CN204843920U CN201520523741.8U CN201520523741U CN204843920U CN 204843920 U CN204843920 U CN 204843920U CN 201520523741 U CN201520523741 U CN 201520523741U CN 204843920 U CN204843920 U CN 204843920U
Authority
CN
China
Prior art keywords
pulley
vertical rod
assembling tool
clip scaffold
scaffold terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520523741.8U
Other languages
Chinese (zh)
Inventor
房桂芹
彭观亮
王洪彬
张云松
武建梅
张静
武中华
刘坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANDONG SANJIAN CONSTRUCTION ENGINEERING Co Ltd
Shandong Three Arrow Assets Investment Management Co Ltd
Original Assignee
SHANDONG SANJIAN CONSTRUCTION ENGINEERING Co Ltd
Shandong Three Arrow Assets Investment Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDONG SANJIAN CONSTRUCTION ENGINEERING Co Ltd, Shandong Three Arrow Assets Investment Management Co Ltd filed Critical SHANDONG SANJIAN CONSTRUCTION ENGINEERING Co Ltd
Priority to CN201520523741.8U priority Critical patent/CN204843920U/en
Application granted granted Critical
Publication of CN204843920U publication Critical patent/CN204843920U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Connection Of Plates (AREA)

Abstract

The utility model relates to an equipment instrument of wheel knot formula scaffold connection pad and pole setting, including the pedestal, fixed connection is equipped with support device, support device and clamping piece device looks built -up connection on the pedestal, the support device includes that mutually perpendicular connects the dull and stereotyped and support riser of the support that forms L font structure, be equipped with the recess on the support riser, be equipped with rotatory stationary blade on the support flat board, on the support flat board, the front side position department of rotatory stationary blade is equipped with the fixed orifices, the both sides at the top of support riser are connected respectively and are equipped with the plug, the clamping piece device includes the clamping piece of Y font, and the one end of bull stick is connected with the one end of handrail, and the other end connection of handrail is equipped with the heavy object, the clamping piece is connected the setting perpendicularly and on the support flat board, is set up a round knot between support riser and the clamping piece. It can gain interim steady fixed effect, make the operating personnel need not be hand, also can guarantee the perpendicularity of round knot.

Description

The assembling tool of a kind of pulley-clip scaffold terminal pad and vertical rod
Technical field
The utility model belongs to construction engineering technical field, relates to a kind of assembling tool, particularly relates to the assembling tool of a kind of pulley-clip scaffold terminal pad and vertical rod.
Background technology
At present, in Building Construction, the perpendicularity deviation that wheel detains card orthogonal with vertical rod longitudinal axis should not be greater than 0.3mm, for this reason, need the assembling tool of a kind of pulley-clip scaffold terminal pad and vertical rod, solving wheel button card and the steel pipe problem that perpendicularity meets the demands when assembling, interim steadily fixing effect can be obtained simultaneously; And the tolerance solving wheel button perpendicularity meets the problem of code requirement, make operating personnel need not be hand steered, also can ensure the perpendicularity of taking turns button.
Application number is " CN201310533705.5 ", publication number is " CN104594621A ", name is called the Chinese utility model patent application of " scaffold connecting mechanism ", disclose a kind of scaffold connecting mechanism, comprise for inserting the inserted link in vertical rod, the plug being welded on crossbar end and lock sleeve, be welded with terminal pad in the middle part of described inserted link, the card of described terminal pad be evenly equipped with four spliced eyes; Described plug is vertically welded with connecting rod, and described connecting rod coordinates with described spliced eye, and the side of described lock sleeve has locking slot, and described locking slot is L-shaped.Although it can play the effect of connection to scaffold, it cannot solve wheel button card and the steel pipe problem that perpendicularity meets the demands when assembling, and cannot obtain interim steadily fixing effect simultaneously.
Application number is " CN201320781500.4 ", publication number is " CN203669321U ", name is called the Chinese utility model patent of " socket joint type dish button steel pipe scaffold ", disclose a kind of socket joint type dish button steel pipe scaffold, comprise many cross bars, the main frame that many vertical rods and Duo Gen brace are formed, the top of main frame is provided with scaffold board, scaffold board is fixedly connected with cross bar by mushroom head, also comprise the bevelled connecting pin of band, the periphery of described vertical rod is provided with terminal pad, terminal pad is provided with multiple connecting hole, the two ends of cross bar are equipped with inserting paragraph, inserting paragraph is provided with patchhole, connecting pin inserts connecting hole and patchhole successively, cross bar is fixedly connected with vertical rod, connecting pin is also provided with peep hole.Although it can play the effect of scaffold, there is equally the problem that the tolerance that cannot solve wheel button perpendicularity meets code requirement in it, makes operating personnel need not be hand steered, be then difficult to the perpendicularity ensureing wheel button.
On the whole, more existing scaffolds and jockey thereof, many existence cannot solve wheel button card and the steel pipe problem that perpendicularity meets the demands when assembling, and cannot obtain interim steady fixing effect simultaneously; And there is the tolerance that cannot solve wheel button perpendicularity and meet the problem of code requirement, make operating personnel need not be hand steered, be then difficult to the perpendicularity ensureing wheel button.For this reason, needing the assembling tool of a kind of pulley-clip scaffold terminal pad and vertical rod, solving wheel button card and the steel pipe problem that perpendicularity meets the demands when assembling, interim steadily fixing effect can be obtained simultaneously; And the tolerance solving wheel button perpendicularity meets the problem of code requirement, make operating personnel need not be hand steered, also can ensure the perpendicularity of taking turns button.
Utility model content
The purpose of this utility model is the assembling tool providing a kind of pulley-clip scaffold terminal pad and vertical rod, solves wheel button card and the steel pipe problem that perpendicularity meets the demands when assembling, and can obtain interim steadily fixing effect simultaneously; And the tolerance solving wheel button perpendicularity meets the problem of code requirement, make operating personnel need not be hand steered, also can ensure the perpendicularity of taking turns button.
For achieving the above object, the utility model provides the assembling tool of a kind of pulley-clip scaffold terminal pad and vertical rod, comprises pedestal, pedestal is fixedly connected with and is provided with stand apparatus, and stand apparatus is connected with clip device is combined; Stand apparatus comprises the bearing flat board and bearing riser that are mutually vertically connected to form L-shaped structure; Bearing riser is provided with groove; Bearing flat board is provided with rotation stator; On bearing flat board, rotate the forward position place of stator and be provided with fixing hole; The both sides at the top of bearing riser are connected with plug respectively; Clip device comprises the intermediate plate of Y-shaped, and the top of the intermediate plate of Y-shaped is set to arc-shaped structure, and the middle position of arc-shaped structure is connected with the bottom of the intermediate plate of Y-shaped, and the bottom of the intermediate plate of Y-shaped is set to rectilinear structure; The lower end of the intermediate plate of Y-shaped is connected with bull stick is perpendicular, and one end of bull stick is connected with one end of handrail, and the other end of handrail is connected with weight; Intermediate plate vertically connects and is arranged on bearing flat board, arranges to take turns and detain between bearing riser and intermediate plate; Wheel button comprises circular wheel buckle body, and the inner hub location place of wheel buckle body is provided with centre bore; The both sides of pedestal are respectively equipped with spacing hole, are respectively equipped with bolt in spacing hole, and bolt is provided with the nut of belt washer.
In above scheme preferably, the quantity of bearing flat board is one, and the left and right sides of bearing flat board is respectively equipped with rotation stator; On bearing flat board, rotate the forward position place of stator and be equipped with fixing hole.
Can also preferably in above scheme, the quantity of bearing flat board is two, and two bearing flat boards are vertically connected on the both sides of bearing riser respectively; Each bearing flat board is equipped with rotation stator; On each bearing flat board, rotate the forward position place of stator and be equipped with fixing hole.
In above either a program preferably, the two ends at bearing riser top are provided with the first sunk part of circular arc respectively, and the middle position on the top of bearing riser is provided with the second sunk part; First sunk part and the second sunk part form the hump shape structure of bearing riser.
In above either a program preferably, plug connects the raised position place of two humps of the bearing riser being arranged on hump shape structure respectively.
In above either a program preferably, the first sunk part and the second sunk part are all set to circular arc.
In above either a program preferably, groove is set to the cutting that the degree of depth is 1mm.
In above either a program preferably, plug is set to the round steel perpendicular with bearing riser.
In above either a program preferably, the diameter of the round steel of plug is 10mm.
In above either a program preferably, the length of the round steel of plug is 14mm.
In above either a program preferably, bearing flat board is set to the steel plate of rectangle.
In above either a program preferably, the steel plate of bearing flat board is 10mm.
In above either a program preferably, bearing riser is set to the steel plate that thickness is 10mm.
In above either a program preferably, rotation stator is set to the semi-circular shape structure that steel plate is bent into.
In above either a program preferably, the thickness rotating the steel plate of stator is 2mm.
In above either a program preferably, fixing hole is set to circular port.
In above either a program preferably, the diameter of circular fixing hole is 7mm.
In above either a program preferably, the lower end of the intermediate plate of Y-shaped is connected with bull stick is perpendicular in the middle position of bull stick.
In above either a program preferably, the lower end of the intermediate plate of Y-shaped is connected by welding manner with bull stick, and the position be connected is provided with filling wlding.
In above either a program preferably, fill wlding and be set to weld seam.
In above either a program preferably, weld seam is of a size of 2mm.
In above either a program preferably, intermediate plate is set to steel plate.
In above either a program preferably, the thickness of the steel plate of intermediate plate is 10mm.
In above either a program preferably, bull stick is set to round steel.
In above either a program preferably, the diameter of the round steel of bull stick is 6mm.
In above either a program preferably, handrail is set to round steel.
In above either a program preferably, the diameter of the round steel of handrail is 6mm.
In above either a program preferably, weight is set to square steel.
In above either a program preferably, square steel is of a size of 10 × 10 × 26mm.
In above either a program preferably, pedestal is set to H-shaped shaped steel.
In above either a program preferably, spacing hole is separately positioned on the flange plate of pedestal both sides of H-shaped formed steel construction.
In above either a program preferably, the H-shaped shaped steel of 200 × 200 × 10 × 10mm.
In above either a program preferably, bolt is set to the bolt of diameter 8mm.
In above either a program preferably, the quantity of packing ring is two.
In above either a program preferably, it is 2mm that packing ring is set to thickness, and external diameter is the annular galvanized sheet iron of 24mm.
In above either a program preferably, nut is set to hex nut; It is highly 5mm that hex nut is set to, and diameter is the hex nut of 20mm.
In above either a program preferably, spacing hole is set to the Long Circle hole that width is 8mm.
In above either a program preferably, take turns buckle body and be set to the circular steel plate that thickness is 10mm.
In above either a program preferably, be provided with steel pipe in the circular hole at the inner hub location place of wheel buckle body, steel pipe is set to annular, and its external diameter is 48.3mm, and wall thickness is 3.6mm.
In above either a program preferably, the centre bore that the inner hub location place of wheel buckle body is arranged is set to circular hole, and the edge of circular hole is uniformly distributed the depression cell body being provided with four rectangles.
In above either a program preferably, the cylindrical of taking turns buckle body is uniformly distributed the concave arc being provided with four circular arcs.
The using method of the assembling tool of pulley-clip scaffold terminal pad of the present utility model and vertical rod, first bolt is adjusted in spacing hole suitable wheel button spacing, tighten the nut with packing ring, bearing is fixed, make to take turns two plugs and the groove that fastening leans against bearing, two plugs and groove is made to carry out temporary fixed to taking turns the side of buckleing, steel pipe is penetrated again in the centre bore of wheel button center position, after steel pipe is in place, by handrail, bull stick is rotated, intermediate plate is made to be close to the opposite side of wheel button, make to take turns the constraint that button is subject to two sides.The perpendicularity deviation that wheel detains card orthogonal with vertical rod longitudinal axis is at most 0.3mm.
Compared with prior art, the utility model has the following advantages:
The utility model provides the assembling tool of a kind of pulley-clip scaffold terminal pad and vertical rod, solves wheel button card and the steel pipe problem that perpendicularity meets the demands when assembling, and can obtain interim steadily fixing effect simultaneously; And the tolerance solving wheel button perpendicularity meets the problem of code requirement, make operating personnel need not be hand steered, also can ensure the perpendicularity of taking turns button.
Accompanying drawing explanation
Fig. 1 is the structural representation of an embodiment of assembling tool according to pulley-clip scaffold terminal pad of the present utility model and vertical rod;
Fig. 2 is to sectional view according to the a-a of the assembling tool of pulley-clip scaffold terminal pad of the present utility model embodiment illustrated in fig. 1 and vertical rod;
Fig. 3 is to sectional view according to the b-b of the assembling tool of pulley-clip scaffold terminal pad of the present utility model embodiment illustrated in fig. 1 and vertical rod;
Fig. 4 is to sectional view according to the c-c of the assembling tool of pulley-clip scaffold terminal pad of the present utility model embodiment illustrated in fig. 1 and vertical rod;
Fig. 5 is the front view of the stand apparatus of assembling tool according to pulley-clip scaffold terminal pad of the present utility model embodiment illustrated in fig. 1 and vertical rod;
Fig. 6 is the top view of the stand apparatus of assembling tool according to pulley-clip scaffold terminal pad of the present utility model embodiment illustrated in fig. 1 and vertical rod;
Fig. 7 is the side view of the stand apparatus of assembling tool according to pulley-clip scaffold terminal pad of the present utility model embodiment illustrated in fig. 1 and vertical rod;
Fig. 8 is the front view of the clip device of assembling tool according to pulley-clip scaffold terminal pad of the present utility model embodiment illustrated in fig. 1 and vertical rod;
Fig. 9 is the top view of the clip device of assembling tool according to pulley-clip scaffold terminal pad of the present utility model embodiment illustrated in fig. 1 and vertical rod;
Figure 10 is the side view of the clip device of assembling tool according to pulley-clip scaffold terminal pad of the present utility model embodiment illustrated in fig. 1 and vertical rod;
Figure 11 is the front view of the wheel button of assembling tool according to pulley-clip scaffold terminal pad of the present utility model embodiment illustrated in fig. 1 and vertical rod;
Figure 12 is the top view of the wheel button of assembling tool according to pulley-clip scaffold terminal pad of the present utility model embodiment illustrated in fig. 1 and vertical rod;
Figure 13 is the side view of the wheel button of assembling tool according to pulley-clip scaffold terminal pad of the present utility model embodiment illustrated in fig. 1 and vertical rod.
In figure, 1 is pedestal, and 2 is stand apparatus, and 3 is clip device, 4 is bolt, and 5 is packing ring, and 6 is hex nut, and 7 is spacing hole, 8 is wheel button, and 9 is steel pipe, and 10 is bull stick, and 11 is handrail, 12 is weight, and 13 is plug, and 14 is bearing riser, 15 is groove, and 16 for rotating stator, and 17 is fixing hole, 18 is that bearing is dull and stereotyped, and 19 for filling wlding, and 20 is intermediate plate.
Detailed description of the invention
In order to understand the utility model better, below in conjunction with specific embodiment, the utility model is explained in detail.But, obviously can carry out different modification and remodeling to the utility model and not exceed the wider spirit and scope of the utility model of appended claims.Therefore, following examples have exemplary and hard-core implication.
Embodiment 1:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, comprises pedestal 1, pedestal 1 is fixedly connected with and is provided with stand apparatus 2, and stand apparatus 2 is connected with clip device 3 is combined; Stand apparatus 2 comprises the bearing dull and stereotyped 18 and bearing riser 14 that are mutually vertically connected to form L-shaped structure; Bearing riser 14 is provided with groove 15; Bearing flat board 18 is provided with and rotates stator 16; On bearing flat board 18, rotate the forward position place of stator 16 and be provided with fixing hole 17; The both sides at the top of bearing riser 14 are connected with plug 13 respectively; Clip device 3 comprises the intermediate plate 20 of Y-shaped, and the top of the intermediate plate 20 of Y-shaped is set to arc-shaped structure, and the middle position of arc-shaped structure is connected with the bottom of the intermediate plate 20 of Y-shaped, and the bottom of the intermediate plate 20 of Y-shaped is set to rectilinear structure; The lower end of the intermediate plate 20 of Y-shaped is connected with bull stick 10 is perpendicular, and one end of bull stick 10 is connected with one end of handrail 11, and the other end of handrail 11 is connected with weight 12; Intermediate plate 20 vertically connection is arranged on bearing flat board 18, arranges and take turns button 8 between bearing riser 14 and intermediate plate 20; Wheel button 8 comprises circular wheel and detains 8 plate bodys, and the inner hub location place of wheel button 8 plate body is provided with centre bore; The both sides of pedestal 1 are respectively equipped with spacing hole 7, are respectively equipped with bolt 4 in spacing hole 7, and bolt 4 is provided with the nut of belt washer 5.
Embodiment 2:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 1, difference is, the quantity of bearing flat board 18 is one, and the left and right sides of bearing flat board 18 is respectively equipped with and rotates stator 16; On bearing flat board 18, rotate the forward position place of stator 16 and be equipped with fixing hole 17.
Embodiment 3:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 1, difference is, the quantity of bearing flat board 18 is two, and two bearing flat boards 18 are vertically connected on the both sides of bearing riser 14 respectively; Each bearing flat board 18 is equipped with and rotates stator 16; On each bearing flat board 18, rotate the forward position place of stator 16 and be equipped with fixing hole 17.
Embodiment 4:
The assembling tool of a kind of pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 3, difference is, the two ends at bearing riser 14 top are provided with the first sunk part of circular arc respectively, and the middle position on the top of bearing riser 14 is provided with the second sunk part; First sunk part and the second sunk part form the hump shape structure of bearing riser 14.
Embodiment 5:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 4, difference is, plug 13 connects the raised position place of two humps of the bearing riser 14 being arranged on hump shape structure respectively.
Embodiment 6:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 5, difference is, the first sunk part and the second sunk part are all set to circular arc.
Embodiment 7:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 6, difference is, groove 15 is set to the cutting that the degree of depth is 1mm.
Embodiment 8:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 7, difference is, plug 13 is set to the round steel perpendicular with bearing riser 14.
Embodiment 9:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 8, difference is, the diameter of the round steel of plug 13 is 10mm.
Embodiment 10:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 9, difference is, the length of the round steel of plug 13 is 14mm.
Embodiment 11:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 10, difference is, bearing flat board 18 is set to the steel plate of rectangle.
Embodiment 12:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 11, difference is, the steel plate of bearing flat board 18 is 10mm.
Embodiment 13:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 12, difference is, bearing riser 14 is set to the steel plate that thickness is 10mm.
Embodiment 14:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 13, difference is, rotation stator 16 is set to the semi-circular shape structure that steel plate is bent into.
Embodiment 15:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 14, difference is, the thickness rotating the steel plate of stator 16 is 2mm.
Embodiment 16:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 15, difference is, fixing hole 17 is set to circular port.
Embodiment 17:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 16, difference is, the diameter of circular fixing hole 17 is 7mm.
Embodiment 18:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 17, difference is, the lower end of the intermediate plate 20 of Y-shaped is connected with bull stick 10 is perpendicular in the middle position of bull stick 10.
Embodiment 19:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 18, difference is, the lower end of the intermediate plate 20 of Y-shaped is connected by welding manner with bull stick 10, and the position be connected is provided with fills wlding 19.
Embodiment 20:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 19, difference is, fills wlding 19 and is set to weld seam.
Embodiment 21:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 20, difference is, weld seam is of a size of 2mm.
Embodiment 22:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 21, difference is, intermediate plate 20 is set to steel plate.
Embodiment 23:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 22, difference is, the thickness of the steel plate of intermediate plate 20 is 10mm.
Embodiment 24:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 23, difference is, bull stick 10 is set to round steel.
Embodiment 25:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 24, difference is, the diameter of the round steel of bull stick 10 is 6mm.
Embodiment 26:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 25, difference is, handrail 11 is set to round steel.
Embodiment 27:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 26, difference is, the diameter of the round steel of handrail 11 is 6mm.
Embodiment 28:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 27, difference is, weight 12 is set to square steel.
Embodiment 29:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 28, difference is, square steel is of a size of 10 × 10 × 26mm.
Embodiment 30:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 29, difference is, pedestal 1 is set to H-shaped shaped steel.
Embodiment 31:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 30, difference is, spacing hole 7 is separately positioned on the flange plate of pedestal 1 both sides of H-shaped formed steel construction.
Embodiment 32:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 31, difference is, the H-shaped shaped steel of 200 × 200 × 10 × 10mm.
Embodiment 33:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 32, difference is, bolt 4 is set to the bolt of diameter 8mm.
Embodiment 34:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 33, difference is, the quantity of packing ring 5 is two.
Embodiment 35:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 34, difference is, it is 2mm that packing ring 5 is set to thickness, and external diameter is the annular galvanized sheet iron of 24mm.
Embodiment 36:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 35, difference is, nut is set to hex nut 6; It is highly 5mm that hex nut 6 is set to, and diameter is the hex nut 6 of 20mm.
Embodiment 37:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 36, difference is, spacing hole 7 is set to the Long Circle hole that width is 8mm.
Embodiment 38:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 37, difference is, wheel button 8 plate body is set to the circular steel plate that thickness is 10mm.
Embodiment 39:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 38, difference is, be provided with steel pipe 9 in the circular hole at the inner hub location place of wheel button 8 plate body, steel pipe 9 is set to annular, and its external diameter is 48.3mm, and wall thickness is 3.6mm.
Embodiment 40:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 39, difference is, the centre bore that the inner hub location place of wheel button 8 plate body is arranged is set to circular hole, and the edge of circular hole is uniformly distributed the depression cell body being provided with four rectangles.
Embodiment 41:
An assembling tool for pulley-clip scaffold terminal pad and vertical rod, similar to embodiment 40, difference is, the cylindrical of wheel button 8 plate body is uniformly distributed the concave arc being provided with four circular arcs.
The using method of the assembling tool of pulley-clip scaffold terminal pad of the present utility model and vertical rod, first bolt 4 is adjusted in spacing hole 7 suitable wheel and detain 8 spacing, tighten the nut with packing ring 5, bearing is fixed, make to take turns two plugs 13 and the groove 15 that button 8 abuts against bearing, two plugs 13 and groove 15 is made to carry out temporary fixed to the side that wheel buckles 8, steel pipe 9 is penetrated again in the centre bore of wheel button 8 center position, after steel pipe 9 is in place, rotated by handrail 11 pairs of bull sticks 10, intermediate plate 20 is made to be close to the opposite side of wheel button 8, make to take turns the constraint that button 8 is subject to two sides.The perpendicularity deviation of taking turns button 8 card orthogonal with vertical rod longitudinal axis is at most 0.3mm.
The assembling tool of pulley-clip scaffold terminal pad of the present utility model and vertical rod, as shown in figure 1 to figure 13, when its stand apparatus 2 is for ensureing that wheel button 8 welds with hack lever, take turns the temporarily in place of button 8, the profile along wheel button 8 is provided with groove 15 on bearing riser 14; Its groove 15 is set to the dark cutting of mm arranged on bearing riser 14, and wheel button 8 can be made to be stuck on bearing riser 14; Its plug 13 is weldingly fixed on the top of bearing riser 14; Its bearing riser 14 is set to the structure of a hump shape; Sunk part in the middle of the bearing riser 14 of hump shape can make to carry out during hack lever horizontal positioned temporarily in place.Rotate constraint when stator 16 rotates for device; Fixing hole 17 overlaps along pedestal 1 spacing hole 7 center line of boring a hole on bearing flat board 18, is undertaken temporary fixed by bolt 4 by dull and stereotyped for bearing 18 and pedestal 1.It can solve wheel button card and steel pipe 9 problem that perpendicularity meets the demands when assembling, and obtains interim steadily fixing effect simultaneously.
The assembling tool of pulley-clip scaffold terminal pad of the present utility model and vertical rod, as shown in figure 1 to figure 13, the weight 12 of its clip device 3 adopts 10mm × 10mm × 26mm square steel, be welded to connect with handrail 11, the center of gravity of whole intermediate plate 20 moves to the direction of clamping wheel button 8 by weight 12, ensure that clip device 3 can carry out effectively temporary fixed to wheel button 8; Its handrail 11 adopts diameter to be the round steel of 6mm, and its one end and weight 12 are welded and fixed, and the other end and bull stick 10 are welded and fixed, and mainly plays and makes weight 12 be connected to effect in clip device 3, and facilitate workman to operate; Its bull stick 10 adopts diameter to be the round steel of 6mm, and its one end and handrail 11 are welded and fixed, and middle part and the intermediate plate 20 of bull stick 10 are welded and fixed, and rotates on bearing flat board 18 by rotating stator 16, ensures that wheel button 8 can be clamped and decontrol to intermediate plate 20 freely; The steel plate that its intermediate plate 20 adopts 10mm thick, and be set to " Y " type, the sunk space on the top of intermediate plate 20 can make frame pipe be fixed, and whole intermediate plate 20 can make wheel button 8 vertically be attached on bearing riser 14 closely, thus ensure that the perpendicularity of taking turns when button 8 makes.It is in Building Construction, and the tolerance that can solve wheel button 8 perpendicularity meets the problem of code requirement, makes operating personnel need not be hand steered, also can ensure the perpendicularity of taking turns button 8; Thus meet the construction requirement of taking turns the button card perpendicularity deviation orthogonal with vertical rod longitudinal axis and should not be greater than 0.3mm.
The assembling tool of pulley-clip scaffold terminal pad of the present utility model and vertical rod, as shown in figure 1 to figure 13, its perpendicularity deviation of taking turns button card orthogonal with vertical rod longitudinal axis should not be greater than 0.3mm.Namely " L " type design of stand apparatus 2 ensure that bearing steadily can be fixed on below pedestal 1, can meet again the requirement of wheel button card and steel pipe 9 perpendicularity when assembling.And two plugs 13 in stand apparatus 2 and groove 15 carry out temporary fixed to the side that wheel buckles 8.After steel pipe 9 is in place, rotated by handrail 11 pairs of bull sticks 10, make intermediate plate 20 be close to the opposite side of wheel button 8, make wheel button 8 be subject to the constraint of two sides, ensure that the tolerance of its perpendicularity meets code requirement.Rear end makes the center of gravity of intermediate plate 20 move forward with the handrail 11 of weight 12, even if operating personnel need not be hand steered, also can ensure that intermediate plate 20 is close to wheel button 8.Bolt 4 can carry out free adjustment wheel and buckle 8 spacing in spacing hole 7 along steel pipe 9 direction, but suffers restraints along steel pipe 9 vertical direction.

Claims (41)

1. an assembling tool for pulley-clip scaffold terminal pad and vertical rod, comprises pedestal (1), it is characterized in that: pedestal (1) is fixedly connected with and is provided with stand apparatus (2), and stand apparatus (2) is connected with clip device (3) is combined; Stand apparatus (2) comprises the bearing flat board (18) and the bearing riser (14) that are mutually vertically connected to form L-shaped structure; Bearing riser (14) is provided with groove (15); Bearing flat board (18) is provided with and rotates stator (16); Bearing flat board (18) forward position place that is upper, that rotate stator (16) is provided with fixing hole (17); The both sides at the top of bearing riser (14) are connected with plug (13) respectively; Clip device (3) comprises the intermediate plate (20) of Y-shaped, the top of the intermediate plate (20) of Y-shaped is set to arc-shaped structure, the middle position of arc-shaped structure is connected with the bottom of the intermediate plate (20) of Y-shaped, and the bottom of the intermediate plate (20) of Y-shaped is set to rectilinear structure; The lower end of the intermediate plate (20) of Y-shaped is connected with bull stick (10) is perpendicular, and one end of bull stick (10) is connected with one end of handrail (11), and the other end of handrail (11) is connected with weight (12); Intermediate plate (20) vertically connection is arranged on bearing flat board (18), arranges to take turns and detain (8) between bearing riser (14) and intermediate plate (20); Wheel button (8) comprises circular wheel button (8) plate body, and the inner hub location place of wheel button (8) plate body is provided with centre bore; The both sides of pedestal (1) are respectively equipped with spacing hole (7), are respectively equipped with bolt (4) in spacing hole (7), and bolt (4) is provided with the nut of belt washer (5).
2. the assembling tool of pulley-clip scaffold terminal pad as claimed in claim 1 and vertical rod, is characterized in that: the quantity of bearing flat board (18) is one, and the left and right sides of bearing flat board (18) is respectively equipped with and rotates stator (16); Bearing flat board (18) forward position place that is upper, that rotate stator (16) is equipped with fixing hole (17).
3. the assembling tool of pulley-clip scaffold terminal pad as claimed in claim 1 and vertical rod, is characterized in that: the quantity of bearing flat board (18) is two, and two bearing flat boards (18) are vertically connected on the both sides of bearing riser (14) respectively; Each bearing flat board (18) is equipped with and rotates stator (16); Each bearing flat board (18) forward position place that is upper, that rotate stator (16) is equipped with fixing hole (17).
4. the assembling tool of pulley-clip scaffold terminal pad as claimed in claim 3 and vertical rod, it is characterized in that: the two ends at bearing riser (14) top are provided with the first sunk part of circular arc respectively, and the middle position on the top of bearing riser (14) is provided with the second sunk part; First sunk part and the second sunk part form the hump shape structure of bearing riser (14).
5. the assembling tool of pulley-clip scaffold terminal pad as claimed in claim 4 and vertical rod, is characterized in that: plug (13) connects the raised position place of two humps of the bearing riser (14) being arranged on hump shape structure respectively.
6. the assembling tool of pulley-clip scaffold terminal pad as claimed in claim 5 and vertical rod, is characterized in that: the first sunk part and the second sunk part are all set to circular arc.
7. the assembling tool of pulley-clip scaffold terminal pad as claimed in claim 6 and vertical rod, is characterized in that: groove (15) is set to the cutting that the degree of depth is 1mm.
8. the assembling tool of pulley-clip scaffold terminal pad as claimed in claim 7 and vertical rod, is characterized in that: plug (13) is set to the round steel perpendicular with bearing riser (14).
9. the assembling tool of pulley-clip scaffold terminal pad as claimed in claim 8 and vertical rod, is characterized in that: the diameter of the round steel of plug (13) is 10mm.
10. the assembling tool of pulley-clip scaffold terminal pad as claimed in claim 9 and vertical rod, is characterized in that: the length of the round steel of plug (13) is 14mm.
The assembling tool of 11. pulley-clip scaffold terminal pads as claimed in claim 10 and vertical rod, is characterized in that: bearing flat board (18) is set to the steel plate of rectangle.
The assembling tool of 12. pulley-clip scaffold terminal pads as claimed in claim 11 and vertical rod, is characterized in that: the steel plate of bearing flat board (18) is 10mm.
The assembling tool of 13. pulley-clip scaffold terminal pads as claimed in claim 12 and vertical rod, is characterized in that: bearing riser (14) is set to the steel plate that thickness is 10mm.
The assembling tool of 14. pulley-clip scaffold terminal pads as claimed in claim 13 and vertical rod, is characterized in that: rotation stator (16) is set to the semi-circular shape structure that steel plate is bent into.
The assembling tool of 15. pulley-clip scaffold terminal pads as claimed in claim 14 and vertical rod, is characterized in that: the thickness rotating the steel plate of stator (16) is 2mm.
The assembling tool of 16. pulley-clip scaffold terminal pads as claimed in claim 15 and vertical rod, is characterized in that: fixing hole (17) is set to circular port.
The assembling tool of 17. pulley-clip scaffold terminal pads as claimed in claim 16 and vertical rod, is characterized in that: the diameter of circular fixing hole (17) is 7mm.
The assembling tool of 18. pulley-clip scaffold terminal pads according to any one of claim 1-17 and vertical rod, is characterized in that: the lower end of the intermediate plate (20) of Y-shaped is connected with bull stick (10) is perpendicular in the middle position of bull stick (10).
The assembling tool of 19. pulley-clip scaffold terminal pads as claimed in claim 18 and vertical rod, it is characterized in that: the lower end of the intermediate plate (20) of Y-shaped is connected by welding manner with bull stick (10), the position be connected is provided with fills wlding (19).
The assembling tool of 20. pulley-clip scaffold terminal pads as claimed in claim 19 and vertical rod, is characterized in that: fill wlding (19) and be set to weld seam.
The assembling tool of 21. pulley-clip scaffold terminal pads as claimed in claim 20 and vertical rod, is characterized in that: weld seam is of a size of 2mm.
The assembling tool of 22. pulley-clip scaffold terminal pads as claimed in claim 21 and vertical rod, is characterized in that: intermediate plate (20) is set to steel plate.
The assembling tool of 23. pulley-clip scaffold terminal pads as claimed in claim 22 and vertical rod, is characterized in that: the thickness of the steel plate of intermediate plate (20) is 10mm.
The assembling tool of 24. pulley-clip scaffold terminal pads as claimed in claim 23 and vertical rod, is characterized in that: bull stick (10) is set to round steel.
The assembling tool of 25. pulley-clip scaffold terminal pads as claimed in claim 24 and vertical rod, is characterized in that: the diameter of the round steel of bull stick (10) is 6mm.
The assembling tool of 26. pulley-clip scaffold terminal pads as claimed in claim 25 and vertical rod, is characterized in that: handrail (11) is set to round steel.
The assembling tool of 27. pulley-clip scaffold terminal pads as claimed in claim 26 and vertical rod, is characterized in that: the diameter of the round steel of handrail (11) is 6mm.
The assembling tool of 28. pulley-clip scaffold terminal pads as claimed in claim 27 and vertical rod, is characterized in that: weight (12) is set to square steel.
The assembling tool of 29. pulley-clip scaffold terminal pads as claimed in claim 28 and vertical rod, is characterized in that: square steel is of a size of 10 × 10 × 26mm.
The assembling tool of 30. pulley-clip scaffold terminal pads according to any one of claim 1-17 and vertical rod, is characterized in that: pedestal (1) is set to H-shaped shaped steel.
The assembling tool of 31. pulley-clip scaffold terminal pads as claimed in claim 30 and vertical rod, is characterized in that: spacing hole (7) is separately positioned on the flange plate of pedestal (1) both sides of H-shaped formed steel construction.
The assembling tool of 32. pulley-clip scaffold terminal pads as claimed in claim 30 and vertical rod, is characterized in that: the H-shaped shaped steel of 200 × 200 × 10 × 10mm.
The assembling tool of 33. pulley-clip scaffold terminal pads as claimed in claim 32 and vertical rod, is characterized in that: bolt (4) is set to the bolt of diameter 8mm.
The assembling tool of 34. pulley-clip scaffold terminal pads as claimed in claim 33 and vertical rod, is characterized in that: the quantity of packing ring (5) is two.
The assembling tool of 35. pulley-clip scaffold terminal pads as claimed in claim 34 and vertical rod, is characterized in that: it is 2mm that packing ring (5) is set to thickness, external diameter is the annular galvanized sheet iron of 24mm.
The assembling tool of 36. pulley-clip scaffold terminal pads as claimed in claim 35 and vertical rod, is characterized in that: nut is set to hex nut (6); It is highly 5mm that hex nut (6) is set to, and diameter is the hex nut (6) of 20mm.
The assembling tool of 37. pulley-clip scaffold terminal pads as claimed in claim 36 and vertical rod, is characterized in that: spacing hole (7) is set to the Long Circle hole that width is 8mm.
The assembling tool of 38. pulley-clip scaffold terminal pads as claimed in claim 37 and vertical rod, is characterized in that: wheel button (8) plate body is set to the circular steel plate that thickness is 10mm.
The assembling tool of 39. pulley-clip scaffold terminal pads as claimed in claim 38 and vertical rod, it is characterized in that: in the circular hole at the inner hub location place of wheel button (8) plate body, be provided with steel pipe (9), steel pipe (9) is set to annular, and its external diameter is 48.3mm, and wall thickness is 3.6mm.
The assembling tool of 40. pulley-clip scaffold terminal pads according to any one of claim 1-17 and vertical rod, it is characterized in that: the centre bore that the inner hub location place of wheel button (8) plate body is arranged is set to circular hole, and the edge of circular hole is uniformly distributed the depression cell body being provided with four rectangles.
The assembling tool of 41. pulley-clip scaffold terminal pads according to any one of claim 1-17 and vertical rod, is characterized in that: the cylindrical of wheel button (8) plate body is uniformly distributed the concave arc being provided with four circular arcs.
CN201520523741.8U 2015-07-17 2015-07-17 Equipment instrument of wheel knot formula scaffold connection pad and pole setting Expired - Fee Related CN204843920U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520523741.8U CN204843920U (en) 2015-07-17 2015-07-17 Equipment instrument of wheel knot formula scaffold connection pad and pole setting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520523741.8U CN204843920U (en) 2015-07-17 2015-07-17 Equipment instrument of wheel knot formula scaffold connection pad and pole setting

Publications (1)

Publication Number Publication Date
CN204843920U true CN204843920U (en) 2015-12-09

Family

ID=54734514

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520523741.8U Expired - Fee Related CN204843920U (en) 2015-07-17 2015-07-17 Equipment instrument of wheel knot formula scaffold connection pad and pole setting

Country Status (1)

Country Link
CN (1) CN204843920U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105150131A (en) * 2015-07-17 2015-12-16 山东三箭资产投资管理有限公司 Assembling tool for connecting discs and vertical rods of pulley-clip scaffold and use method of assembling tool
CN105625706A (en) * 2015-12-29 2016-06-01 北京国家游泳中心有限责任公司 Connecting piece for enhancing bearing capacity of tool type scaffold and installing method of connecting piece
CN111571095A (en) * 2020-05-30 2020-08-25 阜阳市棋剑节能环保设备有限公司 Flower disc positioning fixture of sucking disc type vertical rod welding machine

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105150131A (en) * 2015-07-17 2015-12-16 山东三箭资产投资管理有限公司 Assembling tool for connecting discs and vertical rods of pulley-clip scaffold and use method of assembling tool
CN105625706A (en) * 2015-12-29 2016-06-01 北京国家游泳中心有限责任公司 Connecting piece for enhancing bearing capacity of tool type scaffold and installing method of connecting piece
CN111571095A (en) * 2020-05-30 2020-08-25 阜阳市棋剑节能环保设备有限公司 Flower disc positioning fixture of sucking disc type vertical rod welding machine

Similar Documents

Publication Publication Date Title
CN204843920U (en) Equipment instrument of wheel knot formula scaffold connection pad and pole setting
CN201620472U (en) C-shaped channel steel and bolt fastener structure
CN106460784B (en) Connect alignment tools, system and the method for wind turbine tower segment
CN204212399U (en) Flip-shell is to clasp
CN206105242U (en) Steel bow member connecting plate and bow member I -steel fixed -position welding device
CN106968695B (en) Prefabricated tunnel lock foot stock and steelframe connecting element
CN203875645U (en) Clamping device for hole boring of land leveler front shaft connecting support
CN203808495U (en) Socket type connecting device for key groove type steel pipe supports
CN105150131A (en) Assembling tool for connecting discs and vertical rods of pulley-clip scaffold and use method of assembling tool
CN207005014U (en) Steel structure column butt joint positioning device
CN205935630U (en) Scaffold frame is with wheel knot formula connecting device
CN205778937U (en) A kind of auxiliary device being accurately positioned preliminary bracing steel arch-shelf unit and junction steel plate
CN202187538U (en) Instant lap scaffolding
CN104831916B (en) Wedge-shaped locking type fastener used for circular steel pipe and combined fastener
CN203062161U (en) Welding positioning device for tunnel steel arch truss and connecting steel plate
CN214351932U (en) A chuck for scissors foot
CN213573060U (en) Light-duty automatic nuclear position ware of reinforcement
CN204339167U (en) A kind of structural member apparatus for welding and positioning
CN106284401B (en) One kind unloading pit bend foundation built-in bolt group's rapid construction technology
CN210260903U (en) Assembled type safety passage for tower crane driver to walk
CN205063307U (en) Dedicated uninstallation device of inserted lift scaffold
CN219745898U (en) Rod piece correcting device of tower crane
CN204804310U (en) Equipment clamping piece device of wheel knot formula scaffold connection pad and pole setting
CN209619777U (en) Roadbed cushion construction falsework
CN214302574U (en) Novel reinforcing bar interval location device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151209

Termination date: 20190717