CN105041316A - Pillar mining method - Google Patents

Pillar mining method Download PDF

Info

Publication number
CN105041316A
CN105041316A CN201510365523.0A CN201510365523A CN105041316A CN 105041316 A CN105041316 A CN 105041316A CN 201510365523 A CN201510365523 A CN 201510365523A CN 105041316 A CN105041316 A CN 105041316A
Authority
CN
China
Prior art keywords
pillar
support column
supporting columns
column
supporting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510365523.0A
Other languages
Chinese (zh)
Inventor
徐庆余
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510365523.0A priority Critical patent/CN105041316A/en
Publication of CN105041316A publication Critical patent/CN105041316A/en
Pending legal-status Critical Current

Links

Abstract

The invention provides a pillar mining method. According to the structure of supporting columns, the supporting columns are prefabricated by reinforced concrete, the cross section of each supporting column is in the shape of a square column, each supporting column is divided into an upper section and a lower section, a supporting column top is arranged on the upper portion of each seam, a round hole is formed between the seams, and a threaded jacking rod is arranged in the round hole. The pillar mining method comprises the following steps of abutting the prefabricated supporting columns to a pillar; excavating the pillar; and remaining or abandoning the supporting columns after the pillar is excavated. The pillar is clamped by the two supporting columns and is excavated, the supporting columns are withdrawn after mining and are abandoned in a mine or taken out from the mine, precious mineral resources can be utilized sufficiently, and the social benefit is improved. The pillar mining method is suitable for mining pillars.

Description

A kind of pillar exploitation method
Technical field
The present invention is to provide the method for mining machinery field for digging up mine, specifically a kind of pillar exploitation method.
Background technology
At present, in mining process, in order to increase strength of roof, prevent landslide, usually pre-pillar, ore pillar is generally ore shoot, more owing to building ore pillar, so cause a large amount of ore to waste, some pillar strength is low, so usually cause ore pillar to collapse, thus loses the supporting role of ore pillar.After mining completes, a large amount of ore pillar that stays is stayed in hole, ore deposit, causes mineral resources to waste, and thus how to exploit ore pillar, accomplishes that the utilization of resources is the problem needing to solve.
Have a kind of method at present, denomination of invention is frame concrete pillar, and the patent No. is CN85102494A, and clip Text is that this invention belongs to frame concrete pillar.This people's industrial and mineral
The framework that post uses, cushion block are formed by reinforced concrete prefabricated, one is assembled into coupling bar, wedge and bolt by leading truck, branch, doing the artificial ore pillar of artificial sill pillar and stope for cheating lower exploitation, being convenient to install, adjustable height, steadiness is good, expand the artificial ore pillar scope of application, improve the rate of extraction, reduce ore resource loss, reduce tunnel, reduce the cost of winning of ore.
The artificial ore pillar structure that this method uses is: form artificial ore pillar by two-sided concrete column, pass through wedge plate supporting between concrete upper piles and lower piles.There is shortcoming is that wedge is subject to size restrictions and angle limits, when angle is large, can not squeeze into, when angle hour easily relaxes again, not produce supporting role, therefore considers from structure and operating principle angle, can not reach imagination effect, that is inapplicable.
Above patent as the artificial ore pillar supported, can only not have actual application value for natural pillar exploitation.
Summary of the invention
In order to overcome the shortcoming of prior art, the present invention proposes a kind of pillar exploitation method.The method, by two support column common support ore bodies, exploits the ore pillar be placed between two support columns, solves the technical problem of pillar exploitation.
The scheme that technical solution problem of the present invention adopts is:
Support column arrangement: by reinforced concrete prefabricated one-tenth support column, described support column cross section is square-column-shaped, and support column is divided into two sections, on seam top, support capital is housed, between seam, is provided with circular hole, at circular hole built with screw thread lifting pin.
Pillar exploitation method: by two prefabricated support columns near pillar, excavates pillar, selects retain support column or abandon support column after having excavated pillar.
Good effect, the present invention utilizes two support column clamping pillars, and exploitation pillar, withdraws from support column after exploitation, discards in ore body or takes out, therefore, it is possible to make full use of valuable mineral resources, increases social benefit.Be suitable for applying as pillar exploitation method.
Accompanying drawing explanation
Fig. 1 is pillar mining distribution schematic diagram of the present invention
Fig. 2 is support column arrangement schematic diagram of the present invention
In figure, 1. pillar, 2. support column, 3. support capital, 3.1. seam, 4. screw thread lifting pin.
Detailed description of the invention
According to the figure,
Support column arrangement: by reinforced concrete prefabricated one-tenth support column 2, described support column cross section is square-column-shaped, and support column is divided into two sections, is equipped with and supports capital 3, be provided with circular hole, at circular hole built with screw thread lifting pin 4 between seam on seam 3.1 top.
Pillar exploitation method: by two prefabricated support columns near the pillar 1 in hole, ore deposit, excavates pillar, selects retain support column or abandon support column after having excavated pillar.
Advantage of the present invention:
1, make full use of the mineral resources of pillar, improve ore extraction rate.
2, support column makes support capital close contact ore deposit push up by the action of screw thread lifting pin, makes firm supporting, is conducive to construction, analyzes and in practical effect, be superior to the artificial ore pillar adopting wedge to carry out jacking from know-why.
3, support column can be reused, saving resource.

Claims (1)

1. a pillar exploitation method, is characterized in that: by reinforced concrete prefabricated one-tenth support column, and described support column cross section is square-column-shaped, support column is divided into two sections, on seam top, support capital is housed, between seam, is provided with circular hole, at circular hole built with screw thread lifting pin;
By two prefabricated support columns near the pillar in hole, ore deposit, excavate pillar, select after having excavated pillar retain support column or abandon support column.
CN201510365523.0A 2015-06-29 2015-06-29 Pillar mining method Pending CN105041316A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510365523.0A CN105041316A (en) 2015-06-29 2015-06-29 Pillar mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510365523.0A CN105041316A (en) 2015-06-29 2015-06-29 Pillar mining method

Publications (1)

Publication Number Publication Date
CN105041316A true CN105041316A (en) 2015-11-11

Family

ID=54448238

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510365523.0A Pending CN105041316A (en) 2015-06-29 2015-06-29 Pillar mining method

Country Status (1)

Country Link
CN (1) CN105041316A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108825233A (en) * 2018-06-06 2018-11-16 徐庆余 A kind of pillar recovery method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85102494A (en) * 1985-04-01 1986-09-17 贵州省铁合金公司 Frame concrete pillar
CN102226396A (en) * 2011-05-19 2011-10-26 中南大学 Non-explosive mining method by excavation, artificial group-column reconstruction, long-hole caving and subsequent filling
CN102444411A (en) * 2011-09-20 2012-05-09 山东海力实业集团有限公司 Spiral lifting pressure stabilization support column
CN202250111U (en) * 2011-08-08 2012-05-30 招金矿业股份有限公司夏甸金矿 Supporting tool
CN102493824A (en) * 2011-12-12 2012-06-13 庄炳元 Retractable trapezoid support with cushion blocks
CN103016031A (en) * 2012-12-04 2013-04-03 付志亮 Mining telescopic support and using method thereof
CN203022760U (en) * 2013-01-14 2013-06-26 山东科技大学 Novel compound artificial boundary ore pillar

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN85102494A (en) * 1985-04-01 1986-09-17 贵州省铁合金公司 Frame concrete pillar
CN102226396A (en) * 2011-05-19 2011-10-26 中南大学 Non-explosive mining method by excavation, artificial group-column reconstruction, long-hole caving and subsequent filling
CN202250111U (en) * 2011-08-08 2012-05-30 招金矿业股份有限公司夏甸金矿 Supporting tool
CN102444411A (en) * 2011-09-20 2012-05-09 山东海力实业集团有限公司 Spiral lifting pressure stabilization support column
CN102493824A (en) * 2011-12-12 2012-06-13 庄炳元 Retractable trapezoid support with cushion blocks
CN103016031A (en) * 2012-12-04 2013-04-03 付志亮 Mining telescopic support and using method thereof
CN203022760U (en) * 2013-01-14 2013-06-26 山东科技大学 Novel compound artificial boundary ore pillar

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
孙琳琳等: "露天转地采复合型人工境界矿柱结构设计", 《金属矿山》 *
邹德清: "张家湾矿床的矿柱回采", 《有色矿山》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108825233A (en) * 2018-06-06 2018-11-16 徐庆余 A kind of pillar recovery method

Similar Documents

Publication Publication Date Title
CN103161480B (en) Initiatively support the method for roadside packing gob side entry retaining
CN102425439B (en) Method for reinforcing bidirectional staged stretched anchor cable of preset steel strand
CN203145038U (en) Latticed column type tower crane foundation
CN204311459U (en) Oblique double soldier pile body structure before chair shape
CN103244122A (en) Trinity coupling support stability control method for gob-side entry-driving coal pillar
CN202881958U (en) Foundation pit supporting structure with water falling function
CN103485808A (en) Electro-osmosis home position modified roadway anchoring method of underground swelling soft rock
CN104947681A (en) Super large super deep basement ground pit construction method
CN205778903U (en) A kind of soft-rock tunnel pucking preventing and treating device
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN106089207A (en) Super high seam work surface gob side entry driving thin coal pillar stays equipment, method
CN205154251U (en) Gentle mould pocket type obsturator mould structure in lane
CN205260049U (en) Deep roadway support uses novel concrete support
CN104179511A (en) Novel hole arrangement grouting method for enabling ground pre-grouting reinforcing roadway to penetrate through surrounding rocks at fault fracture zone
CN105041316A (en) Pillar mining method
CN104790991A (en) Mining roadway surrounding rock strong and long top anchoring technology
CN205444232U (en) Stock - gravity type infiltration retaining wall
CN204000885U (en) Metro Deep Excavation concrete support hangs mould mould
CN102493436A (en) Novel manual tunneling construction method of rectangular anti-slide pile
CN204040042U (en) A kind of super large ultra-deep support with manually dug piles structure
CN203583501U (en) Deep-layer shear resistant device capable of preventing rock sliding
CN106801609B (en) A method of with jack up ∏ shape steel tube concrete support system gob side entry retainings
CN203701104U (en) Connection structure for prefabricated open column and foundation pit
CN104594380B (en) A kind of novel underground construction and method of construction thereof
CN104453966B (en) Large mining height end is adopted fully-mechanized digging machine and is removed frame passage passing sunk pillars on full frame acnemia canopy construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20151111

RJ01 Rejection of invention patent application after publication