CN205099738U - Double -deck heater protective case - Google Patents

Double -deck heater protective case Download PDF

Info

Publication number
CN205099738U
CN205099738U CN201520726357.8U CN201520726357U CN205099738U CN 205099738 U CN205099738 U CN 205099738U CN 201520726357 U CN201520726357 U CN 201520726357U CN 205099738 U CN205099738 U CN 205099738U
Authority
CN
China
Prior art keywords
layer sleeve
sleeve pipe
inner layer
sleeve
double
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520726357.8U
Other languages
Chinese (zh)
Inventor
黎星界
韦雯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pyrotek (guangxi Nanning) High Temperature Material Co Ltd
Original Assignee
Pyrotek (guangxi Nanning) High Temperature Material Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pyrotek (guangxi Nanning) High Temperature Material Co Ltd filed Critical Pyrotek (guangxi Nanning) High Temperature Material Co Ltd
Priority to CN201520726357.8U priority Critical patent/CN205099738U/en
Application granted granted Critical
Publication of CN205099738U publication Critical patent/CN205099738U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipe Accessories (AREA)

Abstract

The utility model discloses a double -deck heater protective case, this dual layer protection sleeve pipe comprises inlayer sleeve pipe and outer sleeve pipe, layer sheathed tube periphery including the outer cover pipe box, outer sleeve pipe and inlayer sheathed tube top are the open end, and the bottom is the blind end, and leaves closed clearance between inlayer sleeve pipe and the outer sleeve pipe. The utility model discloses double -deck heater protection tube greatly improves the thermal shock resistance that the heater protective case of degassing apparatus was processed to aluminium to show extension sheathed tube life.

Description

A kind of double boiler protective casing
Technical field
The utility model relates to for the heater protecting accessory that air-removal equipment is equipped with in aluminium processing industry, specifically a kind of double boiler protective casing and working method.
Background technology
In aluminium processing industry, usually with heater heats process aluminium liquid in the degasification casing of air-removal equipment, the outside of well heater, usually with protective casing protection, avoids well heater directly to contact aluminium liquid.
Traditional heater protecting sleeve pipe is all adopt the mode of individual layer cast to process, but this individual layer heater protecting sleeve pipe usual life-span is shorter, mainly there is localized cracks after frequently suffering thermal shocking in protective casing, and the aluminium liquid of jacket exterior is penetrated in sleeve pipe by crackle and causes well heater short circuit to burn; Double shielding sleeve pipe is bilayer structure; when outer layer sleeve is cracked by thermal shocking; aluminium liquid penetrates between cover outer tube layer and internal layer by crackle; start condensation afterwards; thermal shocking can not be formed for inner layer sleeve; cover inner tube layer also there will not be crackle to cause aluminising, finally extends the work-ing life of sleeve pipe.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of double boiler protective casing and working method, makes this heater protecting sleeve pipe both meet service requirements, also improves the work-ing life of protective casing.
The utility model solves the problems of the technologies described above with following technical scheme:
A kind of double boiler protective sleeve of the utility model; it is made up of inner layer sleeve and outer layer sleeve, and outer layer sleeve is enclosed within the periphery of inner layer sleeve, and the top of outer layer sleeve and inner layer sleeve is opening end; bottom is blind end, and leaves closing gap between inner layer sleeve and outer layer sleeve.
Inner layer sleeve of the present utility model adopts vibration casting shaping; outer layer sleeve is that core rod vibration casting is shaping with inner layer sleeve; and make between inner layer sleeve and outer layer sleeve, to form the very thin gap of one deck; use the utility model double boiler protective tube; high degree improves the performance of heater protecting sleeve pipe heat shock resistance; extend the work-ing life of protective casing, finally improve the labour intensity of client and enhance productivity.
Accompanying drawing explanation
Fig. 1 is the structural representation of the utility model double shielding sleeve pipe.
Fig. 2 is fabrication processing figure of the present utility model.
Embodiment
Below in conjunction with accompanying drawing, the technical solution of the utility model is described further:
As shown in Figure 1; the utility model double boiler protective sleeve; it is made up of inner layer sleeve 1 and outer layer sleeve 2; outer layer sleeve 2 is enclosed within the periphery of inner layer sleeve 1; the top of outer layer sleeve 2 and inner layer sleeve 1 is opening end; bottom is blind end, and leaves gap between inner layer sleeve and outer layer sleeve, and inner layer sleeve is closed connecting with the top of outer layer sleeve.
The work flow of the utility model double boiler protective sleeve as shown in Figure 2, specifically comprises following operation steps:
1) inner layer sleeve mould and mould material prepare
Operator get the inner layer sleeve mould through being up to the standards; be fixed on bumper by bundling belt; and be ready to pour into a mould raw material; the mould material that double boiler protective casing uses is SiC, and operator require to weigh powder body material and water according to the actual amount of water watering fluence and material supplier and provide.
2) inner layer sleeve mould material batch mixing
The powder body material weighed up is dropped into stirrer, stirs several minutes in advance, add water gradually, stir while add waterside, total churning time is no more than 15 minutes.
3) inner layer sleeve vibration casting is shaping
1. open bumper, require routinely to regulate vibration frequency, start slowly to pour into a mould, the about per kilogram material of pouring speed is no less than 5 minutes.
2. after slurry cast terminates, then vibrations are no more than 10 minutes, and cast vibrations must can see slurry.
3. mould bundling belt is unclamped, use doctor blade casting area.
4) inner layer sleeve leaves standstill health, the demoulding
1. the inner layer sleeve of casting complete at room temperature keeps leaving standstill and solidifying.
2. inner layer sleeve leaves standstill and can start the demoulding after solidifying 24 hours, and demoulding special tool is micro-loose nut in order, lays down stress, is turning on mold-locked nut successively.
3. after the demoulding, with cotton wiping sleeve tube outer surface, as phaneropore need be repaired by body mould material.
4. the inner layer sleeve after the demoulding must health 2-3 days.
5) take inner layer sleeve as core rod, outer layer sleeve external mold is installed
1. the inner layer sleeve that terminates of health is for making the core rod of outer layer sleeve mould.
2. fix inner layer sleeve, at the flexible graphite paper of the equal bag one deck 0.2mm of the outside surface of inner layer sleeve and outer bottom, fix with transparent adhesive tape.
3. the outer layer sleeve mould be up to the standards is enclosed within inner layer sleeve and is also fixed on together on bumper.
6) outer layer sleeve mould material batch mixing
With step 2) operation identical.
7) outer layer sleeve vibration casting
By step 3) inner layer sleeve pouring section operates, and uses doctor blade casting area, makes inner layer sleeve form closed connecting with the top of outer layer sleeve.
8) outer layer sleeve leaves standstill health
With step 4) operation identical.
9) double shielding sleeve pipe is integral sintered
The double shielding sleeve pipe of casting complete sinters with reference to " guide of refractory materials sintering process ", and in sintering process, flexible graphite paper is burnt, thus makes to form gap between inner layer sleeve and outer layer sleeve, and is closed.
The utility model double boiler protective casing compares, in table 1 with conventional monolayers protective casing:
Table 1
Project The utility model double shielding sleeve pipe Conventional monolayers protective casing
Molding mode Twice casting One-time cast-forming
Shaping characteristic Twice shaping once sintered, and technique is more complicated Once shaped is once sintered, and technique is simpler
Work-ing life About 4-6 month About 2-3 month

Claims (1)

1. a double boiler protective casing, is characterized in that, it is made up of inner layer sleeve and outer layer sleeve; outer layer sleeve is enclosed within the periphery of inner layer sleeve; the top of outer layer sleeve and inner layer sleeve is opening end, and bottom is blind end, and leaves closing gap between inner layer sleeve and outer layer sleeve.
CN201520726357.8U 2015-09-16 2015-09-16 Double -deck heater protective case Expired - Fee Related CN205099738U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520726357.8U CN205099738U (en) 2015-09-16 2015-09-16 Double -deck heater protective case

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520726357.8U CN205099738U (en) 2015-09-16 2015-09-16 Double -deck heater protective case

Publications (1)

Publication Number Publication Date
CN205099738U true CN205099738U (en) 2016-03-23

Family

ID=55515528

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520726357.8U Expired - Fee Related CN205099738U (en) 2015-09-16 2015-09-16 Double -deck heater protective case

Country Status (1)

Country Link
CN (1) CN205099738U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105112686A (en) * 2015-09-16 2015-12-02 派罗特克(广西南宁)高温材料有限公司 Double-layered heater protection sleeve and processing method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105112686A (en) * 2015-09-16 2015-12-02 派罗特克(广西南宁)高温材料有限公司 Double-layered heater protection sleeve and processing method
CN105112686B (en) * 2015-09-16 2017-04-12 派罗特克(广西南宁)高温材料有限公司 Double-layered heater protection sleeve and processing method

Similar Documents

Publication Publication Date Title
CN104086161B (en) The preparation method of the silicon-base ceramic core of a kind of adjustable thermal expansivity
CN103722127B (en) A kind of rapid investment casting method based on photocuring (SL)
CN103706760B (en) A kind of casting method of meat grinder top cover
CN105127373B (en) A kind of double wall hollow blade preparation method of hollow ceramic core
CN110076292A (en) A kind of investment casting method of duplex block cast directional solidification turborotor
CN1827256A (en) Method for direct production of core in narrow groove and blind hole of wax mould
CN108672693A (en) A kind of sealing structure and method using the submersed nozzle containing expanded graphite meterial
CN105478672B (en) A kind of formwork dewaxing fusible pattern centre spinning method and its device of the mouth with plugging device
CN104384452A (en) Preparation technique for thin-walled silica-based ceramic mold core
CN105855468A (en) Ceramic shell manufacturing method and method for manufacturing ceramic shell of turbine blade
CN109534837B (en) Silicon carbide coated graphite sagger and manufacturing process thereof
CN106244953A (en) A kind of connection filters flange efficiently
CN109093072B (en) Casting process of turbine blade for gas turbine
CN106853508A (en) A kind of method for preventing ceramic shell cracking
CN205099738U (en) Double -deck heater protective case
CN111069539A (en) Casting process of impeller of large dredge pump
CN106216636B (en) A kind of AlMg3 aluminium alloy vanes tip arrester low-pressure casting method
CN111203514A (en) Precision casting method for high-temperature alloy complex thin-wall casting
CN107695295A (en) A kind of casting processing method of fusible pattern
CN105112686A (en) Double-layered heater protection sleeve and processing method
CN101805159B (en) Liquid-state casting fast curing-formed high-temperature resistant pottery clay and moulding technology
CN201572914U (en) Baking-free submersed nozzle made of aluminum/zirconium/carbon
CN114799064B (en) Aluminum alloy processing equipment and processing method
CN103658537B (en) A kind of formwork preparation method of casting cutter with 4Cr13
CN103386703B (en) Forming method for ceramic die core

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160323

Termination date: 20190916