CN105133781B - Building load-bearing floor - Google Patents

Building load-bearing floor Download PDF

Info

Publication number
CN105133781B
CN105133781B CN201510597555.3A CN201510597555A CN105133781B CN 105133781 B CN105133781 B CN 105133781B CN 201510597555 A CN201510597555 A CN 201510597555A CN 105133781 B CN105133781 B CN 105133781B
Authority
CN
China
Prior art keywords
floor
tension wire
preload tension
water
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510597555.3A
Other languages
Chinese (zh)
Other versions
CN105133781A (en
Inventor
俞建良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huzhou You Yan Intellectual Property Service Co.,Ltd.
Original Assignee
Jiangsu Sf Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Sf Construction Co Ltd filed Critical Jiangsu Sf Construction Co Ltd
Priority to CN201510597555.3A priority Critical patent/CN105133781B/en
Publication of CN105133781A publication Critical patent/CN105133781A/en
Application granted granted Critical
Publication of CN105133781B publication Critical patent/CN105133781B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a building load-bearing floor. The floor includes a floor body, wherein a self-repairing tensioning structure and a fracture waterproof structure are arranged in the floor body; the self-repairing tensioning structure includes a plurality of prestressed wires arranged inside the floor body; connecting structures used for connecting two adjacent floor bodies are arranged at the two ends of the prestressed wires; the fracture waterproof structure includes a plurality of capsule bodies and a cement powder layer which are arranged inside the floor body; a plurality of parallelly-arranged water-swellable rubber strips are arranged inside the floor body; the water-swellable rubber strips are not parallel to the edge of the floor body. The building load-bearing floor provided by the invention overcomes the deficiencies of existing floors, can repair by self after fracture occurs, and realizes water resistance and water-seepage resistance of the fractured floor.

Description

A kind of load-bearing floor for building
Technical field
The present invention relates to a kind of load-bearing floor for building, belongs to building field.
Background technology
Floor is a kind of separation supporting member.Floor is the supporting part in floor, and it is divided into house vertical direction If dried layer, and the vertical loads such as people and furniture and floor deadweight are passed to basis by body of wall, beam or post.Material as used by it Several forms such as the floor of wood floor, brick arch floor, reinforced concrete floor and steel liner plate load-bearing can be divided into.Reinforced concrete Tulou Plate is made jointly using concrete and rebar.This floor is firm, durable, and rigidity is big, and intensity is high, and fire protecting performance is good, currently should With commonplace.Can be divided into in-situ reinforced concrete slab and the big class of assembled steel bar concrete floor two by construction method. In-situ reinforced concrete slab is generally solid slab, and cast-in-situ floor also Jing is often poured together with Cast-in-situ Beam, forms cast-in-situ beam slab.It is existing Pouring the common type of beam slab has ribbed floor, cross beam floor and girderless floor etc..Assembled steel bar concrete floor, except few For beyond solid slab, the overwhelming majority is using circular hole slab and trough plate (be divided into positive flute profile with anti-flute profile two kinds) for number.It is assembled steel reinforced Concrete floor is typically all stretched at plate end reinforcing bar, and the concrete cementation of fissures is used after on-site consolidation, to strengthen globality.Modern room sets In meter, waterproof is the most important thing, generally, can carry out water-proofing treatment in places such as lavatory kitchens.But, waterproof layer due to The shallow air circulation of table, easily ageing failure.And in fitment process, due to ground surface finishing, easily cause waterproof damage layer Leak.So being badly in need of a kind of New Floor Slab now solves this problem.
The content of the invention
In view of the shortcomings of the prior art, the technical problem to be solved is to provide a kind of load-bearing for building Floor, solves the weak point of existing floor, after there is crackle can self-regeneration, realize fracture floor waterproof prevent Ooze.
To solve above-mentioned technical problem, the present invention is adopted the technical scheme that, a kind of load-bearing floor for building, including floor Body, is provided with selfreparing tightening structure and fracture waterproof construction in the floor body;The selfreparing tightening structure includes some The some preload tension wires being arranged in floor body, the two ends of preload tension wire are provided with the connection for connecting two neighboring floor body Structure;The fracture waterproof construction includes some capsule bodies being arranged in floor body and cement bisque;In the floor body also Some hydro-expansive rubber bars be arrangeding in parallel are provided with, hydro-expansive rubber bar is not parallel to the edge of floor body.
Optimization, above-mentioned load-bearing floor for building, the preload tension wire includes 8 bases arranged along floor body diagonal Preload tension wire, also including some with basic preload tension wire into 20-45 degree angles reinforcement preload tension wire;The basic prestressing force The pretightning force of line is the 1/2 of building slab rupture shearing, and the pretightning force for strengthening preload tension wire is the 1/3.5 of building slab rupture shearing.
Optimization, above-mentioned load-bearing floor for building is filled with hydrogel in the capsule body;The length of the capsule body is The 1/30 to 1/40 of the long edge lengths of floor body, width is the 1/25 to 1/35 of floor body bond length;The capsule body is in floor Uniformly it is arranged in two parallel planes in vivo, the axis of capsule body is in 30 degree of angles with the long side of floor body.
Optimization, above-mentioned load-bearing floor for building, the longitudinal section of the water-swellable adhesive tape is square, the longitudinal section length of side For the 1/10 of floor body bond length;Spacing between the water-swellable adhesive tape for floor body minor face 1/18 and with floor body Long side is in 30 degree of angles.
Optimization, above-mentioned load-bearing floor for building, the quantity of the reinforcement preload tension wire is less than or equal to 20;The reinforcement Preload tension wire is 32 degree with the angle of basic preload tension wire.
Optimization, above-mentioned load-bearing floor for building is provided with some stress metal grabs, stress gold in the preload tension wire Category grab is I-shaped and is fixedly connected with preload tension wire.
Optimization, above-mentioned load-bearing floor for building, the stress metal grab quantity in same preload tension wire is 5 and Even arrangement.
Optimization, above-mentioned load-bearing floor for building, the capsule body is not present in same vertical flat with water-swellable adhesive tape In face.
Optimization, above-mentioned load-bearing floor for building, the capsule body is wrapped up by glass cement softgel shell, and cement bisque is wrapped in glass In glass plate;The thickness of the cement bisque is the 1/10 of floor body thickness.
It is an advantage of the current invention that:
(1) when floor ruptures, 8 pile foundation preload tension wires provide a drawing merged from floor two ends to breaking part Power, cracks on floor slab is merged as possible, reduces the width of cracks on floor slab;Because basic preload tension wire is 8 and along 8 of floor Diagonal arrange, its provide pulling force be not from single direction to crack at apply, it is such arrange cause pulling force it is more uniform, Improve the effect of basic preload tension wire.
(2) setting for strengthening preload tension wire increased pulling force effect.For in theory, the quantity for strengthening preload tension wire is got over Many, its effect is stronger, but due to due to cost, the symbolic animal of the birth year for strengthening preload tension wire is restricted, so will can only strengthen Preload tension wire is arranged with basic preload tension wire according to angle, so in the case where pulling force effect is ensured, moreover it is possible to reached preferably Economic benefit.In this application, show that both can reach preferable pulling force when into 20-45 degree angles through substantial amounts of experiment Effect, in the quantity for strengthening preload tension wire 20 are less than or equal to, and angle is when being 32 degree, and economic benefit and actual effect reach One preferably balances.
(3) draw through substantial amounts of floor pull test:In the case where ensure that (1) and (2), basic preload tension wire Pretightning force is the 1/2 of floor fracture shearing, and the pretightning force for strengthening preload tension wire ensure that it for floor fracture is sheared 1/3.5 Pulling force reaches preferably effect.
(4) effect of capsule body is:Splitting, occurs in floor in dried powder due to adding hydrogel in capsule body After in seam and water infiltration crack, hydrogel capsule rupture, hydrogel oozes out after chance water and forms gelinite.Gelinite can have The gap in effect ground filled floor crack, prevents water from oozing out floor.It is because that fragile material exists as capsule shell from vitreum Just can rupture when running into less shearing, fragile material has a lot, including ceramics, brick, watt, stone, concrete etc., but its His fragile material is higher due to poor in processability, processing cost, is not suitable for the technical scheme of the application.Although concrete price It is low, can process, but because concrete is not suitable for being made as small processing part, so the application selects glass as capsule Housing.
(5) water-swellable adhesive tape is a kind of existing waterproof material, and the performance of its existing general rubber product can meet water certainly again The performance of row expansion, is that a kind of waterproof material, sealing, waterproof effect are more more reliable than ordinary rubber.But existing chance Water expansion adhesive tape is laterally to fill in it at crack mainly there is clear and definite crack, prevents infiltration.In this application, do not have It is determined that crack at, so water-swellable adhesive tape can not be horizontally set in floor.Draw through fracture experiment, cracks on floor slab Probability along the arrangement parallel to floor edge is minimum, so water-swellable adhesive tape is arranged along the long side of floor in 30 degree of angles.
(6) the stress metal grab quantity in same preload tension wire is 5 and uniformly arranges.Although not using stress gold Category grab can also reach the effect for providing pulling force by the frictional force on aramid line surface, can but add stress metal grab Preferably to ensure pulling force effect.
(7) although capsule body is identical with the angle at floor edge with water-swellable adhesive tape, its in solid space not It is present in same vertical plane, such capsule body is staggered in solid space with water-swellable adhesive tape, is so passed through The reciprocation of capsule body and water-swellable adhesive tape, can be better protected from floor and occur being had water leakage during crack.
(8) cement bisque is wrapped in glass plate, and so after cracks on floor slab, glass rupture, cement flour exposes, enters in water Enter cement chance water-setting behind floor gap to consolidate, serve more preferable percolation-proof effect.
In the technical scheme of the application, cement bisque, preload tension wire, capsule body and water-swellable adhesive tape form a jail Solid antiseepage water system, when crack occurs in floor, the hydrogel powders and cement in capsule body and cement bisque are exposed, and work as water Hydrogel powders first become gel-like into after gap, while water-swellable adhesive tape water-swellable, cement chance water.Hydrogel and chance Both water expansion adhesive tape alternating actions, filled floor crack.In the presence of preload tension wire, due to hydrogel and water-swellable glue Bar is elastic material, and when in crack, pulling force inwardly merges, hydrogel and water-swellable adhesive tape receive the extruding of sides of fracture, to splitting Filling in seam, so both this can fill the gap in crack and their place plane intersections.But due to hydrogel and chance Water expansion adhesive tape is easily aging material, so they need the synergy of cement.The time for theing cement solidifies is compared with hydrogel The time of powder chance water change gel will be grown, so the effect in preload tension wire is little, cement is met first water and become with mobility Mud, after hydrogel and water-swellable adhesive tape fill the gap in crack and their place plane intersections, cement slurry is also slow Slow enters in crack, fills crack, and after crack is full by cement filling, cement slowly solidifies, and gap is filled, and works as chance Water is expanded after adhesive tape and hydrogel ageing failure, and cement remains able to play a part of antiseepage, the technical scheme of such the application The side's infiltration effect brought can be more lasting.Through crack, filling test draws, cement bisque, preload tension wire, capsule body When lacking any of which item with water-swellable adhesive tape, the post-rift waterproof, seepage control effect of floor is had a greatly reduced quality.
Description of the drawings
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the A-A cross section structure diagrams of Fig. 1;
Fig. 3 is the B-B cross section structure diagrams of Fig. 1;
Fig. 4 is the C-C cross section structure diagrams of Fig. 1.
Specific embodiment
The technical characterstic of the present invention is expanded on further with specific embodiment below in conjunction with the accompanying drawings.
Specific embodiment
Embodiment 1
The present invention is a kind of load-bearing floor for building, including floor body 1 is provided with selfreparing tension in the floor body 1 Structure and fracture waterproof construction;The selfreparing tightening structure includes some some preload tension wires 2 being arranged in floor body 1, The two ends of preload tension wire 2 are provided with the attachment structure for connecting two neighboring floor body 1;If the fracture waterproof construction includes The dry capsule body 3 being arranged in floor body and cement bisque 4;Some chance water be arrangeding in parallel are additionally provided with the floor body swollen Swollen rubber strip 5, hydro-expansive rubber bar 5 is not parallel to the edge of floor body 1.
The preload tension wire 2 include 8 along the diagonal of floor body 1 arrange basic preload tension wires, also including some with Reinforcement preload tension wire of the basic preload tension wire into 20 degree of angles;The pretightning force of the basic preload tension wire is that the fracture of floor body 1 is cut The 1/2 of power, the pretightning force for strengthening preload tension wire is the 1/3.5 of the fracture shearing of floor body 1.
Hydrogel is filled with the capsule body 3;The length of the capsule body 3 for the long edge lengths of floor body 1 1/30 to 1/40, width is the 1/25 to 1/35 of the bond length of floor body 1;The capsule body 3 is uniformly arranged in two in floor body 1 and puts down In capable plane, the axis of capsule body 3 is in 30 degree of angles with the long side of floor body 1.
The longitudinal section of the water-swellable adhesive tape 5 is square, and the longitudinal section length of side is the 1/10 of the bond length of floor body 1; Spacing between the water-swellable adhesive tape 5 is the 1/18 of the minor face of floor body 1 and is in 30 degree of angles with the long side of floor body 1.
The quantity for strengthening preload tension wire is less than or equal to 20;The folder for strengthening preload tension wire and basic preload tension wire Angle is 32 degree.
Some stress metal grabs 6 are provided with the preload tension wire, stress metal grab 6 is I-shaped and and prestressing force Line 2 is fixedly connected.
The quantity of stress metal grab 6 in the same preload tension wire 2 is 5 and uniformly arranges.
The capsule body 3 is not present in same vertical plane with water-swellable adhesive tape 5.
The capsule body 3 is wrapped up by glass cement softgel shell, and cement bisque bag 4 is wrapped in glass plate;The thickness of the cement bisque 4 Spend for the 1/10 of the thickness of floor body 1.
It is an advantage of the current invention that:
(1) when floor ruptures, 8 pile foundation preload tension wires provide a drawing merged from floor two ends to breaking part Power, cracks on floor slab is merged as possible, reduces the width of cracks on floor slab;Because basic preload tension wire is 8 and along 8 of floor Diagonal arrange, its provide pulling force be not from single direction to crack at apply, it is such arrange cause pulling force it is more uniform, Improve the effect of basic preload tension wire.
(2) setting for strengthening preload tension wire increased pulling force effect.For in theory, the quantity for strengthening preload tension wire is got over Many, its effect is stronger, but due to due to cost, the symbolic animal of the birth year for strengthening preload tension wire is restricted, so will can only strengthen Preload tension wire is arranged with basic preload tension wire according to angle, so in the case where pulling force effect is ensured, moreover it is possible to reached preferably Economic benefit.In this application, show that both can reach preferable pulling force when into 20-45 degree angles through substantial amounts of experiment Effect, in the quantity for strengthening preload tension wire 20 are less than or equal to, and angle is when being 32 degree, and economic benefit and actual effect reach One preferably balances.
(3) draw through substantial amounts of floor pull test:In the case where ensure that (1) and (2), basic preload tension wire Pretightning force is the 1/2 of floor fracture shearing, and the pretightning force for strengthening preload tension wire ensure that it for floor fracture is sheared 1/3.5 Pulling force reaches preferably effect.
(4) effect of capsule body is:Splitting, occurs in floor in dried powder due to adding hydrogel in capsule body After in seam and water infiltration crack, hydrogel capsule rupture, hydrogel oozes out after chance water and forms gelinite.Gelinite can have The gap in effect ground filled floor crack, prevents water from oozing out floor.It is because that fragile material exists as capsule shell from vitreum Just can rupture when running into less shearing, fragile material has a lot, including ceramics, brick, watt, stone, concrete etc., but its His fragile material is higher due to poor in processability, processing cost, is not suitable for the technical scheme of the application.Although concrete price It is low, can process, but because concrete is not suitable for being made as small processing part, so the application selects glass as capsule Housing.
(5) water-swellable adhesive tape is a kind of existing waterproof material, and the performance of its existing general rubber product can meet water certainly again The performance of row expansion, is that a kind of waterproof material, sealing, waterproof effect are more more reliable than ordinary rubber.But existing chance Water expansion adhesive tape is laterally to fill in it at crack mainly there is clear and definite crack, prevents infiltration.In this application, do not have It is determined that crack at, so water-swellable adhesive tape can not be horizontally set in floor.Draw through fracture experiment, cracks on floor slab Probability along the arrangement parallel to floor edge is minimum, so water-swellable adhesive tape is arranged along the long side of floor in 30 degree of angles.
(6) the stress metal grab quantity in same preload tension wire is 5 and uniformly arranges.Although not using stress gold Category grab can also reach the effect for providing pulling force by the frictional force on aramid line surface, can but add stress metal grab Preferably to ensure pulling force effect.
(7) although capsule body is identical with the angle at floor edge with water-swellable adhesive tape, its in solid space not It is present in same vertical plane, such capsule body is staggered in solid space with water-swellable adhesive tape, is so passed through The reciprocation of capsule body and water-swellable adhesive tape, can be better protected from floor and occur being had water leakage during crack.
(8) cement bisque is wrapped in glass plate, and so after cracks on floor slab, glass rupture, cement flour exposes, enters in water Enter cement chance water-setting behind floor gap to consolidate, serve more preferable percolation-proof effect.
In the technical scheme of the application, cement bisque, preload tension wire, capsule body and water-swellable adhesive tape form a jail Solid antiseepage water system, when crack occurs in floor, the hydrogel powders and cement in capsule body and cement bisque are exposed, and work as water Hydrogel powders first become gel-like into after gap, while water-swellable adhesive tape water-swellable, cement chance water.Hydrogel and chance Both water expansion adhesive tape alternating actions, filled floor crack.In the presence of preload tension wire, due to hydrogel and water-swellable glue Bar is elastic material, and when in crack, pulling force inwardly merges, hydrogel and water-swellable adhesive tape receive the extruding of sides of fracture, to splitting Filling in seam, so both this can fill the gap in crack and their place plane intersections.But due to hydrogel and chance Water expansion adhesive tape is easily aging material, so they need the synergy of cement.The time for theing cement solidifies is compared with hydrogel The time of powder chance water change gel will be grown, so the effect in preload tension wire is little, cement is met first water and become with mobility Mud, after hydrogel and water-swellable adhesive tape fill the gap in crack and their place plane intersections, cement slurry is also slow Slow enters in crack, fills crack, and after crack is full by cement filling, cement slowly solidifies, and gap is filled, and works as chance Water is expanded after adhesive tape and hydrogel ageing failure, and cement remains able to play a part of antiseepage, the technical scheme of such the application The side's infiltration effect brought can be more lasting.Through crack, filling test draws, cement bisque, preload tension wire, capsule body When lacking any of which item with water-swellable adhesive tape, the post-rift waterproof, seepage control effect of floor is had a greatly reduced quality.
Embodiment 2
The present embodiment is with the difference of embodiment 1:Basic preload tension wire is with reinforcement preload tension wire in angle of 45 degrees.
Embodiment 3
The present embodiment is with the difference of the first two:Basic preload tension wire is with reinforcement preload tension wire into 32 degree of angles.
Certainly, described above is not limitation of the present invention, and the present invention is also not limited to the example above, the art Those of ordinary skill, in the essential scope of the present invention, the change made, remodeling, addition or replace, should all belong to of the invention Protection domain.

Claims (9)

1. a kind of load-bearing floor for building, it is characterised in that:Including floor body, selfreparing is provided with the floor body and tenses knot Structure and fracture waterproof construction;The selfreparing tightening structure includes some some preload tension wires being arranged in floor body, in advance should The two ends of the line of force are provided with the attachment structure for connecting two neighboring floor body;The fracture waterproof construction includes some settings Capsule body and cement bisque in floor body;Some hydro-expansive rubbers be arrangeding in parallel are additionally provided with the floor body Bar, hydro-expansive rubber bar is not parallel to the edge of floor body.
2. load-bearing floor for building according to claim 1, it is characterised in that:The preload tension wire includes 8 along floor The basic preload tension wire that body diagonal is arranged, also in advance should with basic preload tension wire including some into the reinforcement of 20-45 degree angles The line of force;The pretightning force of the basic preload tension wire is the 1/2 of building slab rupture shearing, and the pretightning force for strengthening preload tension wire is floor The 1/3.5 of body fracture shearing.
3. load-bearing floor for building according to claim 2, it is characterised in that:Hydrogel is filled with the capsule body; The length of the capsule body is the 1/30 to 1/40 of the long edge lengths of floor body, and width is the 1/25 to 1/ of floor body bond length 35;The capsule body is uniformly arranged in two parallel planes in floor body, the axis of capsule body and the long side of floor body In 30 degree of angles.
4. load-bearing floor for building according to claim 3, it is characterised in that:The longitudinal section of the water-swellable adhesive tape is Square, the longitudinal section length of side is the 1/10 of floor body bond length;Spacing between the water-swellable adhesive tape is that floor body is short While 1/18 and it is long with floor body while be in 30 degree of angles.
5. load-bearing floor for building according to claim 4, it is characterised in that:The quantity for strengthening preload tension wire is less than Equal to 20;The preload tension wire and the angle of basic preload tension wire strengthened is 32 degree.
6. load-bearing floor for building according to claim 5, it is characterised in that:Some answering is provided with the preload tension wire Power metal grab, stress metal grab is I-shaped and is fixedly connected with preload tension wire.
7. load-bearing floor for building according to claim 6, it is characterised in that:Stress metal in same preload tension wire Grab quantity is 5 and uniformly arranges.
8. load-bearing floor for building according to claim 7, it is characterised in that:The capsule body is with water-swellable adhesive tape not It is present in same vertical plane.
9. load-bearing floor for building according to claim 8, it is characterised in that:The capsule body is by glass cement softgel shell bag Wrap up in, cement bisque is wrapped in glass plate;The thickness of the cement bisque is the 1/10 of floor body thickness.
CN201510597555.3A 2015-09-20 2015-09-20 Building load-bearing floor Active CN105133781B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510597555.3A CN105133781B (en) 2015-09-20 2015-09-20 Building load-bearing floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510597555.3A CN105133781B (en) 2015-09-20 2015-09-20 Building load-bearing floor

Publications (2)

Publication Number Publication Date
CN105133781A CN105133781A (en) 2015-12-09
CN105133781B true CN105133781B (en) 2017-05-10

Family

ID=54719327

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510597555.3A Active CN105133781B (en) 2015-09-20 2015-09-20 Building load-bearing floor

Country Status (1)

Country Link
CN (1) CN105133781B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115627845A (en) * 2022-10-28 2023-01-20 中国一冶集团有限公司 Cast-in-place concrete deformation joint waterproof structure and construction method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1160505C (en) * 2001-12-10 2004-08-04 邱则有 Hollow and steel bar reinforced concrete building member
CN101289300B (en) * 2008-05-20 2012-03-21 深圳大学 Self-repair concrete using polyurethane high molecule microcapsule and method of manufacture
CN102808372B (en) * 2012-08-20 2016-10-05 杨众 The integral precast overlapping bridge of a kind of freely-supported and construction method
CN103224343A (en) * 2013-04-17 2013-07-31 重庆交通大学 Manufacturing method of microcapsule for concrete crack self-repairing
CN105155868A (en) * 2015-09-16 2015-12-16 项剑锋 Method for pulling pillar through prestress using non-binding steel strands
CN205189231U (en) * 2015-09-20 2016-04-27 成都育芽科技有限公司 Novel bearing floor

Also Published As

Publication number Publication date
CN105133781A (en) 2015-12-09

Similar Documents

Publication Publication Date Title
CN204983306U (en) Amalgamation prefabricated plate
CN104452978B (en) A kind of advance reservation is in thin beam bars anchorage sleeve within the walls and construction method thereof
Ramos et al. The effect of the vertical component of prestress forces on the punching strength of flat slabs
CN104452984A (en) Double-layer steel wire gauze insulating mortar outer wall outer insulating structure and construction method thereof
CN105003020A (en) Ceramsite concrete metal net rack light wallboard and splicing structure thereof
CN104179363A (en) Reinforcing structure and reinforcing method for door and window opening of brick-and-concrete house
CN106760073A (en) Assembly concrete lining structural assembly
CN204326299U (en) The antidetonation adobe wall that a kind of steel concrete sleeper and dark beam are strengthened
CN105133781B (en) Building load-bearing floor
CN105155690A (en) Connection node of precast slabs and construction method for spliced precast slabs
CN205189231U (en) Novel bearing floor
CN104631658A (en) Construction method of adobe wall suitable for seismic fortification high-seismic-intensity area and adobes
CN105735517B (en) Assembled steel reinforced concrete wall structure based on heat bridge separating technology
CN104110096A (en) Prefabricated building plate, building wall part and building house composed of prefabricated building plates and construction method of building house
CN204001409U (en) Precast composite slab
CN206053123U (en) A kind of civil air defense constructions and installations groove type plate of built-in retarded adhesive prestressed steel bar
CN104947948A (en) Rammed earth wall reinforcing method
CN206189618U (en) A style of calligraphy post -cast strip connection structure of wallboard and wallboard
CN107542217A (en) A kind of sandwich groove type plate of prestressing force concrete dense-rib
CN107142956A (en) A kind of prefabricated assembled elevator basis
CN209779955U (en) Cast-in-place reinforced concrete shear wall
CN209083031U (en) A kind of ruggedized construction of masonry structure load bearing wall
CN202925541U (en) Concrete wall body pile and protection wall
CN104790810A (en) Window installation structure in aerated concrete block wall and construction method
CN202544167U (en) Device for preventing top cracking of beam or beamless plate bottom filler walls

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Hu Lichun

Inventor before: Xiang Hongxian

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20170322

Address after: 510665 Guangdong city of Guangzhou province Tianhe District Software Park Building No. 59 Middle East block, Grand Building Room 501

Applicant after: Hu Lichun

Address before: The middle Tianfu Avenue in Chengdu city Sichuan province 610041 No. 1388 1 8 storey building No. 866

Applicant before: CHENGDU YUYA SCIENCE & TECHNOLOGY CO., LTD.

TA01 Transfer of patent application right
CB03 Change of inventor or designer information

Inventor after: Yu Jianliang

Inventor before: Hu Lichun

CB03 Change of inventor or designer information
TA01 Transfer of patent application right

Effective date of registration: 20170411

Address after: Suzhou Changshou City City, Jiangsu province 215500 Dong Bang Ye Hua Road

Applicant after: Jiangsu SF Construction Co., Ltd.

Address before: 510665 Guangdong city of Guangzhou province Tianhe District Software Park Building No. 59 Middle East block, Grand Building Room 501

Applicant before: Hu Lichun

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200415

Address after: Room 1,020, Nanxun Science and Technology Pioneering Park, No. 666 Chaoyang Road, Nanxun District, Huzhou City, Zhejiang Province, 313000

Patentee after: Huzhou You Yan Intellectual Property Service Co.,Ltd.

Address before: Suzhou Changshou City City, Jiangsu province 215500 Dong Bang Ye Hua Road

Patentee before: JIANGSU SHUNFENG CONSTRUCTION Co.,Ltd.

TR01 Transfer of patent right