CN105022022B - A kind of intelligent electric meter failure crawl test equipment and its application - Google Patents

A kind of intelligent electric meter failure crawl test equipment and its application Download PDF

Info

Publication number
CN105022022B
CN105022022B CN201510399191.8A CN201510399191A CN105022022B CN 105022022 B CN105022022 B CN 105022022B CN 201510399191 A CN201510399191 A CN 201510399191A CN 105022022 B CN105022022 B CN 105022022B
Authority
CN
China
Prior art keywords
intelligent electric
electric meter
component
faulty components
test equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510399191.8A
Other languages
Chinese (zh)
Other versions
CN105022022A (en
Inventor
张晓颖
庄葛巍
余进
朱铮
陈海宾
厉达
项旭杨
陶翔华
申娟
张静月
张洪红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Shanghai Electric Power Co Ltd
East China Power Test and Research Institute Co Ltd
Original Assignee
State Grid Shanghai Electric Power Co Ltd
East China Power Test and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Shanghai Electric Power Co Ltd, East China Power Test and Research Institute Co Ltd filed Critical State Grid Shanghai Electric Power Co Ltd
Priority to CN201510399191.8A priority Critical patent/CN105022022B/en
Publication of CN105022022A publication Critical patent/CN105022022A/en
Application granted granted Critical
Publication of CN105022022B publication Critical patent/CN105022022B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manipulator (AREA)

Abstract

The present invention relates to a kind of intelligent electric meter failure crawl test equipment and its application, wherein equipment includes:Catching robot, for capturing intelligent electric meter on streamline;Test device, for connecting the intelligent electric meter of crawl, and is tested each component of the intelligent electric meter;Also include:Simulator, is connected with test device, for connecting intelligent electric meter, and the working condition of the faulty components of artificial intelligence ammeter, so as to test device to being serially connected in faulty components after component test.Compared with prior art, simulator of the present invention can be with the working condition of simulated fault component, and then can once test all faulty components of identification.

Description

A kind of intelligent electric meter failure crawl test equipment and its application
Technical field
The present invention relates to a kind of intelligent electric meter quality inspection technology, test equipment is captured more particularly, to a kind of intelligent electric meter failure And its application.
Background technology
In recent years, intelligent electric meter has obtained development energetically, but is due to that product control is not in place, and some intelligent electric meters are often Break down, no matter this uses for user, or the public praise of producer can be all negatively affected, so for intelligent electric meter Product test is most important, but is due to that each component of intelligent electric meter much has concurrency relation, using existing single defeated Enter and the test mode that exports intelligently whether some clear and definite intelligent electric meter normal, and can not clearly be what component failure, or Person is only capable of finding the faulty components of one-level at first, as shown in figure 1, certain model intelligent electric meter includes three groups being connected in series successively Part, is tested it, when test is broken down to component b, because component c can not be inputted from component b, therefore at this Just component c can not be tested in the case of sample.
The content of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide a kind of intelligent electric meter failure Capture test equipment.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of intelligent electric meter failure captures test equipment, including:
Catching robot, for capturing intelligent electric meter on streamline;
Test device, for connecting the intelligent electric meter of crawl, and is tested each component of the intelligent electric meter;
Also include:
Simulator, is connected with test device, for connecting the intelligent electric meter, and the faulty components of artificial intelligence ammeter Working condition, so as to test device to being serially connected in faulty components after component test.
The crawl test equipment also includes reclaiming frame, and the recovery frame includes multiple for placing returning for intelligent fault ammeter Receive compartment;
Intelligent fault ammeter is positioned over each correspondence according to the species of faulty components and reclaimed in compartment by the catching robot.
The end of the catching robot is provided with three groups of sucker units, for capturing three intelligent electric meters simultaneously.
The sucker unit includes two suckers.
The simulator includes communicator, transmitter and the processor being connected respectively with communicator and transmitter, institute State communicator to be connected with test device, the transmitter is connected with intelligent electric meter.
I/O port of the transmitter respectively with each component of intelligent electric meter is connected.
A kind of intelligent electric meter failure captures the emulation mode of test equipment, including step:
S1:Communicator obtains the kind of information of faulty components by test device, and sends it to processor;
S2:Transmitter obtains the input signal of the component, and the input signal is sent to processor;
S3:Processor emulates the working condition of the component according to input signal and configuration information, generates simulation result, and will The simulation result as faulty components output;
S4:Simulation result is sent to the component being serially connected in after faulty components to be used as its input by transmitter.
A kind of intelligent electric meter failure captures the application process of test equipment, including step:
A. catching robot captures intelligent electric meter from streamline;
B. test device coordinates simulator to test intelligent electric meter, and judges whether faulty components, if It is step C then to be performed, if it has not, then the intelligent electric meter is returned on streamline by catching robot;
C. test device obtains the species of intelligent electric meter faulty components, and by species of the catching robot according to faulty components The intelligent electric meter is positioned over each correspondence and reclaims compartment.
Compared with prior art, the present invention has advantages below:
1) simulator can be with the working condition of simulated fault component, and then can once test all failure groups of identification Part.
2) intelligent fault ammeter is positioned over each correspondence according to the species of faulty components and reclaimed in compartment by catching robot, is entered And can classify and be sent to corresponding workshop and carry out maintenance of doing over again, convenient and swift, raising efficiency.
3) end of catching robot can capture three intelligent electric meters, efficient quick simultaneously provided with three groups of sucker units.
4) every group of sucker unit includes two suckers, can be high with grasp stability.
5) transmitter make use of the I/O port that each component is carried in intelligent electric meter, have the advantages that Interventional is strong.
Brief description of the drawings
Fig. 1 is the structural representation of a certain intelligent electric meter;
Fig. 2 is structural representation of the invention;
Fig. 3 is the structural representation of intelligent electric meter in the embodiment of the present invention;
Fig. 4 is component a, component b and component c input/output interface schematic diagram;
Wherein:1st, catching robot, 2, intelligent electric meter, 3, test device, 4, simulator, 5, reclaim frame, 6, streamline, 7th, testboard, 11, sucker, 12, catching robot end bottom plate, 41, communicator, 42, processor, 43, transmitter, 51, reclaim Compartment.
Embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to Following embodiments.
A kind of intelligent electric meter failure captures test equipment, as shown in Fig. 2 including:
Catching robot 1, for capturing intelligent electric meter 2 on streamline 6;
Test device 3, for connecting the intelligent electric meter 2 of crawl, and is tested each component of the intelligent electric meter 2;
Also include:
Simulator 4, is connected with test device 3, for connecting intelligent electric meter 2, and the faulty components of artificial intelligence ammeter 2 Working condition, the component after faulty components is serially connected in so as to 3 pairs of test device and is tested.
As shown in figure 3, the end of catching robot 1 is provided with three groups of sucker units, for capturing three intelligent electric meters simultaneously 2, sucker unit includes two suckers 11, and when capturing intelligent electric meter 2, the bottom of catching robot end bottom plate 12 is rotated, Make 6 suckers 11 down, while capturing three intelligent electric meters 2 from streamline and being positioned on testboard 7, complete whole crawl Process.
Test device 3 and simulator 4 are placed on testboard 7.
Capturing test equipment also includes reclaiming frame 5, and the recovery frame 5 includes multiple for placing returning for intelligent fault ammeter 2 Receive compartment 51;Intelligent fault ammeter 2 is positioned over each correspondence according to the species and number of faulty components and reclaimed by catching robot In compartment 51.
Simulator 4 includes communicator 41, transmitter 43 and the processing being connected respectively with communicator 41 and transmitter 43 Device 42, communicator 41 is connected with test device 3, and transmitter 43 is connected with intelligent electric meter 2, transmitter 43 respectively with intelligent electric meter 2 The I/O port connection of each component.Each component in intelligent electric meter 2 has independent I/O port, as shown in figure 4, component a is gathered around There are input interface Input a, output interface Output a, component b possess input interface Input b, output interface Output b, Component c possesses input interface Input c, output interface Output c.
A kind of intelligent electric meter failure captures the application process of test equipment, including step:
A. catching robot 1 captures intelligent electric meter 2 from streamline 6;
B. test device 3 coordinates simulator 4 to test intelligent electric meter 2, and judges whether faulty components, if It is yes, then step C is performed, if it has not, then the intelligent electric meter 2 is returned on streamline 6 by catching robot 1;
C. test device 3 obtains the species of the faulty components of intelligent electric meter 2, and by catching robot 1 according to faulty components The intelligent fault ammeter 2 that the intelligent electric meter 2 is positioned in each correspondence recovery compartment 51, each compartment 51 is sent to difference by species Workshop do over again maintenance, and then can classify and be sent to corresponding workshop and carry out maintenance of doing over again, convenient and swift, raising efficiency.
Wherein simulation process includes step:
S1:Communicator 41 obtains the kind of information of faulty components by test device 3, and sends it to processor 42;
S2:Transmitter 43 obtains the input signal of the component, and the input signal is sent to processor 42;
S3:Processor 42 emulates the working condition of the component according to input signal and configuration information, generates simulation result, and Using the simulation result as faulty components output, specifically, simultaneously the faulty components of not all are required for being simulated, only which Concatenate below just needed by the faulty components of other assemblies it is simulated, for example, when component b is faulty components, processor according to Component a output interface Output a output data as faulty components b input signal;
S4:Simulation result is sent to the component that is serially connected in after faulty components using as its input by transmitter 43, for example, Simulation result is directly sent to component c by Input c in the present embodiment.

Claims (5)

1. a kind of intelligent electric meter failure captures the emulation mode of test equipment, the crawl test equipment includes:
Catching robot, for capturing intelligent electric meter on streamline,
Test device, for connecting the intelligent electric meter of crawl, and is tested each component of the intelligent electric meter,
Simulator, is connected with test device, for connecting the intelligent electric meter, and the work of the faulty components of artificial intelligence ammeter Make state, so as to test device to being serially connected in faulty components after component test;
Characterized in that, the simulator includes communicator, transmitter and the place being connected respectively with communicator and transmitter Device is managed, the communicator is connected with test device, and the transmitter is connected with intelligent electric meter;
The emulation mode includes step:
S1:Communicator obtains the kind of information of faulty components by test device, and sends it to processor,
S2:Transmitter obtains the input signal of the component, and the input signal is sent to processor,
S3:Processor emulates the working condition of the component according to input signal and configuration information, generates simulation result, and this is imitated True result as faulty components output,
S4:Simulation result is sent to the component being serially connected in after faulty components to be used as its input by transmitter.
2. a kind of intelligent electric meter failure according to claim 1 captures the emulation mode of test equipment, it is characterised in that institute Stating crawl test equipment also includes reclaiming frame, and the recovery frame includes multiple recovery compartments for being used to place intelligent fault ammeter;
Intelligent fault ammeter is positioned over each correspondence according to the species of faulty components and reclaimed in compartment by the catching robot.
3. a kind of intelligent electric meter failure according to claim 1 captures the emulation mode of test equipment, it is characterised in that institute The end of catching robot is stated provided with three groups of sucker units, for capturing three intelligent electric meters simultaneously.
4. a kind of intelligent electric meter failure according to claim 3 captures the emulation mode of test equipment, it is characterised in that institute Stating sucker unit includes two suckers.
5. a kind of intelligent electric meter failure according to claim 1 captures the emulation mode of test equipment, it is characterised in that institute I/O port of the transmitter respectively with each component of intelligent electric meter is stated to be connected.
CN201510399191.8A 2015-07-08 2015-07-08 A kind of intelligent electric meter failure crawl test equipment and its application Active CN105022022B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510399191.8A CN105022022B (en) 2015-07-08 2015-07-08 A kind of intelligent electric meter failure crawl test equipment and its application

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510399191.8A CN105022022B (en) 2015-07-08 2015-07-08 A kind of intelligent electric meter failure crawl test equipment and its application

Publications (2)

Publication Number Publication Date
CN105022022A CN105022022A (en) 2015-11-04
CN105022022B true CN105022022B (en) 2017-09-12

Family

ID=54412129

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510399191.8A Active CN105022022B (en) 2015-07-08 2015-07-08 A kind of intelligent electric meter failure crawl test equipment and its application

Country Status (1)

Country Link
CN (1) CN105022022B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106513210A (en) * 2016-11-29 2017-03-22 厦门理工学院 Saw blade paint spraying device with automatic cleaning function and control method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101056216B (en) * 2006-04-10 2011-02-02 华为技术有限公司 A test system and test method
KR20110050404A (en) * 2008-05-16 2011-05-13 퓨전-아이오, 인크. Apparatus, system, and method for detecting and replacing failed data storage
JP5238419B2 (en) * 2008-09-09 2013-07-17 日置電機株式会社 Wiring state detection method for power meter
CN201749183U (en) * 2010-07-09 2011-02-16 天津容大机电科技有限公司 Automatic wall-mounted multi-position and multi-product independent test system for watt-hour meter
CN102608465B (en) * 2012-03-22 2014-06-04 珠海许继电气有限公司 Automatic testing system for feed terminals
CN204789978U (en) * 2015-07-08 2015-11-18 国网上海市电力公司 Smart electric meter trouble snatchs test equipment

Also Published As

Publication number Publication date
CN105022022A (en) 2015-11-04

Similar Documents

Publication Publication Date Title
CN109919925A (en) Printed circuit board intelligent detecting method, system, electronic device and storage medium
CN103869260B (en) A kind of power detecting system and method
CN104680905B (en) A kind of teaching process automatic monitoring system and monitoring method for being applied to experimental teaching
CN204924967U (en) Image acquisition mechanism of full -automatic AOI complete machine
CN105301450A (en) Distribution network fault automatic diagnosis method and system
CN104459516A (en) Testing method used for SMT first article detection
CN102539984A (en) Mass production tester and mass production aging test system
CN104390982A (en) Test method for SMT first article inspection
CN105022022B (en) A kind of intelligent electric meter failure crawl test equipment and its application
CN103913728A (en) Portable radar general-purpose tester and testing method
CN204789978U (en) Smart electric meter trouble snatchs test equipment
CN205540248U (en) Detection apparatus for vehicle control unit
CN104793081B (en) USB interface detection means and method
CN201586640U (en) Testing and sorting control system for multi-station sound surface filtering device
CN106598793B (en) Test system and test method based on BIOS serial port log data
CN107133170A (en) A kind of detection method of car-mounted terminal automatic detection black box, apparatus and system
CN117114420A (en) Image recognition-based industrial and trade safety accident risk management and control system and method
CN104237723A (en) Low-frequency cable network testing system and method based on boundary scanning
CN105550083A (en) MSS (maintenance support subsystem) automatic test method and system
CN207051406U (en) A kind of new USB parameter testers
CN108255145A (en) A kind of test system and method for system of vehicle transmission control unit
CN105223489A (en) A kind of interlock circuit testing apparatus and method of testing
CN204884054U (en) Quality developments real time monitoring alarm system
CN110471855A (en) A kind of computer application software test macro and method
CN115343558A (en) Fault analysis and detection system of low-voltage apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant