CN105119064A - 电梯施工现场快速可靠接地连接工装 - Google Patents
电梯施工现场快速可靠接地连接工装 Download PDFInfo
- Publication number
- CN105119064A CN105119064A CN201510653091.3A CN201510653091A CN105119064A CN 105119064 A CN105119064 A CN 105119064A CN 201510653091 A CN201510653091 A CN 201510653091A CN 105119064 A CN105119064 A CN 105119064A
- Authority
- CN
- China
- Prior art keywords
- shaped support
- bolt
- shaped bracket
- elevator
- grounding connection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
本发明公开了一种电梯施工现场快速可靠接地连接工装,它包括U型支架、长螺栓、压紧板,所述的U型支架上端和中部都设有螺孔;所述的长螺栓下端设有螺纹孔;所述的长螺栓通过U型支架上端螺孔与U型支架相连接;所述的压紧板上端连接杆设有螺纹与长螺栓下端螺纹孔相连接;所述的短螺栓通过U型支架中部螺孔与U型支架相连接;所述的接地分端子通过短螺栓与U型支架相连接;所述的接地总线通过压紧板与U型支架相连接。本发明结构简单、操作方便、即可保证电梯施工现场电器接地的可靠性,又能提高其生产效率。
Description
技术领域
本发明涉及电梯施工技术领域,具体涉及到电梯施工现场快速可靠接地连接工装。
背景技术
电梯是特种设备的一个种类,电梯广泛应用在商场、写字楼、住宅等建筑物内,电梯施工的电器接地质量无疑对人民群众安全使用电梯起到至关重要的作用。电梯施工现场快速可靠接地连接工装的设计可靠性决定了电梯使用的安全,如果电梯施工现场快速可靠接地连接工装设计不可靠,在电梯乘人部分发生漏电故障,电梯电器接地装置不能有效使用,易产生安全事故以及影响电梯的安全使用。
在多数电梯施工现场,电梯的电器接地采用临时连接在建筑物的接地端子上,这种安装方法,安装质量的稳定性差,质量的优劣取决于工人的技术水平的高低。
发明内容
本发明的目的在于提供一种结构简单、操作方便的电梯施工现场快速可靠接地连接工装,它可解决背景技术中存在的安装难题。
为达到上述目的,本发明的技术方案,它包括U型支架、长螺栓、压紧板,所述的U型支架上端和中部都设有螺孔;所述的长螺栓下端设有螺纹孔;所述的长螺栓通过U型支架上端螺孔与U型支架相连接;所述的压紧板上端连接杆设有螺纹与长螺栓下端螺纹孔相连接;所述的短螺栓通过U型支架中部螺孔与U型支架相连接;所述的接地分端子通过短螺栓与U型支架相连接;所述的接地总线通过压紧板与U型支架相连接。
在上述技术方案中,所述的螺母一连接在长螺栓上;所述的螺母二连接在短螺栓上。
本发明的效果在于:结构简单、操作方便,夹紧可靠,电梯电器接地质量的稳定性好,生产效率高。
附图说明
图1是本发明电梯施工现场快速可靠接地连接工装的结构示意图。
附图中标号分别是:1、U型支架,2、长螺栓,2’、短螺栓,3、接地分端子,4、接地总线,5、螺母一,5’、螺母二,6、压紧板。
具体实施方式
下面结合附图对本发明电梯施工现场快速可靠接地连接工装作进一步说明。
由图1可见,本发明它包括U型支架、长螺栓、压紧板,所述的U型支架上端和中部都设有螺孔;所述的长螺栓下端设有螺纹孔;所述的长螺栓通过U型支架上端螺孔与U型支架相连接;所述的压紧板上端连接杆设有螺纹与长螺栓下端螺纹孔相连接;所述的短螺栓通过U型支架中部螺孔与U型支架相连接;所述的接地分端子通过短螺栓与U型支架相连接;所述的接地总线通过压紧板与U型支架相连接。
本发明的使用方法是:先将螺母一(5)拧到长螺栓(2)的上部,将长螺栓(2)通过U型支架(1)上端螺孔拧到长螺栓(2)长度一半的位置,将压紧板(6)上端连接杆与长螺栓(2)下端螺纹孔相连接,把长螺栓(2)往下转动,直到施加50N预紧力使压紧板(6)压紧接地总线(4),防松螺母一(5)拧到紧贴U型支架(1),将各个需要接地的接地分端子(3)连接在短螺栓(2’)上,直到施加50N预紧力使短螺栓(2’)压紧接地分端子(3),防松螺母二(5’)拧到紧贴U型支架(1)上,各接地端连接完成。
在本实施例中,所述的螺母一(5)连接在长螺栓(2)上,所述的螺母二(5’)连接在短螺栓(2’)上,这可保证各个接地端子使用时不发生松动。
Claims (2)
1.一种电梯施工现场快速可靠接地连接工装,它包括U型支架(1)、长螺栓(2)、压紧板(6),其特征在于:所述的U型支架(1)上端和中部都设有螺孔;所述的长螺栓(2)下端设有螺纹孔;所述的长螺栓(2)通过U型支架(1)上端螺孔与U型支架(1)相连接;所述的压紧板(6)上端连接杆设有螺纹与长螺栓(2)下端螺纹孔相连接;所述的短螺栓(2’)通过U型支架(1)中部螺孔与U型支架(1)相连接;所述的接地分端子(3)通过短螺栓(2’)与U型支架(1)相连接;所述的接地总线(4)通过压紧板(6)与U型支架(1)相连接。
2.根据权利要求书1所述的电梯施工现场快速可靠接地连接工装,其特征在于:所述的螺母一(5)连接在长螺栓(2)上;所述的螺母二(5’)连接在短螺栓(2’)上。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510653091.3A CN105119064A (zh) | 2015-10-10 | 2015-10-10 | 电梯施工现场快速可靠接地连接工装 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510653091.3A CN105119064A (zh) | 2015-10-10 | 2015-10-10 | 电梯施工现场快速可靠接地连接工装 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105119064A true CN105119064A (zh) | 2015-12-02 |
Family
ID=54666994
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510653091.3A Pending CN105119064A (zh) | 2015-10-10 | 2015-10-10 | 电梯施工现场快速可靠接地连接工装 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105119064A (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6109937A (en) * | 1999-02-19 | 2000-08-29 | Hubbell Incorporated | Four-sided ground contact assembly |
US20080020612A1 (en) * | 2002-11-07 | 2008-01-24 | Consolidating Manufacturing International, Llc | Clamping Apparatus for Connecting Ground Wire to Grounding Member |
CN201336385Y (zh) * | 2008-11-10 | 2009-10-28 | 北京市电力公司 | 套管型便携式接地线 |
CN102055079A (zh) * | 2009-11-03 | 2011-05-11 | 河南省电力公司许昌供电公司 | 万用接地线接地端线卡 |
CN203103517U (zh) * | 2013-01-21 | 2013-07-31 | 上海市电力公司 | 一种线夹式应急电源车快速接入接头 |
CN205004456U (zh) * | 2015-10-10 | 2016-01-27 | 夏艳光 | 电梯施工现场快速可靠接地连接工装 |
-
2015
- 2015-10-10 CN CN201510653091.3A patent/CN105119064A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6109937A (en) * | 1999-02-19 | 2000-08-29 | Hubbell Incorporated | Four-sided ground contact assembly |
US20080020612A1 (en) * | 2002-11-07 | 2008-01-24 | Consolidating Manufacturing International, Llc | Clamping Apparatus for Connecting Ground Wire to Grounding Member |
CN201336385Y (zh) * | 2008-11-10 | 2009-10-28 | 北京市电力公司 | 套管型便携式接地线 |
CN102055079A (zh) * | 2009-11-03 | 2011-05-11 | 河南省电力公司许昌供电公司 | 万用接地线接地端线卡 |
CN203103517U (zh) * | 2013-01-21 | 2013-07-31 | 上海市电力公司 | 一种线夹式应急电源车快速接入接头 |
CN205004456U (zh) * | 2015-10-10 | 2016-01-27 | 夏艳光 | 电梯施工现场快速可靠接地连接工装 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204651526U (zh) | 电力系统用组合式线夹 | |
CN204029998U (zh) | 接触网接地装置 | |
CN203733963U (zh) | 地线头 | |
CN204441491U (zh) | 一种线夹 | |
CN203014232U (zh) | 一种变电站管型母线单卡箍接地装置 | |
CN205004456U (zh) | 电梯施工现场快速可靠接地连接工装 | |
CN203367502U (zh) | 电线接地装置 | |
CN105119064A (zh) | 电梯施工现场快速可靠接地连接工装 | |
CN202633757U (zh) | 低压接地用辅助接地环 | |
CN102593617B (zh) | 设备线夹 | |
CN203312466U (zh) | 一种新型防水直线接线夹 | |
CN204215822U (zh) | 一种低压绝缘子 | |
CN204720262U (zh) | 一种线路绝缘子 | |
CN205211967U (zh) | 配电网线路检修用接地放电装置 | |
CN203951012U (zh) | 有效防脱落的变电设备接地装置 | |
CN203839881U (zh) | 专用于110kv输电线的耐张线夹的结构 | |
CN104332722B (zh) | 一种核电桥架专用的接地线卡紧部件 | |
CN103647164A (zh) | 多功能接地棒线路端线夹 | |
CN103762517A (zh) | 高压接地线安装方法 | |
CN204333330U (zh) | 一种电压小母线接线端子 | |
CN203690870U (zh) | 避雷器引流线夹 | |
CN203326542U (zh) | 低压电缆终端固定装置 | |
CN210835018U (zh) | 一种三相动力表箱用固定装置 | |
CN204885497U (zh) | 一种多功能接电头 | |
CN106207871B (zh) | 地电位防风偏合成绝缘子导线快装方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |