CN105076522A - Roasted green tea production system with secondary fixation function - Google Patents

Roasted green tea production system with secondary fixation function Download PDF

Info

Publication number
CN105076522A
CN105076522A CN201510552054.3A CN201510552054A CN105076522A CN 105076522 A CN105076522 A CN 105076522A CN 201510552054 A CN201510552054 A CN 201510552054A CN 105076522 A CN105076522 A CN 105076522A
Authority
CN
China
Prior art keywords
tealeaves
green
air
tea
bucket body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510552054.3A
Other languages
Chinese (zh)
Inventor
王传财
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing informed investment home intellectual property rights Operation Co., Ltd.
Original Assignee
王传财
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王传财 filed Critical 王传财
Priority to CN201510552054.3A priority Critical patent/CN105076522A/en
Publication of CN105076522A publication Critical patent/CN105076522A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a roasted green tea production system with a secondary fixation function. A microwave fixation device comprises a third box and a third conveying belt, wherein an air collection plate and an air distribution plate are horizontally arranged in the third box and both adopt pore plates; microwave generators are arranged between the third conveying belt and the air distribution plate; air collection ports and air supply outlets are formed in the upper top wall and the lower bottom wall of the third box respectively and are connected through an air supply pipeline; a dehumidifier and a third fan are arranged on the air supply pipeline. According to the technical scheme, the microwave fixation device and a roller fixation device are jointly utilized, so that tea leaves are cleaned and subjected to primary fixation for color setting during blanch fixation; the roller fixation device is used for performing primary fixation to facilitate tea fragrance forming and non-enzymic chemical reaction, the tea soup quality is improved and becomes mellow and fresh, and meanwhile, the tea acquires chestnut fragrance; the microwave fixation device is used for performing secondary fixation and used for enhancing and retaining tea color, and accordingly, the color of finished tea is dark green, smooth and bright.

Description

The production system that roasted green tea secondary completes
Technical field
The present invention relates to Tea Production apparatus field, be specifically related to the production system that a kind of roasted green tea secondary completes.
Background technology
Yuexi abounds with green tea, wherein famous with Yuexi Cuilan tea, tealeaves latter stage is belonged to after 1 month Ching Ming Festival, the fresh tea leaf now grown is larger, pluck for tealeaves be bud two, three leaf or to folder one, two leaf, tea leaf quality is not in early stage tea leaf quality, and this type of tea grass is mainly used in making roasted green tea, and there are the following problems for the production of current Yuexi green tea:
1, because Urbanization Construction is implemented and the discharge of industrial waste gas, boundless and indistinct in air have a large amount of dusts and harmful substance, these harmful substances meeting sedimentation is attached on the surface of tea tree tender leaf, tender leaf is directly processed after being plucked, and people do not carry out cleaning (specialty sample tea except), therefore a large amount of harmful substance is drunk.At present, scald green grass or young crops and operate in the new process for processing of Yuexi Cuilan tea by adopting, to wash away the harmful substance on tealeaves surface, but boiling hot blue or green equipment used at present also cannot realize the abundant cleaning of tealeaves and tealeaves to carry out evenly scalding blue or green.
2, in modern streamline Tea Production system, general employing cylinder completes to tealeaves, but easily there is the phenomenon of complete uneven, red stalk, Jiao Bianjiaoye in roller fixation, affect the quality of finished tea, also the technique adopting microwave de-enzyming to carry out alternative roller fixation is had, although microwave de-enzyming is even, but the brewed millet paste of its obtained finished tea is not as the mellow of roller fixation and freshly feel well, that is the poor quality of millet paste, be therefore necessary to take into account both that improve tea product and millet paste and a kind of mode that completes newly is provided.
Summary of the invention
Object of the present invention is just to provide the production system that a kind of roasted green tea secondary completes, and it at least effectively can solve an above-mentioned problem, promotes the quality of tealeaves.
The production system that a kind of roasted green tea secondary completes, it is characterized in that: comprise the boiling hot blue or green device for carrying out scalding green grass or young crops to tealeaves be connected sequentially, for the airing device dried tealeaves, for carrying out the roller fixation device that one-level completes to tealeaves, for carrying out the first spreading for cooling device of one-level spreading for cooling to tealeaves, for carrying out the microwave green-killing device that secondary completes to tealeaves, for the kneading machine kneaded tealeaves, for the roasting machine stir-fried to tealeaves, and the drying unit for drying tealeaves, microwave green-killing device comprises the 3rd casing and runs through the 3rd casing carries out horizontal feed the 3rd conveyer belt to tealeaves, horizontally disposed air gathering plate and air distribution plate is provided with in 3rd casing, air gathering plate and air distribution plate are placed in the upper and lower side of the 3rd conveyer belt, air gathering plate and air distribution plate are orifice plate and form, 3rd is provided with microwave generator between conveyer belt and air distribution plate, the upper roof of the 3rd casing and lower diapire arrange collection air port and air outlet respectively, be connected by air delivery pipe between collection air port and air outlet, air delivery pipe be provided with dehumidifier and the 3rd blower fan, scald blue or green device and comprise vertical shape layout for adding the hopper of tealeaves and installing the frame of hopper, the annular element that hopper is arranged by bucket body and bucket body top is formed, internal face at the bottom of the bucket of bucket body is hemispheric arcwall face, the center of curvature of arcwall face is positioned at hopper oral area side, the lowest part of arcwall face is provided with discharging interface, bucket body rotates around its heart yearn and is fixed in frame, bucket body is connected with its first driving mechanism carrying out rotating of driving, the bottom of annular element and the top of bucket body form to be rotatably assorted around the heart yearn of bucket body and are connected, the downside of hopper is provided with boiling hot blue or green carrier pipe, the upper end charging mouth of pipe and the discharging interface that scald blue or green carrier pipe form to be rotatably assorted around the heart yearn of bucket body and are connected, boiling hot blue or green carrier pipe and annular element are fixed in frame, annular heat water cavity is provided with in annular element, the internal face of annular element sets out water hole along its circumferential uniform intervals, the bucket chamber of hopper to be connected with annular heat water cavity by apopore and to be connected.
In technique scheme, by being used in conjunction of microwave green-killing device and roller fixation device, when scalding blue or green, cleaning is carried out to tealeaves and elementary completing carries out fixation; Roller fixation carries out one-level and completes shaping for tea aroma and promote non-enzymatic chemical reaction, promotes millet paste quality, makes millet paste mellow, fresh refreshing, makes tealeaves develop into Li Xiang simultaneously; Microwave de-enzyming carries out secondary and completes, and carries look and Bao Se for tealeaves, make the color of finished tea dark green, moisten bright.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention;
Fig. 2 is the structural representation of microwave de-enzyming machine;
Fig. 3 is the structural representation of boiling hot blue or green machine;
Fig. 4 is A place enlarged diagram;
Fig. 5 is the structural representation of boiling hot blue or green carrier pipe;
Fig. 6 is the schematic diagram of foraminous conveyer feed end;
Fig. 7 is inner bellows structural representation;
Fig. 8 is the schematic diagram of foraminous conveyer discharge end;
Fig. 9 is the structural representation of cloth materials and parts;
Figure 10 is that hot water circuit utilizes schematic diagram.
Detailed description of the invention
In order to make objects and advantages of the present invention clearly understand, below in conjunction with embodiment, the present invention is specifically described.Should be appreciated that following word only in order to describe one or more concrete embodiments of the present invention, considered critical is not carried out to the protection domain that the present invention specifically asks." heart yearn " described below all refers to the center line of these parts.
The invention provides a kind of green tea production equipment, as shown in Figure 1, comprise the boiling hot blue or green device 10 for carrying out scalding green grass or young crops to tealeaves be connected sequentially, for the airing device 20 dried tealeaves, for carrying out the roller fixation device 50 that one-level completes to tealeaves, for carrying out the first spreading for cooling device 41 of one-level spreading for cooling to tealeaves, for carrying out the microwave green-killing device W10 that secondary completes to tealeaves, for the kneading machine 60 kneaded tealeaves, for the roasting machine 90 stir-fried to tealeaves, and the drying unit 70 for drying tealeaves.Roasting machine 90 is drum-type tea roasting machine, and roller fixation device 50, kneading machine 60, drying unit 70 all can adopt the existing tea machine equipment with identical function to use, and between neighboring devices, tealeaves conveying can adopt conveyer belt and/or manually transport.By being used in conjunction of microwave green-killing device W10 and roller fixation device 50, when scalding blue or green, cleaning being carried out to tealeaves and elementaryly to complete, fixation is carried out to tealeaves; The roller fixation one-level of carrying out in short-term completes shaping for tea aroma and promotes non-enzymatic chemical reaction, promotes millet paste quality, makes millet paste mellow, fresh refreshing, makes tealeaves odor type develop into Li Xiang shape simultaneously; Microwave de-enzyming carries out secondary and completes, and carries look and Bao Se for tealeaves, make the color of finished tea dark green, moisten bright.Microwave green-killing device specifically adopts as shown in Figure 2, comprise the 3rd casing and run through the 3rd casing carries out horizontal feed the 3rd conveyer belt W11 to tealeaves, horizontally disposed air gathering plate W13 and air distribution plate W14 is provided with in 3rd casing, air gathering plate W13 and air distribution plate W14 is placed in the upper of the 3rd conveyer belt W11, downside, air gathering plate W13 and air distribution plate W14 is orifice plate and forms, microwave generator W12 is provided with between 3rd conveyer belt W11 and air distribution plate W14, the upper roof of the 3rd casing and lower diapire arrange collection air port W15 and air outlet W16 respectively, be connected by air delivery pipe between collection air port W15 and air outlet W16, air delivery pipe is provided with dehumidifier and the 3rd blower fan.Due to when microwave de-enzyming, the moisture in tealeaves can distribute, and is therefore extracted to remove by the steam of generation by arranging the 3rd blower fan, simultaneously by dried hot-air delivering in the 3rd casing, economize energy and promote the dehydration rate of tealeaves.Microwave generator W12 is arranged between the 3rd conveyer belt W11 and air distribution plate W14 in addition, steam can be avoided the impact of circuit, guarantee equipment reliability of operation and increasing the service life, the 3rd conveyer belt W11 selects the plastics guipure of food-grade to form, avoids absorbing microwave and guarantee food security.
Scald blue or green device 10 as Fig. 3, shown in 4, comprising vertical shape arranges for adding the hopper 12 of tealeaves and installing the frame 11 of hopper 12, the annular element 121 that hopper 12 is arranged by bucket body 122 and bucket body 122 top is formed, internal face at the bottom of the bucket of bucket body 122 is hemispheric arcwall face, the center of curvature of arcwall face is positioned at hopper 12 oral area side, the lowest part of arcwall face is provided with discharging interface 122a, bucket body 122 rotates around its heart yearn and is fixed in frame 11, bucket body 122 is connected with its first driving mechanism carrying out rotating of driving, the bottom of annular element 121 and the top of bucket body 122 form to be rotatably assorted around the heart yearn of bucket body 122 and are connected, the downside of hopper 12 is provided with boiling hot blue or green carrier pipe 13, the upper end and the discharging interface 122a that scald blue or green carrier pipe 13 form to be rotatably assorted around the heart yearn of bucket body 122 and are connected, boiling hot blue or green carrier pipe 13 and annular element 121 are fixed in frame 11, annular heat water cavity 121b is provided with in annular element 121, annular heat water cavity 121b is connected with hot-water cylinder and is connected, the internal face of annular element 121 sets out water hole 121a along its circumferential uniform intervals, the bucket chamber of hopper 12 to be connected with annular heat water cavity 121b by apopore 121a and to be connected.
Scald in blue or green device 10 by tealeaves being dropped in hopper 12, because the first driving mechanism drives bucket body 122 together to rotate, the tealeaves fallen into like this in bucket body 122 will enter boiling hot blue or green carrier pipe 13 with hot water is together spiral helicine from discharging interface 122a outflow, tealeaves can not be detained in bucket body 122, ensure that all tealeaves can enter boiling hot blue or green carrier pipe 13 fast, the every sheet tealeaves entering boiling hot blue or green carrier pipe 13 is all surrounded by hot water and evenly carries out scalding green grass or young crops, thus improve boiling hot blue or green effect and shorten the boiling hot blue or green time, above-mentioned boiling hot blue or green machine is adopted to carry out scalding green grass or young crops to tealeaves, the time that tealeaves scalds green grass or young crops only needs 50 ~ 60s, avoid tealeaves to cross like this and scald blue or green and owe boiling hot blue or green, improve the color and luster of tealeaves and avoid the stripping of the benefit materials such as Tea Polyphenols, promote tea matter.
Tealeaves scalds the blue or green time can by arranging the boiling hot length of blue or green carrier pipe 13 and the flow velocity of hot water controls, and it is consistent with the optimal transport flow in boiling hot blue or green carrier pipe 13 that the hot water in hopper 12 injects flow.From boiling hot blue or green carrier pipe 13 lower end, out tealeaves is separated by foraminous conveyer (screen cloth) with hot water, and after being separated, tealeaves dries rapidly and carries out next step operation.
Further scheme is, as shown in Figure 4: bucket body 122 upper surface be arranged to step-like, comprise first and second table top of arranging in the horizontal direction and between first and second table top along the first terrace that vertical is arranged; That the lower end of annular element 121 is arranged to and bucket body 122 upper surface matches is step-like, comprise third and fourth table top of arranging in the horizontal direction and between third and fourth table top along the second terrace that vertical is arranged; The height of the first table top is greater than the height of the second table top and is positioned at the outside of the second table top, first and third table top offers cannelure respectively, be arranged with for forming the ball assembly 122c being rotatably assorted and connecting in cannelure, the bearing assembly forming and be rotatably assorted and connect is provided with between first and second terrace, second table top is provided with the annular protrusion 122a protruding from its surface, 4th table top is offered the annular groove for accommodating annular protrusion 122a, bucket body 122 headwall between annular protrusion 122a and the first terrace offers outage 122b.Scalding blue or green carrier pipe 13 is that spiral helicine insulating tube is formed, as shown in Figure 5.Need owing to being rotatably assorted to inject lubricating oil, there is seam between annular element 121 and bucket body 122, lubricating oil can flow in bucket body 122 from seam, pollutes tealeaves; In addition, the hot fog that hot water distributes also can condensation in the joint, therefore by such scheme, lubricating oil stop by annular protrusion 122a, avoid lubricant pollution tealeaves, the oil droplet dripped in seam and the water of condensation will be discharged from outage 122b.Spiral helicine insulating tube can reduce the length of boiling hot blue or green carrier pipe 13, avoids tealeaves to block in boiling hot blue or green carrier pipe 13.In addition, can arrange gripper shoe at the periphery wall of bucket body 122, gripper shoe is set up and is fixed in frame 11, gripper shoe consists of to be rotatably assorted with frame 11 ball connector and is connected, first driving mechanism can be motor and forms, and bucket body 122 is connected with motor by belt, and motor drives bucket body 122 to rotate.
For airing device 20, its technical scheme taked is as Fig. 6, 7, shown in 8, airing device 20 comprises horizontally disposed foraminous conveyer, feed end and the corresponding layout of the lower end discharging mouth of pipe 131 of scalding blue or green carrier pipe 13 of foraminous conveyer, scalding to be provided with between blue or green carrier pipe 13 and foraminous conveyer makes tealeaves evenly drop down onto cloth materials and parts 24 on foraminous conveyer along the bandwidth direction of foraminous conveyer, the middle part of foraminous conveyer is positioned at bellows 25, and foraminous conveyer comprises, first of lower layout, two guipures 21, 22, first, two guipures 21, water leg 23 is provided with between 22, water leg 23 layout corresponding with the blanking port of cloth materials and parts 24, bellows 25 are that the casing of strip is formed, the vacancy portion passed for foraminous conveyer is offered at the two ends of casing, the bottom of bellows 25 arranges air inlet pipe interface 251, the top of bellows 25 sets out air pipe interface 252, horizontally disposed air distribution plate 253 and gas collection plate 254 is also provided with in bellows 25, air distribution plate 253 and gas collection plate 254 are orifice plate and form, gas collection plate 254 is positioned at the upside of the first guipure 21, air distribution plate 253 is positioned at the downside of the second guipure 22, in bellows 25 first, two guipures 21, also first is provided with between 22, two tracheae 20a, 20b, first, two tracheae 20a, 20b lays respectively at two edge (two edge of throughput direction) of foraminous conveyer and arranges (that is first respectively along the throughput direction of foraminous conveyer, two tracheae 20a, the length direction of 20b is consistent with the throughput direction of foraminous conveyer), first, two tracheae 20a, the pipe shaft of 20b is arranged at intervals with the first air nozzle, the outgassing direction of the first air nozzle points to the middle part of foraminous conveyer obliquely, and first, two guipures 21, the 3rd tracheae 20c is also provided with between 22, 3rd tracheae 20c is positioned at the discharge end of foraminous conveyer and the width along foraminous conveyer is arranged, the pipe shaft of the 3rd tracheae 20c is arranged at intervals with the second air nozzle, the outgassing direction of the second air nozzle points to the side away from foraminous conveyer obliquely, air inlet pipe interface 251 and first, two, three tracheaes are all connected with the air outlet of the second blower fan.
Drop down onto on foraminous conveyer because tealeaves can not directly impact, therefore needing, cloth materials and parts 24 are set and carries out buffering cloth, prevent tealeaves impaired and tealeaves is evenly arranged at the bandwidth direction of foraminous conveyer.By passing into thermal current in the air inlet mouth of pipe aweather case 25, thermal current makes the tealeaves of foraminous conveyer stir dehydration by being uniformly distributed of cloth materials and parts, makes tealeaves rapid airing.The setting of first and second tracheae 20a, 20b be drop and increase tealeaves when preventing tealeaves from stirring on the first guipure from the edge of guipure stir effect, shorten tealeaves flash-off time.The air-flow that 3rd air nozzle is formed can make tealeaves depart from from foraminous conveyer, enters subsequent processing.As arranged the first conveyer belt 26 at the blanking end of foraminous conveyer, the upper strata belt body of the first conveyer belt 26 takes the shape of the letter U, first conveyer belt 26 and foraminous conveyer interlaced arrangement, the tealeaves fallen from foraminous conveyer like this drops down onto in the first conveyer belt 26, is delivered to subsequent processing carries out other and operate by the first conveyer belt 26.
Concrete is operating as, as shown in Figure 9, cloth materials and parts 24 comprise the coaming plate 243 of drapery panel and the setting of drapery panel periphery, drapery panel is that a folding shape plate body is formed, the height of folding shape plate body reduces gradually along the throughput direction of foraminous conveyer, the width of folding shape plate body increases gradually along the throughput direction of foraminous conveyer, folding shape plate body comprises the first plate body 241 and the second plate body 242 that the throughput direction along foraminous conveyer is arranged successively, second plate body 242 is arranged to concordant blade-like compared with the side of low side, second plate body 242 is 3 ~ 5 ° with angle formed by horizontal plane, first plate body 241 is 5 ~ 8 ° with angle formed by horizontal plane, scald the lower end charging mouth of pipe and the corresponding layout of the first plate body 241 of blue or green carrier pipe 13, the boiling hot blue or green heart yearn of the carrier pipe 13 lower end discharging mouth of pipe 131 and the angle of the first plate body 241 are 8 ~ 10 °, scald the lower end discharging mouth of pipe 131 of blue or green carrier pipe 13 and be arranged to horn-like (that is the lower end discharging mouth of pipe 131 be arranged to cross section that is horn-like and the lower end discharging mouth of pipe 131 be elliposoidal) that cross section is elliposoidal.Above-mentioned drapery panel can make tealeaves be uniformly distributed along the width of foraminous conveyer, improves follow-up tealeaves and dries effect.The control of above-mentioned angle is necessary, its can make tealeaves smooth-going drop down onto on foraminous conveyer, prevent tealeaves and foraminous conveyer from clashing into, tealeaves is made to be stuck in mesh interior or broken, found by great many of experiments optimization, adopt above-mentioned angle to implement, the breakage rate of tealeaves can be down to less than 0.8%, greatly improves tea leaf quality.Cloth materials and parts 24 are by connector and support Joint.
Because tealeaves is in boiling hot blue or green process, the impurity on tealeaves surface and pesticide residue can be in the hot water molten, in order to energy-conservation, general hot water and thermal current repeat to recycle, therefore, the present invention adopts scheme as shown in Figure 10 to implement: the delivery port of water leg 23 is connected with rough filtering device 10A, the delivery port of rough filtering device 10A is connected with organic matter removal device 10B, the delivery port of organic matter removal device 10B is connected with heater 10C, the delivery port of heater 10C is connected with hot-water cylinder 10D, and the delivery port of hot-water cylinder 10D is connected with hot-water line and is connected; The escape pipe interface of bellows is connected with the first blower fan 20A, the gas outlet of the first blower fan is connected with dehydrating unit 20B, the gas outlet of dehydrating unit 20B is connected with heater 20C, the gas outlet of heater 20C is connected with the second blower fan 20D, and the gas outlet of the second blower fan 20D is connected with the air inlet pipe interface of bellows.Rough filtering device 10A can be general net filtration device, and for removing some larger impurity, organic matter removal device 10B is mainly used for removing the pesticide residue in water body, can be charcoal absorption filter or other conventional pesticides removal devices; Heater 10C heats hot water, makes the water temperature of hot water meet tealeaves and scalds blue or green demand, realized the conveying of hot water between rough filtering device 10A, organic matter removal device 10B, heater 10C, hot-water cylinder 10D, hopper by the pump housing.Thus realize energy-conservation basis ensureing scalding continuously of tealeaves is blue or green.Dehydrating unit 20B for removing the moisture in thermal current, the demand that heater 20C dries to meet tealeaves for the temperature improving thermal current.
All spreading for cooling devices all can adopt bamboo plaque to form.
The concrete technology adopting the said equipment to produce green tea is:
A kind of roasted green tea production technology, comprises the following steps:
Spread: the fresh leaf of first exhibition (bud two, three leaf, to folder one, two leaf) plucked is positioned over spread and device spreads until tealeaves color starts to turn dark, spread in process and stir fresh leaf;
Scald blue or green: the tealeaves after spreading is dropped into boiling hot blue or green process 55 ~ 60s in boiling hot blue or green device, and controlling hot water temperature is 95 ~ 98 DEG C, after boiling hot green grass or young crops, tea leaf conveying is delivered to airing device and dries;
One-level completes: after drying, tealeaves is put into roller fixation machine 140 ~ 150 DEG C of one-levels and to complete process 2.5 ~ 3min;
, there is non-enzymatic chemical reaction in spreading for cooling: the tealeaves after one-level being completed is put on the first spreading for cooling device, and room temperature spreading for cooling 5 ~ 8min, makes tealeaves recover, development odor type and fragrance;
Secondary completes: the tea leaf conveying after spreading for cooling is delivered to microwave green-killing device and carry out secondary and complete, secondary fixation time 2 ~ 2.2min, power 12KW (microwave output power);
Post processing: by tea spreading-and-cooling after secondary completes, then be placed in kneading machine and carry out kneading operation, knead operation to terminate manually to deblock afterwards, tealeaves after deblocking drops into roasting machine 100 ~ 110 DEG C stir-fry and is down to less than 35% to tealeaves moisture content, room temperature spreading for cooling 5 ~ 10min on baking bed is first spread after tealeaves fried dry, and then baking bed to be pushed in drying unit 90 ~ 100 DEG C by drying tea leaves, dry and after terminating, tealeaves to be taken out cooling and to get product roasted green tea;
Knead operation and comprise following sequentially operation: first time kneads 10min without pressure, and second time kneads 5min without pressure, third time light kneadding sth. made by twisting 5min, the 4th time weight kneads 2min, and the 5th time total head kneads 2min, kneads 5min the 6th time without pressure.Light pressure applied pressure is P1, and weight applied pressure is P2, and total head applied pressure is P3, P2=1.5P1, P3=1.2P2, kneads at every turn and to stir tealeaves afterwards, and applied pressure is specifically determined according to the model of kneading machine and tealeaves dosage, tea leaf quality.Adopt and above-mentionedly knead operation, the bar shaped of its tealeaves is good, and millet paste is more mellow strong.
The green tea that above-mentioned technique is produced, the curling tight knot of bar shaped, the verdant profit of color and luster is bright, and fragrant high lasting, soup look dark green is bright, and millet paste flavour is strong, is fine work in fried green.
The above is only the preferred embodiment of the present invention; should be understood that; for those skilled in the art; to know in the present invention after contents; under the premise without departing from the principles of the invention; can also make some equal conversion to it and substitute, these convert on an equal basis and substitute and also should be considered as belonging to protection scope of the present invention.

Claims (2)

1. the production system that completes of a roasted green tea secondary, it is characterized in that: comprise the boiling hot blue or green device for carrying out scalding green grass or young crops to tealeaves be connected sequentially, for the airing device dried tealeaves, for carrying out the roller fixation device that one-level completes to tealeaves, for carrying out the first spreading for cooling device of one-level spreading for cooling to tealeaves, for carrying out the microwave green-killing device that secondary completes to tealeaves, for the kneading machine kneaded tealeaves, for the roasting machine stir-fried to tealeaves, and the drying unit for drying tealeaves, microwave green-killing device comprises the 3rd casing and runs through the 3rd casing carries out horizontal feed the 3rd conveyer belt to tealeaves, horizontally disposed air gathering plate and air distribution plate is provided with in 3rd casing, air gathering plate and air distribution plate are placed in the upper and lower side of the 3rd conveyer belt, air gathering plate and air distribution plate are orifice plate and form, 3rd is provided with microwave generator between conveyer belt and air distribution plate, the upper roof of the 3rd casing and lower diapire arrange collection air port and air outlet respectively, be connected by air delivery pipe between collection air port and air outlet, air delivery pipe be provided with dehumidifier and the 3rd blower fan, scald blue or green device and comprise vertical shape layout for adding the hopper of tealeaves and installing the frame of hopper, the annular element that hopper is arranged by bucket body and bucket body top is formed, internal face at the bottom of the bucket of bucket body is hemispheric arcwall face, the center of curvature of arcwall face is positioned at hopper oral area side, the lowest part of arcwall face is provided with discharging interface, bucket body rotates around its heart yearn and is fixed in frame, bucket body is connected with its first driving mechanism carrying out rotating of driving, the bottom of annular element and the top of bucket body form to be rotatably assorted around the heart yearn of bucket body and are connected, the downside of hopper is provided with boiling hot blue or green carrier pipe, the upper end charging mouth of pipe and the discharging interface that scald blue or green carrier pipe form to be rotatably assorted around the heart yearn of bucket body and are connected, boiling hot blue or green carrier pipe and annular element are fixed in frame, annular heat water cavity is provided with in annular element, the internal face of annular element sets out water hole along its circumferential uniform intervals, the bucket chamber of hopper to be connected with annular heat water cavity by apopore and to be connected.
2. the production system that completes of roasted green tea secondary according to claim 1, is characterized in that: the front end of scalding blue or green device is also provided with and spreads device for what spread tealeaves.
CN201510552054.3A 2015-08-31 2015-08-31 Roasted green tea production system with secondary fixation function Pending CN105076522A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510552054.3A CN105076522A (en) 2015-08-31 2015-08-31 Roasted green tea production system with secondary fixation function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510552054.3A CN105076522A (en) 2015-08-31 2015-08-31 Roasted green tea production system with secondary fixation function

Publications (1)

Publication Number Publication Date
CN105076522A true CN105076522A (en) 2015-11-25

Family

ID=54558584

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510552054.3A Pending CN105076522A (en) 2015-08-31 2015-08-31 Roasted green tea production system with secondary fixation function

Country Status (1)

Country Link
CN (1) CN105076522A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101999479A (en) * 2010-12-14 2011-04-06 长沙湘丰茶叶机械制造有限公司 Full-automatic tea processing method and equipment
CN102488035A (en) * 2011-12-26 2012-06-13 段丹莉 Green tea processing technology
CN102753029A (en) * 2010-02-16 2012-10-24 株式会社伊藤园 Tea leaf-transporting apparatus
CN102960476A (en) * 2012-11-19 2013-03-13 中国农业科学院茶叶研究所 Full-automatic production line of scented tea and method for preparing scented tea by using same
CN202890373U (en) * 2012-10-13 2013-04-24 黄山市徽州洪通茶厂 Tea leaf production system
CN203020909U (en) * 2012-11-29 2013-06-26 湖南三十九铺茶业有限公司 Full automatic conveying device
CN103271175A (en) * 2013-06-25 2013-09-04 浙江永金茶业有限公司 Processing method of spiral white tea
CN203969102U (en) * 2014-07-28 2014-12-03 林清矫 A kind of tea leaf water-removing device
CN104543262A (en) * 2014-12-12 2015-04-29 王丽 Tea leaves and preparation method thereof

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102753029A (en) * 2010-02-16 2012-10-24 株式会社伊藤园 Tea leaf-transporting apparatus
CN101999479A (en) * 2010-12-14 2011-04-06 长沙湘丰茶叶机械制造有限公司 Full-automatic tea processing method and equipment
CN102488035A (en) * 2011-12-26 2012-06-13 段丹莉 Green tea processing technology
CN202890373U (en) * 2012-10-13 2013-04-24 黄山市徽州洪通茶厂 Tea leaf production system
CN102960476A (en) * 2012-11-19 2013-03-13 中国农业科学院茶叶研究所 Full-automatic production line of scented tea and method for preparing scented tea by using same
CN203020909U (en) * 2012-11-29 2013-06-26 湖南三十九铺茶业有限公司 Full automatic conveying device
CN103271175A (en) * 2013-06-25 2013-09-04 浙江永金茶业有限公司 Processing method of spiral white tea
CN203969102U (en) * 2014-07-28 2014-12-03 林清矫 A kind of tea leaf water-removing device
CN104543262A (en) * 2014-12-12 2015-04-29 王丽 Tea leaves and preparation method thereof

Similar Documents

Publication Publication Date Title
CN105076531A (en) Method for producing pan-fired green tea by combination of blanching and microwave de-enzyming
CN105028725A (en) Production method of roasted green tea
CN105028720A (en) System for roasted green tea production
CN105028732A (en) Production method of green tea
CN105325578A (en) Roasted green tea production line
CN105145900A (en) Two-stage de-enzyming production method for roasted green tea
CN104996616A (en) Novel organic flat tea scalding and multistage fixation combined production process
CN105104592A (en) Method for producing green tea by combination of scalding and microwave deactivation
CN105166109A (en) Tea leaf boiling and microwave enzyme deactivating combined processing technology for the production of roasted green tea
CN105028722A (en) Method for producing roasting green tea
CN105028730A (en) System for producing pan-fired green tea
CN105076522A (en) Roasted green tea production system with secondary fixation function
CN105028721A (en) Green tea production system
CN105192129A (en) Organic green tea production system based on combination of blanch fixation and two-stage fixation
CN205757028U (en) A kind of roasted green tea production system
CN105076532A (en) Second-level fixation production process for selenium-rich green tea
CN105028726A (en) Selenium-enriched green tea production process
CN105166108A (en) Organic green tea production system by combining blanching tea leaves and two-stage fixation
CN105192137A (en) Novel production technology for green ironing-multilevel green removing combination of organic flat tea
CN105076533A (en) Blanch fixation and microwave fixation combined system for producing pan-fired green tea
CN105053298A (en) New organic flat tea boiling and multi-stage enzyme deactivating combined production system
CN105076544A (en) Production system for microwave enzyme deactivation of organic flat tea
CN105145933A (en) Process for organic green tea production
CN105053296A (en) Production system of pan-fired green teas
CN105166107A (en) System for producing roasted green tea by combining blanching tea leaves and performing fixation with microwaves

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20180919

Address after: 102600 3 floor, 2 building, No. 4 Daxing District Garden Road, Beijing, 1 unit 317

Applicant after: Beijing informed investment home intellectual property rights Operation Co., Ltd.

Address before: 246001 1 Ling Xin Road, Yi Xiu District, Anqing, Anhui

Applicant before: Wang Chuancai

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20151125

RJ01 Rejection of invention patent application after publication