CN105019915A - 一种装有涡轮风力发电装置的高速隧道 - Google Patents

一种装有涡轮风力发电装置的高速隧道 Download PDF

Info

Publication number
CN105019915A
CN105019915A CN201510470350.9A CN201510470350A CN105019915A CN 105019915 A CN105019915 A CN 105019915A CN 201510470350 A CN201510470350 A CN 201510470350A CN 105019915 A CN105019915 A CN 105019915A
Authority
CN
China
Prior art keywords
tunnel
wind
air
highway tunnel
turbine wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510470350.9A
Other languages
English (en)
Inventor
陈果
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SICHUAN TAIYI NEW ENERGY DEVELOPMENT Co Ltd
Original Assignee
SICHUAN TAIYI NEW ENERGY DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SICHUAN TAIYI NEW ENERGY DEVELOPMENT Co Ltd filed Critical SICHUAN TAIYI NEW ENERGY DEVELOPMENT Co Ltd
Priority to CN201510470350.9A priority Critical patent/CN105019915A/zh
Publication of CN105019915A publication Critical patent/CN105019915A/zh
Pending legal-status Critical Current

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction

Landscapes

  • Wind Motors (AREA)

Abstract

本发明公开了一种装有涡轮风力发电装置的高速隧道,属于能源回收技术领域。它包括高速隧道,所述高速隧道两边的侧壁上搭建有引风槽,所述引风槽的出风口处安装有涡轮风机,所述涡轮风机的转子与发电机进行连接,发电机通过充电控制器与蓄电池进行连接,所述蓄电池通过照明控制器与LED隧道灯相连;所述引风槽内设置多个弧形挡风装置,挡风装置间的间距为10米;所述引风槽的高度不低于2米;所述涡轮风机风口处设置聚风口;所述发电机和蓄电池可置于墙壁上的凹槽内。本发明能回收隧道中高速奔跑的汽车所产生的风力,通过风力发电装置产生电力,储存在蓄电池中,为隧道照明提供电能,环保节能。

Description

一种装有涡轮风力发电装置的高速隧道
技术领域
本发明涉及一种装有涡轮风力发电装置的高速隧道,属于能源回收技术领域。
背景技术
在能源危机、环境危机的大环境下,迫切要求我们停止对非可再生资源的开发,尽可能地利用自然资源,及对已有的资源进行回收。新型能源太阳能、风能越来越被人们关注,太阳能在高速公路行业已被广泛开发利用。风能作为取之不尽用之不竭的可再生天然能源,具有广阔的发展前景。伴随隧道过往的车辆与日俱增,所产生的风力持续不断,特别是在高速隧道中,车辆通过时风速很大、风力之强,如果能加以回收利用,将具有积极的社会效益和环保效益。
发明内容
为解决上述问题,本发明提供一种装有涡轮风力发电装置的高速隧道,它可完美地回收隧道中高速奔跑的汽车所产生的风力,通过风力发电装置产生电力,储存在蓄电池中,为隧道照明提供电能。
本发明所要解决的技术问题采取以下技术方案来实现:
一种装有涡轮风力发电装置的高速隧道,它包括高速隧道,所述高速隧道两边的侧壁上搭建有引风槽,所述引风槽的出风口处安装有涡轮风机,所述涡轮风机的的转子与发电机进行连接,发电机通过充电控制器与蓄电池进行连接,所述蓄电池通过照明控制器与LED隧道灯相连。
所述引风槽内设置多个弧形挡风装置,挡风装置间的间距为10米。
所述引风槽的高度不低于2米。
所述涡轮风机风口处设置聚风口。
所述发电机和蓄电池可置于墙壁上的凹槽内。
本发明的有益效果是:本发明结构简单、设计合理,能回收隧道中高速奔跑的汽车所产生的风力,通过风力发电装置产生电力,储存在蓄电池中,为隧道照明提供电能;引风槽的高度不低2米,可以保证各种车辆所产生的风能最大化利用;引风槽内每间隔10米左右设置弧形挡风装置,使产生的风能顺利进入轴流风机中;在风机风口处设有聚风口,尽可能多地收集引风槽所带来的风量。
附图说明
图1为本发明实施例一断面图;
图2为本发明实施例二断面图;
图3为本发明实施例三断面图。
图中:侧壁1,引风槽2,涡轮风机3,蓄电池4,LED隧道灯5,挡风装置6,聚风口7,凹槽8。
具体实施方式
为了对本发明的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体实施例及图示,进一步阐述本发明。
实施例一
如图1所示,一种装有涡轮风力发电装置的高速隧道,它包括高速隧道,高速隧道两边的侧壁1上搭建有引风槽2,引风槽2的出风口处安装有涡轮风机3,涡轮风机3的的转子与发电机进行连接,发电机通过充电控制器与蓄电池4进行连接,蓄电池4通过照明控制器与LED隧道灯5相连。
引风槽2内设置多个弧形挡风装置6,挡风装置6间的间距为10米。
引风槽2的高度不低于2米。
实施例二
如图2所示,涡轮风机3风口处设置聚风口7。
实施例三
如图3所示,发电机和蓄电池6可置于墙壁上的凹槽8内。
汽车在高速隧道内奔跑,带动空气流动产生风,风由引风槽2进入聚风口7,再进入涡轮风机3内,带动涡轮风机3转动,从而带动发电机进行发电,发电机所产生的电能一部分维持隧道内LED隧道灯5的照明使用,另一方面储存在蓄电池4中,留以备用。利用回收隧道中高速奔跑的汽车所产生的风力,通过风力发电装置产生电力,储存在蓄电池中,为隧道照明提供电能,经济使用,环保节能。
以上显示和描述了本发明的基本原理和主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。

Claims (5)

1.一种装有涡轮风力发电装置的高速隧道,它包括高速隧道,其特征在于:所述高速隧道两边的侧壁上搭建有引风槽,所述引风槽的出风口处安装有涡轮风机,所述涡轮风机的的转子与发电机进行连接,发电机通过充电控制器与蓄电池进行连接,所述蓄电池通过照明控制器与LED隧道灯相连。
2.根据权利要求1所述一种装有涡轮风力发电装置的高速隧道,其特征在于:所述引风槽内设置多个弧形挡风装置,挡风装置间的间距为10米。
3.根据权利要求1所述一种装有涡轮风力发电装置的高速隧道,其特征在于:所述引风槽的高度不低于2米。
4.根据权利要求1所述一种装有涡轮风力发电装置的高速隧道,其特征在于:所述涡轮风机风口处设置聚风口。
5.根据权利要求1所述一种装有涡轮风力发电装置的高速隧道,其特征在于:所述发电机和蓄电池可置于墙壁上的凹槽内。
CN201510470350.9A 2015-08-04 2015-08-04 一种装有涡轮风力发电装置的高速隧道 Pending CN105019915A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510470350.9A CN105019915A (zh) 2015-08-04 2015-08-04 一种装有涡轮风力发电装置的高速隧道

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510470350.9A CN105019915A (zh) 2015-08-04 2015-08-04 一种装有涡轮风力发电装置的高速隧道

Publications (1)

Publication Number Publication Date
CN105019915A true CN105019915A (zh) 2015-11-04

Family

ID=54410158

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510470350.9A Pending CN105019915A (zh) 2015-08-04 2015-08-04 一种装有涡轮风力发电装置的高速隧道

Country Status (1)

Country Link
CN (1) CN105019915A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108194120A (zh) * 2018-03-15 2018-06-22 四川省交通运输厅公路规划勘察设计研究院 具有发电功能的隧道构造
CN112963189A (zh) * 2020-12-31 2021-06-15 贵州道坦坦科技股份有限公司 一种高速公路隧道通风照明用节能控制系统
CN114382536A (zh) * 2021-12-17 2022-04-22 河北省高速公路延崇管理中心 一种用于寒区隧道排水管的交通风发电供热防冻系统

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2434411A (en) * 2006-01-19 2007-07-25 Henry Edward Garnett Bateson Vehicular induced air powered turbine generator units
CN202031782U (zh) * 2011-04-20 2011-11-09 东莞市鑫亚塑胶制品有限公司 一种地铁隧道式风力涡轮发电装置及其地铁隧道系统
US20120049525A1 (en) * 2011-11-04 2012-03-01 Owens Andrew J System for a vehicle to capture energy from environmental air movement
CN202902138U (zh) * 2012-11-09 2013-04-24 东莞市科旺网络能源有限公司 一种隧道照明装置
CN204877490U (zh) * 2015-08-04 2015-12-16 四川太一新能源开发有限公司 一种装有涡轮风力发电装置的高速隧道

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2434411A (en) * 2006-01-19 2007-07-25 Henry Edward Garnett Bateson Vehicular induced air powered turbine generator units
CN202031782U (zh) * 2011-04-20 2011-11-09 东莞市鑫亚塑胶制品有限公司 一种地铁隧道式风力涡轮发电装置及其地铁隧道系统
US20120049525A1 (en) * 2011-11-04 2012-03-01 Owens Andrew J System for a vehicle to capture energy from environmental air movement
CN202902138U (zh) * 2012-11-09 2013-04-24 东莞市科旺网络能源有限公司 一种隧道照明装置
CN204877490U (zh) * 2015-08-04 2015-12-16 四川太一新能源开发有限公司 一种装有涡轮风力发电装置的高速隧道

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108194120A (zh) * 2018-03-15 2018-06-22 四川省交通运输厅公路规划勘察设计研究院 具有发电功能的隧道构造
CN108194120B (zh) * 2018-03-15 2023-11-28 四川省公路规划勘察设计研究院有限公司 具有发电功能的隧道构造
CN112963189A (zh) * 2020-12-31 2021-06-15 贵州道坦坦科技股份有限公司 一种高速公路隧道通风照明用节能控制系统
CN114382536A (zh) * 2021-12-17 2022-04-22 河北省高速公路延崇管理中心 一种用于寒区隧道排水管的交通风发电供热防冻系统

Similar Documents

Publication Publication Date Title
CN104895746A (zh) 一种隧道内微型风力发电利用系统
CN102235293A (zh) 排水系统垂直落差发电装置
CN201841970U (zh) 双能源电动汽车
CN105019915A (zh) 一种装有涡轮风力发电装置的高速隧道
CN203130376U (zh) 高速公路隧道内风力发电系统
CN204877490U (zh) 一种装有涡轮风力发电装置的高速隧道
CN105098955A (zh) 一种风光互补供电环保空调机组
CN104779897A (zh) 一种用于高速公路上的风光发电系统
CN204239157U (zh) 一种小型风力发电设备
WO2015000450A1 (zh) 利用高速公路风能为用电设施提供电力的方法
CN203511329U (zh) 风力电动车
CN204244137U (zh) 太阳能、风能发电墙
CN103573556A (zh) 一种双能源发电设备
CN203978714U (zh) 用空气涡流发电的风叶装置
CN203460718U (zh) 一种用于电动轿车上的空气动力风速发电系统
CN104037809A (zh) 一种家用风能光能供电系统
Jahanfar et al. Design and Simulation of a Wind Turbine Powered Electric Car Charging System for St. John's, NL
CN206135533U (zh) 一种变桨系统的供电电路
CN204806221U (zh) 一种设置有超级电容的风力及太阳能发电装置
CN104454371B (zh) 一种小型风力发电设备
CN204425229U (zh) 一种由风光互补发电装置提供电源的高速公路监控设备
RU157306U1 (ru) Устройство автономного освещения уличных рекламных щитов на основе ветроэнергетической установки
CN204993158U (zh) 一种新型风光互补发电装置
CN203995732U (zh) 一种风能发电电动汽车
Dare et al. Vehicular Wind Energy Converter (VWEC): A Solution to Sustainable Charging For Electric Vehicles

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20151104

WD01 Invention patent application deemed withdrawn after publication