CN105134136B - 一种地热回灌专用井内设备 - Google Patents

一种地热回灌专用井内设备 Download PDF

Info

Publication number
CN105134136B
CN105134136B CN201510497840.8A CN201510497840A CN105134136B CN 105134136 B CN105134136 B CN 105134136B CN 201510497840 A CN201510497840 A CN 201510497840A CN 105134136 B CN105134136 B CN 105134136B
Authority
CN
China
Prior art keywords
mounting post
inner cylinder
connecting flange
cylinder body
hollow ball
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510497840.8A
Other languages
English (en)
Other versions
CN105134136A (zh
Inventor
谭现锋
赵季初
王肖波
康凤新
宋明春
秦耀军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Provincial Bureau Of Geology & Mineral Resources Second Hydrogeology Engineering Geology Brigade (shandong Lubei Geological Engineering Investigation Institute)
Original Assignee
Second Hydrological Geology Engineering Geological Team Of Shandong Provincial Bureau Of Geology & Mineral Resources
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Hydrological Geology Engineering Geological Team Of Shandong Provincial Bureau Of Geology & Mineral Resources filed Critical Second Hydrological Geology Engineering Geological Team Of Shandong Provincial Bureau Of Geology & Mineral Resources
Priority to CN201510497840.8A priority Critical patent/CN105134136B/zh
Publication of CN105134136A publication Critical patent/CN105134136A/zh
Application granted granted Critical
Publication of CN105134136B publication Critical patent/CN105134136B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

本发明公开了一种地热回灌专用井内设备,其外圆筒体的上端与上连接法兰连接在一起,外圆筒体的下段套设在内圆筒体外,外圆筒体与内圆筒体外壁之间具有空间,弹簧套在内圆筒体上并位于空间中,外圆筒体中部的壁上开设有通槽,安装柱位于外圆筒体内,与通槽位置相对应的安装柱上固定有密封橡胶块,安装柱的下端位于空间中,弹簧的上端顶抵安装柱的底面,上提与球体限制锥固定在安装柱顶部,内圆筒体的顶面安装密封橡胶环,空心球位于内圆筒体上,下连接法兰与内圆筒体的下端连接,上连接法兰与上泵管连接,下连接法兰与下泵管连接。本发明实现了回灌与回扬在井内共用一套管路,简化了回灌设备,降低生产成本。

Description

一种地热回灌专用井内设备
技术领域
本发明涉及可再生能源的开发与利用领域,特别涉及一种地热回灌专用井内设备。
背景技术
目前国内外还没有专门针对回灌与回扬管路共用的井内设备。油田上有针对分层注水的井内注水设备——分层注水工艺管柱,该设备既能实现分层注水,又能保护油层以上套管,井口注水压力最高达39MPa,注水有效期最长已经达到46个月。
分层注水工艺管柱实现了分层注水、提高注水压力、保护套管的目的,但该设备只能单方向的向井内注水,不能回扬抽水。
发明内容
本发明的目的是为了解决上述问题,而提供一种地热回灌专用井内设备。本发明实现了回灌与回扬在井内共用一套管路,简化了回灌设备,降低生产成本。
本发明是由上连接法兰、外圆筒体、上提与球体限制锥、安装柱、密封橡胶块、内圆筒体、下连接法兰、支撑圆环、空心球、密封橡胶环和弹簧组成,外圆筒体的上端与上连接法兰连接在一起,外圆筒体的下段套设在内圆筒体外,外圆筒体与内圆筒体外壁之间具有空间,弹簧套在内圆筒体上并位于空间中,外圆筒体中部的壁上开设有通槽,安装柱位于外圆筒体内,与通槽位置相对应的安装柱上固定有密封橡胶块,安装柱的下端位于空间中,弹簧的上端顶抵安装柱的底面,安装柱的中部固定支撑圆环,上提与球体限制锥固定在安装柱顶部,内圆筒体的顶面安装密封橡胶环,空心球位于内圆筒体上,下连接法兰与内圆筒体的下端连接,上连接法兰与上泵管连接,下连接法兰与下泵管连接。所述密封橡胶块与通槽四周之间紧密接触,两者之间的摩擦力大于上提与球体限制锥和安装柱的重量之和。
所述的空心球外径大于支撑圆环的内径;空心球能自由穿过支撑圆环。
所述通槽的总面积大于与上连接法兰连接的上泵管内孔面积。
所述的空心球与安装柱内壁之间具有空隙,该空隙的面积大于上泵管内孔面积和下泵管内孔面积。
本发明的工作过程和原理:
回灌时:在回灌水流压力作用下,上提与球体限制锥的上表面及安装柱的上表面承受回灌水流的冲击,带动安装柱整体下行,直至上提与球体限制锥下压到空心球上半部分,此时,密封橡胶块脱离对外圆筒体通槽的封堵,通槽打开,回灌水流从通槽流出。该过程中,上提与球体限制锥、安装柱、支撑圆环和密封橡胶块整体下移。回灌时,空心球对下泵管进行有效封堵,防止回灌水进入下泵管。
回扬时:在回扬水流的冲击作用下,空心球上行脱离对内圆筒体的密封,空心球带动安装柱整体上行,直至安装柱下部扩大端顶部与内圆筒体上方限制块接触,通槽被密封橡胶块全部封闭,回扬水流从内圆筒体中流入安装柱内,经空心球四周进入上泵管中流出地表。
所述的空心球与安装柱内壁之间具有空隙,该间隙的面积大于上泵管内孔面积和下泵管内孔面积。不至于对回扬泵产生过大的压力。
本发明的有益效果:
本发明实现了回灌与回扬在井内共用一套管路,简化了回灌设备,降低生产成本。
附图说明
图1为本发明的剖视图。
图2为本发明的外圆筒体具有通槽处的截面图。
具体实施方式
参阅图1和图2所示,本实施例是由上连接法兰1、外圆筒体2、上提与球体限制锥3、安装柱4、密封橡胶块5、内圆筒体6、下连接法兰7、支撑圆环8、空心球9、密封橡胶环10和弹簧11组成,外圆筒体2的上端与上连接法兰1连接在一起,外圆筒体2的下段套设在内圆筒体6外,外圆筒体2与内圆筒体6外壁之间具有空间13,弹簧11套在内圆筒体6上并位于空间13中,外圆筒体2中部的壁上开设有通槽12,安装柱4位于外圆筒体2内,与通槽12位置相对应的安装柱4上固定有密封橡胶块5,安装柱4的下端位于空间13中,弹簧11的上端顶抵安装柱4的底面,安装柱4的中部固定支撑圆环8,上提与球体限制锥3固定在安装柱4顶部,内圆筒体6的顶面安装密封橡胶环10,空心球9位于内圆筒体6上,下连接法兰7与内圆筒体6的下端连接,上连接法兰1与上泵管连接,下连接法兰7与下泵管连接。所述密封橡胶块5与通槽12四周之间紧密接触,两者之间的摩擦力大于上提与球体限制锥3和安装柱4的重量之和。
所述的空心球9外径大于支撑圆环8的内径;空心球9能自由穿过支撑圆环8。
所述通槽12的总面积大于与上连接法兰1连接的上泵管内孔面积。
所述的空心球9与安装柱4内壁之间具有空隙,该空隙的面积大于上泵管内孔面积和下泵管内孔面积。
本实施例的工作过程和原理:
回灌时:在回灌水流压力作用下,上提与球体限制锥3的上表面及安装柱4的上表面承受回灌水流的冲击,带动安装柱4整体下行,直至上提与球体限制锥3下压到空心球9上半部分,此时,密封橡胶块5脱离对外圆筒体2通槽12的封堵,通槽12打开,回灌水流从通槽12流出。该过程中,上提与球体限制锥3、安装柱4、支撑圆环8和密封橡胶块5整体下移。回灌时,空心球9对下泵管进行有效封堵,防止回灌水进入下泵管。
回扬时:在回扬水流的冲击作用下,空心球9上行脱离对内圆筒体6的密封,空心球9带动安装柱4整体上行,直至安装柱4下部扩大端顶部与内圆筒体6上方限制块接触,通槽12被密封橡胶块5全部封闭,回扬水流从内圆筒体6中流入安装柱4内,经空心球9四周进入上泵管中流出地表。
所述的空心球9与安装柱4内壁之间具有空隙,该间隙的面积大于上泵管内孔面积和下泵管内孔面积。不至于对回扬泵产生过大的压力。

Claims (2)

1.一种地热回灌专用井内设备,其特征在于:是由上连接法兰(1)、外圆筒体(2)、上提与球体限制锥(3)、安装柱(4)、密封橡胶块(5)、内圆筒体(6)、下连接法兰(7)、支撑圆环(8)、空心球(9)、密封橡胶环(10)和弹簧(11)组成,外圆筒体(2)的上端与上连接法兰(1)连接在一起,外圆筒体(2)的下段套设在内圆筒体(6)外,外圆筒体(2)与内圆筒体(6)外壁之间具有空间(13),弹簧(11)套在内圆筒体(6)上并位于空间(13)中,外圆筒体(2)中部的壁上开设有通槽(12),安装柱(4)位于外圆筒体(2)内,与通槽(12)位置相对应的安装柱(4)上固定有密封橡胶块(5),安装柱(4)的下端位于空间(13)中,弹簧(11)的上端顶抵安装柱(4)的底面,安装柱(4)的中部固定支撑圆环(8),上提与球体限制锥(3)固定在安装柱(4)顶部,内圆筒体(6)的顶面安装密封橡胶环(10),空心球(9)位于内圆筒体(6)上,下连接法兰(7)与内圆筒体(6)的下端连接,上连接法兰(1)与上泵管连接,下连接法兰(7)与下泵管连接;所述密封橡胶块(5)与通槽(12)四周之间紧密接触,两者之间的摩擦力大于上提与球体限制锥(3)和安装柱(4)的重量之和;所述的空心球(9)外径小于支撑圆环(8)的内径;空心球(9)能自由穿过支撑圆环(8);所述的空心球(9)与安装柱(4)内壁之间具有空隙,该空隙的面积大于上泵管内孔面积和下泵管内孔面积。
2.根据权利要求1所述的一种地热回灌专用井内设备,其特征在于:所述通槽(12)的总面积大于与上连接法兰(1)连接的上泵管内孔面积。
CN201510497840.8A 2015-08-14 2015-08-14 一种地热回灌专用井内设备 Active CN105134136B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510497840.8A CN105134136B (zh) 2015-08-14 2015-08-14 一种地热回灌专用井内设备

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510497840.8A CN105134136B (zh) 2015-08-14 2015-08-14 一种地热回灌专用井内设备

Publications (2)

Publication Number Publication Date
CN105134136A CN105134136A (zh) 2015-12-09
CN105134136B true CN105134136B (zh) 2018-05-01

Family

ID=54719674

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510497840.8A Active CN105134136B (zh) 2015-08-14 2015-08-14 一种地热回灌专用井内设备

Country Status (1)

Country Link
CN (1) CN105134136B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593359B (zh) * 2016-12-20 2022-11-04 山东省地质矿产勘查开发局 一种回灌井井身结构

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1015996C2 (nl) * 2000-08-23 2002-03-07 Marinus Johannes Willem Hoek Infiltratie- terugslagklep.
CN2646629Y (zh) * 2003-10-20 2004-10-06 古春林 自控式地热水回灌装置
CN103644323A (zh) * 2013-12-17 2014-03-19 中国地质科学院水文地质环境地质研究所 一种高效抽灌自动转换器
CN103822403A (zh) * 2014-02-19 2014-05-28 潍坊市星河地下水热资源开发科技有限公司 地下水源热泵群井封闭式自动调节全回灌系统
CN205172526U (zh) * 2015-08-14 2016-04-20 山东省地质矿产勘查开发局第二水文地质工程地质大队 一种地热回灌专用井内设备

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH702359A2 (fr) * 2009-12-04 2011-06-15 Cla Val Europ Sarl Vanne tubulaire de régulation.

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1015996C2 (nl) * 2000-08-23 2002-03-07 Marinus Johannes Willem Hoek Infiltratie- terugslagklep.
CN2646629Y (zh) * 2003-10-20 2004-10-06 古春林 自控式地热水回灌装置
CN103644323A (zh) * 2013-12-17 2014-03-19 中国地质科学院水文地质环境地质研究所 一种高效抽灌自动转换器
CN103822403A (zh) * 2014-02-19 2014-05-28 潍坊市星河地下水热资源开发科技有限公司 地下水源热泵群井封闭式自动调节全回灌系统
CN205172526U (zh) * 2015-08-14 2016-04-20 山东省地质矿产勘查开发局第二水文地质工程地质大队 一种地热回灌专用井内设备

Also Published As

Publication number Publication date
CN105134136A (zh) 2015-12-09

Similar Documents

Publication Publication Date Title
CN204311987U (zh) 一种油管柱塞卡瓦式井下缓冲器
CN102400662A (zh) 可插入式油层防漏失阀
CN105134136B (zh) 一种地热回灌专用井内设备
CN109555492A (zh) 基于钻柱振动的井底环空钻井液降压装置及方法
CN115522891A (zh) 一种应用于油田固井施工的浮箍浮鞋
CN103527138B (zh) 水平井专用浮箍浮鞋装置
CN205089284U (zh) 一种注水管柱底部沉砂单流阀
CN205172526U (zh) 一种地热回灌专用井内设备
CN206280039U (zh) 长胶筒抗蠕动扩张式封隔器
CN202360051U (zh) 安全双向洗井阀
CN205370963U (zh) 电潜螺杆泵
CN202348226U (zh) 双向定压器
CN202627986U (zh) 运动转换减振装置
CN202690042U (zh) 液压推靠仪器压力平衡仓装置
CN204060623U (zh) 一种内置式地下抽水回灌两用阀
CN103527139A (zh) 可钻式套管浮箍浮鞋装置
CN105587286A (zh) 防漏失洗井封隔器
CN208502727U (zh) 自吸式承压座
CN203626717U (zh) 可钻式套管浮箍浮鞋
CN205778710U (zh) 一种封隔器
CN202673231U (zh) 球面与锥面配合密封浮箍结构
CN206054781U (zh) 一种柔性密封结构的阀芯组件
CN201705631U (zh) 一种旋流式抽油泵
CN203769690U (zh) 钻具止回阀
CN210766999U (zh) 一种球式地下水封闭抽灌装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 1499 Daxue East Road, Dezhou City, Shandong Province, 253072

Patentee after: SHANDONG PROVINCIAL BUREAU OF GEOLOGY & MINERAL RESOURCES, SECOND HYDROGEOLOGY ENGINEERING GEOLOGY BRIGADE (SHANDONG LUBEI GEOLOGICAL ENGINEERING INVESTIGATION INSTITUTE)

Address before: No. 1499 Daxue East Road, Dezhou City, Shandong Province, 253072

Patentee before: SECOND HYDROLOGICAL GEOLOGY ENGINEERING GEOLOGICAL TEAM OF SHANDONG PROVINCIAL BUREAU OF GEOLOGY & MINERAL RESOURCES