CN105113419B - The method using the prestress concrete box girder of hanging basket formwork making band sightseeing walkway board - Google Patents

The method using the prestress concrete box girder of hanging basket formwork making band sightseeing walkway board Download PDF

Info

Publication number
CN105113419B
CN105113419B CN201510586099.2A CN201510586099A CN105113419B CN 105113419 B CN105113419 B CN 105113419B CN 201510586099 A CN201510586099 A CN 201510586099A CN 105113419 B CN105113419 B CN 105113419B
Authority
CN
China
Prior art keywords
sightseeing
hanging basket
walkway board
template
formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510586099.2A
Other languages
Chinese (zh)
Other versions
CN105113419A (en
Inventor
刘红岩
饶昌福
耿越
孙金鹏
曾良红
刘超
周振兴
吉婷
王小飞
袁勤凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gezhouba Construction Technology Chengdu Co ltd
China Gezhouba Group No 2 Engineering Co Ltd
Original Assignee
China Ge Zhou Ba Group Is Second Project Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Ge Zhou Ba Group Is Second Project Co Ltd filed Critical China Ge Zhou Ba Group Is Second Project Co Ltd
Priority to CN201510586099.2A priority Critical patent/CN105113419B/en
Publication of CN105113419A publication Critical patent/CN105113419A/en
Application granted granted Critical
Publication of CN105113419B publication Critical patent/CN105113419B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The present invention uses the method for the prestress concrete box girder of hanging basket formwork making band sightseeing walkway board, including: (1) makes hanging basket formwork side form;(2) sightseeing walkway board template and support are made;(3) sightseeing walkway board template adjusts and fixes after each parts of hanging basket formwork are adjusted in place, and on the operating platform of Hanging Basket side, by regulation adjustable jack, the regulation of sightseeing walkway board form height is put in place, and template is locked with Hanging Basket bed die, mortar leakage prevention;(4) pour sightseeing walkway board concrete and box beam each position concrete: (5) demoulding: (6) walk: during hanging basket formwork walking, the forward and backward sill of Hanging Basket drive sightseeing walkway board template to run to next section of pouring, the same step of formwork erection method (1)~(5) together.The present invention goes sightseeing, and walkway board template is vertical, form removal is convenient, flexible adjustment, saves human and material resources, and efficiency of construction is high.

Description

The method using the prestress concrete box girder of hanging basket formwork making band sightseeing walkway board
Technical field:
The present invention relates to road and bridge construction field, particularly relate to a kind of method that prestress concrete box girder using hanging basket formwork to make band sightseeing walkway board is once constructed.
Background technology:
In current domestic science of bridge building, the structure being provided with sightseeing walkway board in prestressing force solidifying soil continuous beam side is the rarest, if light sees walkway board structure and main tank beam pouring construction simultaneously, hanging basket formwork side side form formwork erection will be there is and found the problems such as form removal difficulty by the interference of sightseeing walkway board, sightseeing walkway board template.
Summary of the invention:
The invention aims to overcome hanging basket formwork side side form formwork erection to be found the problems such as form removal difficulty by the interference of sightseeing walkway board, sightseeing walkway board template, a kind of sightseeing walkway board template of offer is vertical, form removal is convenient, flexible adjustment, using manpower and material resources sparingly, the prestress concrete box girder of the band sightseeing walkway board that efficiency of construction is high uses the method that Hanging Basket is once constructed.
The present invention purpose be achieved like this:
The present invention uses the method for the prestress concrete box girder of hanging basket formwork side form making sightseeing walkway board, comprises the following steps:
1) hanging basket formwork side form is made:
By making the hanging basket formwork side form being made up of the template of some joint detachables on the form height direction, hanging basket formwork side of sightseeing walkway board, merogenesis height is that adjacent to pour segmental height poor for precast beam, because box beam height is gradually lowered from 0# BOB(beginning of block), the effective usable floor area of Hanging Basket side form is also gradually decreasing, wherein on one side side form can the most cantilevered out bed die, and opposite side template is disturbed by sightseeing walkway board, it is impossible to cantilevered out Hanging Basket bed die, it has to be possible to advance along with sections and remove section by section;
(2) sightseeing walkway board template and support are made:
Forward and backward sill at hanging basket formwork has the side of sightseeing walkway board template to set up two longerons, and longeron uses pin joint mode with the forward and backward sill of Hanging Basket, it is simple to longeron carries out nature angle adjustment with bed die change;At least three adjustable jack is installed on every longeron, while supporting sightseeing walkway board template, template is adjusted in place;
(3) sightseeing walkway board template adjusts and fixing:
After each parts of hanging basket formwork are adjusted in place, on the operating platform of Hanging Basket side, by regulation adjustable jack, the regulation of sightseeing walkway board form height is put in place, and template is locked with Hanging Basket bed die, mortar leakage prevention;
(4) sightseeing walkway board concrete and box beam each position concrete are poured;
(5) demoulding:
After concrete arrives certain age, should first remove sightseeing walkway board template to retrain with end template, again by adjustable jack by below the sightseeing walkway board template demoulding to concrete face 4.5~5.5cm, then the demoulding of hanging basket formwork is carried out, form removable one joint of sightseeing walkway board side first will be had before the hanging basket formwork demoulding, carry out the conventional demoulding of Hanging Basket, the same conventional method of the hanging basket formwork remaining part demoulding again, repeat no more here;
(6) walking: during hanging basket formwork walking, is driven sightseeing walkway board template to run to next section of pouring, the same step of formwork erection method (1)~(5) together by the forward and backward sill of Hanging Basket.
The inventive method by carrying out local particular design by routine hanging basket formwork, and by sightseeing walkway board shuttering supporting on the forward and backward sill of Hanging Basket, sightseeing walkway board template is vertical, form removal is convenient, flexible adjustment, and can realize and hanging basket formwork synchronous walking, saving construction human and material resources, construction effect is high.
Accompanying drawing illustrates:
Fig. 1 is the prestress concrete box girder structure chart of band sightseeing walkway board
Fig. 2 is the A A sectional view in Fig. 1.
Fig. 3 is the side view using hanging basket formwork construction.
Fig. 4 is the opposite side view using hanging basket formwork construction.
Fig. 5 is hanging basket formwork side form schematic diagram
Fig. 6 is sightseeing walkway board template formwork erection detail drawing
Fig. 7 be in Fig. 6 sightseeing walkway board template at the location drawing of the forward and backward sill of hanging basket formwork.
Detailed description of the invention:
Prestress concrete box girder 2 structure of band sightseeing walkway board 1 is shown in Fig. 1, Fig. 2.Pouring with box beam 2 main body to realize sightseeing walkway board 1, the present embodiment uses hanging basket formwork to make construction method of prestress concrete box girder of band sightseeing walkway board, comprises the steps: simultaneously
(1) some for hanging basket formwork side form 7 points restrainings are made:
Seeing Fig. 3, Fig. 4, Fig. 5, the side form 7 of hanging basket formwork is being made up of some joints by the form height direction, side of sightseeing walkway board, and merogenesis height is that adjacent to pour segmental height poor for precast beam;In Fig. 4, sequence number 71,72,73,74,75,76 is respectively first segment template, second section template, Section of three template, Section of four template, Section of five template, Section of six template;
(2) sightseeing walkway board template 6 formwork erection:
Seeing Fig. 6, Fig. 7, front sill 2 and rear sill 3 at hanging basket formwork have the side of sightseeing walkway board to set up two longerons welded respectively 4 by channel-section steel.Longeron 4 uses pin joint mode with the forward and backward sill of Hanging Basket, it is simple to longeron 4 carries out nature angle adjustment with bed die change;Three (or four) individual adjustable jack 5 is had to be used for supporting sightseeing walkway board template 6 on every longeron 4.Sightseeing walkway board template 6 is designed to the steel form that shapes;
(3) sightseeing walkway board template 6 adjusts and fixing:
After each parts of hanging basket formwork are adjusted in place, on the operating platform of Hanging Basket side, by regulation adjustable jack 5, sightseeing walkway board template 6 altitude mixture control is put in place, and template is locked with Hanging Basket bed die gib headed bolt 8, mortar leakage prevention;
(4) sightseeing walkway board concrete and box beam each position concrete of box beam 1# block (0# block has poured by other template and finished) are poured;
(5) demoulding;
After concrete reaches certain age, should first remove sightseeing walkway board template 6 and retrain gib headed bolt 8 with end template, again by regulation adjustable jack 5 by about about 5cm below sightseeing walkway board template stamping die to concrete face, then the second layer template of side form 7 is removed, and ground floor template is connected with third layer template, it is last by existing conventional method demoulding Hanging Basket remaining part that the rest may be inferred;
(6) walking:
During hanging basket formwork walking, run to the 2# section of pouring with sightseeing walkway board template 6, the most repeatedly.
Above-described embodiment is that the foregoing to the present invention is described further, but this should not being interpreted as, the scope of the above-mentioned theme of the present invention is only limitted to above-described embodiment.All technology realized based on foregoing belong to protection scope of the present invention.

Claims (1)

1. the method using the prestress concrete box girder of hanging basket formwork making band sightseeing walkway board, comprises the following steps:
(1) hanging basket formwork side form is made:
By making by the hanging basket formwork side form being made up of the template of some joint detachables on the form height direction, hanging basket formwork side of sightseeing walkway board, merogenesis height is that adjacent to pour segmental height poor for precast beam;
(2) sightseeing walkway board template and support are made:
Forward and backward sill at hanging basket formwork has the side of sightseeing walkway board template to set up two longerons, and longeron uses pin joint mode with the forward and backward sill of Hanging Basket, it is simple to longeron carries out nature angle adjustment with bed die change;At least three adjustable jack is installed on every longeron, while supporting sightseeing walkway board template, template is adjusted in place;
(3) sightseeing walkway board template adjusts and fixing:
After each parts of hanging basket formwork are adjusted in place, on the operating platform of Hanging Basket side, by regulation adjustable jack, the regulation of sightseeing walkway board form height is put in place, and template is locked with Hanging Basket bed die, mortar leakage prevention;
(4) sightseeing walkway board concrete and box beam each position concrete are poured;
(5) demoulding:
After concrete arrives certain age, should first remove sightseeing walkway board template to retrain with end template, again by adjustable jack by below the sightseeing walkway board template demoulding to concrete face 4.5~5.5cm, then the demoulding of hanging basket formwork is carried out, first will there is form removable one joint of sightseeing walkway board side before the demoulding, then carry out the conventional demoulding of Hanging Basket;
(6) walking: during hanging basket formwork walking, is driven sightseeing walkway board template to run to next section of pouring, the same step of formwork erection method (1)~(5) together by the forward and backward sill of Hanging Basket.
CN201510586099.2A 2015-09-16 2015-09-16 The method using the prestress concrete box girder of hanging basket formwork making band sightseeing walkway board Active CN105113419B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510586099.2A CN105113419B (en) 2015-09-16 2015-09-16 The method using the prestress concrete box girder of hanging basket formwork making band sightseeing walkway board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510586099.2A CN105113419B (en) 2015-09-16 2015-09-16 The method using the prestress concrete box girder of hanging basket formwork making band sightseeing walkway board

Publications (2)

Publication Number Publication Date
CN105113419A CN105113419A (en) 2015-12-02
CN105113419B true CN105113419B (en) 2016-08-31

Family

ID=54661513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510586099.2A Active CN105113419B (en) 2015-09-16 2015-09-16 The method using the prestress concrete box girder of hanging basket formwork making band sightseeing walkway board

Country Status (1)

Country Link
CN (1) CN105113419B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106958345B (en) * 2017-05-16 2022-08-02 简华炽 Adjustable rigid hanging basket

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201785704U (en) * 2010-09-19 2011-04-06 中铁十二局集团有限公司 Cradle device of continuous box beam folding-segment construction
CN202039299U (en) * 2011-03-25 2011-11-16 中铁十二局集团第二工程有限公司 Totally-closed hanging basket
KR101249285B1 (en) * 2011-10-05 2013-04-01 주식회사 동성엔지니어링 Bridge with prestressed concrete box girder of cantilever support structure by precast bracket, and it`s construction method
CN203361021U (en) * 2013-07-08 2013-12-25 中国水利水电第十三工程局有限公司 Double-spliced type truss hanging basket
CN103669217B (en) * 2013-11-21 2017-12-05 中建三局建设工程股份有限公司 A kind of rear-support hanging basket and its entirety change width method for traversing
CN203834366U (en) * 2014-03-12 2014-09-17 滨州市博远模板有限公司 Energy-saving universal hanging basket for bridge construction

Also Published As

Publication number Publication date
CN105113419A (en) 2015-12-02

Similar Documents

Publication Publication Date Title
CN107905114B (en) A kind of construction method of large span Successive interference cancellation
CN105908777A (en) Comprehensive pipe gallery sliding mold and application method thereof
CN1028556C (en) Building construction system
CN104963289B (en) A kind of abnormity pier stud mass concrete overall time pouring construction method
CN102493341A (en) Construction method for hollow thin-walled high pier non-bracket formwork turnover of railway
CN104405123B (en) Cast-in-situ reinforced concrete thin-wall rectangular small bore open tubular column template assembly and construction method thereof
CN108589535B (en) Reinforced concrete box type arch bridge construction method
CN108561156B (en) Separated tunnel arch-changing supporting structure and construction method thereof
CN104533460B (en) Support replacement formula formwork jumbo and the construction method of underpass concreting
CN102561690A (en) Construction method for supporting structures on two sides of post-cast strip by use of brick column
CN103046746A (en) Construction method of conversion beam reinforcing bars for tall building structure
WO2015184476A1 (en) Precast concrete falsework bubbledeck element and process of manufacturing thereof
CA3037888A1 (en) Structure and method of making the same
CN103603359A (en) Deep foundation pit diagonal bracing support structure demolition method
CN106854941B (en) A kind of construction method of big section Stand Inclined Beams and batter post
CN110410109A (en) A kind of construction of hangar tunnel lining cutting arch shifting formwork trolley and construction method
CN110904969A (en) High steep slope slab corridor structure concrete placement slipform system
CN110468743A (en) A kind of traveling cradle and construction method for the transformation of old pier coping
CN205894670U (en) Template structure for concrete joint construction between floors
CN106032704A (en) Construction method for using concrete columns to support structures on both sides of post-pouring strip
CN110042743A (en) The hydraulic climbing die block system of twin legged thin wall hollow pier with synchronize climb construction technology
CN105113419B (en) The method using the prestress concrete box girder of hanging basket formwork making band sightseeing walkway board
CN106948267B (en) A kind of memorial archway bar formula bridge cable tower king-post method for synchronously constructing
CN103061509A (en) Construction process for implementing post-cast strip casting by post-cast strip stiff steel pipe support system
JP2009228301A (en) Elongation method for bridge pier

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20240607

Address after: 610091 building 15, zone n, Qingyang Industrial headquarters base, No. 239, Guangfu Road, Supo street, Qingyang District, Chengdu, Sichuan Province

Patentee after: CHINA GEZHOUBA GROUP SECOND ENGINEERING Co.,Ltd.

Country or region after: China

Patentee after: Gezhouba Construction Technology (Chengdu) Co.,Ltd.

Address before: 610091 building 15, zone n, Qingyang Industrial headquarters base, No. 239, Guangfu Road, Supo street, Qingyang District, Chengdu, Sichuan Province

Patentee before: CHINA GEZHOUBA GROUP SECOND ENGINEERING Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right