CN105113503A - Precast concrete tubular pile - Google Patents

Precast concrete tubular pile Download PDF

Info

Publication number
CN105113503A
CN105113503A CN201510513842.1A CN201510513842A CN105113503A CN 105113503 A CN105113503 A CN 105113503A CN 201510513842 A CN201510513842 A CN 201510513842A CN 105113503 A CN105113503 A CN 105113503A
Authority
CN
China
Prior art keywords
steel pipe
pipe pile
concrete pipe
connection
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510513842.1A
Other languages
Chinese (zh)
Other versions
CN105113503B (en
Inventor
郑荣跃
黄吉永
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Sanhe Pile Co Ltd
Original Assignee
Ningbo University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ningbo University filed Critical Ningbo University
Priority to CN201510513842.1A priority Critical patent/CN105113503B/en
Publication of CN105113503A publication Critical patent/CN105113503A/en
Application granted granted Critical
Publication of CN105113503B publication Critical patent/CN105113503B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a precast concrete tubular pile. The precast concrete tubular pile comprises at least two concrete tubular pile sections and a pile section connection mechanism used for connecting the two adjacent concrete tubular pile sections, wherein the concrete tubular pile sections and the pile section connection mechanism are sequentially distributed from top to bottom. The tubular pile is characterized in that the pile section connection mechanism comprises a connection plug and a connection base, the connection plug is fixedly arranged at the end of one concrete tubular pile section, and the connection base is fixedly arranged at the end of the other concrete tubular pile section; the connection plug is inserted into the connection base, and a plurality of elastic connection pins protruding in the radial direction are arranged on the connection plug; the connection base is provided with annular fixing grooves matched with the elastic connection pins, and the elastic connection pins are clamped in the annular fixing grooves. The tubular pile has the advantages that when connection is performed, people only need to clamp the elastic connection pins into the annular fixing grooves after the connection plug is inserted into the connection base; on the premise that connection firmness is guaranteed, connection operation of the concrete tubular pile sections is more convenient; besides, the tubular pile can be used directly after the connection process is completed, people do not need to wait, and accordingly construction efficiency is improved.

Description

A kind of prefabricated concrete pipe pile
Technical field
The present invention relates to a kind of engineering pile, especially a kind of prefabricated concrete pipe pile.
Background technology
In engineer applied, prefabricated concrete pipe pile needs one to three joint concrete pipe pile cutoff composition, first by first segment concrete pipe pile cutoff press-in soil during construction, again second section concrete pipe pile cutoff is docked with first segment concrete pipe pile cutoff, then Section of three concrete pipe pile cutoff is docked with second section concrete pipe pile cutoff, pile extension method is generally adopted and is fixedly connected with by electric welding by the termination steel plate that each concrete pipe pile cutoff is arranged, and completes the docking assembling between each joint concrete pipe pile cutoff.But the weld seam at present when pile extension is only the surface distributed around butt joint, and the size of seam cross-section is limited, therefore welding quality arrival rate poor controllability, and weldquality exists hidden danger; Electrode welding process produces a large amount of heats, wait heat to distribute, weld seam temperature decline after just can proceed piling work, therefore need the intermittent time of constructing, and construction intermittent time also bad accurate assurance, often do not drop to standard-required at weld seam temperature and just carry out piling, the integrality of weld seam may be destroyed; There is the operating mode needing the pulling force born upwards in prefabricated concrete pipe pile, and the weld seam resistance to tension formed in pile extension process is poor, therefore there is certain potential safety hazard.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of pile extension process fast and easy and the prefabricated concrete pipe pile be connected firmly.
The present invention solves the problems of the technologies described above adopted technical scheme: a kind of prefabricated concrete pipe pile, comprise at least two joint concrete pipe pile cutofves and the pile cutoff bindiny mechanism for being connected the concrete pipe pile cutoff described in two adjacent joints that distribute successively from top to bottom, described pile cutoff bindiny mechanism comprises attachment plug and Connection Block, described attachment plug is fixedly installed the end of the concrete pipe pile cutoff wherein described in a joint, described Connection Block is fixedly installed another end of concrete pipe pile cutoff described in joint wherein, the described Connection Block described in attachment plug insertion, described attachment plug is provided with the resilient attachment pins of multiple radial protrusion, described Connection Block is provided with the annular anchoring groove coordinated with described resilient attachment pins, described resilient attachment pins is fastened in described annular anchoring groove.
Described attachment plug comprises connection end plate, fixed base plate, supporting steel pipe and socket joint steel pipe, described connection end plate is fixedly installed on the end of the concrete pipe pile cutoff wherein described in a joint, described connection end plate is coaxially arranged with center fixing hole and socket joint hole, center, the aperture of described center fixing hole is greater than the aperture in described socket joint hole, center, described fixed base plate is embedded in described center fixing hole, the end of described socket joint steel pipe is all fixedly connected with described fixed base plate with the end of described supporting steel pipe, described supporting steel pipe is coaxially arranged in described socket joint steel pipe, described socket joint steel pipe is plugged in described Connection Block through described socket joint hole, center, be provided with at least two between described socket joint steel pipe and described supporting steel pipe to be uniformly distributed and the radial appearance pin steel pipe extended around described supporting steel pipe, described resilient attachment pins comprises the spring be arranged in described appearance pin steel pipe, shank and plunger, one end of described spring is bearing on described supporting steel pipe, the other end of described spring is bearing in one end of described shank, the other end of described shank is fixedly connected with described plunger, described socket joint steel pipe is provided with pin-and-hole, described plunger is fastened in described annular anchoring groove through described pin-and-hole.When two joint concrete pipe pile cutoff pile extensions, as long as be laminated by two joint concrete pipe pile cutofves, the inside Compress Spring of plunger of resilient attachment pins is also fastened in annular anchoring groove, and now two joint concrete pipe pile cutofves are interconnected firmly, pile extension completes, and whole pile extension process is fast very convenient.
Described appearance pin steel pipe is four, and the appearance pin steel pipe described in four is uniformly distributed around described supporting steel pipe.Strengthen the connectivity robustness between two joint concrete pipe pile cutofves.
Described connection end plate is fixedly installed first reinforcing bar of uniform ring around described concrete pipe pile cutoff and in axial distribution, described Connection Block is fixedly installed second reinforcing bar of uniform ring around described concrete pipe pile cutoff and in axial distribution, the first described reinforcing bar plugs in the concrete pipe pile cutoff be fixed therein described in a joint, the second described reinforcing bar plug be fixed on another joint described in concrete pipe pile cutoff in.The lateral stress of Concrete Structure pile tube section.
Described connection end plate is fixedly installed the first additional dowel coaxially distributed with the first described reinforcing bar, described Connection Block is fixedly installed the second additional dowel coaxially distributed with the second described reinforcing bar, described first additional dowel axially plugs in the concrete pipe pile cutoff be fixed therein described in a joint, described second additional dowel axially plugs and is fixed in another concrete pipe pile cutoff described in joint, the first described reinforcing bar and described first adds dowel on circumferential direction in being dislocatedly distributed, the second described reinforcing bar and described second adds dowel on circumferential direction in being dislocatedly distributed.The lateral stress of further Concrete Structure pile tube section, enhances concrete pipe pile cutoff and the fastness be connected between end plate and Connection Block simultaneously.
Described plunger comprises a clamping inclined-plane and a contraction cambered surface, and be provided with the constant inclined surface matched with described clamping inclined-plane in described annular anchoring groove, described Connection Block is provided with the slip cambered surface coordinated with described contraction cambered surface.When plunger is inwardly shunk, shrink cambered surface to abut in slip cambered surface and to slide along slip cambered surface, plunger is shunk smoothly, when plunger snaps in after in annular anchoring groove, clamping inclined-plane is fastened on constant inclined surface, make plunger reach stationary state, thus two joint concrete pipe pile cutofves are connected and fixed.
When described resilient attachment pins is fastened in described annular anchoring groove, be provided with the first gap that minimum widith is 3 ~ 5mm between the top of described plunger and the bottom land of described annular anchoring groove, between described shank and described socket joint steel pipe, be provided with the second gap that minimum widith is 3 ~ 5mm.Ensure that plunger is when just snapping in annular anchoring groove, gap is left with the bottom land of annular anchoring groove, recall once the active force be applied on concrete pipe pile cutoff, plunger can carry out small movement according to the weight of concrete pipe pile cutoff self, again the correct position of apical grafting in annular anchoring groove is also fixing, finally makes to reach stable connection status between adjacent two joint concrete pipe pile cutofves.
Compared with prior art, the invention has the advantages that and be connected by the pile cutoff bindiny mechanism be made up of attachment plug and Connection Block between two joint concrete pipe pile cutofves, attachment plug is provided with the resilient attachment pins of multiple radial protrusion, Connection Block is provided with the annular anchoring groove coordinated with resilient attachment pins, after only attachment plug need being inserted Connection Block during connection, resilient attachment pins is fastened in annular anchoring groove, under the prerequisite that ensure that connectivity robustness, the attended operation of concrete pipe pile cutoff is convenient, and connection procedure directly completes and just can use, without the need to waiting for, therefore improve efficiency of construction.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structure enlarged diagram at A place in Fig. 1;
Fig. 3 is part-structure top view of the present invention.
Detailed description of the invention
Below in conjunction with accompanying drawing embodiment, the present invention is described in further detail.
Embodiment one: a kind of prefabricated concrete pipe pile, comprise the two joint concrete pipe pile cutofves 1 and the pile cutoff bindiny mechanism for being connected two adjacent joint concrete pipe pile cutofves 1 that distribute successively from top to bottom, pile cutoff bindiny mechanism comprises attachment plug and Connection Block 11, attachment plug is fixedly installed the end of a joint concrete pipe pile cutoff 1 wherein, Connection Block 11 is fixedly installed the end of another joint concrete pipe pile cutoff 1 wherein, attachment plug is provided with the resilient attachment pins of two radial protrusions, Connection Block 11 is provided with the annular anchoring groove 111 coordinated with resilient attachment pins, attachment plug comprises and connects end plate 21, fixed base plate 22, supporting steel pipe 23 and socket joint steel pipe 24, connect the end that end plate 21 is fixedly installed a joint concrete pipe pile cutoff 1 wherein, connect on end plate 21 and be fixedly installed first reinforcing bar 31 of uniform ring around concrete pipe pile cutoff 1 and in axial distribution, Connection Block 11 is fixedly installed second reinforcing bar 32 of uniform ring around concrete pipe pile cutoff 1 and in axial distribution, first reinforcing bar 31 plugs and is fixed therein in a joint concrete pipe pile cutoff 1, second reinforcing bar 32 plugs and is fixed in another joint concrete pipe pile cutoff 1, connect end plate 21 and be coaxially arranged with center fixing hole 211 and socket joint hole, center 212, the aperture of center fixing hole 211 is greater than the aperture in socket joint hole, center 212, fixed base plate 22 is embedded in center fixing hole 211, the end of socket joint steel pipe 24 is all fixedly connected with fixed base plate 22 with the end of supporting steel pipe 23, supporting steel pipe 23 is coaxially arranged in socket joint steel pipe 24, socket joint steel pipe 24 is plugged in Connection Block 11 through socket joint hole, center 212, be provided with two between socket joint steel pipe 24 and supporting steel pipe 23 to be uniformly distributed and the radial appearance pin steel pipe 25 extended around supporting steel pipe 23, resilient attachment pins comprises the spring 41 being arranged on and holding in pin steel pipe 25, shank 42 and plunger 43, one end of spring 41 is bearing on supporting steel pipe 23, the other end of spring 41 is bearing in one end of shank 42, the other end of shank 42 is fixedly connected with plunger 43, socket joint steel pipe 24 is provided with pin-and-hole 241, plunger 43 is fastened in annular anchoring groove 111 through pin-and-hole 241.
Embodiment two: remainder is identical with embodiment one, its difference is that concrete pipe pile cutoff 1 is three joints, attachment plug is provided with the resilient attachment pins of four radial protrusions, holding pin steel pipe 25 is four, and four are held pin steel pipe 25 and are uniformly distributed around supporting steel pipe 23.
Embodiment three: remainder is identical with embodiment one, its difference is to connect on end plate 21 and is fixedly installed coaxial the first additional dowel 51 distributed with the first reinforcing bar 31, Connection Block 11 is fixedly installed coaxial the second additional dowel 52 distributed with the second reinforcing bar 32, first additional dowel 51 axially plugs and is fixed therein in a joint concrete pipe pile cutoff 1, second additional dowel 52 axially plugs and is fixed in another joint concrete pipe pile cutoff 1, first reinforcing bar 31 and first adds dowel 51 on circumferential direction in being dislocatedly distributed, second reinforcing bar 32 and second adds dowel 52 on circumferential direction in being dislocatedly distributed.
Embodiment four: remainder is identical with embodiment one, its difference is that plunger 43 comprises a clamping inclined-plane 431 and a contraction cambered surface 432, be provided with the constant inclined surface 61 matched with clamping inclined-plane 431 in annular anchoring groove 111, Connection Block 11 is provided with and the slip cambered surface 62 of shrinking cambered surface 432 and coordinating.
Embodiment five: remainder is identical with embodiment one, its difference is when resilient attachment pins is fastened in annular anchoring groove 111, be provided with the first gap that minimum widith is 3mm between the top of plunger 43 and the bottom land of annular anchoring groove 111, between shank 42 and socket joint steel pipe 24, be provided with the second gap that minimum widith is 3mm.
Embodiment six: remainder is identical with embodiment one, its difference is when resilient attachment pins is fastened in annular anchoring groove 111, be provided with the first gap that minimum widith is 4mm between the top of plunger 43 and the bottom land of annular anchoring groove 111, between shank 42 and socket joint steel pipe 24, be provided with the second gap that minimum widith is 4mm.
Embodiment seven: remainder is identical with embodiment one, its difference is when resilient attachment pins is fastened in annular anchoring groove 111, be provided with the first gap that minimum widith is 5mm between the top of plunger 43 and the bottom land of annular anchoring groove 111, between shank 42 and socket joint steel pipe 24, be provided with the second gap that minimum widith is 5mm.

Claims (7)

1. a prefabricated concrete pipe pile, comprise at least two joint concrete pipe pile cutofves and the pile cutoff bindiny mechanism for being connected the concrete pipe pile cutoff described in two adjacent joints that distribute successively from top to bottom, it is characterized in that described pile cutoff bindiny mechanism comprises attachment plug and Connection Block, described attachment plug is fixedly installed the end of the concrete pipe pile cutoff wherein described in a joint, described Connection Block is fixedly installed another end of concrete pipe pile cutoff described in joint wherein, the described Connection Block described in attachment plug insertion, described attachment plug is provided with the resilient attachment pins of multiple radial protrusion, described Connection Block is provided with the annular anchoring groove coordinated with described resilient attachment pins, described resilient attachment pins is fastened in described annular anchoring groove.
2. a kind of prefabricated concrete pipe pile according to claim 1, it is characterized in that described attachment plug comprises connection end plate, fixed base plate, supporting steel pipe and socket joint steel pipe, described connection end plate is fixedly installed on the end of the concrete pipe pile cutoff wherein described in a joint, described connection end plate is coaxially arranged with center fixing hole and socket joint hole, center, the aperture of described center fixing hole is greater than the aperture in described socket joint hole, center, described fixed base plate is embedded in described center fixing hole, the end of described socket joint steel pipe is all fixedly connected with described fixed base plate with the end of described supporting steel pipe, described supporting steel pipe is coaxially arranged in described socket joint steel pipe, described socket joint steel pipe is plugged in described Connection Block through described socket joint hole, center, be provided with at least two between described socket joint steel pipe and described supporting steel pipe to be uniformly distributed and the radial appearance pin steel pipe extended around described supporting steel pipe, described resilient attachment pins comprises the spring be arranged in described appearance pin steel pipe, shank and plunger, one end of described spring is bearing on described supporting steel pipe, the other end of described spring is bearing in one end of described shank, the other end of described shank is fixedly connected with described plunger, described socket joint steel pipe is provided with pin-and-hole, described plunger is fastened in described annular anchoring groove through described pin-and-hole.
3. a kind of prefabricated concrete pipe pile according to claim 2, it is characterized in that described appearance pin steel pipe is four, the appearance pin steel pipe described in four is uniformly distributed around described supporting steel pipe.
4. a kind of prefabricated concrete pipe pile according to claim 2, it is characterized in that described connection end plate being fixedly installed first reinforcing bar of uniform ring around described concrete pipe pile cutoff and in axial distribution, described Connection Block is fixedly installed second reinforcing bar of uniform ring around described concrete pipe pile cutoff and in axial distribution, the first described reinforcing bar plugs in the concrete pipe pile cutoff be fixed therein described in a joint, the second described reinforcing bar plug be fixed on another joint described in concrete pipe pile cutoff in.
5. a kind of prefabricated concrete pipe pile according to claim 4, it is characterized in that described connection end plate being fixedly installed the first additional dowel coaxially distributed with the first described reinforcing bar, described Connection Block is fixedly installed the second additional dowel coaxially distributed with the second described reinforcing bar, described first additional dowel axially plugs in the concrete pipe pile cutoff be fixed therein described in a joint, described second additional dowel axially plugs and is fixed in another concrete pipe pile cutoff described in joint, the first described reinforcing bar and described first adds dowel on circumferential direction in being dislocatedly distributed, the second described reinforcing bar and described second adds dowel on circumferential direction in being dislocatedly distributed.
6. a kind of prefabricated concrete pipe pile according to Claims 2 or 3, it is characterized in that described plunger comprises a clamping inclined-plane and a contraction cambered surface, be provided with the constant inclined surface matched with described clamping inclined-plane in described annular anchoring groove, described Connection Block is provided with the slip cambered surface coordinated with described contraction cambered surface.
7. a kind of prefabricated concrete pipe pile according to claim 2, it is characterized in that when described resilient attachment pins is fastened in described annular anchoring groove, be provided with the first gap that minimum widith is 3 ~ 5mm between the top of described plunger and the bottom land of described annular anchoring groove, between described shank and described socket joint steel pipe, be provided with the second gap that minimum widith is 3 ~ 5mm.
CN201510513842.1A 2015-08-20 2015-08-20 Precast concrete tubular pile Active CN105113503B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510513842.1A CN105113503B (en) 2015-08-20 2015-08-20 Precast concrete tubular pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510513842.1A CN105113503B (en) 2015-08-20 2015-08-20 Precast concrete tubular pile

Publications (2)

Publication Number Publication Date
CN105113503A true CN105113503A (en) 2015-12-02
CN105113503B CN105113503B (en) 2017-05-24

Family

ID=54661595

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510513842.1A Active CN105113503B (en) 2015-08-20 2015-08-20 Precast concrete tubular pile

Country Status (1)

Country Link
CN (1) CN105113503B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780767A (en) * 2016-02-29 2016-07-20 济南轨道交通集团有限公司 Precast pile fast mechanical connection device and construction method
CN106049459A (en) * 2016-07-21 2016-10-26 泰州润伟机械有限公司 Tubular uplift pile end plate
CN108612098A (en) * 2018-05-24 2018-10-02 江苏千汇轻量化技术研究院有限公司 A kind of novel high-strength pipe pile joint device
CN108643154A (en) * 2018-03-20 2018-10-12 武汉船用机械有限责任公司 A kind of spud leg and its assembly method
CN110543734A (en) * 2019-09-06 2019-12-06 山东省建筑科学研究院有限公司 Variable-rigidity cement-soil core-insert combined pile and design method
CN112554181A (en) * 2020-11-30 2021-03-26 王玉中 Precast concrete tubular pile
CN112663601A (en) * 2020-12-07 2021-04-16 中建五局华东建设有限公司 Tubular pile splicing device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000265459A (en) * 1999-03-15 2000-09-26 Kubota Corp Pile
CN102220758A (en) * 2011-04-20 2011-10-19 钟智谦 Prestressed concrete pipe piles and mechanical joggle joint for same
CN102409673A (en) * 2011-08-18 2012-04-11 李宏涛 Elastic pin type mechanical quick connector for connecting prestressed concrete pipe piles
CN202881940U (en) * 2012-08-30 2013-04-17 福建省大地管桩有限公司 Connected type prestressed concrete pipe pile structure
CN103628475A (en) * 2012-08-27 2014-03-12 林基 Mechanical threaded reinforced joint of prestressed concrete pipe pile
CN204959738U (en) * 2015-08-20 2016-01-13 宁波大学 Prefabricated concrete tubular pile

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000265459A (en) * 1999-03-15 2000-09-26 Kubota Corp Pile
CN102220758A (en) * 2011-04-20 2011-10-19 钟智谦 Prestressed concrete pipe piles and mechanical joggle joint for same
CN102409673A (en) * 2011-08-18 2012-04-11 李宏涛 Elastic pin type mechanical quick connector for connecting prestressed concrete pipe piles
CN103628475A (en) * 2012-08-27 2014-03-12 林基 Mechanical threaded reinforced joint of prestressed concrete pipe pile
CN202881940U (en) * 2012-08-30 2013-04-17 福建省大地管桩有限公司 Connected type prestressed concrete pipe pile structure
CN204959738U (en) * 2015-08-20 2016-01-13 宁波大学 Prefabricated concrete tubular pile

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈志雄: "预制混凝土管桩施工的质量控制", 《大众科技》 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105780767A (en) * 2016-02-29 2016-07-20 济南轨道交通集团有限公司 Precast pile fast mechanical connection device and construction method
CN105780767B (en) * 2016-02-29 2017-11-14 济南轨道交通集团有限公司 Prefabricated pile Quick mechanical attachment means and construction method
CN106049459A (en) * 2016-07-21 2016-10-26 泰州润伟机械有限公司 Tubular uplift pile end plate
CN108643154A (en) * 2018-03-20 2018-10-12 武汉船用机械有限责任公司 A kind of spud leg and its assembly method
CN108612098A (en) * 2018-05-24 2018-10-02 江苏千汇轻量化技术研究院有限公司 A kind of novel high-strength pipe pile joint device
CN110543734A (en) * 2019-09-06 2019-12-06 山东省建筑科学研究院有限公司 Variable-rigidity cement-soil core-insert combined pile and design method
CN112554181A (en) * 2020-11-30 2021-03-26 王玉中 Precast concrete tubular pile
CN112554181B (en) * 2020-11-30 2022-09-23 宁波津和建材科技发展有限公司 Precast concrete tubular pile
CN112663601A (en) * 2020-12-07 2021-04-16 中建五局华东建设有限公司 Tubular pile splicing device

Also Published As

Publication number Publication date
CN105113503B (en) 2017-05-24

Similar Documents

Publication Publication Date Title
CN105113503A (en) Precast concrete tubular pile
CN104520936A (en) Resistance welding of an end cap for nuclear fuel rods
CN204959738U (en) Prefabricated concrete tubular pile
CN106801610B (en) Segment-to-segment connection joint using stacked structure and method of connection using the same
CN104948554A (en) Bolt-type connecting piece and connecting pile
CN101499602A (en) Welding clamp and dragging welding process for applying the welding clamp
CN216238500U (en) Quick butt-joint structural of precast concrete pile
CN204780879U (en) A prefabricated component for connecting connecting piece of two objects and connecting with this connecting piece
CN211143495U (en) Connecting and fixing device for concrete filled steel tube column
CN109083139B (en) Anti-pulling pile connecting structure
CN104120793A (en) Steel structure connecting device convenient to disassemble and assemble
CN209084265U (en) It is a kind of for connecting the electric melting pipe fittings of unlike material tubing
CN114737671B (en) Connection structure and method for steel pipe concrete column and steel node and transitional connection member
CN214245800U (en) Connection system between underwater steel pipe piles
CN214402444U (en) Reinforcing steel bar sleeve joint and control system thereof
CN204312481U (en) The interfacing part of a kind of use axial Y shape annulus plate docking steel pipe
CN105463989A (en) Bridge plate frame manufacturing process
CN204343454U (en) A kind of interfacing part of axial cross shape annulus plate docking steel pipe
CN203822188U (en) Three-edge arc-shaped flange friction welding type drill stem
CN208749364U (en) A kind of novel shield duct piece connector
CN210372480U (en) Inner socket electric smelting connection structure
CN111705923A (en) Steel pipe and square pipe assembled joint and construction method
CN209144800U (en) Uplift pile connection structure
CN217536924U (en) Anti-corrosion concrete pipe pile
CN204344595U (en) The interfacing part of a kind of use axial meter-shape annulus plate docking steel pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201010

Address after: Tongxing road 528414 Guangdong city of Zhongshan Province Dongsheng Town, No. 30

Patentee after: GUANGDONG SANHE PILES Co.,Ltd.

Address before: 315211 Zhejiang Province, Ningbo Jiangbei District Fenghua Road No. 818

Patentee before: Ningbo University

TR01 Transfer of patent right