CN85102494A - Frame concrete pillar - Google Patents
Frame concrete pillar Download PDFInfo
- Publication number
- CN85102494A CN85102494A CN85102494.7A CN85102494A CN85102494A CN 85102494 A CN85102494 A CN 85102494A CN 85102494 A CN85102494 A CN 85102494A CN 85102494 A CN85102494 A CN 85102494A
- Authority
- CN
- China
- Prior art keywords
- pillar
- ore
- artificial
- concrete
- reduce
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Abstract
The invention belongs to frame concrete pillar.Framework, cushion block that this artificial ore pillar uses are formed by reinforced concrete prefabricated, be assembled into one by leading truck, horizontal coupling bar, wedge and bolt, be used to cheat down the artificial ore pillar that artificial sill pillar and stope are made in exploitation, be convenient to adjustable height is installed, steadiness is good, enlarge the artificial ore pillar scope of application, improve the rate of extraction, reduce the ore resource loss, reduce the tunnel, reduce the cost of winning of ore.
Description
The invention belongs to frame concrete pillar.
The artificial ore pillar concrete buttress formula artificial ore pillar that adopts at present, because of being that the fritter preform is piled up neatly, so the waste raw material, poor stability can not use at the ore bed of great slope.
The objective of the invention is to use frame concrete pillar,, can improve the economic benefit of artificial ore pillar significantly in order to replace the concrete buttress.
The present invention has seven parts and forms: i.e. upper frame, underframe, leading truck, laterally coupling bar, cushion block, wedge and bolt.(above-mentioned parts are successively as accompanying drawing 1,2,3,4,5,6,7), upper frame, underframe and cushion block are all formed by the steel concrete system of giving, and are the support sections of artificial ore pillar, and leading truck adopts angle steel, and in order to guiding to be installed, making up and down, the framework direction is consistent.Laterally coupling bar adopts channel-section steel, in order to connect left and right sides framework.It is wooden that wedge adopts, in order to the wedging upper frame and make artificial ore pillar obtain contractibility.Bolt is used for leading truck is fixed on the coupling bar of bottom.The present invention is mainly used in hole exploitation down.The appearance and size of frame concrete pillar, the shape of framework, left and right sides framework distance, rod member cross dimensions, concrete grade and arrangement of reinforcement should design according to service condition and purposes.The seam floor of artificial ore pillar should be correspondingly processed according to the purposes of using.When being used as foundation, the supporting in stope polycrystalline substance tunnel should design to combine with the present invention to be carried out.
The present invention compares with prior art, and the scope of application enlarges, and can be used as the artificial sill pillar of shrinkage mining below 60 ° of ore bed inclination angle, solid ore deposit and wall type method exploitation and the artificial ore pillar of other method stope.Save raw material, be convenient to install, the time and labour saving, adjustable height, steadiness is good, improves the rate of extraction, reduces resources loss, reduces the tunnel, and economic benefit is obvious.
Shown in this accompanying drawing: 1 upper frame; 2 underframes; 3 leading trucks; 4 horizontal coupling bars; 5 cushion blocks; 6 wedges; 7 bolts.
The present invention will make in ground processing, and suitably local assembling under the hole is transported to then the place to use and adopted special-purpose utensil to install.
Claims (2)
1, a kind of concrete fritter artificial ore pillar that is used for exploitation under the solid pit, feature of the present invention is the utilization frame concrete pillar, framework, cushion block are formed by the steel concrete system of giving, and are assembled into one by leading truck, horizontal coupling bar, wedge, bolt.
2, ore pillar according to claim 1, concrete pillar framework can be rectangles, trapezoidal.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN85102494.7A CN1006164B (en) | 1985-04-01 | 1985-04-01 | Frame concrete pillar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN85102494.7A CN1006164B (en) | 1985-04-01 | 1985-04-01 | Frame concrete pillar |
Publications (2)
Publication Number | Publication Date |
---|---|
CN85102494A true CN85102494A (en) | 1986-09-17 |
CN1006164B CN1006164B (en) | 1989-12-20 |
Family
ID=4792556
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN85102494.7A Expired CN1006164B (en) | 1985-04-01 | 1985-04-01 | Frame concrete pillar |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN1006164B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105041316A (en) * | 2015-06-29 | 2015-11-11 | 徐庆余 | Pillar mining method |
CN105626069A (en) * | 2016-01-19 | 2016-06-01 | 中国海洋石油总公司 | Outer-masonry and inner-concrete artificial pillar and construction method thereof |
CN106522947A (en) * | 2016-11-22 | 2017-03-22 | 武汉理工大学 | Prestress artificial pillar |
-
1985
- 1985-04-01 CN CN85102494.7A patent/CN1006164B/en not_active Expired
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105041316A (en) * | 2015-06-29 | 2015-11-11 | 徐庆余 | Pillar mining method |
CN105626069A (en) * | 2016-01-19 | 2016-06-01 | 中国海洋石油总公司 | Outer-masonry and inner-concrete artificial pillar and construction method thereof |
CN105626069B (en) * | 2016-01-19 | 2018-04-27 | 中国海洋石油集团有限公司 | Concrete artificial ore pillar and its construction method in a kind of outer block |
CN106522947A (en) * | 2016-11-22 | 2017-03-22 | 武汉理工大学 | Prestress artificial pillar |
Also Published As
Publication number | Publication date |
---|---|
CN1006164B (en) | 1989-12-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207932932U (en) | A kind of twin beams slope Bridge Erector | |
CN85102494A (en) | Frame concrete pillar | |
CN2131978Y (en) | Lining-building platform car for tunnel construction | |
CN1026605C (en) | Gallery supporting method for recovering supports and equipment on working face | |
CN210684349U (en) | Assembled gantry crane track foundation | |
CN108128234A (en) | A kind of transport device of vehicle-mounted adjustable prefabricated panel | |
CN213444533U (en) | Movable chute | |
CN1083896A (en) | The laneway support method that is used for gob side entry driving under the coal mine | |
CN209670331U (en) | A kind of Bailey beam bracing members compound die carrier system support construction | |
CN2182880Y (en) | Means for supporting and keeping gallery | |
CN211257342U (en) | Connection structure of steel shotcrete and concrete frame structure node | |
CN205296579U (en) | Combination reinforcing bar girder construction | |
CN110939473A (en) | Prefabricated framework pillar for underground coal mine | |
CN214498409U (en) | Vertical thin-wall side wall template system | |
CN210561496U (en) | Assembled gantry crane track beam | |
CN217299928U (en) | Outer frame faces limit protective structure | |
CN215055130U (en) | Wall body unilateral formwork system | |
CN220395758U (en) | Ore unloading system for drop shaft | |
CN113217047B (en) | Yielding high-strength concrete skeleton roadside support | |
CN220415448U (en) | Blocking retaining wall for underground goaf of mine | |
CN218375279U (en) | Formwork support system utilizing structure | |
CN217897902U (en) | Supporting bracket for mine roadway | |
CN219410962U (en) | Comprehensive pipe rack side wall and top plate supporting system | |
CN220522590U (en) | Double-side pilot tunnel steel frame rock wall combined supporting system for four-lane tunnel | |
CN212922999U (en) | Construction garbage truck |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C13 | Decision | ||
GR02 | Examined patent application | ||
AD01 | Patent right deemed abandoned | ||
C20 | Patent right or utility model deemed to be abandoned or is abandoned |