of the above scheme preferably, the H-shaped shaped steel of 200 × 200 × 10 × 10mm.
In any of the above scheme preferably, bolt is set to the bolt of diameter 8mm.
In any of the above scheme preferably, the quantity of packing ring is two.
In any of the above scheme preferably, packing ring is set to thickness is 2mm, and external diameter is the annular galvanized iron of 24mm
Piece.
In any of the above scheme preferably, nut is set to hex nut;It is 5mm that hex nut is set to height, diameter
Hex nut for 20mm.
In any of the above scheme preferably, spacing hole is set to the Long Circle hole that width is 8mm.
In any of the above scheme preferably, wheel buckle body is set to the circular steel plate that thickness is 10mm.
In any of the above scheme preferably, it is provided with steel pipe, steel in the circular hole at the inner hub location of wheel buckle body
Pipe is set to annular, and its external diameter is 48.3mm, and wall thickness is 3.6mm.
In any of the above scheme preferably, at the inner hub location of wheel buckle body, the centre bore of setting is set to justify
Hole, the edge of circular hole is uniformly distributed the depression cell body being provided with four rectangles.
In any of the above scheme preferably, wheel buckle body cylindrical on be uniformly distributed and be provided with the recessed of four circular arcs
Arc.
Another aspect of the present invention provides the using method of a kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, first
First bolt is adjusted to suitably take turns button spacing in spacing in the hole, tightens the nut with packing ring, bearing is fixed,
So that wheel buckles two plugs leaning against bearing and groove so that the side that two plugs and groove are buckled to wheel is carried out temporarily admittedly
Fixed, then penetrate steel pipe in the center in the hole taking turns button center position, after steel pipe is in place, by handrail, bull stick is rotated,
Intermediate plate is made to be close to the opposite side of wheel button so that wheel button is constrained by two sides.
In above scheme preferably, the wheel button card perpendicularity deviation orthogonal with vertical rod longitudinal axis is at most 0.3mm.
Compared with prior art, the invention has the advantages that
The invention provides the assembling tool of a kind of pulley-clip scaffold terminal pad and vertical rod and its using method, solve wheel
The button card and steel pipe perpendicularity in assembling meets the problem requiring, and can obtain the effect temporarily steadily fixed simultaneously;And solve
The tolerance of wheel button perpendicularity of determining meets the problem of code requirement so that operator detain it is also possible to ensure to take turns without hand steered
Perpendicularity.
Brief description
Fig. 1 is the structure of the pulley-clip scaffold terminal pad according to the present invention and an embodiment of the assembling tool of vertical rod
Schematic diagram;
Fig. 2 is the assembling tool with vertical rod for the pulley-clip scaffold terminal pad of the present invention according to embodiment illustrated in fig. 1
A-a is to sectional view;
Fig. 3 is the assembling tool with vertical rod for the pulley-clip scaffold terminal pad of the present invention according to embodiment illustrated in fig. 1
B-b is to sectional view;
Fig. 4 is the assembling tool with vertical rod for the pulley-clip scaffold terminal pad of the present invention according to embodiment illustrated in fig. 1
C-c is to sectional view;
Fig. 5 is the assembling tool with vertical rod for the pulley-clip scaffold terminal pad of the present invention according to embodiment illustrated in fig. 1
The front view of stand apparatus;
Fig. 6 is the assembling tool with vertical rod for the pulley-clip scaffold terminal pad of the present invention according to embodiment illustrated in fig. 1
The top view of stand apparatus;
Fig. 7 is the assembling tool with vertical rod for the pulley-clip scaffold terminal pad of the present invention according to embodiment illustrated in fig. 1
The side view of stand apparatus;
Fig. 8 is the assembling tool with vertical rod for the pulley-clip scaffold terminal pad of the present invention according to embodiment illustrated in fig. 1
The front view of clip device;
Fig. 9 is the assembling tool with vertical rod for the pulley-clip scaffold terminal pad of the present invention according to embodiment illustrated in fig. 1
The top view of clip device;
Figure 10 is the assembling tool with vertical rod for the pulley-clip scaffold terminal pad of the present invention according to embodiment illustrated in fig. 1
The side view of clip device;
Figure 11 is the assembling tool with vertical rod for the pulley-clip scaffold terminal pad of the present invention according to embodiment illustrated in fig. 1
The front view of wheel button;
Figure 12 is the assembling tool with vertical rod for the pulley-clip scaffold terminal pad of the present invention according to embodiment illustrated in fig. 1
The top view of wheel button;
Figure 13 is the assembling tool with vertical rod for the pulley-clip scaffold terminal pad of the present invention according to embodiment illustrated in fig. 1
The side view of wheel button.
In figure, 1 is pedestal, and 2 is stand apparatus, and 3 is clip device, and 4 is bolt, and 5 is packing ring, and 6 is hex nut,
7 is spacing hole, and 8 is wheel button, and 9 is steel pipe, and 10 is bull stick, and 11 is handrail, and 12 is weight, and 13 is plug, and 14 is bearing riser, 15
For groove, 16 is rotation stator, and 17 is fixing hole, and 18 is bearing flat board, and 19 is filling wlding, and 20 is intermediate plate.
Specific embodiment
For a better understanding of the present invention, with reference to specific embodiment, the present invention is explained in detail.It is clear that
Different modifications and remodeling can be carried out to the present invention and spirit broader without departing from the present invention of appended claims and model
Enclose.Therefore, following examples have the exemplary implication without restriction.
Embodiment 1:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, including pedestal 1, pedestal 1 are fixedly connected and are provided with
Stand apparatus 2, stand apparatus 2 and the combined connection of clip device 3;Stand apparatus 2 include being mutually connected vertically formation l font knot
The bearing flat board 18 of structure and bearing riser 14;Bearing riser 14 is provided with groove 15;Bearing flat board 18 is provided with rotation stator
16;On bearing flat board 18, at the forward position of rotation stator 16, it is provided with fixing hole 17;The both sides at the top of bearing riser 14 are divided
It is not connected with plug 13;Clip device 3 includes the intermediate plate 20 of y font, and the top of the intermediate plate 20 of y font is set to circular arc knot
Structure, the middle position of arc-shaped structure is connected with the bottom of the intermediate plate 20 of y font, and the bottom of the intermediate plate 20 of y font is set to
Rectilinear structure;The lower end of intermediate plate 20 of y font and the perpendicular connection of bull stick 10, one end of bull stick 10 and the one of handrail 11
End is connected, and the other end of handrail 11 is connected with weight 12;On bearing flat board 18, bearing stands the vertical connect setting of intermediate plate 20
Setting wheel button 8 between plate 14 and intermediate plate 20;Wheel button 8 includes wheel button 8 plate body of circle, at the inner hub location of wheel button 8 plate bodys
It is provided with centre bore;Pedestal 1 be respectively provided on two sides with spacing hole 7, be respectively equipped with bolt 4 in spacing hole 7, on bolt 4
It is provided with the nut of belt washer 5.
Embodiment 2:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to Example 1, except that, bearing
The quantity of flat board 18 is one, and being respectively arranged on the left side and the right side of bearing flat board 18 rotates stator 16;On bearing flat board 18, rotate
It is equipped with fixing hole 17 at the forward position of stator 16.
Embodiment 3:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to Example 1, except that, bearing
The quantity of flat board 18 is two, and two bearing flat boards 18 are respectively perpendicular the both sides being connected to bearing riser 14;Each bearing flat board
It is equipped with rotation stator 16 on 18;On each bearing flat board 18, at the forward position of rotation stator 16, it is equipped with fixing hole
17.
Embodiment 4:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to Example 3, except that, bearing
The two ends at riser 14 top are respectively provided with the first female of circular arc, and the middle position on the top of bearing riser 14 sets
There is the second female;First female and the hump shape structure of the second female formation bearing riser 14.
Embodiment 5:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to Example 4, except that, plug
13 difference connect settings are at the raised position of two humps of the bearing riser 14 of hump shape structure.
Embodiment 6:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to Example 5, except that, first
Female and the second female are all set to circular arc.
Embodiment 7:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to Example 6, except that, groove
15 are set to the cutting that depth is 1mm.
Embodiment 8:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to Example 7, except that, plug
13 are set to the round steel perpendicular with bearing riser 14.
Embodiment 9:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to Example 8, except that, plug
A diameter of 10mm of 13 round steel.
Embodiment 10:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to Example 9, except that, plug
The length of 13 round steel is 14mm.
Embodiment 11:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to Example 10, except that, bearing
Flat board 18 is set to the steel plate of rectangle.
Embodiment 12:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 11, except that, bearing
The steel plate of flat board 18 is 10mm.
Embodiment 13:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 12, except that, bearing
Riser 14 is set to the steel plate that thickness is 10mm.
Embodiment 14:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 13, except that, rotation
Stator 16 is set to the semi-circular shape structure that steel plate is bent into.
Embodiment 15:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 14, except that, rotation
The thickness of the steel plate of stator 16 is 2mm.
Embodiment 16:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 15, except that, fixing
Hole 17 is set to circular port.
Embodiment 17:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 16, except that, circular
Fixing hole 17 a diameter of 7mm.
Embodiment 18:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 17, except that, y word
The lower end of the intermediate plate 20 of shape is in middle position and the perpendicular connection of bull stick 10 of bull stick 10.
Embodiment 19:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 18, except that, y word
The lower end of intermediate plate 20 of shape is connected by welding manner with bull stick 10, is provided with filling wlding 19 at the position being connected.
Embodiment 20:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 19, except that, filling
Wlding 19 is set to weld seam.
Embodiment 21:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 20, except that, weld seam
Size be 2mm.
Embodiment 22:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 21, except that, intermediate plate
20 are set to steel plate.
Embodiment 23:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 22, except that, intermediate plate
The thickness of 20 steel plate is 10mm.
Embodiment 24:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 23, except that, bull stick
10 are set to round steel.
Embodiment 25:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 24, except that, bull stick
A diameter of 6mm of 10 round steel.
Embodiment 26:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 25, except that, handrail
11 are set to round steel.
Embodiment 27:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 26, except that, handrail
A diameter of 6mm of 11 round steel.
Embodiment 28:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 27, except that, weight
12 are set to square steel.
Embodiment 29:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 28, except that, square steel
Size be 10 × 10 × 26mm.
Embodiment 30:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 29, except that, pedestal
1 is set to H-shaped shaped steel.
Embodiment 31:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 30, except that, spacing
Hole 7 is separately positioned on the flange plate of pedestal 1 both sides of H-shaped formed steel construction.
Embodiment 32:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 31, except that, 200
The H-shaped shaped steel of × 200 × 10 × 10mm.
Embodiment 33:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 32, except that, positioning
Bolt 4 is set to the bolt of diameter 8mm.
Embodiment 34:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 33, except that, packing ring
5 quantity is two.
Embodiment 35:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 34, except that, packing ring
5 are set to thickness for 2mm, and external diameter is the annular galvanized sheet iron of 24mm.
Embodiment 36:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 35, except that, nut
It is set to hex nut 6;It is 5mm that hex nut 6 is set to height, the hex nut 6 of a diameter of 20mm.
Embodiment 37:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 36, except that, spacing
Hole 7 is set to the Long Circle hole that width is 8mm.
Embodiment 38:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 37, except that, wheel button
8 plate bodys are set to the circular steel plate that thickness is 10mm.
Embodiment 39:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 38, except that, wheel button
It is provided with steel pipe 9, steel pipe 9 is set to annular, its external diameter is 48.3mm, wall thickness is in circular hole at the inner hub location of 8 plate bodys
3.6mm.
Embodiment 40:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 39, except that, wheel button
At the inner hub location of 8 plate bodys, the centre bore of setting is set to circular hole, and the edge of circular hole is uniformly distributed and is provided with four rectangles
Depression cell body.
Embodiment 41:
A kind of pulley-clip scaffold terminal pad and the assembling tool of vertical rod, similar to embodiment 40, except that, wheel button
8 plate bodys cylindrical on be uniformly distributed the concave arc being provided with four circular arcs.
Embodiment 42:
Bolt 4 is being limited by a kind of pulley-clip scaffold terminal pad and the using method of the assembling tool of vertical rod first
Be adjusted to suitably to take turns button 8 spacing in the hole 7 of position, tighten the nut with packing ring 5, bearing is fixed so that take turns detain 8 against
Bearing two plugs 13 and groove 15 so that the side that two plugs 13 and groove 15 buckle 8 to wheel is fixed temporarily, then
Penetrate steel pipe 9 in the center in the hole of wheel button 8 center positions, after steel pipe 9 is in place, by handrail 11, bull stick 10 is revolved
Turn so that intermediate plate 20 is close to the opposite side of wheel button 8 so that wheel button 8 is constrained by two sides.
Embodiment 43:
A kind of using method of the assembling tool of pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 42, institute is not
With the wheel button 8 cards perpendicularity deviation orthogonal with vertical rod longitudinal axis is at most 0.3mm.
The pulley-clip scaffold terminal pad of the present invention and the assembling tool of vertical rod and its using method, as Fig. 1 to Figure 13 institute
Show, when its stand apparatus 2 is guarantee wheel button 8 and hack lever welding, take turns the temporarily in place of button 8, the profile detaining 8 along wheel is stood in bearing
Fluted 15 are arranged on plate 14;Its groove 15 is set to the cutting of the mm depth of setting on bearing riser 14, so that wheel button 8 card
On bearing riser 14;Its plug 13 is weldingly fixed on the top of bearing riser 14;Its bearing riser 14 is set to a hump shape
Structure;Female in the middle of the bearing riser 14 of hump shape is so that carry out during hack lever horizontal positioned temporarily in place.Rotation
Turn constraint when stator 16 rotates for device;Fixing hole 17 is on bearing flat board 18 along pedestal 1 spacing hole 7 perforation center line weight
Close, by bolt 4, bearing flat board 18 and pedestal 1 are fixed temporarily.It can solve the problem that wheel button card and steel pipe 9 in group
During dress, perpendicularity meets the problem requiring, and obtains the effect temporarily steadily fixed simultaneously.
The pulley-clip scaffold terminal pad of the present invention and the assembling tool of vertical rod and its using method, as Fig. 1 to Figure 13 institute
Show, the weight 12 of its clip device 3 adopts 10mm × 10mm × 26mm square steel, is welded to connect with handrail 11, weight 12 will be whole
The direction taking turns button 8 is mobile it is ensured that clip device 3 can be carried out effectively admittedly to wheel button 8 temporarily to clamping for the center of gravity of intermediate plate 20
Fixed;Its handrail 11 adopts the round steel of a diameter of 6mm, and its one end is welded and fixed with weight 12, and the other end is welded and fixed with bull stick 10,
Primarily serve so that weight 12 is connected to the effect in clip device 3, and facilitate workman to be operated;Its bull stick 10 is using straight
Footpath is the round steel of 6mm, and its one end is welded and fixed with handrail 11, and the middle part of bull stick 10 is welded and fixed with intermediate plate 20, solid by rotation
Stator 16 is rotated on bearing flat board 18 it is ensured that intermediate plate 20 can be clamped freely and decontrol wheel buckles 8;Its intermediate plate 20 adopts
The thick steel plate of 10mm, and it is set to " y " type, the sunk space on the top of intermediate plate 20 enables to frame pipe and is fixed, entirely
Intermediate plate 20 can make wheel button 8 closely vertically be attached on bearing riser 14, thus perpendicularity when ensure that wheel button 8 makes.Its
In Building Construction, can solve the problem that the tolerance of wheel button 8 perpendicularity meets the problem of code requirement so that operating
Personnel are without hand steered it is also possible to ensure the perpendicularity of wheel button 8;Thus meeting the wheel button card perpendicularity orthogonal with vertical rod longitudinal axis
Deviation not should be greater than the construction requirement of 0.3mm.
The pulley-clip scaffold terminal pad of the present invention and the assembling tool of vertical rod and its using method, as Fig. 1 to Figure 13 institute
Show, its wheel button card perpendicularity deviation orthogonal with vertical rod longitudinal axis not should be greater than 0.3mm." l " type of stand apparatus 2 designs
Ensure that bearing can steadily be fixed on lower section pedestal 1, can meet again wheel button card and steel pipe 9 in assembling perpendicularity will
Ask.And the side that two plugs 13 in stand apparatus 2 and groove 15 buckle 8 to wheel is fixed temporarily.After steel pipe 9 is in place,
By handrail 11, bull stick 10 is rotated, make intermediate plate 20 be close to the opposite side of wheel button 8, make wheel button 8 be subject to the pact of two sides
Bundle is it is ensured that the tolerance of its perpendicularity meets code requirement.The handrail 11 with weight 12 for the rear end makes the center of gravity of intermediate plate 20
Moved forward, though operator without hand steered it is also ensured that intermediate plate 20 be close to wheel button 8.Bolt 4 is in spacing hole 7
Free left regulation wheel can be carried out along steel pipe 9 direction and buckle 8 spacing, but suffer restraints along steel pipe 9 vertical direction.
Claims (43)
1. the assembling tool of a kind of pulley-clip scaffold terminal pad and vertical rod, including pedestal (1) it is characterised in that: on pedestal (1)
It is fixedly connected and be provided with stand apparatus (2), stand apparatus (2) and the combined connection of clip device (3);Stand apparatus (2) include phase
The mutually vertical bearing flat board (18) connecting formation l character form structure and bearing riser (14);Bearing riser (14) is provided with groove
(15);Bearing flat board (18) is provided with rotation stator (16);Bearing flat board (18) is upper, the forward position of rotation stator (16)
Place is provided with fixing hole (17);The both sides at the top of bearing riser (14) are connected with plug (13) respectively;Clip device (3) includes
The intermediate plate (20) of y font, the top of the intermediate plate (20) of y font is set to arc-shaped structure, the middle position of arc-shaped structure and y
The bottom of the intermediate plate (20) of font is connected, and the bottom of the intermediate plate (20) of y font is set to rectilinear structure;The intermediate plate of y font
(20) lower end and the perpendicular connection of bull stick (10), one end of bull stick (10) is connected with one end of handrail (11), handrail
(11) the other end is connected with weight (12);The vertical connect setting of intermediate plate (20) on bearing flat board (18), bearing riser
(14) setting wheel button (8) and intermediate plate (20) between;Wheel button (8) includes circular wheel button (8) plate body, the inside of wheel button (8) plate body
Center position is provided with centre bore;Pedestal (1) be respectively provided on two sides with spacing hole (7), spacing hole is respectively equipped with positioning spiral shell in (7)
Bolt (4), bolt (4) is provided with the nut of belt washer (5);Fixing hole (17) on bearing flat board (18) along pedestal (1) with
The perforation center line of spacing hole (7) coincides.
2. pulley-clip scaffold terminal pad as claimed in claim 1 and vertical rod assembling tool it is characterised in that: bearing flat board
(18) quantity is one, and being respectively arranged on the left side and the right side of bearing flat board (18) rotates stator (16);On bearing flat board (18),
It is equipped with fixing hole (17) at the forward position of rotation stator (16).
3. pulley-clip scaffold terminal pad as claimed in claim 1 and vertical rod assembling tool it is characterised in that: bearing flat board
(18) quantity is two, and two bearing flat boards (18) are respectively perpendicular the both sides being connected to bearing riser (14);Each bearing is put down
Rotation stator (16) is equipped with plate (18);Each bearing flat board (18) is upper, equal at the forward position of rotation stator (16)
It is provided with fixing hole (17).
4. pulley-clip scaffold terminal pad as claimed in claim 3 and vertical rod assembling tool it is characterised in that: bearing riser
(14) two ends at top are respectively provided with the first female of circular arc, and the middle position on the top of bearing riser (14) sets
There is the second female;First female and the hump shape structure of the second female formation bearing riser (14).
5. pulley-clip scaffold terminal pad as claimed in claim 4 and vertical rod assembling tool it is characterised in that: plug (13)
Connect setting is at the raised position of two humps of the bearing riser (14) of hump shape structure respectively.
6. pulley-clip scaffold terminal pad as claimed in claim 5 and vertical rod assembling tool it is characterised in that: the first depression
Part and the second female are all set to circular arc.
7. pulley-clip scaffold terminal pad as claimed in claim 6 and vertical rod assembling tool it is characterised in that: groove (15)
It is set to the cutting that depth is 1mm.
8. pulley-clip scaffold terminal pad as claimed in claim 7 and vertical rod assembling tool it is characterised in that: plug (13)
It is set to the round steel perpendicular with bearing riser (14).
9. pulley-clip scaffold terminal pad as claimed in claim 8 and vertical rod assembling tool it is characterised in that: plug (13)
Round steel a diameter of 10mm.
10. pulley-clip scaffold terminal pad as claimed in claim 9 and vertical rod assembling tool it is characterised in that: plug
(13) length of round steel is 14mm.
The assembling tool of 11. pulley-clip scaffold terminal pads as claimed in claim 10 and vertical rod it is characterised in that: bearing is put down
Plate (18) is set to the steel plate of rectangle.
The assembling tool of 12. pulley-clip scaffold terminal pads as claimed in claim 11 and vertical rod it is characterised in that: bearing is put down
The steel plate of plate (18) is 10mm.
The assembling tool of 13. pulley-clip scaffold terminal pads as claimed in claim 12 and vertical rod it is characterised in that: bearing stands
Plate (14) is set to the steel plate that thickness is 10mm.
The assembling tool of 14. pulley-clip scaffold terminal pads as claimed in claim 13 and vertical rod it is characterised in that: rotation is solid
Stator (16) is set to the semi-circular shape structure that steel plate is bent into.
The assembling tool of 15. pulley-clip scaffold terminal pads as claimed in claim 14 and vertical rod it is characterised in that: rotation is solid
The thickness of the steel plate of stator (16) is 2mm.
The assembling tool of 16. pulley-clip scaffold terminal pads as claimed in claim 15 and vertical rod it is characterised in that: fixing hole
(17) it is set to circular port.
The assembling tool of 17. pulley-clip scaffold terminal pads as claimed in claim 16 and vertical rod it is characterised in that: circular
A diameter of 7mm of fixing hole (17).
The 18. pulley-clip scaffold terminal pads as any one of claim 1-17 and the assembling tool of vertical rod, its feature
It is: the lower end of the intermediate plate (20) of y font is in middle position and the perpendicular connection of bull stick (10) of bull stick (10).
The assembling tool of 19. pulley-clip scaffold terminal pads as claimed in claim 18 and vertical rod it is characterised in that: y font
The lower end of intermediate plate (20) be connected by welding manner with bull stick (10), be provided with filling wlding at the position being connected
(19).
The assembling tool of 20. pulley-clip scaffold terminal pads as claimed in claim 19 and vertical rod it is characterised in that: filling weldering
Material (19) is set to weld seam.
The assembling tool of 21. pulley-clip scaffold terminal pads as claimed in claim 20 and vertical rod it is characterised in that: weld seam
A size of 2mm.
The assembling tool of 22. pulley-clip scaffold terminal pads as claimed in claim 21 and vertical rod it is characterised in that: intermediate plate
(20) it is set to steel plate.
The assembling tool of 23. pulley-clip scaffold terminal pads as claimed in claim 22 and vertical rod it is characterised in that: intermediate plate
(20) thickness of steel plate is 10mm.
The assembling tool of 24. pulley-clip scaffold terminal pads as claimed in claim 23 and vertical rod it is characterised in that: bull stick
(10) it is set to round steel.
The assembling tool of 25. pulley-clip scaffold terminal pads as claimed in claim 24 and vertical rod it is characterised in that: bull stick
(10) a diameter of 6mm of round steel.
The assembling tool of 26. pulley-clip scaffold terminal pads as claimed in claim 25 and vertical rod it is characterised in that: handrail
(11) it is set to round steel.
The assembling tool of 27. pulley-clip scaffold terminal pads as claimed in claim 26 and vertical rod it is characterised in that: handrail
(11) a diameter of 6mm of round steel.
The assembling tool of 28. pulley-clip scaffold terminal pads as claimed in claim 27 and vertical rod it is characterised in that: weight
(12) it is set to square steel.
The assembling tool of 29. pulley-clip scaffold terminal pads as claimed in claim 28 and vertical rod it is characterised in that: square steel
A size of 10 × 10 × 26mm.
The 30. pulley-clip scaffold terminal pads as any one of claim 1-17 and the assembling tool of vertical rod, its feature
It is: pedestal (1) is set to H-shaped shaped steel.
The assembling tool of 31. pulley-clip scaffold terminal pads as claimed in claim 30 and vertical rod it is characterised in that: spacing hole
(7) it is separately positioned on the flange plate of pedestal (1) both sides of H-shaped formed steel construction.
The assembling tool of 32. pulley-clip scaffold terminal pads as claimed in claim 30 and vertical rod it is characterised in that: 200 ×
The H-shaped shaped steel of 200 × 10 × 10mm.
The assembling tool of 33. pulley-clip scaffold terminal pads as claimed in claim 32 and vertical rod it is characterised in that: positioning spiral shell
Bolt (4) is set to the bolt of diameter 8mm.
The assembling tool of 34. pulley-clip scaffold terminal pads as claimed in claim 33 and vertical rod it is characterised in that: packing ring
(5) quantity is two.
The assembling tool of 35. pulley-clip scaffold terminal pads as claimed in claim 34 and vertical rod it is characterised in that: packing ring
(5) being set to thickness is 2mm, and external diameter is the annular galvanized sheet iron of 24mm.
The assembling tool of 36. pulley-clip scaffold terminal pads as claimed in claim 35 and vertical rod it is characterised in that: nut sets
For hex nut (6);It is 5mm that hex nut (6) is set to height, the hex nut (6) of a diameter of 20mm.
The assembling tool of 37. pulley-clip scaffold terminal pads as claimed in claim 36 and vertical rod it is characterised in that: spacing hole
(7) it is set to the Long Circle hole that width is 8mm.
The assembling tool of 38. pulley-clip scaffold terminal pads as claimed in claim 37 and vertical rod it is characterised in that: wheel button
(8) plate body is set to the circular steel plate that thickness is 10mm.
The assembling tool of 39. pulley-clip scaffold terminal pads as claimed in claim 38 and vertical rod it is characterised in that: wheel button
(8) it is provided with steel pipe (9) in the circular hole at the inner hub location of plate body, steel pipe (9) is set to annular, its external diameter is 48.3mm,
Wall thickness is 3.6mm.
The 40. pulley-clip scaffold terminal pads as any one of claim 1-17 and the assembling tool of vertical rod, its feature
It is: at the inner hub location of wheel button (8) plate body, the centre bore of setting is set to circular hole, and the edge of circular hole is uniformly distributed and is provided with
The depression cell body of four rectangles.
The 41. pulley-clip scaffold terminal pads as any one of claim 1-17 and the assembling tool of vertical rod, its feature
Be: wheel button (8) plate body cylindrical on be uniformly distributed the concave arc being provided with four circular arcs.
The using method of the assembling tool of a kind of 42. pulley-clip scaffold terminal pads and vertical rod it is characterised in that: will position first
Bolt (4) is adjusted to suitably take turns in spacing hole (7) buckles (8) spacing, tightens the nut with packing ring (5), bearing is carried out
Fixing so that wheel button (8) abuts against two plugs (13) of bearing and groove (15) so that two plugs (13) and groove (15)
The side of wheel button (8) is fixed temporarily, then the center in the hole detaining (8) center position in wheel is penetrated steel pipe (9), treats steel pipe
(9) after in place, by handrail (11), bull stick (10) is rotated so that intermediate plate (20) be close to wheel button (8) opposite side so that
Wheel button (8) is constrained by two sides.
The using method of the assembling tool of 43. pulley-clip scaffold terminal pads as claimed in claim 42 and vertical rod, its feature
It is: wheel button (8) card perpendicularity deviation orthogonal with vertical rod longitudinal axis is at most 0.3mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510424479.6A CN105150131B (en) | 2015-07-17 | 2015-07-17 | Assembling tool for connecting discs and vertical rods of pulley-clip scaffold and use method of assembling tool |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510424479.6A CN105150131B (en) | 2015-07-17 | 2015-07-17 | Assembling tool for connecting discs and vertical rods of pulley-clip scaffold and use method of assembling tool |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105150131A CN105150131A (en) | 2015-12-16 |
CN105150131B true CN105150131B (en) | 2017-01-25 |
Family
ID=54791327
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510424479.6A Active CN105150131B (en) | 2015-07-17 | 2015-07-17 | Assembling tool for connecting discs and vertical rods of pulley-clip scaffold and use method of assembling tool |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105150131B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106475935B (en) * | 2016-11-24 | 2018-03-27 | 中冶建工集团有限公司 | A kind of steel construction liftable processing jig and its clamping structure |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB1141020A (en) * | 1965-05-25 | 1969-01-22 | Gerdmans Inredningar Aktiebola | Coupling part for shelf-support frames, scaffoldings, and the like |
US3677582A (en) * | 1970-08-05 | 1972-07-18 | Jewel Mfg Co | Scaffolding clamp |
CN2153597Y (en) * | 1992-12-08 | 1994-01-19 | 朱可夫 | Stiff clamp for connecting scaffold member |
JP2814060B2 (en) * | 1994-10-31 | 1998-10-22 | 株式会社国元商会 | Temporary steel pipe clamp device |
US6019360A (en) * | 1999-02-10 | 2000-02-01 | Rice; Michael R. | Plastic pipe vise |
CN102756347A (en) * | 2012-07-31 | 2012-10-31 | 天润曲轴股份有限公司 | Support device for detection of shell-shaped part |
CN203669321U (en) * | 2013-12-03 | 2014-06-25 | 江苏天任建设装备有限公司 | Spigot-and-socket disk-buckle type steel pipe scaffold |
CN204843920U (en) * | 2015-07-17 | 2015-12-09 | 山东三箭资产投资管理有限公司 | Equipment instrument of wheel knot formula scaffold connection pad and pole setting |
-
2015
- 2015-07-17 CN CN201510424479.6A patent/CN105150131B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105150131A (en) | 2015-12-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203701562U (en) | Tool scaffold wall connecting piece | |
CN204843920U (en) | Equipment instrument of wheel knot formula scaffold connection pad and pole setting | |
CN105150131B (en) | Assembling tool for connecting discs and vertical rods of pulley-clip scaffold and use method of assembling tool | |
CN208105812U (en) | Telescopic scaffold | |
CN202338111U (en) | Special supporting frame for building template | |
CN106335605B (en) | A kind of foot hand-rails erection method at the top of hatch coaming | |
CN108381011A (en) | A kind of H profile steel turns over assembling and welding process and its auxiliary mould | |
CN207469717U (en) | A kind of architectural engineering scaffold bracing means | |
CN203767854U (en) | Pipeline hoisting frame | |
CN107988915B (en) | Self-elevating water platform for bridge construction | |
CN207392721U (en) | It is a kind of can be with the scaffold collet of spacer plate angle degree | |
CN104084623A (en) | Ceiling punching machine | |
CN206636178U (en) | A kind of adjustable bottom support device in scaffold bottom | |
CN205764686U (en) | A kind of steel-pipe welding positioning tool | |
CN213418570U (en) | Liftable concrete placement template support column | |
CN206888488U (en) | Anti-dumping inclined scaffold | |
CN210439644U (en) | Detachable convenient construction frame | |
CN208363583U (en) | Wheel buckle rotatable scaffold device | |
CN108756252A (en) | A kind of building assembly connection component | |
CN205519997U (en) | Soldering tin tool | |
CN203371215U (en) | Fixed foot welding rotating table of tower carne | |
CN208088859U (en) | A kind of elevator shaft mouth Fast Installation protective device | |
TW202024449A (en) | Crossbar structure of construction frame | |
CN212397957U (en) | Steel bar rotator | |
CN204972830U (en) | Barbell shelf convenient to installation is dismantled |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |