CN105112686B - Double-layered heater protection sleeve and processing method - Google Patents

Double-layered heater protection sleeve and processing method Download PDF

Info

Publication number
CN105112686B
CN105112686B CN201510599971.7A CN201510599971A CN105112686B CN 105112686 B CN105112686 B CN 105112686B CN 201510599971 A CN201510599971 A CN 201510599971A CN 105112686 B CN105112686 B CN 105112686B
Authority
CN
China
Prior art keywords
layer sleeve
sleeve
inner layer
outer layer
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510599971.7A
Other languages
Chinese (zh)
Other versions
CN105112686A (en
Inventor
黎星界
韦雯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pyrotek (guangxi Nanning) High Temperature Material Co Ltd
Original Assignee
Pyrotek (guangxi Nanning) High Temperature Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pyrotek (guangxi Nanning) High Temperature Material Co Ltd filed Critical Pyrotek (guangxi Nanning) High Temperature Material Co Ltd
Priority to CN201510599971.7A priority Critical patent/CN105112686B/en
Publication of CN105112686A publication Critical patent/CN105112686A/en
Application granted granted Critical
Publication of CN105112686B publication Critical patent/CN105112686B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Rigid Pipes And Flexible Pipes (AREA)

Abstract

The invention discloses a double-layered heater protection sleeve and a processing method. The double-layered heater protection sleeve consists of an inner-layer sleeve and an outer-layer sleeve, wherein the inner-layer sleeve is sleeved by the outer-layer sleeve; the top ends of the outer-layer sleeve and the inner-layer sleeve are open, the bottom ends of the outer-layer sleeve and the inner-layer sleeve are closed, and a closed gap is reserved between the inner-layer sleeve and the outer-layer sleeve. The processing method of the double-layered heater protection sleeve comprises the following operating steps: pouring and molding the inner-layer sleeve, pouring the outer-layer sleeve by adopting the inner-layer sleeve as a pouring mold core, and finally, performing one-step sinter-molding. According to the double-layered heater protection sleeve, the thermal shock resistance of the heater protection sleeve of aluminium processing degassing equipment is greatly improved, and the service life of the sleeve is obviously prolonged.

Description

A kind of double boiler protection sleeve pipe and processing method
Technical field
The present invention relates in aluminum processing industry, it is used for the heater protecting accessory that degassing apparatus is equipped with, it is specifically a kind of double-deck Heater protecting sleeve pipe and processing method.
Background technology
Lead to common heater heat treated aluminium liquid in aluminum processing industry, the degasification tank body of degassing apparatus, outside heater Portion is generally with protection casing protection, it is to avoid heater directly contact aluminium liquid.
Traditional heater protecting sleeve pipe is processed by the way of monolayer cast, but this monolayer heater is protected The protecting pipe usual life-span is shorter, mainly protects sleeve pipe localized crackses, the aluminum of jacket exterior occur after being frequently subjected to thermal shock Liquid is penetrated into by crackle and cause in sleeve pipe heater short circuit and burn;Double shielding sleeve pipe is double-decker, works as outer layer sleeve When being subjected to thermal shock and cracking, aluminium liquid is penetrated between set outer tube layer and internal layer by crackle, starts afterwards to condense, for Inner layer sleeve will not constitute thermal shock, and set inner tube layer is also not in that crackle causes aluminising, finally extends the use longevity of sleeve pipe Life.
The content of the invention
The technical problem to be solved is to provide a kind of double boiler protection sleeve pipe and processing method, adds this Hot device protection sleeve pipe had both met use requirement, also improved the service life of protection sleeve pipe.
The present invention solves above-mentioned technical problem with following technical scheme:
A kind of double boiler protective case of the present invention, it is made up of inner layer sleeve and outer layer sleeve, and outer layer sleeve is enclosed within interior The periphery of layer sleeve pipe, the top of outer layer sleeve and inner layer sleeve is opening, and bottom is blind end, and inner layer sleeve and outer layer jacket Closing gap is left between pipe.
The processing method of double boiler protective case of the present invention, it includes following operating procedure:
1) inner layer sleeve mould and castable prepare:Ready ferrule mold is fixed on into bumper by bundling belt On, and get out the cast raw material of sleeve pipe;
2) inner layer sleeve castable batch mixing:Routinely the cast raw material of sleeve pipe is mixed;
3) inner layer sleeve vibration casting molding:
1. bumper is opened, routinely requires to adjust vibration frequency, start slow cast, poring rate per kilogram material is many In 5 minutes,
2. after slurry cast terminates, vibrations are continued less than 10 minutes, cast vibrations must be able to see slurry,
3. mould bundling belt is unclamped, uses doctor blade casting area;
4) inner layer sleeve standing, health preserving, the demoulding:
1. the inner layer sleeve of casting complete keeps standing and solidifying 24 hours at room temperature, starts the demoulding afterwards.
2. the inner layer sleeve health preserving after demoulding 2-3 days;
5) with inner layer sleeve as core rod, outer layer sleeve external mold is installed;
1. the inner layer sleeve that health preserving terminates is used for the core rod for making outer layer sleeve mould;
2. inner layer sleeve is fixed, the flexible graphite paper of one layer of 0.2mm is wrapped in the outer surface and outer bottom of inner layer sleeve, use Transparent adhesive tape is fixed;
3. inspection qualified outer layer sleeve mould is enclosed within inner layer sleeve and is fixed on bumper together;
6) outer layer sleeve castable batch mixing:By step 2) operation by castable batch mixing;
7) outer layer sleeve vibration casting:By step 3) operation carry out vibration casting;
8) outer layer sleeve stands health preserving:By step 4) operation carry out standing health preserving;
9) double shielding sleeve pipe is integral sintered:Requirement is instructed to be sintered by industry.
The present invention inner layer sleeve adopt vibration casting molding, outer layer sleeve with inner layer sleeve as core rod vibration casting into Type, and make between inner layer sleeve and outer layer sleeve, to form one layer of very thin gap, using double boiler protection pipe of the present invention, High degree improves the performance of heater protecting sleeve pipe heat shock resistance, extends the service life of protection sleeve pipe, final to improve The labor intensity improve production efficiency of client.
Description of the drawings
Fig. 1 is the structural representation of double shielding sleeve pipe of the present invention.
Fig. 2 is the process chart of the inventive method.
Specific embodiment
Below in conjunction with the accompanying drawings technical scheme is described further:
As shown in figure 1, double boiler protective case of the present invention, it is made up of inner layer sleeve 1 and outer layer sleeve 2, outer layer jacket It is opening that pipe 2 is enclosed within the top of the periphery of inner layer sleeve 1, outer layer sleeve 2 and inner layer sleeve 1, and bottom is blind end, and internal layer Gap is left between sleeve pipe and outer layer sleeve, and inner layer sleeve is connected for closed with the top of outer layer sleeve.
The work flow of double boiler protective case of the present invention as shown in Figure 2, specifically includes following operating procedure:
1) inner layer sleeve mould and castable prepare
Operator get Jing and check qualified inner layer sleeve mould, are fixed on bumper by bundling belt, and are prepared Pour into a mould well raw material, the castable that double boiler protection sleeve pipe is used is SiC, operator are according to actually pouring fluence and material is supplied The amount of water requirement that business provides is answered to weigh powder body material and water.
2) inner layer sleeve castable batch mixing
The powder body material for weighing up is put into into blender, is stirred a few minutes in advance, is gradually added into water, stir when adding water, always stir The time is mixed less than 15 minutes.
3) inner layer sleeve vibration casting molding
1. bumper is opened, routinely requires to adjust vibration frequency, start slow cast, poring rate about per kilogram material No less than 5 minutes.
2. after slurry cast terminates, then shake less than 10 minutes, cast vibrations must be able to see slurry.
3. mould bundling belt is unclamped, uses doctor blade casting area.
4) inner layer sleeve stands health preserving, the demoulding
1. the inner layer sleeve of casting complete keeps standing and solidifying at room temperature.
2. inner layer sleeve stands and can start the demoulding after solidifying 24 hours, demoulding specific purpose tool micro- loose spiral shell in order Mother, lays down stress, is turning on mold-locked nut successively.
3. after the demoulding, bushing outer surface is wiped with cotton, such as phaneropore need to be repaired with body castable.
4. the necessary health preserving of inner layer sleeve after demoulding 2-3 days.
5) with inner layer sleeve as core rod, outer layer sleeve external mold is installed
1. the inner layer sleeve that health preserving terminates is used for the core rod for making outer layer sleeve mould.
2. inner layer sleeve is fixed, the flexible graphite paper of one layer of 0.2mm is wrapped in the outer surface and outer bottom of inner layer sleeve, use Transparent adhesive tape is fixed.
3. inspection qualified outer layer sleeve mould is enclosed within inner layer sleeve and is fixed on bumper together.
6) outer layer sleeve castable batch mixing
With step 2) operation it is identical.
7) outer layer sleeve vibration casting
By step 3) inner layer sleeve pouring section is operated, and doctor blade casting area is used, make inner layer sleeve and outer layer Closed connecting is formed on the top of sleeve pipe.
8) outer layer sleeve stands health preserving
With step 4) operation it is identical.
9) double shielding sleeve pipe is integral sintered
The double shielding sleeve pipe reference of casting complete《Refractory material sintering process is guided》It is sintered, it is soft in sintering process Property graphite paper be burned off so that gap is formed between inner layer sleeve and outer layer sleeve, and for closed.
Double boiler protection sleeve pipe of the present invention protects the comparison of sleeve pipe with conventional monolayers, is shown in Table 1:
Table 1
Project Double shielding sleeve pipe of the present invention Conventional monolayers protect sleeve pipe
Molding mode Moulding by casting twice One-time cast-forming
Shaping characteristic Molding is once sintered twice, and technique is more complicated One-shot forming is once sintered, and technique is simpler
Service life 4-6 month or so 2-3 month or so

Claims (1)

1. a kind of double boiler protective case, it is characterised in that it is made up of inner layer sleeve and outer layer sleeve, and outer layer sleeve is enclosed within The top of the periphery of inner layer sleeve, outer layer sleeve and inner layer sleeve is opening, and bottom is blind end, and inner layer sleeve and outer layer Closing gap is left between sleeve pipe;
The processing method of the double boiler protective case includes following operating procedure:
1) inner layer sleeve mould and castable prepare:Ready ferrule mold is fixed on bumper by bundling belt, and Get out the cast raw material of sleeve pipe;
2) inner layer sleeve castable batch mixing:Routinely the cast raw material of sleeve pipe is mixed;
3) inner layer sleeve vibration casting molding:
1. bumper is opened, routinely requires to adjust vibration frequency, start slow cast, poring rate per kilogram material is no less than 5 Minute,
2. after slurry cast terminates, vibrations are continued less than 10 minutes, cast vibrations must be able to see slurry,
3. mould bundling belt is unclamped, uses doctor blade casting area;
4) inner layer sleeve standing, health preserving, the demoulding;
1. the inner layer sleeve of casting complete keeps standing and solidifying 24 hours at room temperature, starts the demoulding afterwards, 2. after the demoulding Inner layer sleeve health preserving 2-3 days,
5) with inner layer sleeve as core rod, outer layer sleeve external mold is installed;
1. the inner layer sleeve that health preserving terminates is used for the core rod for making outer layer sleeve mould;
2. inner layer sleeve is fixed, and the flexible graphite paper of one layer of 0.2mm is wrapped in the outer surface and outer bottom of inner layer sleeve, with transparent Glue is fixed;
3. inspection qualified outer layer sleeve mould is enclosed within inner layer sleeve and is fixed on bumper together;
6) outer layer sleeve castable batch mixing:By step 2) operation by castable batch mixing;
7) outer layer sleeve vibration casting:By step 3) operation carry out vibration casting;
8) outer layer sleeve stands health preserving:By step 4) operation carry out standing health preserving;
9) double shielding sleeve pipe is integral sintered:Requirement is instructed to be sintered by industry.
CN201510599971.7A 2015-09-16 2015-09-16 Double-layered heater protection sleeve and processing method Active CN105112686B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510599971.7A CN105112686B (en) 2015-09-16 2015-09-16 Double-layered heater protection sleeve and processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510599971.7A CN105112686B (en) 2015-09-16 2015-09-16 Double-layered heater protection sleeve and processing method

Publications (2)

Publication Number Publication Date
CN105112686A CN105112686A (en) 2015-12-02
CN105112686B true CN105112686B (en) 2017-04-12

Family

ID=54660787

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510599971.7A Active CN105112686B (en) 2015-09-16 2015-09-16 Double-layered heater protection sleeve and processing method

Country Status (1)

Country Link
CN (1) CN105112686B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201731757U (en) * 2010-04-23 2011-02-02 福州麦特新高温材料有限公司 Environment-friendly, energy-saving and high-efficient aluminum alloy smelting furnace
CN102506429A (en) * 2011-11-07 2012-06-20 西安交通大学 Immersed gas ceramic inner heater sleeve and preparation method thereof
CN203352828U (en) * 2013-07-30 2013-12-18 丹江口弘源碳化硅有限责任公司 Silicon carbide ceramic galvanized electric heating protective sleeve
CN104654783A (en) * 2015-03-06 2015-05-27 宋振亚 Upper part immersed heating and melting heat-preserving furnace
CN205099738U (en) * 2015-09-16 2016-03-23 派罗特克(广西南宁)高温材料有限公司 Double -deck heater protective case

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201731757U (en) * 2010-04-23 2011-02-02 福州麦特新高温材料有限公司 Environment-friendly, energy-saving and high-efficient aluminum alloy smelting furnace
CN102506429A (en) * 2011-11-07 2012-06-20 西安交通大学 Immersed gas ceramic inner heater sleeve and preparation method thereof
CN203352828U (en) * 2013-07-30 2013-12-18 丹江口弘源碳化硅有限责任公司 Silicon carbide ceramic galvanized electric heating protective sleeve
CN104654783A (en) * 2015-03-06 2015-05-27 宋振亚 Upper part immersed heating and melting heat-preserving furnace
CN205099738U (en) * 2015-09-16 2016-03-23 派罗特克(广西南宁)高温材料有限公司 Double -deck heater protective case

Also Published As

Publication number Publication date
CN105112686A (en) 2015-12-02

Similar Documents

Publication Publication Date Title
KR102249919B1 (en) Method for producing silica-base ceramic core capable of adjusting a thermal expansion coefficient
CN110092645B (en) Composite ceramic substrate and preparation method thereof
CN107021771B (en) Calcium oxide-based ceramic casting mold manufacturing method based on 3D printing technology
CN105478672B (en) A kind of formwork dewaxing fusible pattern centre spinning method and its device of the mouth with plugging device
US8061408B2 (en) Casting method for matrix drill bits and reamers
CN110180991A (en) A kind of precision casting process of the thin-wall aluminum alloy aviation pump housing
CN105112686B (en) Double-layered heater protection sleeve and processing method
CN107138696A (en) A kind of consecutive solidification process unit being used in vacuum smelting equipment and method
CN107140996A (en) A kind of carborundum graphite stalk and preparation method
CN109261901A (en) A kind of process for making shell of easily defeated and dispersed shell
CN205099738U (en) Double -deck heater protective case
CN1394706A (en) Core material for making core of pouring forming process and method for making core by using said core material
JP4421506B2 (en) Intermediate Stoke Manufacturing Method
CN104530716A (en) Hot-vulcanization conducting silicon rubber for transformer casing buffer layers and preparation method thereof
CN101805159B (en) Liquid-state casting fast curing-formed high-temperature resistant pottery clay and moulding technology
JP5062637B2 (en) Intermediate Stoke Manufacturing Method
CN103386703B (en) Forming method for ceramic die core
CN106278194A (en) A kind of manufacture method of long rod pottery
CN103879085A (en) Pure aluminum coated SiC particle reinforced magnesium matrix composite, as well as preparation and application thereof
JP2004174861A (en) Bottomed ceramic tube molding die and its manufacturing method
JP4801222B1 (en) Sliding nozzle plate
CN108246976A (en) A kind of ceramic shell process for dewaxing
CN107716863A (en) A kind of combustion engine turbine bucket casting method
KR101761047B1 (en) Core for precision casting, production method therefor, and mold for precision casting
CN102699286A (en) Casting method of iron casting

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant