Pre-twisted wire winding tool and winding method for repairing power transmission wires Download PDFInfo
- Publication number
- CN105048362B CN105048362B CN201510228132.4A CN201510228132A CN105048362B CN 105048362 B CN105048362 B CN 105048362B CN 201510228132 A CN201510228132 A CN 201510228132A CN 105048362 B CN105048362 B CN 105048362B
- Authority
- CN
- China
- Prior art keywords
- ring bodies
- semicircle ring
- preformed armor
- armor rods
- transmission pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 56
- 238000004804 winding Methods 0.000 title claims abstract description 53
- 238000000034 method Methods 0.000 title claims abstract description 12
- YLQBMQCUIZJEEH-UHFFFAOYSA-N Furan Chemical compound C=1C=COC=1 YLQBMQCUIZJEEH-UHFFFAOYSA-N 0.000 claims description 104
- 210000000078 claw Anatomy 0.000 claims description 12
- 230000002093 peripheral effect Effects 0.000 claims description 12
- 230000029058 respiratory gaseous exchange Effects 0.000 claims description 6
- 238000005452 bending Methods 0.000 claims description 3
- 239000004744 fabric Substances 0.000 claims 1
- 230000005611 electricity Effects 0.000 description 4
- 238000012545 processing Methods 0.000 description 4
- 230000001815 facial effect Effects 0.000 description 2
- 230000003287 optical effect Effects 0.000 description 2
- 238000007596 consolidation process Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 210000004247 hand Anatomy 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
Landscapes
- Gripping Jigs, Holding Jigs, And Positioning Jigs (AREA)
- Toys (AREA)
Abstract
The present invention discloses a pre-twisted wire winding tool and a winding method for repairing power transmission wires and belongs to the field of power machinery. The pre-twisted wire winding tool comprises an outer half module, an inner half module in matched connection with a groove on the inner sidewall of the outer half module, and a plurality of the handles uniformly distributed on the outer sidewall of the outer half module. According to the technical scheme of the invention, based on the cooperation of the outer half module with the inner half module, the handles on the outer ring of the outer half module are rotated to wind a pre-twisted wire around a broken power transmission wire. Especially, when the tail end of the pre-twisted wire is to be wire around the broken power transmission wire by the pre-twisted wire winding tool, the operation is more time-saving and more labor-saving compared with the manually winding manner in the prior art. In this way, not only the working strength of operators is reduced, but also the working efficiency of operators is improved obviously. Meanwhile, the gaps of intertwined pre-twisted wires can be reduced during the rotating and winding process of pre-twisted wires by means of the tool. Moreover, the process quality is improved.
Description
Technical field
The invention belongs to electric machinery field, more particularly to a kind of preformed armor rods winding tool for studying for a second time courses one has flunked transmission pressure and
Winding method.
Background technology
Transmission line of electricity is chronically exposed to field, when wire, ground wire are struck by lightning etc. external force is acted on when easily there is stranded phenomenon,
And on the premise of transformer station's transport regulation requirement is met, the processing method overwhelming majority winds consolidation process using preformed armor rods.
To carrying out preformed armor rods winding when stranded wire, stranded ground wire repairing work, it is desirable to which the activity duration is short, processing quality
It is high;And in current practical operation at the scene, artificial winding preformed armor rods gap is larger, processing quality is low, often restriction repairing work
Industry is smoothly completed, especially process optical cable (wire) it is stranded when, the screwdriver (instrument) for being used is suppressed when sticking up operation, also deposited
In the hidden danger for damaging optical cable (wire), while preformed armor rods is longer, number of share of stock is more and has some strength, it is to be not easy with handss to have
Winding, it is more laborious when particularly finally ending up, cause, during winding preformed armor rods, to take time and effort, inefficiency, labor
Fatigue resistance is big, therefore awaits a kind of preformed armor rods winding tool of developmental research.
The content of the invention
In order to solve the problems, such as above-mentioned prior art, it is an object of the invention to provide a kind of lead for studying for a second time courses one has flunked transmission of electricity
The preformed armor rods winding tool of line and winding method, can reduce winding the gap of preformed armor rods, improve processing quality, it is also possible to improve
Work efficiency, reduces labor intensity.
In order to achieve the above object, the present invention is employed the following technical solutions and is achieved.
A kind of preformed armor rods winding tool for studying for a second time courses one has flunked transmission pressure, on the inside of outer Kazakhstan furan component and outer Kazakhstan furan component
Have interior Kazakhstan furan component and the outer furan component lateral wall of breathing out of the groove fit connection that wall is provided with is provided with equally distributed multiple
Handle;The outer Kazakhstan furan component includes the first semicircle ring bodies and the second semicircle ring bodies, the described first semicircle ring-type
One end of body is articulated and connected with any one end of the described second semicircle ring bodies, and the first semicircle ring bodies other end is hinged with
Rod end hinge nut, the rod end hinge nut are bolted with the rod end hinge screw rod with annular protrusion, the second semicircle ring-type
The other end of body is provided with the groove with rod end hinge screw rod cooperation and is coordinated with the annular protrusion on rod end hinge screw rod
Platform;The interior Kazakhstan furan component includes the 3rd semicircle ring bodies and the 4th semicircle ring bodies, the 3rd semicircular rings
Annular groove is respectively equipped with the both sides wall surface of shape body and the 4th semicircle ring bodies;The instrument also includes claw type shape
The spring is fixed respectively on the both sides wall surface of spring pressuring plate, the described first semicircle ring bodies and the second semicircle ring bodies
The one end of tabletting without pawl, the other end of the spring pressuring plate with pawl are stuck in the 3rd semicircle ring bodies and the 4th semicircle ring-type
In groove on the both sides wall surface of body, the side correspondence of two pawls of outermost of one end of each spring pressuring plate upper band pawl
The 3rd semicircle ring bodies or the 4th semicircle ring bodies two side on annular groove in be provided with pin, the pin
Highly more than the spring pressuring plate to the 3rd semicircle ring bodies or the distance of the 4th semicircle ring bodies both sides wall surface.
The characteristics of of the invention and further improvement is that:
Described rod end hinge nut one end carries female thread, and the other end is that two sides are provided with for the raised and projection of plane
Through the first through hole of raised both sides facial plane, described first semicircle ring bodies one end is provided with and rod end hinge nut one end
On male cooperation spill draw-in groove, and spill draw-in groove two side be provided with rod end hinge nut one end projection on first lead to
Corresponding second through hole in hole, the first nut for also including the first bolt and being coordinated with the first bolt, first bolt are passed through
The first through hole and second through hole are connected with the first nut.
Described rod end hinge screw rod one end is the screw rod that the female thread being provided with described rod end hinge nut one end is spirally connected,
Rod end hinge screw rod mid portion is provided with annular protrusion, and rod end hinge screw rod another side is provided with the hand rod of bending.
Each outer peripheral surface of described first semicircle ring bodies and the second semicircle ring bodies is provided with one vertically outward
The circle surface and countersunk head screwed hole through which, the corresponding with the countersunk head screwed hole the 3rd semicircle ring bodies and the 4th semicircle
Each outer peripheral surface of ring bodies is provided with and countersunk head screw thread bore dia identical cylindrical hole, also includes two the second spiral shells
Bolt, second bolt and countersunk head screw hole and rotates through countersunk head screwed hole and withstands the cylindrical hole.
The outer Kazakhstan furan component lateral wall is provided with and is uniformly distributed three handles.
Also include the first screw, the claw type shape spring pressuring plate passes through first screw and the without one end of pawl
The first screw that three semicircle ring bodies or the 4th semicircle ring bodies both sides wall surface are provided with is spirally connected fixation.
Outside immediate vicinity the 3rd semicircle of correspondence of one end both sides outermost pawl of the claw type shape spring pressuring plate with pawl
The second screw is provided with one sidewall surfaces position of shape ring bodies or the 4th semicircle ring bodies, is connected with the second screw
There is the second screw, the second screw is highly more than spring pressuring plate to the 3rd semicircle ring bodies or the 4th semicircle ring-type body sidewall table
The distance in face.
A kind of winding method for studying for a second time courses one has flunked the preformed armor rods winding tool of transmission pressure, comprises the following steps:
Step one:According to the model of transmission pressure, the interior Kazakhstan furan component being adapted is selected;Then the interior Kazakhstan furan group that will be adapted to
Part is installed;
Step 2:The one end of the spring pressuring plate of claw type shape without pawl is fixed on Kazakhstan furan component outside, the one end with pawl
It is stuck in interior Kazakhstan in the groove that furan assembly surface is provided with;And pin is fixed with beside two pawl of one end outermost with pawl;
Step 3:Second bolt is rotated through into countersunk head screwed hole and cylindrical hole is withstood;
Step 4:Preformed armor rods is stuck on stranded transmission pressure by the interior Kazakhstan furan component of preformed armor rods winding tool, is passed through
Rod end hinge nut is tightly stuck in preformed armor rods on transmission pressure with the cooperation of rod end hinge screw rod;Preformed armor rods one end is stuck in transmission of electricity and leads
On line, then to the other end rotation preformed armor rods winding tool of preformed armor rods, preformed armor rods is wrapped on stranded transmission pressure;
Step 5:After stranded transmission pressure winds, rotated under interior Kazakhstan furan component ejection dismounting by the second bolt
Come, then carry out the winding of next stranded transmission pressure.
Compared with prior art, the invention has the advantages that:
First, the present invention breathes out furan component and interior furan component of breathing out for studying for a second time courses one has flunked the preformed armor rods winding tool of transmission pressure by outer
Coordinate, while the outer handle breathed out on furan component outer ring of rotation is wrapped in preformed armor rods on stranded transmission pressure, the especially work
Tool winds preformed armor rods manually relative to prior art more time saving and energy saving, not only reduces operation when preformed armor rods end is wound
The working strength of personnel, and significantly improve work efficiency;Can also reduce in the instrument rotation winding preformed armor rods simultaneously
The gap of winding preformed armor rods, improves processing quality.
2nd, the instrument can select the interior Kazakhstan furan component of different model according to the model of transmission pressure, disclosure satisfy that different shaped
Number transmission pressure preformed armor rods is wound by the instrument.
3rd, outer Kazakhstan furan module outer surface is provided with the countersunk head screwed hole for running through, and interior Kazakhstan furan corresponding with countersunk head screwed hole
Component is provided with cylindrical hole, and the second bolt of through hole rotates through countersunk head screwed hole and withstands cylindrical hole, on the one hand prevents interior
Breathe out furan component to rotate when preformed armor rods is wound, affect winding preformed armor rods;When being on the other hand easy to breathe out furan component in changing, pass through
Rotate in the ejection of the second bolt and breathe out furan component.
4th, the instrument is convenient dismantles, and is conveniently replaceable the corresponding component of damage.
Description of the drawings
With reference to the accompanying drawings and detailed description the present invention is described in further detail.
Fig. 1 is the overall structure diagram of the present invention;
Fig. 2 is the structural representation of rod end hinge screw rod of the present invention;
Fig. 3 is the structural representation of spring pressuring plate of the present invention;
Fig. 4 is the structural representation for breathing out furan component outside the present invention;
Fig. 5 is the structural representation for breathing out furan component in the present invention;
Fig. 6 is the structural representation that the present invention prevents preformed armor rods tail end winding tool.
In figure:100 is the first semicircle ring bodies;110 is the second semicircle ring bodies;200 is the 3rd semicircle ring-type
Body;210 is the 4th semicircle ring bodies;300 is rod end hinge nut;310 is rod end hinge screw rod;311 is annular protrusion;
312 is hand rod;400 is spring pressuring plate;500 is handle.
Specific embodiment
The present invention will be further described in detail below in conjunction with the accompanying drawings.
Embodiment one:
As shown in figure 1, a kind of preformed armor rods winding tool for studying for a second time courses one has flunked transmission pressure of the present invention, including outer Kazakhstan furan group
What the groove fit that part and outer Kazakhstan furan component medial wall are provided with connected has on interior Kazakhstan furan component and outer Kazakhstan furan component lateral wall
It is provided with equally distributed three handles 500;As shown in figure 4, breathing out outward furan component by the first semicircle ring bodies 100 and the second semicircle
Shape ring bodies 110 are constituted, and one end of the first semicircle ring bodies 100 is hinged with any one end of the second semicircle ring bodies 110
Connection, first semicircle 100 other end of ring bodies are hinged rod end hinge nut 300;As shown in Fig. 2 rod end hinge nut 300
The rod end hinge screw rod 310 with annular protrusion is bolted with, the other end of the second semicircle ring bodies 110 is provided with and is cut with scissors with rod end
Groove and the platform coordinated with the annular protrusion on rod end hinge screw rod 310 that chain screw rod 310 coordinates;As shown in figure 5, interior Kazakhstan furan
Component includes the 3rd semicircle ring bodies 200 and the 4th semicircle ring bodies 210, the 3rd semicircle ring bodies 200 and the 4th half
Annular groove is respectively equipped with the both sides wall surface of circular annuli 210;As shown in figure 3, the instrument also includes claw type shape
Spring pressuring plate 400, fixed on the both sides wall surface of the first semicircle ring bodies 100 and the second semicircle ring bodies 110 respectively
The one end of spring pressuring plate 400 without pawl, the other end of the spring pressuring plate 400 with pawl are stuck in the 3rd 200 He of semicircle ring bodies
In groove on the both sides wall surface of the 4th semicircle ring bodies 210, the outermost of one end of each 400 upper band pawl of spring pressuring plate
It is annular recessed on the two side of the corresponding 3rd semicircle ring bodies 200 in side or the 4th semicircle ring bodies 210 of two pawls
Pin is provided with groove, and the height of pin is more than the spring pressuring plate to the 3rd semicircle ring bodies 200 or the 4th semicircle ring-type
The distance of 210 both sides wall surface of body.
Wherein, 300 one end of rod end hinge nut carries female thread, and the other end is two sides in the raised and projection of plane
The first through hole through raised both sides facial plane is provided with, first semicircle ring bodies one end is provided with and rod end hinge nut 300
The spill draw-in groove of the male cooperation on one end, and spill draw-in groove two side be provided with 300 one end of rod end hinge nut projection on
Corresponding second through hole of first through hole, also include the first bolt and with the first bolt coordinate the first nut, the first bolt
Through being connected for the first through hole and the second through hole and the first nut.
Wherein, 310 one end of rod end hinge screw rod is the spiral shell that the female thread being provided with 300 one end of rod end hinge nut is spirally connected
Bar, rod end hinge screw rod mid portion are provided with annular protrusion 311, and rod end hinge screw rod another side is provided with the hand steered of bending
Bar 312.
Wherein, each outer peripheral surface of the first semicircle ring bodies 100 and the second semicircle ring bodies 110 is provided with one
Vertical outer peripheral surface and the countersunk head screwed hole through which, the corresponding with countersunk head screwed hole the 3rd semicircle ring bodies 200 and the 4th
Each outer peripheral surface of semicircle ring bodies 210 is provided with and countersunk head screw thread bore dia identical cylindrical hole, also includes two
Individual second bolt, the second bolt and countersunk head screw hole and rotates through countersunk head screwed hole and withstands cylindrical hole.
Wherein, outer Kazakhstan furan component lateral wall is provided with and is uniformly distributed three handles 500.
Wherein, also include the first screw, claw type shape spring pressuring plate passes through the first screw and the 3rd without one end of pawl
The first screw that semicircle ring bodies 200 or the 4th semicircle 210 both sides wall surface of ring bodies are provided with is spirally connected fixation.
Wherein, outside immediate vicinity the 3rd semicircle of correspondence of one end both sides outermost pawl of the claw type shape spring pressuring plate with pawl
The second screw is provided with one sidewall surfaces position of shape ring bodies 200 or the 4th semicircle ring bodies 210, is matched somebody with somebody with the second screw
Conjunction is connected with the second screw, and the second screw is highly more than spring pressuring plate to the 3rd semicircle ring bodies 200 or the 4th semicircular rings
The distance of 210 sidewall surfaces of shape body.
A kind of preformed armor rods winding tool winding method for studying for a second time courses one has flunked transmission pressure of the present invention is step one:According to transmission of electricity
The model of wire, selects the interior Kazakhstan furan component being adapted;Then the interior Kazakhstan furan component for adapting to is installed and breathe out on the inside of furan component outside
In the groove that wall is provided with;Step 2:The one end of the spring pressuring plate of claw type shape without pawl is fixed on Kazakhstan furan component outside, band
One end of pawl is stuck in interior Kazakhstan in the groove that furan assembly surface is provided with;And post is fixed with beside two pawl of one end outermost with pawl
Pin;Step 3:Second bolt is rotated through into countersunk head screwed hole and cylindrical hole is withstood;Step 4:By preformed armor rods by preformed
The interior Kazakhstan furan component of silk winding tool is stuck on stranded transmission pressure, and being coordinated by rod end hinge nut and rod end hinge screw rod will
Preformed armor rods is tightly stuck on transmission pressure;Preformed armor rods one end is stuck on transmission pressure, and then the other end rotation to preformed armor rods is pre-
Hank knotting winding tool, preformed armor rods is wrapped on stranded transmission pressure;Step 5:After stranded transmission pressure winds, pass through
Interior Kazakhstan furan component ejection is disassembled by the rotation of the second bolt, then carries out the winding of next stranded transmission pressure.
When in use, preformed armor rods one end is stuck on stranded transmission pressure instrument described above, such as will be pre- with pliers
Hank knotting one end is clamped on stranded transmission pressure, and preformed armor rods tool holder preformed armor rods will be pre- towards another extreme direction rotation of preformed armor rods
Hank knotting is wrapped on stranded transmission pressure.
If during simultaneously wound several strands of preformed armor rodses, one end of several strands of preformed armor rodses is clamped on stranded transmission pressure together
On, such as with instruments such as pliers, binding clasps, several strands of preformed armor rodses of preformed armor rods tool holder towards another direction of preformed armor rods rotate by
Several strands of preformed armor rodses are wrapped on stranded transmission pressure, but in winding process, due to the rotation of several strands of preformed armor rodses it is pre- by several strands
Hank knotting is not clamped on the one ends wound on stranded transmission pressure at one piece, needs the personnel of work high above the ground to be wrapped in one piece
Preformed armor rods is loosened to open and is further continued for winding preformed armor rods toward on transmission pressure, the work high above the ground of unfavorable use staff, therefore for side
Just, inventor devises the instrument that a kind of one ends wound when preventing several strands of preformed armor rodses simultaneously wound is at a piece again, and the instrument is two
The circular annuli of semicircle ring bodies composition, the outer ring wall surface of circular annuli are provided with the gear of multiple tapered outer surfaces
Plate, the baffle plate be all by being screwed onto on the outer peripheral surface of circular annuli, therefore can according to winding several strands of preformed armor rodses and select
There should be several baffle plates on the instrument outer peripheral surface.
Embodiment two:
As shown in fig. 6, further improve on the basis of the preformed armor rods instrument in present invention design, by preformed armor rods instrument or so
Same preformed armor rods instrument is designed in both sides, and the preformed armor rods instrument of the both sides breathes out the preformed armor rods that furan component is screwed onto centre by outer
On instrument, one of them is designed to left-handed, and another is designed to dextrorotation.When in use, three preformed armor rods instruments are installed simultaneously
On stranded transmission pressure, and preformed armor rods on three preformed armor rods instruments, is clamped, the preformed armor rods instrument of left end is in the way of left-handed
Left direction rotates, and the preformed armor rods on the left side is wrapped on stranded transmission pressure;The preformed armor rods instrument of right-hand member is with the side of dextrorotation
Formula right direction rotates, and the preformed armor rods on the right is wrapped on stranded transmission pressure, and middle preformed armor rods instrument is equivalent to general
One end of preformed armor rods has been clamped on transmission pressure, then does not need extra instrument by the clamping of preformed armor rods one end.If while twined
Around several strands of preformed armor rodses when, in left end and right-hand member all one instruments for preventing preformed armor rods one ends wound of supporting installation, the instrument is two
The circular annuli of semicircle ring bodies composition, the outer ring wall surface of circular annuli are provided with the gear of multiple tapered outer surfaces
Plate, the baffle plate be all by being screwed onto on the outer peripheral surface of circular annuli, therefore can according to winding several strands of preformed armor rodses and select
There should be several baffle plates on the instrument outer peripheral surface.
Although being described to embodiment of the present invention above in association with accompanying drawing, the invention is not limited in above-mentioned
Specific embodiments and applications field, above-mentioned specific embodiment be only schematically, directiveness, rather than limit
Property.One of ordinary skill in the art under the enlightenment of description, in the scope protected without departing from the claims in the present invention
In the case of, the form of many kinds can also be made, these belong to the row of the protection of the present invention.
Claims (8)
1. a kind of preformed armor rods winding tool for studying for a second time courses one has flunked transmission pressure, it is characterised in that:Including outer Kazakhstan furan component and outer Kazakhstan furan
Have interior Kazakhstan furan component and the outer furan component lateral wall of breathing out of the groove fit connection that component medial wall is provided with is provided with uniform point
Multiple handles (500) of cloth;The outer Kazakhstan furan component includes the first semicircle ring bodies (100) and the second semicircle ring bodies
(110), one end of the described first semicircle ring bodies (100) is cut with scissors with any one end of the described second semicircle ring bodies (110)
Connect in succession, first semicircle ring bodies (100) other end is hinged rod end hinge nut (300), the rod end hinge nut
(300) rod end hinge screw rod (310) with annular protrusion (311), the other end of the second semicircle ring bodies (110) are bolted with
Be provided with the groove that coordinates with rod end hinge screw rod (310) and with rod end hinge screw rod (310) on annular protrusion (311)
The platform of cooperation;The interior Kazakhstan furan component includes the 3rd semicircle ring bodies (200) and the 4th semicircle ring bodies (210), institute
Annular groove is respectively equipped with the both sides wall surface for stating the 3rd semicircle ring bodies (200) and the 4th semicircle ring bodies (210);
The instrument also includes the spring pressuring plate (400) of claw type shape, the described first semicircle ring bodies (100) and the second semicircular rings
Fix the one end of spring pressuring plate (400) without pawl, spring pressuring plate (400) band on the both sides wall surface of shape body (110) respectively
The other end of pawl is stuck on the both sides wall surface of the 3rd semicircle ring bodies (200) and the 4th semicircle ring bodies (210)
Groove in, corresponding 3rd semicircle in side of two pawls of outermost of one end of each spring pressuring plate (400) upper band pawl
Pin is provided with annular groove on the two side of shape ring bodies (200) or the 4th semicircle ring bodies (210), the pin
Highly more than the spring pressuring plate (400) to the 3rd semicircle ring bodies (200) or the 4th semicircle ring bodies (210) two side
The distance on surface.
2. the preformed armor rods winding tool for studying for a second time courses one has flunked transmission pressure according to claim 1, it is characterised in that:The rod end
Hinge nut (300) one end carries female thread, and the other end is that two sides are provided with through raised two for the raised and projection of plane
The first through hole of lateral plane, described first semicircle ring bodies (100) one end are provided with and rod end hinge nut (300) one end
On male cooperation spill draw-in groove, and spill draw-in groove two side be provided with rod end hinge nut (300) one end projection on
Corresponding second through hole of first through hole, the first nut for also including the first bolt and coordinating with the first bolt, first spiral shell
Bolt passes through being connected for the first through hole and second through hole and the first nut.
3. the preformed armor rods winding tool for studying for a second time courses one has flunked transmission pressure according to claim 1, it is characterised in that:The rod end
Hinge screw rod (310) one end is the screw rod that the female thread being provided with rod end hinge nut (300) one end is spirally connected, rod end hinge
Chain screw rod (310) mid portion is provided with annular protrusion (311), and rod end hinge screw rod (310) another side is provided with bending
Hand rod (312).
4. the preformed armor rods winding tool for studying for a second time courses one has flunked transmission pressure according to claim 1, it is characterised in that:Described first
Each outer peripheral surface of semicircle ring bodies (100) and the second semicircle ring bodies (110) is provided with a vertical outer peripheral surface
And it is heavy on its countersunk head screwed hole, with the described first semicircle ring bodies (100) or the second semicircle ring bodies (110)
The outer peripheral surface of head thread hole corresponding 3rd semicircle ring bodies (200) or the 4th semicircle ring bodies (210) be provided with
Countersunk head screw thread bore dia identical cylindrical hole, also includes two the second bolts, second bolt and countersunk head screwed hole spiral shell
Connect and rotate through countersunk head screwed hole and withstand the cylindrical hole.
5. the preformed armor rods winding tool for studying for a second time courses one has flunked transmission pressure according to claim 1, it is characterised in that:The outer Kazakhstan
Furan component lateral wall is provided with and is uniformly distributed three handles (500).
6. the preformed armor rods winding tool for studying for a second time courses one has flunked transmission pressure according to claim 1, it is characterised in that:Also include
First screw, claw type shape spring pressuring plate (400) without pawl one end by first screw and the 3rd semicircular rings
The first screw that shape body (200) or the 4th semicircle ring bodies (210) both sides wall surface are provided with is spirally connected fixation.
7. the preformed armor rods winding tool for studying for a second time courses one has flunked transmission pressure according to claim 1, it is characterised in that:The claw type
The corresponding 3rd semicircle ring bodies of outside immediate vicinity of one end both sides outermost pawl of the shape spring pressuring plate (400) with pawl
(200) or the second screw is provided with a sidewall surfaces position of the 4th semicircle ring bodies (210), coordinate with the second screw and connect
The second screw is connected to, the second screw is highly semicircle to the 3rd semicircle ring bodies (200) or the 4th more than spring pressuring plate (400)
The distance of ring bodies (210) sidewall surfaces.
8. described in a kind of employing claim 1-7 any one be used for study for a second time courses one has flunked transmission pressure preformed armor rods winding tool winding side
Method, it is characterised in that:
Step one:According to the model of transmission pressure, the interior Kazakhstan furan component being adapted is selected;Then by the interior Kazakhstan furan component peace for adapting to
It is mounted in outer Kazakhstan in the groove that furan component medial wall is provided with;
Step 2:The one end of the spring pressuring plate (400) of claw type shape without pawl is fixed on Kazakhstan furan component outside, the one end with pawl
It is stuck in interior Kazakhstan in the groove that furan assembly surface is provided with;And pin is fixed with beside two pawl of one end outermost with pawl;
Step 3:Second bolt is rotated through into countersunk head screwed hole and cylindrical hole is withstood;
Step 4:Preformed armor rods is stuck on stranded transmission pressure, by rod end by the interior Kazakhstan furan component of preformed armor rods winding tool
Hinge nut (300) is tightly stuck in preformed armor rods on transmission pressure with rod end hinge screw rod (310) cooperation;Preformed armor rods one end is stuck in
On transmission pressure, then to the other end rotation preformed armor rods winding tool of preformed armor rods, preformed armor rods is wrapped in into stranded transmission pressure
On;
Step 5:After stranded transmission pressure winds, rotated by the second bolt and interior Kazakhstan furan component ejection is disassembled, so
The winding of next stranded transmission pressure is carried out afterwards.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510228132.4A CN105048362B (en) | 2015-05-06 | 2015-05-06 | Pre-twisted wire winding tool and winding method for repairing power transmission wires |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510228132.4A CN105048362B (en) | 2015-05-06 | 2015-05-06 | Pre-twisted wire winding tool and winding method for repairing power transmission wires |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105048362A CN105048362A (en) | 2015-11-11 |
CN105048362B true CN105048362B (en) | 2017-03-22 |
Family
ID=54454691
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510228132.4A Active CN105048362B (en) | 2015-05-06 | 2015-05-06 | Pre-twisted wire winding tool and winding method for repairing power transmission wires |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105048362B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105790042B (en) * | 2016-04-26 | 2018-01-05 | 国网山东省电力公司济南市长清区供电公司 | A kind of terminal enhancing instrument and terminal Enhancement Method |
CN107171239B (en) * | 2017-07-05 | 2019-05-24 | 国网青海省电力公司海东供电公司 | Preformed device |
CN110718877B (en) * | 2019-10-18 | 2020-11-13 | 国网河南省电力公司濮阳供电公司 | Device for quickly repairing wire |
CN111941357A (en) * | 2020-08-14 | 2020-11-17 | 广东电网有限责任公司 | Pre-twisted wire protecting line dismounting device |
CN113937654A (en) * | 2021-09-29 | 2022-01-14 | 国网福建省电力有限公司 | Full-tension preformed armor rod aluminum conductor repair strip mounting tool set and working method thereof |
CN114188885B (en) * | 2021-12-13 | 2023-09-22 | 广西电网有限责任公司玉林供电局 | Pre-twisted wire winding tool |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SE516340C2 (en) * | 2000-09-07 | 2001-12-17 | Abb Ab | Procedure for resetting reinforcement on a cable |
CN201408935Y (en) * | 2009-04-22 | 2010-02-17 | 广州鑫源恒业电力线路器材有限公司 | Repair pipe for energy-saving wire with carbon fiber composite core |
CN201528155U (en) * | 2009-11-04 | 2010-07-14 | 河南省电力公司平顶山供电公司 | Lead repairing strip installing device |
CN104064994A (en) * | 2014-07-02 | 2014-09-24 | 国家电网公司 | Pre-twisted wire braider |
-
2015
- 2015-05-06 CN CN201510228132.4A patent/CN105048362B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105048362A (en) | 2015-11-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105048362B (en) | Pre-twisted wire winding tool and winding method for repairing power transmission wires | |
CN209434739U (en) | A kind of transmission pressure damage preformed armor rods winding repair outfit | |
CN107017585B (en) | A kind of broken strand of power transmission line smoothes out with the fingers return device | |
CN209046157U (en) | A kind of preformed armor rods installation tool | |
CN104795756B (en) | Device for winding aluminum armor tape on transmission line and application method of device | |
CN201766314U (en) | Insulator replacing tool | |
CN103441353B (en) | A kind of 110 kilovolts of overhead transmission line anchor support common ground lines | |
CN104518460B (en) | Winder for binding cable binding wire | |
CN206774996U (en) | A kind of self-adaptive conductors on quad bundled line lifter | |
CN202111410U (en) | Lead abutting and fixing device for high tension transmission line | |
CN206041356U (en) | Device that ground wire preformed armor rods was led in installation | |
CN204809771U (en) | Device for preventing hank knotting instrument winding stranded hank knotting tail end winding in advance | |
CN209434763U (en) | A kind of strain insulator more changing device | |
CN204809753U (en) | Turn -buckle is salvageed to electric power | |
CN202550402U (en) | Special tool for coiling pre-twisted wire of earth wire | |
CN105500231B (en) | A kind of pliers for being used to wind wire | |
CN206452060U (en) | Preformed armor rods winding tool | |
CN212360651U (en) | Steel wire rope crimping device | |
CN203475922U (en) | Electric pole wiring manufacturing tool | |
CN205882550U (en) | Wire hangs special processing tool of foreign matter | |
CN204834177U (en) | Electric wire transposition rolling device | |
CN104377587B (en) | Universal lifter for overhead ground wire | |
CN207581024U (en) | The self-service coil inserting apparatus of the long conducting wire of direct-pulling type | |
CN208093784U (en) | A kind of transmission line of electricity angle tower ground wire is special to hang tool | |
CN208369071U (en) | Large pitch distribution line replacement top shelves device simple device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |