CN105113503B - Precast concrete tubular pile - Google Patents

Precast concrete tubular pile Download PDF

Info

Publication number
CN105113503B
CN105113503B CN201510513842.1A CN201510513842A CN105113503B CN 105113503 B CN105113503 B CN 105113503B CN 201510513842 A CN201510513842 A CN 201510513842A CN 105113503 B CN105113503 B CN 105113503B
Authority
CN
China
Prior art keywords
pipe
steel pipe
connection
socket joint
concrete pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510513842.1A
Other languages
Chinese (zh)
Other versions
CN105113503A (en
Inventor
郑荣跃
黄吉永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Sanhe Pile Co Ltd
Original Assignee
Ningbo University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo University filed Critical Ningbo University
Priority to CN201510513842.1A priority Critical patent/CN105113503B/en
Publication of CN105113503A publication Critical patent/CN105113503A/en
Application granted granted Critical
Publication of CN105113503B publication Critical patent/CN105113503B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a precast concrete tubular pile. The precast concrete tubular pile comprises at least two concrete tubular pile sections and a pile section connection mechanism used for connecting the two adjacent concrete tubular pile sections, wherein the concrete tubular pile sections and the pile section connection mechanism are sequentially distributed from top to bottom. The tubular pile is characterized in that the pile section connection mechanism comprises a connection plug and a connection base, the connection plug is fixedly arranged at the end of one concrete tubular pile section, and the connection base is fixedly arranged at the end of the other concrete tubular pile section; the connection plug is inserted into the connection base, and a plurality of elastic connection pins protruding in the radial direction are arranged on the connection plug; the connection base is provided with annular fixing grooves matched with the elastic connection pins, and the elastic connection pins are clamped in the annular fixing grooves. The tubular pile has the advantages that when connection is performed, people only need to clamp the elastic connection pins into the annular fixing grooves after the connection plug is inserted into the connection base; on the premise that connection firmness is guaranteed, connection operation of the concrete tubular pile sections is more convenient; besides, the tubular pile can be used directly after the connection process is completed, people do not need to wait, and accordingly construction efficiency is improved.

Description

A kind of prefabricated concrete pipe pile
Technical field
The present invention relates to a kind of engineering pile, especially a kind of prefabricated concrete pipe pile.
Background technology
In engineer applied, prefabricated concrete pipe pile needs one to three to save pipe of concrete pile cutoff composition, first by the during construction One section pipe of concrete pile cutoff press-in soil, then second section pipe of concrete pile cutoff is docked with first segment pipe of concrete pile cutoff, then will Section three, pipe of concrete pile cutoff is docked with second section pipe of concrete pile cutoff, and pile extension method is typically used each pipe of concrete pile cutoff The termination steel plate of upper setting is fixedly connected by electric welding, completes the docking assembling between each section pipe of concrete pile cutoff.However, at present Weld seam in pile extension is only the surface distributed for surrounding abutment joint, and the size of seam cross-section is limited, therefore welding quality is in place There is hidden danger in rate poor controllability, weldquality;Electrode welding process produces substantial amounts of heat, to wait heat to distribute, weld seam temperature declines Piling work can just be proceeded afterwards, therefore need the intermittent time of constructing, and construction intermittent time also bad accurate assurance, often Not dropping to standard requirement in weld seam temperature just carries out piling, may destroy the integrality of weld seam;Prefabricated concrete pipe pile is deposited In the operating mode of the pulling force for needing to bear upward, and the weld seam tensile capacity formed during pile extension is poor, therefore exists certain Potential safety hazard.
The content of the invention
The technical problems to be solved by the invention be to provide a kind of pile extension process fast and easy and be connected firmly it is prefabricated mixed Solidifying soil pile tube.
The present invention solve the technical scheme that is used of above-mentioned technical problem for:A kind of prefabricated concrete pipe pile, including from upper At least two section pipe of concrete pile cutofves being down sequentially distributed and the stake for connecting the described pipe of concrete pile cutoff of two adjacent sections Section bindiny mechanism, described pile cutoff bindiny mechanism includes connection plug and connecting seat, and described connection plug is fixedly installed on it In the described pipe of concrete pile cutoff of a section end, described connecting seat is fixedly installed pipe of concrete wherein described in another section The end of pile cutoff, the described connecting seat of described connection plug insertion, multiple radial protrusions are provided with described connection plug Resilient attachment pins, the annular anchoring groove coordinated with described resilient attachment pins is provided with described connecting seat, it is described Resilient attachment pins are fastened in described annular anchoring groove.
Described connection plug includes connection end plate, fixed base plate, supporting steel pipe and socket joint steel pipe, described connection end plate The end of the described pipe of concrete pile cutoff of a section wherein is fixedly installed, described connection end plate is coaxially arranged with center fixing hole With center socket joint hole, the aperture of described center fixing hole is more than the aperture in described center socket joint hole, described fixed base plate It is embedded in described center fixing hole, the end of described socket joint steel pipe and the end of described supporting steel pipe are and institute The fixed base plate stated is fixedly connected, and described supporting steel pipe is co-axially located in described socket joint steel pipe, described socket joint steel pipe It is plugged in described connecting seat through described center socket joint hole, is set between described socket joint steel pipe and described supporting steel pipe It is equipped with least two appearance pin steel pipes for being uniformly distributed and radially extending around described supporting steel pipe, described resilient attachment pins bag Spring, shank and the plunger being arranged in described appearance pin steel pipe are included, one end of described spring is supported on described support steel Guan Shang, the other end of described spring is supported on one end of described shank, the other end and described plunger of described shank It is fixedly connected, pin-and-hole is provided with described socket joint steel pipe, described plunger is fastened on described annular through described pin-and-hole In fixed groove.When two section pipe of concrete pile cutoff pile extensions, as long as two section pipe of concrete pile cutofves are laminated, resilient attachment pins The inside compression spring of plunger and be fastened in annular anchoring groove, now two section pipe of concrete pile cutofves are connected with each other firm, connect Stake is completed, and whole pile extension process is very convenient quick.
Described appearance pin steel pipe is four, and the appearance pin steel pipe described in four is uniformly distributed around described supporting steel pipe.Increase Connectivity robustness between strong two sections pipe of concrete pile cutoff.
Uniform ring is fixedly installed on described connection end plate around described pipe of concrete pile cutoff and in the of axially distribution One reinforcing bar, is fixedly installed uniform ring around described pipe of concrete pile cutoff and in the second steel of axially distribution on described connecting seat Muscle, the first described reinforcing bar is plugged and is fixed therein in the pipe of concrete pile cutoff described in a section, and the second described reinforcing bar plugs solid It is scheduled in the pipe of concrete pile cutoff described in another section.Strengthen the lateral stress of pipe of concrete pile cutoff.
The first additional dowel of distribution coaxial with the first described reinforcing bar is fixedly installed on described connection end plate, it is described Connecting seat on be fixedly installed the second additional dowel of distribution coaxial with the second described reinforcing bar, the first described additional dowel Axially plug and be fixed therein in the pipe of concrete pile cutoff described in a section, the second described additional dowel is axially plugged and is fixed on separately In the described pipe of concrete pile cutoff of one section, described the first reinforcing bar and the described first additional dowel are on circumferential direction in dislocation Distribution, described the second reinforcing bar and the described second additional dowel are on circumferential direction in being dislocatedly distributed.Further enhance coagulation The lateral stress of native pile tube section, while enhancing the fastness between pipe of concrete pile cutoff and connection end plate and connecting seat.
Described plunger include a clamping inclined-plane and one contraction cambered surface, be provided with described annular anchoring groove with The constant inclined surface that described clamping inclined-plane is engaged, described connecting seat is provided with the sliding arc coordinated with described contraction cambered surface Face.When plunger is to contract, shrinks cambered surface and abut in slip cambered surface and slided along slip cambered surface, plunger is smoothly received Contracting, after plunger is snapped in annular anchoring groove, clamping inclined-plane is fastened on constant inclined surface, plunger is reached stationary state, from And two section pipe of concrete pile cutofves is connected.
When described resilient attachment pins are fastened in described annular anchoring groove, the top of described plunger with it is described Annular anchoring groove bottom land between be provided with the first gap that minimum widith is 3 ~ 5mm, described shank holds with described The second gap that minimum widith is 3 ~ 5mm is provided between slotting steel pipe.Ensure that plunger just snap in annular anchoring groove when, Bottom land with annular anchoring groove leaves gap, and when the active force being applied on pipe of concrete pile cutoff is recalled, plunger can be with According to pipe of concrete pile cutoff, the weight of itself carries out small movement, and correct position of the apical grafting in annular anchoring groove be simultaneously again It is fixed, finally make to reach the state of being stably connected between two adjacent sections pipe of concrete pile cutoff.
Compared with prior art, the advantage of the invention is that by by connection plug and company between two section pipe of concrete pile cutofves The pile cutoff bindiny mechanism connection of joint chair composition, is provided with the resilient attachment pins of multiple radial protrusions, on connecting seat on connection plug The annular anchoring groove coordinated with resilient attachment pins is provided with, after only connection plug need to being inserted into connecting seat during connection, elasticity is even Pin is fastened in annular anchoring groove, and on the premise of it ensure that connectivity robustness, the attended operation of pipe of concrete pile cutoff is more Plus conveniently, and connection procedure is done directly and just can be used, without waiting for, therefore improve efficiency of construction.
Brief description of the drawings
Fig. 1 is structural representation of the invention;
Fig. 2 is the structure enlarged diagram at A in Fig. 1;
Fig. 3 is part-structure top view of the invention.
Specific embodiment
The present invention is described in further detail below in conjunction with accompanying drawing embodiment.
Embodiment one:A kind of prefabricated concrete pipe pile, including the He of two section pipe of concrete pile cutoff 1 being sequentially distributed from top to bottom Pile cutoff bindiny mechanism for connecting two adjacent section pipe of concrete pile cutofves 1, pile cutoff bindiny mechanism includes connection plug and connection Seat 11, connection plug is fixedly installed the end of a section pipe of concrete pile cutoff 1 wherein, and connecting seat 11 is fixedly installed another wherein The end of section pipe of concrete pile cutoff 1, two resilient attachment pins of radial protrusion are provided with connection plug, are set on connecting seat 11 There is the annular anchoring groove 111 coordinated with resilient attachment pins, connection plug includes connection end plate 21, fixed base plate 22, support steel Pipe 23 and socket joint steel pipe 24, connection end plate 21 are fixedly installed the end of a section pipe of concrete pile cutoff 1 wherein, on connection end plate 21 Uniform ring is fixedly installed around pipe of concrete pile cutoff 1 and in the first reinforcing bar 31 of axially distribution, is fixedly installed on connecting seat 11 Uniform ring around pipe of concrete pile cutoff 1 and in axially distribution the second reinforcing bar 32, the first reinforcing bar 31 plug be fixed therein a section mix In solidifying soil pile tube section 1, the second reinforcing bar 32 is plugged and is fixed in another section pipe of concrete pile cutoff 1, and connection end plate 21 is coaxially arranged with Center fixing hole 211 and center socket joint hole 212, the aperture of the aperture more than center socket joint hole 212 of center fixing hole 211 are fixed Base plate 22 is embedded in center fixing hole 211, the end of socket joint steel pipe 24 and the end of supporting steel pipe 23 with fixed bottom Plate 22 is fixedly connected, and supporting steel pipe 23 is co-axially located in socket joint steel pipe 24, and socket joint steel pipe 24 is plugged through center socket joint hole 212 In connecting seat 11, two are provided between socket joint steel pipe 24 and supporting steel pipe 23 and are uniformly distributed around supporting steel pipe 23 and radial direction The appearance pin steel pipe 25 of extension, resilient attachment pins include being arranged on spring 41, shank 42 and the plunger 43 held in pin steel pipe 25, spring 41 one end is supported on supporting steel pipe 23, and the other end of spring 41 is supported on one end of shank 42, the other end of shank 42 with Plunger 43 is fixedly connected, and pin-and-hole 241 is provided with socket joint steel pipe 24, and plunger 43 is fastened on annular anchoring groove through pin-and-hole 241 In 111.
Embodiment two:Remainder is identical with embodiment one, and its difference is that pipe of concrete pile cutoff 1 is three sections, even Four resilient attachment pins of radial protrusion are provided with plug, it is four to hold pin steel pipe 25, and four are held pin steel pipe 25 around branch Steel pipe 23 is held to be uniformly distributed.
Embodiment three:Remainder is identical with embodiment one, and its difference is to connect to be fixedly installed on end plate 21 With the first additional dowel 51 of the coaxial distribution of the first reinforcing bar 31, it is fixedly installed on connecting seat 11 and the coaxial distribution of the second reinforcing bar 32 The second additional dowel 52, the first additional dowel 51 axially plugs and is fixed therein in a section pipe of concrete pile cutoff 1, and second adds Dowel 52 is axially plugged and is fixed in another section pipe of concrete pile cutoff 1, and the first reinforcing bar 31 and the first additional dowel 51 are in annular side Upwards in being dislocatedly distributed, the second reinforcing bar 32 on circumferential direction is in be dislocatedly distributed with the second additional dowel 52.
Example IV:Remainder is identical with embodiment one, and its difference is that plunger 43 includes a clamping inclined-plane 431 and a contraction cambered surface 432, the constant inclined surface 61 being engaged with clamping inclined-plane 431 is provided with annular anchoring groove 111, Connecting seat 11 is provided with and shrinks the slip cambered surface 62 that cambered surface 432 coordinates.
Embodiment five:Remainder is identical with embodiment one, and its difference is when resilient attachment pins are fastened on annular When in fixed groove 111, it is 3mm's that minimum widith is provided between the top of plunger 43 and the bottom land of annular anchoring groove 111 First gap, is provided with the second gap that minimum widith is 3mm between shank 42 and socket joint steel pipe 24.
Embodiment six:Remainder is identical with embodiment one, and its difference is when resilient attachment pins are fastened on annular When in fixed groove 111, it is 4mm's that minimum widith is provided between the top of plunger 43 and the bottom land of annular anchoring groove 111 First gap, is provided with the second gap that minimum widith is 4mm between shank 42 and socket joint steel pipe 24.
Embodiment seven:Remainder is identical with embodiment one, and its difference is when resilient attachment pins are fastened on annular When in fixed groove 111, it is 5mm's that minimum widith is provided between the top of plunger 43 and the bottom land of annular anchoring groove 111 First gap, is provided with the second gap that minimum widith is 5mm between shank 42 and socket joint steel pipe 24.

Claims (6)

1. a kind of prefabricated concrete pipe pile, including at least two for being sequentially distributed from top to bottom saves pipe of concrete pile cutofves and for connecting The pile cutoff bindiny mechanism of the described pipe of concrete pile cutoff of two adjacent sections, it is characterised in that described pile cutoff bindiny mechanism includes connecting Plug and connecting seat, described connection plug are fixedly installed the end of the described pipe of concrete pile cutoff of a section wherein, described Connecting seat be fixedly installed the end of pipe of concrete pile cutoff wherein described in another section, described connection plug insertion is described Connecting seat, is provided with the resilient attachment pins of multiple radial protrusions on described connection plug, be provided with described connecting seat with The annular anchoring groove that described resilient attachment pins coordinate, described resilient attachment pins are fastened on described annular anchoring groove Interior, described connection plug includes connection end plate, fixed base plate, supporting steel pipe and socket joint steel pipe, and described connection end plate is fixed The end of the pipe of concrete pile cutoff being disposed therein described in a section, described connection end plate is coaxially arranged with center fixing hole with Heart socket joint hole, the aperture of described center fixing hole is more than the aperture in described center socket joint hole, and described fixed base plate is embedded Be fixed in described center fixing hole, the end of described socket joint steel pipe and the end of described supporting steel pipe with it is described Fixed base plate is fixedly connected, and described supporting steel pipe is co-axially located in described socket joint steel pipe, and described socket joint steel pipe is passed through Described center socket joint hole is plugged in described connecting seat, is provided between described socket joint steel pipe and described supporting steel pipe At least two appearance pin steel pipes for being uniformly distributed and radially extending around described supporting steel pipe, described resilient attachment pins include setting Spring, shank and the plunger sold in described appearance in steel pipe are put, one end of described spring is supported on described supporting steel pipe, The other end of described spring is supported on one end of described shank, and the other end of described shank is fixed with described plunger and connected Connect, pin-and-hole is provided with described socket joint steel pipe, described plunger is fastened on described annular anchor through described pin-and-hole In groove.
2. a kind of prefabricated concrete pipe pile according to claim 1, it is characterised in that described appearance pin steel pipe is four, four Appearance pin steel pipe described in root is uniformly distributed around described supporting steel pipe.
3. a kind of prefabricated concrete pipe pile according to claim 1, it is characterised in that fixation sets on described connection end plate Uniform ring is equipped with around described pipe of concrete pile cutoff and in the first reinforcing bar of axially distribution, is fixedly installed on described connecting seat Around described pipe of concrete pile cutoff and in the second reinforcing bar of axially distribution, the first described reinforcing bar is plugged and is fixed therein uniform ring In the described pipe of concrete pile cutoff of one section, the second described reinforcing bar is plugged and is fixed in the pipe of concrete pile cutoff described in another section.
4. a kind of prefabricated concrete pipe pile according to claim 3, it is characterised in that fixation sets on described connection end plate The first additional dowel of distribution coaxial with the first described reinforcing bar is equipped with, is fixedly installed on described connecting seat and described The second additional dowel that two reinforcing bars are coaxially distributed, the first described additional dowel is axially plugged and is fixed therein mixing described in a section In solidifying soil pile tube section, the second described additional dowel is axially plugged and is fixed in the pipe of concrete pile cutoff described in another section, described The first reinforcing bar and the described first additional dowel on circumferential direction in being dislocatedly distributed, described the second reinforcing bar and described the Two additional dowels are in be dislocatedly distributed on circumferential direction.
5. a kind of prefabricated concrete pipe pile according to claim 1 and 2, it is characterised in that described plunger includes a card Inclined-plane and a contraction cambered surface are connect, is provided with described annular anchoring groove oblique with the fixation that described clamping inclined-plane is engaged Face, described connecting seat is provided with the slip cambered surface coordinated with described contraction cambered surface.
6. a kind of prefabricated concrete pipe pile according to claim 1, it is characterised in that when described elastic connection pin card sets When in described annular anchoring groove, it is provided between the described top of plunger and the bottom land of described annular anchoring groove Minimum widith is first gap of 3~5mm, be provided between described shank and described socket joint steel pipe minimum widith for 3~ Second gap of 5mm.
CN201510513842.1A 2015-08-20 2015-08-20 Precast concrete tubular pile Active CN105113503B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510513842.1A CN105113503B (en) 2015-08-20 2015-08-20 Precast concrete tubular pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510513842.1A CN105113503B (en) 2015-08-20 2015-08-20 Precast concrete tubular pile

Publications (2)

Publication Number Publication Date
CN105113503A CN105113503A (en) 2015-12-02
CN105113503B true CN105113503B (en) 2017-05-24

Family

ID=54661595

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510513842.1A Active CN105113503B (en) 2015-08-20 2015-08-20 Precast concrete tubular pile

Country Status (1)

Country Link
CN (1) CN105113503B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780767B (en) * 2016-02-29 2017-11-14 济南轨道交通集团有限公司 Prefabricated pile Quick mechanical attachment means and construction method
CN106049459A (en) * 2016-07-21 2016-10-26 泰州润伟机械有限公司 Tubular uplift pile end plate
CN108643154B (en) * 2018-03-20 2020-10-27 武汉船用机械有限责任公司 Pile leg and assembling method thereof
CN108612098A (en) * 2018-05-24 2018-10-02 江苏千汇轻量化技术研究院有限公司 A kind of novel high-strength pipe pile joint device
CN110543734B (en) * 2019-09-06 2023-06-13 山东省建筑科学研究院有限公司 Variable-rigidity cement soil insert combined pile and design method
CN112554181B (en) * 2020-11-30 2022-09-23 宁波津和建材科技发展有限公司 Precast concrete tubular pile
CN112663601A (en) * 2020-12-07 2021-04-16 中建五局华东建设有限公司 Tubular pile splicing device

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3583009B2 (en) * 1999-03-15 2004-10-27 株式会社クボタ Connection structure of pile
CN102220758A (en) * 2011-04-20 2011-10-19 钟智谦 Prestressed concrete pipe piles and mechanical joggle joint for same
CN102409673B (en) * 2011-08-18 2013-12-18 李宏涛 Elastic pin type mechanical quick connector for connecting prestressed concrete pipe piles
CN103628475A (en) * 2012-08-27 2014-03-12 林基 Mechanical threaded reinforced joint of prestressed concrete pipe pile
CN202881940U (en) * 2012-08-30 2013-04-17 福建省大地管桩有限公司 Connected type prestressed concrete pipe pile structure
CN204959738U (en) * 2015-08-20 2016-01-13 宁波大学 Prefabricated concrete tubular pile

Also Published As

Publication number Publication date
CN105113503A (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN105113503B (en) Precast concrete tubular pile
CN105908977B (en) Joint bar constructing structure and method
CN206144032U (en) Mosaic structure of assembled steel core concrete column and post
CN204959738U (en) Prefabricated concrete tubular pile
CN106437032A (en) Assembled concrete filled steel tubular column splicing structure and method
CN104790388B (en) A kind of prefabricated pile mechanical connecting structure and attaching method thereof
CN109944355B (en) Rigidly connected assembled concrete shear wall and assembling method thereof
CN219261475U (en) Error proofing platform connection structure
CN205660343U (en) Be used for welding rebar cage with fan -shaped utensil of assisting
CN204125943U (en) For the end plate of steel strand centrifugal concrete pile
CN205348164U (en) High -efficient steel -pipe pile connects
CN211285579U (en) Quick pile extension is to stake, anti-pulling concrete precast pile joint
CN209975719U (en) Oblique crossing type single-layer latticed shell welding joint
CN211143495U (en) Connecting and fixing device for concrete filled steel tube column
CN104120793A (en) Steel structure connecting device convenient to disassemble and assemble
CN214245800U (en) Connection system between underwater steel pipe piles
CN211171948U (en) Square pile end plate butt joint connection structure
CN105463989A (en) Bridge plate frame manufacturing process
CN204541433U (en) A kind of stool feet connecting structure of plastic stool
CN109944397B (en) Vertical main muscle of assembled concrete wall exempts from to irritate thick liquid connection structure
CN107387131A (en) A kind of asymmetric trouble hole supporting construction and its construction method
CN208501675U (en) A kind of detachable civil engineering foundation pile
CN106567539A (en) Formwork fixing column hoop used for building construction
CN208121966U (en) A kind of detachable full assembled beam-column splicing node
CN207863154U (en) A kind of assembly concrete bean column node

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201010

Address after: Tongxing road 528414 Guangdong city of Zhongshan Province Dongsheng Town, No. 30

Patentee after: GUANGDONG SANHE PILES Co.,Ltd.

Address before: 315211 Zhejiang Province, Ningbo Jiangbei District Fenghua Road No. 818

Patentee before: Ningbo University