- CN105048362A CN105048362A CN201510228132.4A CN201510228132A CN105048362A CN 105048362 A CN105048362 A CN 105048362A CN 201510228132 A CN201510228132 A CN 201510228132A CN 105048362 A CN105048362 A CN 105048362A
- Authority
- CN
- China
- Prior art keywords
- ring bodies
- semicircle ring
- preformed armor
- armor rods
- transmission pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Toys (AREA)
- Gripping Jigs, Holding Jigs, And Positioning Jigs (AREA)
Abstract
The present invention discloses a pre-twisted wire winding tool and a winding method for repairing power transmission wires and belongs to the field of power machinery. The pre-twisted wire winding tool comprises an outer half module, an inner half module in matched connection with a groove on the inner sidewall of the outer half module, and a plurality of the handles uniformly distributed on the outer sidewall of the outer half module. According to the technical scheme of the invention, based on the cooperation of the outer half module with the inner half module, the handles on the outer ring of the outer half module are rotated to wind a pre-twisted wire around a broken power transmission wire. Especially, when the tail end of the pre-twisted wire is to be wire around the broken power transmission wire by the pre-twisted wire winding tool, the operation is more time-saving and more labor-saving compared with the manually winding manner in the prior art. In this way, not only the working strength of operators is reduced, but also the working efficiency of operators is improved obviously. Meanwhile, the gaps of intertwined pre-twisted wires can be reduced during the rotating and winding process of pre-twisted wires by means of the tool. Moreover, the process quality is improved.
Description
Technical field
The invention belongs to electric machinery field, particularly a kind of preformed armor rods winding tool for studying for a second time courses one has flunked transmission pressure and winding method.
Background technology
, easily being there is disconnected stock phenomenon when wire, ground wire such as to be struck by lightning at the External Force Acting in the wild in transmission line long term exposure, and is meeting under the prerequisite that transformer station's fortune rule require, the processing method overwhelming majority adopts preformed armor rods to be wound around consolidation process.
Carry out preformed armor rods winding to when disconnected stock wire, disconnected stock ground wire repairing work, require that the activity duration is short, processing quality is high, and in current practical operation at the scene, artificial winding preformed armor rods gap is larger, processing quality is on the low side, often completing smoothly of operation is rushed to repair in restriction, especially when the disconnected stock of process optical cable (wire), when the screwdriver (instrument) used is suppressed and is stuck up operation, also there is the hidden danger damaging optical cable (wire), preformed armor rods is longer simultaneously, number of share of stock is more and have some strength, some hands are not easy to be wound around, particularly more require great effort during finally ending, cause in winding preformed armor rods process, take time and effort, inefficiency, labour intensity is large, therefore await a kind of preformed armor rods winding tool of developmental research.
Summary of the invention
In order to solve above-mentioned prior art Problems existing, the object of the present invention is to provide a kind of preformed armor rods winding tool for studying for a second time courses one has flunked transmission pressure and winding method, the gap being wound around preformed armor rods can be reduced, improve processing quality, also can increase work efficiency, reduce labour intensity.
In order to achieve the above object, the present invention is achieved by the following technical solutions.
For studying for a second time courses one has flunked a preformed armor rods winding tool for transmission pressure, comprise outer Kazakhstan furan assembly, be connected with the groove fit that outer Kazakhstan furan assembly madial wall is provided with have interior Kazakhstan furan assembly and outward breathe out furan assembly lateral wall and be provided with equally distributed multiple handle, described outer Kazakhstan furan assembly comprises the first semicircle ring bodies and the second semicircle ring bodies, one end of described first semicircle ring bodies and any one end of described second semicircle ring bodies are articulated and connected, the first semicircle ring bodies other end is hinged with rod end hinge nut, described rod end hinge nut is bolted with the rod end hinge screw rod with annular protrusion, and the other end of the second semicircle ring bodies is provided with the groove coordinated with described rod end hinge screw rod and the platform coordinated with the annular protrusion on rod end hinge screw rod, described interior Kazakhstan furan assembly comprises the 3rd semicircle ring bodies and the 4th semicircle ring bodies, and the two side of described 3rd semicircle ring bodies and the 4th semicircle ring bodies is respectively equipped with annular groove on the surface, this instrument also includes the spring pressuring plate of claw type shape, the two side of described first semicircle ring bodies and the second semicircle ring bodies fixes described spring pressuring plate one end not with pawl on the surface respectively, the other end of spring pressuring plate band pawl is stuck in the groove on the surface, two side of the 3rd semicircle ring bodies and the 4th semicircle ring bodies, pin is provided with in annular groove on the two side of the 3rd semicircle ring bodies that the side of outermost two pawls of the one end with pawl on described each spring pressuring plate is corresponding or the 4th semicircle ring bodies, the height of described pin is greater than the distance of described spring pressuring plate to the 3rd semicircle ring bodies or the 4th surface, semicircle ring bodies two side.
Feature of the present invention and further improvement are:
Described rod end hinge nut one end is with internal thread, to be two sides be the projection of plane to the other end and projection is provided with the first through hole running through protruding two sides plane, described first semicircle ring bodies one end is provided with the spill draw-in groove with the male cooperation on rod end hinge nut one end, and spill draw-in groove two side is provided with second through hole corresponding with the first through hole in the projection of rod end hinge nut one end, the first nut also including the first bolt and coordinate with the first bolt, described first bolt is connected through described first through hole and described second through hole and the first nut.
Described rod end hinge screw rod one end is the screw rod that the internal thread be provided with described rod end hinge nut one end is spirally connected, and rod end hinge screw rod mid portion is provided with annular protrusion, and another side of rod end hinge screw rod is provided with the hand rod of bending.
Described first semicircle ring bodies is provided with a vertical outer peripheral surface with each outer peripheral surface of the second semicircle ring bodies and runs through its countersunk head screwed hole, the three semicircle ring bodies corresponding with described countersunk head screwed hole is provided with the cylindrical hole identical with countersunk head screwed hole diameter with each outer peripheral surface of the 4th semicircle ring bodies, also include two the second bolts, described second bolt and countersunk head screw hole and rotate through countersunk head screwed hole and withstand described cylindrical hole.
Described outer Kazakhstan furan assembly lateral wall is provided with and is uniformly distributed three handles.
Also include the first screw, the first screw that described claw type shape spring pressuring plate one end not with pawl is provided with on the surface by described first screw and the 3rd semicircle ring bodies or the 4th semicircle ring bodies two side is spirally connected fixing.
The corresponding 3rd semicircle ring bodies of outside immediate vicinity of both sides, one end outermost pawl of described claw type shape spring pressuring plate band pawl or a sidewall surfaces position of the 4th semicircle ring bodies are provided with the second screw, be connected with the second screw with the second screw, the second screw height is greater than the distance of spring pressuring plate to the 3rd semicircle ring bodies or the 4th semicircle ring-type body sidewall surface.
For studying for a second time courses one has flunked a winding method for the preformed armor rods winding tool of transmission pressure, comprise the following steps:
Step one: according to the model of transmission pressure, selects the interior Kazakhstan furan assembly adapted; Then be arranged in the groove that outer Kazakhstan furan assembly madial wall is provided with by breathing out furan assembly in adapting to;
Step 2: the spring pressuring plate of claw type shape one end not with pawl is fixed on the furan assembly of outer Kazakhstan, one end of band pawl is stuck in the groove that interior Kazakhstan furan assembly surface is provided with; And be fixed with pin on one end outermost two pawl side of band pawl;
Step 3: the second bolt is rotated through countersunk head screwed hole and withstands cylindrical hole;
Step 4: be stuck on disconnected stock transmission pressure by breathing out furan assembly in preformed armor rods winding tool by preformed armor rods, to be coordinated with rod end hinge screw rod by rod end hinge nut and is tightly stuck on transmission pressure by preformed armor rods; Preformed armor rods one end is stuck on transmission pressure, and the other end then to preformed armor rods rotates preformed armor rods winding tool, is wrapped in by preformed armor rods on disconnected stock transmission pressure;
Step 5: after disconnected stock transmission pressure winds, rotates interior Kazakhstan furan assembly to eject by the second bolt and disassembles, and then carries out next root and to break the winding of strand transmission pressure.
Compared with prior art, the present invention has following beneficial effect:
One, the present invention is for the preformed armor rods winding tool of studying for a second time courses one has flunked transmission pressure coordinating by outer Kazakhstan furan assembly and interior Kazakhstan furan assembly, rotate the outer handle breathed out on furan assembly outer ring preformed armor rods to be wrapped on the transmission pressure of disconnected stock simultaneously, especially this instrument is when being wound around preformed armor rods end, preformed armor rods is manually wound around more time saving and energy saving relative to prior art, not only reduce the working strength of operating personnel, and significantly improve operating efficiency; Also can reduce the gap being wound around preformed armor rods simultaneously when this instrument rotates and is wound around preformed armor rods, improve processing quality.
Two, this instrument can be selected to breathe out furan assembly in different model according to the model of transmission pressure, and the transmission pressure that can meet different model is wound around preformed armor rods by this instrument.
Three, outer Kazakhstan furan module outer surface is provided with the countersunk head screwed hole run through, and corresponding with countersunk head screwed hole in breathe out furan assembly and be provided with cylindrical hole, through hole second bolt rotates through countersunk head screwed hole and withstands cylindrical hole, prevent interior Kazakhstan furan assembly from rotating when being wound around preformed armor rods on the one hand, impact is wound around preformed armor rods; When being convenient on the other hand breathe out furan assembly in changing, eject interior Kazakhstan furan assembly by rotating the second bolt.
Four, this instrument is for convenience detach, is convenient to change the corresponding component damaged.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
Fig. 1 is overall structure schematic diagram of the present invention;
Fig. 2 is the structural representation of rod end hinge screw rod of the present invention;
Fig. 3 is the structural representation of spring pressuring plate of the present invention;
Fig. 4 is the structural representation that the present invention breathes out furan assembly outward;
Fig. 5 is the structural representation breathing out furan assembly in the present invention;
Fig. 6 is the structural representation that the present invention prevents preformed armor rods tail end winding tool.
In figure: 100 is the first semicircle ring bodies; 110 is the second semicircle ring bodies; 200 is the 3rd semicircle ring bodies; 210 is the 4th semicircle ring bodies; 300 is rod end hinge nut; 310 is rod end hinge screw rod; 311 is annular protrusion; 312 is hand rod; 400 is spring pressuring plate; 500 is handle.
Embodiment
Below in conjunction with accompanying drawing, the present invention will be further described in detail.
Embodiment one:
As shown in Figure 1, a kind of preformed armor rods winding tool for studying for a second time courses one has flunked transmission pressure of the present invention, comprise outer Kazakhstan furan assembly, be connected with the groove fit that outer Kazakhstan furan assembly madial wall is provided with have interior Kazakhstan furan assembly and outward breathe out furan assembly lateral wall and be provided with equally distributed three handles 500, as shown in Figure 4, outer Kazakhstan furan assembly is made up of the first semicircle ring bodies 100 and the second semicircle ring bodies 110, one end of first semicircle ring bodies 100 and any one end of the second semicircle ring bodies 110 are articulated and connected, and first semicircle ring bodies 100 other end is hinged with rod end hinge nut 300, as shown in Figure 2, the other end that rod end hinge nut 300 is bolted with the semicircle ring bodies 110 of rod end hinge screw rod 310, second of annular protrusion is provided with the groove coordinated with rod end hinge screw rod 310 and the platform coordinated with the annular protrusion on rod end hinge screw rod 310, as shown in Figure 5, the two side that interior Kazakhstan furan assembly comprises the 3rd semicircle ring bodies 200 and the 4th semicircle ring bodies 200 of semicircle ring bodies the 210, three and the 4th semicircle ring bodies 210 is respectively equipped with annular groove on the surface, as shown in Figure 3, this instrument also includes the spring pressuring plate 400 of claw type shape, fixing spring compressing tablet 400 one end not with pawl respectively on the surface, the two side of the first semicircle ring bodies 100 and the second semicircle ring bodies 110, the other end of spring pressuring plate 400 with pawl is stuck in the groove on the surface, two side of the 3rd semicircle ring bodies 200 and the 4th semicircle ring bodies 210, pin is provided with in annular groove on the two side of the 3rd semicircle ring bodies 200 that the side of outermost two pawls of the one end with pawl on each spring pressuring plate 400 is corresponding or the 4th semicircle ring bodies 210, the height of pin is greater than the distance of described spring pressuring plate to the 3rd semicircle ring bodies 200 or the 4th surface, semicircle ring bodies 210 two side.
Wherein, rod end hinge nut 300 one end is with internal thread, to be two sides be the projection of plane to the other end and projection is provided with the first through hole running through protruding two sides plane, first semicircle ring bodies one end is provided with the spill draw-in groove with the male cooperation on rod end hinge nut 300 one end, and spill draw-in groove two side is provided with second through hole corresponding with the first through hole in the projection of rod end hinge nut 300 one end, the first nut also including the first bolt and coordinate with the first bolt, first bolt is connected through described first through hole and the second through hole and the first nut.
Wherein, rod end hinge screw rod 310 one end is the screw rod that the internal thread be provided with rod end hinge nut 300 one end is spirally connected, and rod end hinge screw rod mid portion is provided with annular protrusion 311, and another side of rod end hinge screw rod is provided with the hand rod 312 of bending.
Wherein, first semicircle ring bodies 100 is provided with a vertical outer peripheral surface with each outer peripheral surface of the second semicircle ring bodies 110 and runs through its countersunk head screwed hole, the three semicircle ring bodies 200 corresponding with countersunk head screwed hole is provided with the cylindrical hole identical with countersunk head screwed hole diameter with each outer peripheral surface of the 4th semicircle ring bodies 210, also include two the second bolts, the second bolt and countersunk head screw hole and rotate through countersunk head screwed hole and withstand cylindrical hole.
Wherein, outer Kazakhstan furan assembly lateral wall is provided with and is uniformly distributed three handles 500.
Wherein, also include the first screw, the first screw that claw type shape spring pressuring plate one end not with pawl is provided with on the surface by the first screw and the 3rd semicircle ring bodies 200 or the 4th semicircle ring bodies 210 two side is spirally connected fixing.
Wherein, the corresponding 3rd semicircle ring bodies 200 of outside immediate vicinity of both sides, one end outermost pawl of claw type shape spring pressuring plate band pawl or a sidewall surfaces position of the 4th semicircle ring bodies 210 are provided with the second screw, be connected with the second screw with the second screw, the second screw height is greater than the distance of spring pressuring plate to the 3rd semicircle ring bodies 200 or the 4th semicircle ring bodies 210 sidewall surfaces.
A kind of preformed armor rods winding tool winding method for studying for a second time courses one has flunked transmission pressure of the present invention is step one: according to the model of transmission pressure, selects the interior Kazakhstan furan assembly adapted; Then be arranged in the groove that outer Kazakhstan furan assembly madial wall is provided with by breathing out furan assembly in adapting to; Step 2: the spring pressuring plate of claw type shape one end not with pawl is fixed on the furan assembly of outer Kazakhstan, one end of band pawl is stuck in the groove that interior Kazakhstan furan assembly surface is provided with; And be fixed with pin on one end outermost two pawl side of band pawl; Step 3: the second bolt is rotated through countersunk head screwed hole and withstands cylindrical hole; Step 4: be stuck on disconnected stock transmission pressure by breathing out furan assembly in preformed armor rods winding tool by preformed armor rods, to be coordinated with rod end hinge screw rod by rod end hinge nut and is tightly stuck on transmission pressure by preformed armor rods; Preformed armor rods one end is stuck on transmission pressure, and the other end then to preformed armor rods rotates preformed armor rods winding tool, is wrapped in by preformed armor rods on disconnected stock transmission pressure; Step 5: after disconnected stock transmission pressure winds, rotates interior Kazakhstan furan assembly to eject by the second bolt and disassembles, and then carries out next root and to break the winding of strand transmission pressure.
Instrument described above in use, preformed armor rods one end is stuck on the transmission pressure of disconnected stock, such as with pliers, preformed armor rods one end is clamped on the transmission pressure of disconnected stock, preformed armor rods tool holder preformed armor rods rotate towards the preformed armor rods other end direction preformed armor rods is wrapped in disconnected stock transmission pressure on.
If when being wound around several strands of preformed armor rodses simultaneously, one end of several strands of preformed armor rodses is clamped on the transmission pressure of disconnected stock together, such as use pliers, the instruments such as binding clasp, preformed armor rods tool holder several strands of preformed armor rodses rotate towards another direction of preformed armor rods and are wrapped on the transmission pressure of disconnected stock by several strands of preformed armor rodses, but in winding process, because several strands of preformed armor rodses not to be clamped on one ends wound on disconnected stock transmission pressure at one piece by the rotation of several strands of preformed armor rodses, need the personnel of work high above the ground to be loosened by the preformed armor rods being wrapped in a piece to open to continue again to be wound around preformed armor rods on transmission pressure, the unfavorable work high above the ground with staff, therefore conveniently, inventor devise again a kind of when preventing several strands of preformed armor rodses to be wound around simultaneously one ends wound at the instrument of a piece, this instrument is the circular annuli of two halves circular annuli composition, the collar wall of circular annuli is provided with the baffle plate of multiple tapered outer surface on the surface, this baffle plate is all by being screwed onto on the outer peripheral surface of circular annuli, therefore can select that this instrument outer peripheral surface should have several baffle plate according to winding several strands of preformed armor rodses.
Embodiment two:
As shown in Figure 6, preformed armor rods instrument basis in the present invention's design is improved further, same preformed armor rods instrument is designed in the preformed armor rods instrument left and right sides, and the preformed armor rods instrument of these both sides is screwed onto on middle preformed armor rods instrument by outer Kazakhstan furan assembly, one of them is designed to left-handed, and another is designed to dextrorotation.In use, three preformed armor rods instruments are arranged on the transmission pressure of disconnected stock simultaneously, and three preformed armor rods instruments clamp preformed armor rods, the preformed armor rods instrument of left end rotates with left-handed mode left direction, is wrapped in by the preformed armor rods on the left side on the transmission pressure of disconnected stock; The preformed armor rods instrument of right-hand member rotates with the mode right direction of dextrorotation, the preformed armor rods on the right is wrapped on the transmission pressure of disconnected stock, middle preformed armor rods instrument is equivalent to one end of preformed armor rods to be clamped on transmission pressure, or else needs extra instrument to be clamped preformed armor rods one end.If when being wound around several strands of preformed armor rodses simultaneously, the instrument of preformed armor rods one ends wound is prevented at left end and all supporting installation of right-hand member one, this instrument is the circular annuli of two halves circular annuli composition, the collar wall of circular annuli is provided with the baffle plate of multiple tapered outer surface on the surface, this baffle plate is all by being screwed onto on the outer peripheral surface of circular annuli, therefore can select that this instrument outer peripheral surface should have several baffle plate according to winding several strands of preformed armor rodses.
Although be below described embodiment of the present invention by reference to the accompanying drawings, the present invention is not limited to above-mentioned specific embodiments and applications field, and above-mentioned specific embodiments is only schematic, guiding, instead of restrictive.Those of ordinary skill in the art is under the enlightenment of specification, and when not departing from the scope that the claims in the present invention are protected, can also make a variety of forms, these all belong to the row of protection of the present invention.
Claims (8)
1., for studying for a second time courses one has flunked a preformed armor rods winding tool for transmission pressure, it is characterized in that: comprise outer Kazakhstan furan assembly, be connected with the groove fit that outer Kazakhstan furan assembly madial wall is provided with have interior Kazakhstan furan assembly and outward breathe out furan assembly lateral wall and be provided with equally distributed multiple handle (500), described outer Kazakhstan furan assembly comprises the first semicircle ring bodies (100) and the second semicircle ring bodies (110), one end of described first semicircle ring bodies (100) and any one end of described second semicircle ring bodies (110) are articulated and connected, first semicircle ring bodies (100) other end is hinged with rod end hinge nut (300), described rod end hinge nut (300) is bolted with the rod end hinge screw rod (310) with annular protrusion (311), the other end of the second semicircle ring bodies (110) is provided with the groove coordinated with described rod end hinge screw rod (310) and the platform coordinated with the annular protrusion (311) on rod end hinge screw rod (310), described interior Kazakhstan furan assembly comprises the 3rd semicircle ring bodies (200) and the 4th semicircle ring bodies (210), and the two side of described 3rd semicircle ring bodies (200) and the 4th semicircle ring bodies (210) is respectively equipped with annular groove on the surface, this instrument also includes the spring pressuring plate (400) of claw type shape, the two side of described first semicircle ring bodies (100) and the second semicircle ring bodies (110) fixes described spring pressuring plate (400) one end not with pawl on the surface respectively, the other end of spring pressuring plate (400) band pawl is stuck in the groove on the surface, two side of the 3rd semicircle ring bodies (200) and the 4th semicircle ring bodies (210), pin is provided with in annular groove on the upper two side of being with the 3rd semicircle ring bodies (200) corresponding to the side of outermost two pawls of one end of pawl or the 4th semicircle ring bodies (210) of described each spring pressuring plate (400), the height of described pin is greater than the distance of described spring pressuring plate (400) to the 3rd semicircle ring bodies (200) or the 4th semicircle ring bodies (210) surface, two side.
2. the preformed armor rods winding tool for studying for a second time courses one has flunked transmission pressure according to claim 1, it is characterized in that: described rod end hinge nut (300) one end is with internal thread, to be two sides be the projection of plane to the other end and projection is provided with the first through hole running through protruding two sides plane, described first semicircle ring bodies (100) one end is provided with the spill draw-in groove with the male cooperation on rod end hinge nut (300) one end, and spill draw-in groove two side is provided with second through hole corresponding with the first through hole in the projection of rod end hinge nut (300) one end, the first nut also including the first bolt and coordinate with the first bolt, described first bolt is connected through described first through hole and described second through hole and the first nut.
3. the preformed armor rods winding tool for studying for a second time courses one has flunked transmission pressure according to claim 1, it is characterized in that: described rod end hinge screw rod (310) one end is the screw rod that the internal thread be provided with described rod end hinge nut (300) one end is spirally connected, rod end hinge screw rod (310) mid portion is provided with annular protrusion (311), and rod end hinge screw rod (310) another side is provided with the hand rod (312) of bending.
4. the preformed armor rods winding tool for studying for a second time courses one has flunked transmission pressure according to claim 1, it is characterized in that: described first semicircle ring bodies (100) is provided with a vertical outer peripheral surface with each outer peripheral surface of the second semicircle ring bodies (110) and runs through its countersunk head screwed hole, the three semicircle ring bodies (200) corresponding with the countersunk head screwed hole on described first semicircle ring bodies (100) or the second semicircle ring bodies (110) or the outer peripheral surface of the 4th semicircle ring bodies (210) are provided with the cylindrical hole identical with countersunk head screwed hole diameter, also include two the second bolts, described second bolt and countersunk head screw hole and rotate through countersunk head screwed hole and withstand described cylindrical hole.
5. the preformed armor rods winding tool for studying for a second time courses one has flunked transmission pressure according to claim 1, is characterized in that: described outer Kazakhstan furan assembly lateral wall is provided with and is uniformly distributed three handles (500).
6. the preformed armor rods winding tool for studying for a second time courses one has flunked transmission pressure according to claim 1, it is characterized in that: also include the first screw, the first screw that described claw type shape spring pressuring plate (400) one end not with pawl is provided with on the surface by described first screw and the 3rd semicircle ring bodies (200) or the 4th semicircle ring bodies (210) two side is spirally connected fixing.
7. the preformed armor rods winding tool for studying for a second time courses one has flunked transmission pressure according to claim 1, it is characterized in that: the corresponding 3rd semicircle ring bodies (200) of outside immediate vicinity of both sides, one end outermost pawl of described claw type shape spring pressuring plate (400) band pawl or a sidewall surfaces position of the 4th semicircle ring bodies (210) are provided with the second screw, the second screw is connected with the second screw, second screw height is greater than the distance of spring pressuring plate (400) to the 3rd semicircle ring bodies (200) or the 4th semicircle ring bodies (210) sidewall surfaces.
8., for studying for a second time courses one has flunked a winding method for the preformed armor rods winding tool of transmission pressure, it is characterized in that:
Step one: according to the model of transmission pressure, selects the interior Kazakhstan furan assembly adapted; Then be arranged in the groove that outer Kazakhstan furan assembly madial wall is provided with by breathing out furan assembly in adapting to;
Step 2: spring pressuring plate (400) one end not with pawl of claw type shape is fixed on the furan assembly of outer Kazakhstan, one end of band pawl is stuck in the groove that interior Kazakhstan furan assembly surface is provided with; And be fixed with pin on one end outermost two pawl side of band pawl;
Step 3: the second bolt is rotated through countersunk head screwed hole and withstands cylindrical hole;
Step 4: be stuck on disconnected stock transmission pressure by breathing out furan assembly in preformed armor rods winding tool by preformed armor rods, to be coordinated with rod end hinge screw rod (310) by rod end hinge nut (300) and is tightly stuck on transmission pressure by preformed armor rods; Preformed armor rods one end is stuck on transmission pressure, and the other end then to preformed armor rods rotates preformed armor rods winding tool, is wrapped in by preformed armor rods on disconnected stock transmission pressure;
Step 5: after disconnected stock transmission pressure winds, rotates interior Kazakhstan furan assembly to eject by the second bolt and disassembles, and then carries out next root and to break the winding of strand transmission pressure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510228132.4A CN105048362B (en) | 2015-05-06 | 2015-05-06 | Pre-twisted wire winding tool and winding method for repairing power transmission wires |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510228132.4A CN105048362B (en) | 2015-05-06 | 2015-05-06 | Pre-twisted wire winding tool and winding method for repairing power transmission wires |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105048362A true CN105048362A (en) | 2015-11-11 |
CN105048362B CN105048362B (en) | 2017-03-22 |
Family
ID=54454691
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510228132.4A Active CN105048362B (en) | 2015-05-06 | 2015-05-06 | Pre-twisted wire winding tool and winding method for repairing power transmission wires |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105048362B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105790042A (en) * | 2016-04-26 | 2016-07-20 | 国网山东省电力公司济南市长清区供电公司 | Conducting wire joint enhancing tool and conducting wire joint enhancing method |
CN107171239A (en) * | 2017-07-05 | 2017-09-15 | 国网青海省电力公司海东供电公司 | Preformed device |
CN110718877A (en) * | 2019-10-18 | 2020-01-21 | 国网河南省电力公司濮阳供电公司 | Device for quickly repairing wire |
CN111941357A (en) * | 2020-08-14 | 2020-11-17 | 广东电网有限责任公司 | Pre-twisted wire protecting line dismounting device |
CN113937654A (en) * | 2021-09-29 | 2022-01-14 | 国网福建省电力有限公司 | Full-tension preformed armor rod aluminum conductor repair strip mounting tool set and working method thereof |
CN114188885A (en) * | 2021-12-13 | 2022-03-15 | 广西电网有限责任公司玉林供电局 | Preformed armor rod winding tool |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002021654A1 (en) * | 2000-09-07 | 2002-03-14 | Abb Ab | A method of restoring armouring on a cable |
CN201408935Y (en) * | 2009-04-22 | 2010-02-17 | 广州鑫源恒业电力线路器材有限公司 | Repair pipe for energy-saving wire with carbon fiber composite core |
CN201528155U (en) * | 2009-11-04 | 2010-07-14 | 河南省电力公司平顶山供电公司 | Lead repairing strip installing device |
CN104064994A (en) * | 2014-07-02 | 2014-09-24 | 国家电网公司 | Pre-twisted wire braider |
-
2015
- 2015-05-06 CN CN201510228132.4A patent/CN105048362B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2002021654A1 (en) * | 2000-09-07 | 2002-03-14 | Abb Ab | A method of restoring armouring on a cable |
CN201408935Y (en) * | 2009-04-22 | 2010-02-17 | 广州鑫源恒业电力线路器材有限公司 | Repair pipe for energy-saving wire with carbon fiber composite core |
CN201528155U (en) * | 2009-11-04 | 2010-07-14 | 河南省电力公司平顶山供电公司 | Lead repairing strip installing device |
CN104064994A (en) * | 2014-07-02 | 2014-09-24 | 国家电网公司 | Pre-twisted wire braider |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105790042A (en) * | 2016-04-26 | 2016-07-20 | 国网山东省电力公司济南市长清区供电公司 | Conducting wire joint enhancing tool and conducting wire joint enhancing method |
CN105790042B (en) * | 2016-04-26 | 2018-01-05 | 国网山东省电力公司济南市长清区供电公司 | A kind of terminal enhancing instrument and terminal Enhancement Method |
CN107171239A (en) * | 2017-07-05 | 2017-09-15 | 国网青海省电力公司海东供电公司 | Preformed device |
CN107171239B (en) * | 2017-07-05 | 2019-05-24 | 国网青海省电力公司海东供电公司 | Preformed device |
CN110718877A (en) * | 2019-10-18 | 2020-01-21 | 国网河南省电力公司濮阳供电公司 | Device for quickly repairing wire |
CN111941357A (en) * | 2020-08-14 | 2020-11-17 | 广东电网有限责任公司 | Pre-twisted wire protecting line dismounting device |
CN113937654A (en) * | 2021-09-29 | 2022-01-14 | 国网福建省电力有限公司 | Full-tension preformed armor rod aluminum conductor repair strip mounting tool set and working method thereof |
CN114188885A (en) * | 2021-12-13 | 2022-03-15 | 广西电网有限责任公司玉林供电局 | Preformed armor rod winding tool |
CN114188885B (en) * | 2021-12-13 | 2023-09-22 | 广西电网有限责任公司玉林供电局 | Pre-twisted wire winding tool |
Also Published As
Publication number | Publication date |
---|---|
CN105048362B (en) | 2017-03-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105048362A (en) | Pre-twisted wire winding tool and winding method for repairing power transmission wires | |
CN209046157U (en) | A kind of preformed armor rods installation tool | |
CN209434739U (en) | A kind of transmission pressure damage preformed armor rods winding repair outfit | |
CN104795756B (en) | Device for winding aluminum armor tape on transmission line and application method of device | |
CN201766314U (en) | Insulator replacing tool | |
CN204538572U (en) | Control cables threaded shaft | |
CN103606856A (en) | Pre-twisted wire installation clamp | |
CN207853319U (en) | Bird's nest cleanout tool | |
CN106451233A (en) | Detachable clamping apparatus for replacement of monolithic insulator and method for replacement of monolithic insulator | |
CN204809771U (en) | Device for preventing hank knotting instrument winding stranded hank knotting tail end winding in advance | |
CN202111410U (en) | Lead abutting and fixing device for high tension transmission line | |
CN205377163U (en) | General type 500kV overhead earth wire carries ply -yarn drill utensil | |
CN203522035U (en) | Pin-removing device for disassembling split pin | |
CN204835354U (en) | Power cable draw vice | |
CN204809753U (en) | Turn -buckle is salvageed to electric power | |
CN105500231B (en) | A kind of pliers for being used to wind wire | |
CN205016928U (en) | Transformer station tour -inspection auxiliary device | |
CN204030527U (en) | A kind of planer-type cable unreeling rack | |
CN203475922U (en) | Electric pole wiring manufacturing tool | |
CN210838425U (en) | Electromechanical installation electric wire head combining device | |
CN204103263U (en) | High-altitude hard busbar grounding line erecting device | |
CN203574297U (en) | Pre-twisted wire mounting clamp | |
CN105098660A (en) | Polling assistant device of substation | |
CN206164002U (en) | Change removable fixture of remodeling of monolithic insulator | |
CN205920887U (en) | Insulating operation rod and rod head |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |