CN105064415A - Jack fixing method for slope anchor pole drawing test - Google Patents

Jack fixing method for slope anchor pole drawing test Download PDF

Info

Publication number
CN105064415A
CN105064415A CN201510396778.3A CN201510396778A CN105064415A CN 105064415 A CN105064415 A CN 105064415A CN 201510396778 A CN201510396778 A CN 201510396778A CN 105064415 A CN105064415 A CN 105064415A
Authority
CN
China
Prior art keywords
jack
groove
side slope
hole
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510396778.3A
Other languages
Chinese (zh)
Other versions
CN105064415B (en
Inventor
翁其能
张永涛
闫永杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Jiaotong University
Original Assignee
Chongqing Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Jiaotong University filed Critical Chongqing Jiaotong University
Priority to CN201510396778.3A priority Critical patent/CN105064415B/en
Publication of CN105064415A publication Critical patent/CN105064415A/en
Application granted granted Critical
Publication of CN105064415B publication Critical patent/CN105064415B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a jack fixing method for slope anchor pole drawing tests; a pit slot is dug and filled with mud so as to fix the jack into the pit slot of a slope; slope surface rock-soil can be cooled so as to form a frozen soil layer, thus improving pit slot intensity and stability, so the jack can be more stably fixed in the pit slot, thus preventing inaccurate test data caused by the self weight of the jack applying active force on the anchor pole, and improving test data accuracy.

Description

For the jack fixing means of side slope anchor rod drawing test
Technical field
The present invention relates to the test of side slope anchor rod drawing, be specifically related to a kind of jack fixing means for the test of side slope anchor rod drawing.
Background technology
All the time, the stability of side slope is a major issue in civil engineering always, and slope instability can cause life and property loss, or even security incident, and bolt support is a kind of more satisfactory method for reinforcing side slope.In order to judge anchor rod anchored performance, usually needing to do the test of side slope anchor rod drawing at the scene, obtaining the measured value of anchor-holding force of anchor bolt.At present, in the pull-out test process of anchor pole, usually adopt the laboratory apparatus such as charger, hand oil pump, oil pressure gauge, displacement meter, during loading, jack produces displacement, the displacement of displacement meter record jack, thus the size obtaining pulling capacity.But for side slope, the side slope that particularly some geology are soft, due to the deadweight of jack, disturbed test result, makes test result inaccurate, even because jack is overweight, cannot be fixed on completely in side slope, cannot test.
Summary of the invention
In view of this, the object of the present invention is to provide a kind of jack fixing means for the test of side slope anchor rod drawing, utilize the method can make stable being fixed in side slope of jack, and can avoid conducting oneself with dignity the inaccurate phenomenon of test result caused due to jack.
Jack fixing means for side slope anchor rod experiment of the present invention, comprises the following steps:
(1) in side slope, dig hole groove, ensure that hole groove bottom is vertical with anchor pole, side is parallel with anchor pole;
(2) anchor pole is passed jack centre bore, and jack is placed in the groove of hole;
(3) regulate jack position, ensure that jack centre bore axis is parallel with anchor pole and do not contact, between hole groove and jack, filling up mud, jack is fixed on and cheats in groove;
(4) will be used for measuring the thermometer I of jack bottom rock-soil temperature through the mud hole groove and jack, make thermometer I end and cheat groove bottom and contact; Thermometer II end being used for measuring mantle rock soil temperature degree around the groove of hole is imbedded in the side slope top layer ground around the groove of hole;
(5) cheat with the condenser cooling coil arranged of contacting outside groove around being arranged on, and be fixed on side slope surface;
(6) condenser is opened, cooling medium in condenser enters cooling coil, and adjustment regulates condenser, the cooling medium controlled in condenser enters the speed of cooling coil, ground temperature t1 around cooling coil is made to remain on less than 0 DEG C, namely thermometer II reading is less than 0 DEG C, and make jack bottom rock-soil temperature remain on more than 0 DEG C, namely thermometer I reading is greater than 0 DEG C;
(7) test of side slope anchor rod drawing is carried out.
Further, also step a is comprised between step (2) and (3): between jack and hole groove, place backing plate.
Further, the hole groove depth dug in step (1) is 20-30cm.
Further, the hole groove dug in step (1) is rectangle hole, and digging width is 20cm.
Further, the hole groove dug in step (1) is cylindrical recess, and digging diameter is 20cm.
Further, also step b is comprised between step (1) and (2): be wrapped in thermal insulation material by jack.
Beneficial effect of the present invention is:
Utilize jack fixing means of the present invention, not only make jack stable be fixed in side slope, ensure that simultaneously the deadweight of jack can not act on to anchor pole produce eccentric force, ensure that the accuracy of experimental data; Meanwhile, utilize the method for cooling ground and filling mud that geotechnical stability around jack is increased, what jack was more stable is fixed in side slope, improves the accuracy of result of the test.
Other advantages of the present invention, target and feature will be set forth to a certain extent in the following description, and to a certain extent, based on will be apparent to those skilled in the art to investigating hereafter, or can be instructed from the practice of the present invention.Target of the present invention and other advantages can be realized by manual below and obtain.
Accompanying drawing explanation
In order to make object of the present invention, technical scheme and beneficial effect clearly, the invention provides following accompanying drawing and being described:
Fig. 1 is embodiment of the present invention schematic diagram;
Fig. 2 is the connected mode schematic diagram of condenser coil and condenser in Fig. 1.
Detailed description of the invention
Hereinafter with reference to accompanying drawing, the preferred embodiment of invention is described in detail.Should be appreciated that preferred embodiment only in order to the present invention is described, instead of in order to limit the scope of the invention.
As shown in Figure 1 and Figure 2, the jack fixing means for the test of side slope anchor rod drawing of the present embodiment, comprises the following steps:
(1) in side slope, dig hole groove 5, ensure that groove 5 bottom surface, hole is vertical with anchor pole 1, side is parallel with anchor pole 1, for the placement of jack provides position, and provides condition for guarantee jack centre bore does not contact with anchor pole;
(2) by the centre bore of anchor pole 1 through jack 4, and jack 4 is placed in the groove 5 of hole;
(3) regulate jack 4 position, ensure that jack 4 centre bore axis is parallel with anchor pole 1 and do not contact, making jack 4 can not produce eccentric force to anchor pole, now, between hole groove 5 and jack 4, fill up mud, form mud layer 8, jack 4 is fixed in the groove 5 of hole.In the groove of hole, fill up mud can not only make the side wall strength of hole groove 5 increase, and jack 4 can also be made to be fixed on completely in the groove 5 of hole simultaneously.
(4) will be used for measuring the thermometer I 10 of jack 4 bottom rock-soil temperature through the mud layer 8 hole groove 5 and jack 4, make thermometer I 10 end and cheat groove 5 bottom surface and contact; Thermometer II 9 end being used for measuring hole groove 5 surrounding mantle rock soil temperature degree is imbedded in the side slope top layer ground around the groove 5 of hole;
(5) cheat with condenser 11 cooler pan 3 pipe ring arranged of contacting outside groove 5 around being arranged on, and be fixed on side slope surface;
(6) condenser 11 is opened, cooling medium in condenser 11 enters cooling coil 3 by the outlet on condenser 11, then condenser is recovered to by the entrance of condenser 11, adjust and regulate condenser 11, the cooling medium controlled in condenser 11 enters the speed of cooling coil 3, and make ground temperature t1 around cooling coil remain on less than 0 DEG C, namely thermometer II 9 reading is less than 0 DEG C, ensure that jack 4 bottom rock-soil temperature remains on more than 0 DEG C, namely thermometer I 10 reading is greater than 0 DEG C.Ensure that hole groove 5 surrounding ground forms frozen soil layer 2, and mud layer is hardened, hardness improves, and meanwhile, avoids jack 4 bottom rock-soil (i.e. anchor pole 1 surrounding ground) geology Yin Wendu and reduces and change.
(7) test of side slope anchor rod drawing is carried out.
In the present embodiment, the hole groove 5 dug in step (1) is rectangle hole, and digging width is 20cm, digging the degree of depth is 25cm, makes the space of cheating groove 5 be large enough to hold jack 4, simultaneously, the degree of depth of the hole groove 5 dug is enough shallow, can not affect the accuracy of pull-out test result.
As the improvement of the present embodiment, after completing steps (2), before jack 4 and hole groove 5, place one piece of backing plate 7, then carrying out step (3).Place backing plate 7, the deadweight of jack 4 is first acted on backing plate, is then being delivered to uniformly on mud layer 8, make mud layer 8 stressed evenly, structure is more stable, also just make hole groove more stable.
As the improvement of the present embodiment, after hole groove in completing steps (1) digs, jack 4 asbestos 6 are wrapped up in, be placed in the groove 5 of hole again, the low temperature around by cooling coil 3 is avoided to be delivered to jack 4 inner, thus avoid the inner fluid condensation of jack 4, the accuracy of guarantee test result.
What finally illustrate is, above preferred embodiment is only in order to illustrate technical scheme of the present invention and unrestricted, although by above preferred embodiment to invention has been detailed description, but those skilled in the art are to be understood that, various change can be made to it in the form and details, and not depart from claims of the present invention limited range.

Claims (6)

1., for a jack fixing means for side slope anchor rod drawing test, it is characterized in that comprising the following steps:
(1) in side slope, dig hole groove, ensure that hole groove bottom is vertical with anchor pole, side is parallel with anchor pole;
(2) anchor pole is passed jack centre bore, and jack is placed in the groove of hole;
(3) regulate jack position, ensure that jack centre bore axis is parallel with anchor pole and do not contact, between hole groove and jack, filling up mud, jack is fixed on and cheats in groove;
(4) will be used for measuring the thermometer I of jack bottom rock-soil temperature through the mud hole groove and jack, make thermometer I end and cheat groove bottom and contact; Thermometer II end being used for measuring mantle rock soil temperature degree around the groove of hole is imbedded in the side slope top layer ground around the groove of hole;
(5) cheat with the condenser cooling coil arranged of contacting outside groove around being arranged on, and be fixed on side slope surface;
(6) condenser is opened, cooling medium in condenser enters cooling coil, and adjustment regulates condenser, the cooling medium controlled in condenser enters the speed of cooling coil, ground temperature t1 around cooling coil is made to remain on less than 0 DEG C, namely thermometer II reading is less than 0 DEG C, and make jack bottom rock-soil temperature remain on more than 0 DEG C, namely thermometer I reading is greater than 0 DEG C;
(7) test of side slope anchor rod drawing is carried out.
2. the jack fixing means for the test of side slope anchor rod drawing according to claim 1, is characterized in that: also comprise step a between step (2) and (3): between jack and hole groove, place backing plate.
3. the jack fixing means for the test of side slope anchor rod drawing according to claim 1, is characterized in that: the hole groove depth dug in step (1) is 20-30cm.
4. the jack fixing means for the test of side slope anchor rod drawing according to claim 1, is characterized in that: the hole groove dug in step (1) is rectangle hole, and digging width is 20cm.
5. the jack fixing means for the test of side slope anchor rod drawing according to claim 1, it is characterized in that: the hole groove dug in step (1) is cylindrical recess, digging diameter is 20cm.
6. the jack fixing means for the test of side slope anchor rod drawing according to claim 1, is characterized in that: also comprise step b between step (1) and (2): be wrapped in thermal insulation material by jack.
CN201510396778.3A 2015-07-08 2015-07-08 Jack fixing means for the test of side slope anchor rod drawing Expired - Fee Related CN105064415B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510396778.3A CN105064415B (en) 2015-07-08 2015-07-08 Jack fixing means for the test of side slope anchor rod drawing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510396778.3A CN105064415B (en) 2015-07-08 2015-07-08 Jack fixing means for the test of side slope anchor rod drawing

Publications (2)

Publication Number Publication Date
CN105064415A true CN105064415A (en) 2015-11-18
CN105064415B CN105064415B (en) 2016-11-30

Family

ID=54493902

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510396778.3A Expired - Fee Related CN105064415B (en) 2015-07-08 2015-07-08 Jack fixing means for the test of side slope anchor rod drawing

Country Status (1)

Country Link
CN (1) CN105064415B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447795A (en) * 2017-07-31 2017-12-08 海南方能测试技术有限公司 A kind of pile measurement device and detection method
CN109470116A (en) * 2018-12-29 2019-03-15 贵州省质安交通工程监控检测中心有限责任公司 A kind of anchor pole, which is drawn, dials experiment displacement measurement system and its measurement method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5099706U (en) * 1974-01-14 1975-08-19
DE4226655A1 (en) * 1992-08-12 1994-02-17 Zueblin Ag Earth anchorage for excavation walls of building in ground with settlement - has apertured casing tube around whole length of anchoring rod, with hardening material injected via tube to enclose rod
RU2201503C2 (en) * 2000-08-14 2003-03-27 Государственное унитарное предприятие Тимано-Печорский научно-исследовательский центр Gear to investigate formation fluids
CN102279135A (en) * 2011-07-06 2011-12-14 湖南科技大学 Lossless dynamic detection apparatus and method for anchor pile drawing force
RU2491395C2 (en) * 2011-05-12 2013-08-27 Виктор Аршакович Кеворков Thermal formwork for manufacturing of pre-stressed monolithic reinforced concrete structures with linear and flat pre-stressing
CN103698215A (en) * 2013-12-31 2014-04-02 中国地质大学(北京) Pull-out test device for anchor cable
CN104458436A (en) * 2014-12-24 2015-03-25 太原理工大学 High-temperature drawing experiment device of anchoring material and experiment method of high-temperature drawing experiment device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5099706U (en) * 1974-01-14 1975-08-19
DE4226655A1 (en) * 1992-08-12 1994-02-17 Zueblin Ag Earth anchorage for excavation walls of building in ground with settlement - has apertured casing tube around whole length of anchoring rod, with hardening material injected via tube to enclose rod
RU2201503C2 (en) * 2000-08-14 2003-03-27 Государственное унитарное предприятие Тимано-Печорский научно-исследовательский центр Gear to investigate formation fluids
RU2491395C2 (en) * 2011-05-12 2013-08-27 Виктор Аршакович Кеворков Thermal formwork for manufacturing of pre-stressed monolithic reinforced concrete structures with linear and flat pre-stressing
CN102279135A (en) * 2011-07-06 2011-12-14 湖南科技大学 Lossless dynamic detection apparatus and method for anchor pile drawing force
CN103698215A (en) * 2013-12-31 2014-04-02 中国地质大学(北京) Pull-out test device for anchor cable
CN104458436A (en) * 2014-12-24 2015-03-25 太原理工大学 High-temperature drawing experiment device of anchoring material and experiment method of high-temperature drawing experiment device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107447795A (en) * 2017-07-31 2017-12-08 海南方能测试技术有限公司 A kind of pile measurement device and detection method
CN109470116A (en) * 2018-12-29 2019-03-15 贵州省质安交通工程监控检测中心有限责任公司 A kind of anchor pole, which is drawn, dials experiment displacement measurement system and its measurement method

Also Published As

Publication number Publication date
CN105064415B (en) 2016-11-30

Similar Documents

Publication Publication Date Title
CN109030137B (en) Experimental device and method for simulating frozen soil stratum cement sheath consolidation
Murphy et al. Thermal borehole shear device
Aldaeef et al. Interface shear strength characteristics of steel piles in frozen clay under varying exposure temperature
Baycan et al. Field investigation of a geothermal energy pile: initial observations
Likitlersuang et al. Geotechnical parameters from pressuremeter tests for MRT Blue Line Extension in Bangkok
CN106645261A (en) Large-sized multifunctional artificial freezing platform
Henke et al. Field measurements regarding the influence of the installation method on soil plugging in tubular piles
RU2580316C1 (en) Method for determining the number of unfrozen water content in frozen soil
Zhao et al. Deformation and strength behaviors of frozen clay with thermal gradient under uniaxial compression
CN108104716A (en) Simulate the device of tundra drilling well
CN106320389A (en) Freezing force determination test device and determination method thereof
CN105064415A (en) Jack fixing method for slope anchor pole drawing test
Zhan et al. Instrumentation of an unsaturated expansive soil slope
Kramer An experimental investigation on performance of a model geothermal pile in sand
Peláez et al. Freezing-thawing tests on natural pyroclastic samples
Amanuma et al. Evaluation of frost heave pressure characteristics in transverse direction to heat flow
CN204781024U (en) A jack fixed structure that is used for side slope stock to draw experiment
Lee et al. Effect of freezing and thawing on K 0 geostatic stress state for granular materials
CN205426669U (en) Normal position detection device based on collapsible loess
JP2010222805A (en) Method for evaluating stability of excavated surface against sump water
Wu Feasibility study of centrifuge modeling of SAGD Caprock integrity
JP2019015126A (en) Estimation method of strength of improved soil
Zhang et al. Long-term plate load tests in permafrost region on the Qinghai-Tibetan Plateau
Nguyen et al. The dependence of strength and modulus of frozen saline sand on temperature, strain rate and salinity
Zhao et al. Radial thermal gradient–dependent deformation behaviors of frozen hollow cylinder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161130