CN85102494A - Frame concrete pillar - Google Patents

Frame concrete pillar Download PDF

Info

Publication number
CN85102494A
CN85102494A CN85102494.7A CN85102494A CN85102494A CN 85102494 A CN85102494 A CN 85102494A CN 85102494 A CN85102494 A CN 85102494A CN 85102494 A CN85102494 A CN 85102494A
Authority
CN
China
Prior art keywords
pillar
ore
artificial
concrete
reduce
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN85102494.7A
Other languages
Chinese (zh)
Other versions
CN1006164B (en
Inventor
庄炳元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Iron Alloy Co
Original Assignee
Guizhou Iron Alloy Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Iron Alloy Co filed Critical Guizhou Iron Alloy Co
Priority to CN85102494.7A priority Critical patent/CN1006164B/en
Publication of CN85102494A publication Critical patent/CN85102494A/en
Publication of CN1006164B publication Critical patent/CN1006164B/en
Expired legal-status Critical Current

Links

Images

Abstract

The invention belongs to frame concrete pillar.Framework, cushion block that this artificial ore pillar uses are formed by reinforced concrete prefabricated, be assembled into one by leading truck, horizontal coupling bar, wedge and bolt, be used to cheat down the artificial ore pillar that artificial sill pillar and stope are made in exploitation, be convenient to adjustable height is installed, steadiness is good, enlarge the artificial ore pillar scope of application, improve the rate of extraction, reduce the ore resource loss, reduce the tunnel, reduce the cost of winning of ore.

Description

Frame concrete pillar
The invention belongs to frame concrete pillar.
The artificial ore pillar concrete buttress formula artificial ore pillar that adopts at present, because of being that the fritter preform is piled up neatly, so the waste raw material, poor stability can not use at the ore bed of great slope.
The objective of the invention is to use frame concrete pillar,, can improve the economic benefit of artificial ore pillar significantly in order to replace the concrete buttress.
The present invention has seven parts and forms: i.e. upper frame, underframe, leading truck, laterally coupling bar, cushion block, wedge and bolt.(above-mentioned parts are successively as accompanying drawing 1,2,3,4,5,6,7), upper frame, underframe and cushion block are all formed by the steel concrete system of giving, and are the support sections of artificial ore pillar, and leading truck adopts angle steel, and in order to guiding to be installed, making up and down, the framework direction is consistent.Laterally coupling bar adopts channel-section steel, in order to connect left and right sides framework.It is wooden that wedge adopts, in order to the wedging upper frame and make artificial ore pillar obtain contractibility.Bolt is used for leading truck is fixed on the coupling bar of bottom.The present invention is mainly used in hole exploitation down.The appearance and size of frame concrete pillar, the shape of framework, left and right sides framework distance, rod member cross dimensions, concrete grade and arrangement of reinforcement should design according to service condition and purposes.The seam floor of artificial ore pillar should be correspondingly processed according to the purposes of using.When being used as foundation, the supporting in stope polycrystalline substance tunnel should design to combine with the present invention to be carried out.
The present invention compares with prior art, and the scope of application enlarges, and can be used as the artificial sill pillar of shrinkage mining below 60 ° of ore bed inclination angle, solid ore deposit and wall type method exploitation and the artificial ore pillar of other method stope.Save raw material, be convenient to install, the time and labour saving, adjustable height, steadiness is good, improves the rate of extraction, reduces resources loss, reduces the tunnel, and economic benefit is obvious.
Shown in this accompanying drawing: 1 upper frame; 2 underframes; 3 leading trucks; 4 horizontal coupling bars; 5 cushion blocks; 6 wedges; 7 bolts.
The present invention will make in ground processing, and suitably local assembling under the hole is transported to then the place to use and adopted special-purpose utensil to install.

Claims (2)

1, a kind of concrete fritter artificial ore pillar that is used for exploitation under the solid pit, feature of the present invention is the utilization frame concrete pillar, framework, cushion block are formed by the steel concrete system of giving, and are assembled into one by leading truck, horizontal coupling bar, wedge, bolt.
2, ore pillar according to claim 1, concrete pillar framework can be rectangles, trapezoidal.
CN85102494.7A 1985-04-01 1985-04-01 Frame concrete pillar Expired CN1006164B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN85102494.7A CN1006164B (en) 1985-04-01 1985-04-01 Frame concrete pillar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN85102494.7A CN1006164B (en) 1985-04-01 1985-04-01 Frame concrete pillar

Publications (2)

Publication Number Publication Date
CN85102494A true CN85102494A (en) 1986-09-17
CN1006164B CN1006164B (en) 1989-12-20

Family

ID=4792556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN85102494.7A Expired CN1006164B (en) 1985-04-01 1985-04-01 Frame concrete pillar

Country Status (1)

Country Link
CN (1) CN1006164B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105041316A (en) * 2015-06-29 2015-11-11 徐庆余 Pillar mining method
CN105626069A (en) * 2016-01-19 2016-06-01 中国海洋石油总公司 Outer-masonry and inner-concrete artificial pillar and construction method thereof
CN106522947A (en) * 2016-11-22 2017-03-22 武汉理工大学 Prestress artificial pillar

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105041316A (en) * 2015-06-29 2015-11-11 徐庆余 Pillar mining method
CN105626069A (en) * 2016-01-19 2016-06-01 中国海洋石油总公司 Outer-masonry and inner-concrete artificial pillar and construction method thereof
CN105626069B (en) * 2016-01-19 2018-04-27 中国海洋石油集团有限公司 Concrete artificial ore pillar and its construction method in a kind of outer block
CN106522947A (en) * 2016-11-22 2017-03-22 武汉理工大学 Prestress artificial pillar

Also Published As

Publication number Publication date
CN1006164B (en) 1989-12-20

Similar Documents

Publication Publication Date Title
CN207932932U (en) A kind of twin beams slope Bridge Erector
CN85102494A (en) Frame concrete pillar
CN2131978Y (en) Lining-building platform car for tunnel construction
CN1026605C (en) Gallery supporting method for recovering supports and equipment on working face
CN210684349U (en) Assembled gantry crane track foundation
CN108128234A (en) A kind of transport device of vehicle-mounted adjustable prefabricated panel
CN213444533U (en) Movable chute
CN1083896A (en) The laneway support method that is used for gob side entry driving under the coal mine
CN209670331U (en) A kind of Bailey beam bracing members compound die carrier system support construction
CN2182880Y (en) Means for supporting and keeping gallery
CN211257342U (en) Connection structure of steel shotcrete and concrete frame structure node
CN205296579U (en) Combination reinforcing bar girder construction
CN110939473A (en) Prefabricated framework pillar for underground coal mine
CN214498409U (en) Vertical thin-wall side wall template system
CN210561496U (en) Assembled gantry crane track beam
CN217299928U (en) Outer frame faces limit protective structure
CN215055130U (en) Wall body unilateral formwork system
CN220395758U (en) Ore unloading system for drop shaft
CN113217047B (en) Yielding high-strength concrete skeleton roadside support
CN220415448U (en) Blocking retaining wall for underground goaf of mine
CN218375279U (en) Formwork support system utilizing structure
CN217897902U (en) Supporting bracket for mine roadway
CN219410962U (en) Comprehensive pipe rack side wall and top plate supporting system
CN220522590U (en) Double-side pilot tunnel steel frame rock wall combined supporting system for four-lane tunnel
CN212922999U (en) Construction garbage truck

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C13 Decision
GR02 Examined patent application
AD01 Patent right deemed abandoned
C20 Patent right or utility model deemed to be abandoned or is abandoned