CN105019463B CN201510477881.0A CN201510477881A CN105019463B CN 105019463 B CN105019463 B CN 105019463B CN 201510477881 A CN201510477881 A CN 201510477881A CN 105019463 B CN105019463 B CN 105019463B
Authority
CN
China
Prior art keywords
outside
section
anchoring beam
underground structure
cross
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510477881.0A
Other languages
Chinese (zh)
Other versions
CN105019463A (en
Inventor
李勇
扈胜霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Crrc Intelligent Transportation Engineering Technology Co ltd
Original Assignee
CRRC Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRRC Construction Engineering Co Ltd filed Critical CRRC Construction Engineering Co Ltd
Priority to CN201510477881.0A priority Critical patent/CN105019463B/en
Publication of CN105019463A publication Critical patent/CN105019463A/en
Application granted granted Critical
Publication of CN105019463B publication Critical patent/CN105019463B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of integral tension formula big cross section underground structure, inner side anchors beam and is arranged circumferentially about in the boundary for excavating cavern cross section, outside anchors beam and is arranged circumferentially about outside the border for excavating cavern cross section, inner side anchors beam and corresponded with outside anchoring beam, bearing of trend arranged for interval of the rope net along excavation cavern, rope net includes medial strand, lateral funiculus and radial cable, it is connected between adjacent inboard anchoring beam by medial strand, it is connected between adjacent outer anchoring beam by lateral funiculus, inner side is anchored to be connected between beam and corresponding outside anchoring beam by radial cable.Meanwhile, also disclose its construction method.As the force structure of underground structure, formed before big cross section underground structure excavation, more preferable safety guarantee is provided so as to be excavated for big cross section underground structure, and full face tunneling can be carried out, working space is larger.

Description

Integral tension formula big cross section underground structure and its construction method
Technical field
The present invention relates to the structure of underground structure and construction method, and in particular to big cross section underground structure and its construction party Method.
Background technology
Big cross section underground structure is the direction of underground structure development.It is now general at present to use for big cross section underground structure Composite lining structure, is made up of preliminary bracing and secondary lining, and preliminary bracing typically uses combined bolting and shotcrete.Combined bolting and shotcrete is by anchor The formation such as bar (or anchor cable), bar-mat reinforcement, gunite concrete, combined bolting and shotcrete forms common effect system with country rock.The master of presence Wanting deficiency is:On the one hand, traditional big cross section underground structure is not utilized sufficiently to Cable Structure, is only used as anchor Rope, is reinforced to rock stratum.On the other hand, this structure is applied after big cross section underground structure excavation, and requires timely Complete supporting.
In terms of big cross section Underground Construction, mainly there are upper half section advanced short benching tunnelling method, CD methods, two side-wall pilot tunnel Deng, but to there is excavation sequence more for these excavating loads, and working space is smaller, does not apply to big cross section supporting machineryization construction etc. no Foot.
The content of the invention
For supporting after first being excavated when overcoming prior art not make full use of, construct to Cable Structure, construction working space by The problems such as limit, the present invention is intended to provide a kind of integral tension formula underground structure, this structure takes full advantage of the tensile property of rope, Rope forms a kind of integral tension structure with country rock, and this new force structure can be the replacement of traditional force structure, while this Plant structure just to be formed before excavation, provide safety guarantee for the excavation of the underground space, full face tunneling can be carried out, work Space is larger.
Therefore, the technical solution adopted in the present invention is:A kind of integral tension formula big cross section underground structure, including interior side anchor Gu Liang (1), outside anchoring beam (2) and rope net, boundary circumferentially cloth of the inner side anchoring beam (1) in excavation cavern cross section Put, outside anchoring beam (2) is arranged circumferentially about outside the border for excavating cavern cross section, the inner side anchoring beam (1) and outer side anchor Gu Liang (2) is corresponded, and it is consistent with the bearing of trend for excavating cavern that inner side anchoring beam (1) anchors beam (2) with outside;The rope net Along the bearing of trend arranged for interval for excavating cavern, rope net includes medial strand (3), lateral funiculus (4) and radial cable (5), adjacent inboard It is connected between anchoring beam (1) by the medial strand (3), the lateral funiculus (4) phase is passed through between adjacent outer anchoring beam (2) Even, it is connected between inner side anchoring beam (1) and corresponding outside anchoring beam (2) by the radial cable (5).
Meanwhile, present invention also offers a kind of construction method of integral tension formula big cross section underground structure, including following step Suddenly:
(a) the small pilot tunnel in multiple inner sides (6), is opened up in the boundary for excavating cavern cross section, cavern cross section is being excavated Accordingly opened up outside border and offer medial strand hole between the small pilot tunnel in outside (7) of identical quantity, the small pilot tunnel of adjacent inboard (6), Lateral funiculus hole is offered between the small pilot tunnel of adjacent outer (7), footpath is offered between the small pilot tunnel in inner side and the small pilot tunnel in corresponding outside Xiang Suokong, and medial strand hole, lateral funiculus hole and radial cable hole offered along the bearing of trend compartment of terrain for excavating cavern it is multiple;
(b) inner side anchoring beam (1), is set in the small pilot tunnel in inner side (6), sets outside to anchor in the small pilot tunnel in outside (7) It is equipped with beam (2), each medial strand hole in medial strand (3), each lateral funiculus hole and is equipped with lateral funiculus (4), each radial cable Radial cable (5) is equipped with hole, two ends, the inner of radial cable (5) of medial strand (3) are anchored in corresponding inner side anchoring beam (1) On, two ends, the outer end of radial cable (5) of lateral funiculus (4) are anchored on corresponding outside anchoring beam (2);
(c) full face tunneling or two step constructions, are carried out to underground structure;
(d) combined bolting and shotcrete, is carried out to underground structure.
Beneficial effects of the present invention:Inner side anchoring beam, outside anchoring beam are used to fix rope net, and country rock is carried out using rope net Integral tension, in integral tension structure, rope net tension and country rock are pressurized, and rope net is by interior strop, outer strop and radial cable group Into specific fabulous globality.This structure has been formed before big cross section underground structure excavation, and country rock is reinforced, it After can carry out full face tunneling, increase working space.
Brief description of the drawings
Fig. 1 is the shaft side figure of integral tension formula big cross section underground structure.
Fig. 2 is Fig. 1 cross-sectional view.
Fig. 3 is outside pilot tunnel, inner side pilot tunnel, radial direction pilot tunnel layout drawing.
Fig. 4 is outside anchoring beam, inner side anchoring beam, lateral funiculus, medial strand, the layout drawing of radial cable.
Embodiment
Below by embodiment and with reference to accompanying drawing, the invention will be further described:
With reference to shown in Fig. 1~Fig. 2, a kind of integral tension formula big cross section underground structure mainly anchors beam 1, outside by inner side Anchor beam 2 and rope net composition.
Inner side anchors totally eight, beam 1, is arranged circumferentially about in the boundary for excavating cavern cross section.Outside anchoring beam 2 totally eight Root, is arranged circumferentially about outside the border for excavating cavern cross section.Inner side anchors beam 1 and corresponded with outside anchoring beam 2, quantity phase Deng, inner side anchoring beam 1 and outside, to anchor beam 2 consistent with the bearing of trend of excavation cavern.Inner side anchoring beam 1, outside anchoring beam 2 are used Rope net is fixed in installing.
Bearing of trend arranged for interval of the rope net along excavation cavern.Rope net is main by medial strand 3, lateral funiculus 4 and the structure of radial cable 5 Into.It is connected between adjacent inboard anchoring beam 1 by medial strand 3, totally eight medial strands 3, surround interior strop.Adjacent outer anchors beam It is connected between 2 by lateral funiculus 4, totally eight lateral funiculus 4, surround outer strop.Inner side anchors beam 1 and anchors beam 2 with corresponding outside Between be connected by radial cable 5, each rope net includes eight radial cables 5.Therefore, eight medial strands 3, eight lateral funiculus 4 and eight Root radial cable 5 surrounds rope net jointly.
Inner side anchoring beam 1, outside anchoring beam 2 are used to fix rope net, and integral tension structure is formed using rope net and country rock, In this integral tension structure, rope net is made up of interior strop, outer strop and radial cable, and rope net tension and country rock are pressurized, and this The specific fabulous globality of structure.
Preferably, inner side anchoring beam 1 is circumferentially uniform in the boundary for excavating cavern cross section, and outside anchoring beam 2 is being opened Dig a hole circumferentially uniform outside the border in room cross section.Bearing of trend of the rope net along excavation cavern is uniformly at intervals.
In addition, being additionally provided with spray anchor layer on the inwall for excavating cavern;Further, it is also provided with lining cutting in spray anchor layer Structure.Spray anchor layer and liner structure are set up, the split room of digging a hole further is reinforced.
Certainly, inner side anchoring beam 1, the quantity of outside anchoring beam 2 are not limited to eight, and quantity is more, and stretch-draw effect is better, but Quantity is excessive, can also increase construction volume, therefore, is selected generally according to actual conditions.
A kind of construction method of integral tension formula big cross section underground structure, comprises the following steps:
(a), as shown in figure 3, opening up the small pilot tunnel 6 in multiple inner sides in the boundary for excavating cavern cross section, cavern is being excavated Accordingly opened up outside the border in cross section and offer medial strand between the small pilot tunnel 7 in outside of identical quantity, the small pilot tunnel 6 of adjacent inboard Hole passes through for medial strand 3, and offer lateral funiculus hole between the small pilot tunnel 7 of adjacent outer passes through for lateral funiculus 4.The small pilot tunnel in inner side with it is right Radial cable hole is offered between the small pilot tunnel in outside answered for radial cable 5 to pass through.Medial strand hole, lateral funiculus hole and radial cable hole edge are opened Dig a hole room bearing of trend compartment of terrain offer it is multiple.
(b), with reference to shown in Fig. 3, Fig. 4, beam 1 is anchored on the inside of setting in the small pilot tunnel 6 in inner side, is set in the small pilot tunnel 7 in outside Put to be equipped with medial strand 3, each lateral funiculus hole in outside anchoring beam 2, each medial strand hole and be equipped with lateral funiculus 4, Mei Gejing Radial cable 5 is equipped with Xiang Suokong.Two ends, the inner of radial cable 5 of medial strand 3 are anchored on corresponding inner side anchoring beam 1, outside Two ends, the outer end of radial cable 5 of funiculus lateralis 4 are anchored on corresponding outside anchoring beam 2.During Specific construction, it is necessary to medial strand 3, Lateral funiculus 4 and radial cable 5 apply prestressing force, finally also to carry out slip casting backfill to rope hole.
(c) full face tunneling or two step constructions, are carried out to underground structure.
(d) combined bolting and shotcrete traditionally, is carried out to underground structure.
Preferably, in addition to step (e), lining construction is carried out after combined bolting and shotcrete.
Step (c), step (d) and step (e) are traditional construction method, be will not be repeated here.

Claims (7)

1. a kind of integral tension formula big cross section underground structure, it is characterised in that:Including inner side anchoring beam (1), outside anchoring beam (2) With rope net, the inner side anchoring beam (1) is arranged circumferentially about in the boundary for excavating cavern cross section, and outside anchoring beam (2) is being opened Dig a hole room cross section border outside be arranged circumferentially about, inner side anchoring beam (1) is corresponded with outside anchoring beam (2), inner side Anchor beam (1) consistent with the bearing of trend for excavating cavern with outside anchoring beam (2);Bearing of trend of the rope net along excavation cavern Arranged for interval, rope net is included between medial strand (3), lateral funiculus (4) and radial cable (5), adjacent inboard anchoring beam (1) by described Medial strand (3) is connected, and is connected between adjacent outer anchoring beam (2) by the lateral funiculus (4), inner side anchoring beam (1) with it is corresponding Outside anchoring beam (2) between be connected by the radial cable (5).
2. integral tension formula big cross section underground structure according to claim 1, it is characterised in that:The inner side anchors beam (1) circumferentially uniform in the boundary for excavating cavern cross section, outside anchoring beam (2) is in outside the border for excavating cavern cross section Circumference uniform distribution.
3. integral tension formula big cross section underground structure according to claim 1, it is characterised in that:Excavate hole in the rope net edge The bearing of trend of room is uniformly at intervals.
4. integral tension formula big cross section underground structure according to claim 1, it is characterised in that:The excavation cavern it is interior Spray anchor layer is additionally provided with wall.
5. integral tension formula big cross section underground structure according to claim 4, it is characterised in that:Also set in the spray anchor layer It is equipped with liner structure.
6. a kind of construction method of integral tension formula big cross section underground structure, it is characterised in that comprise the following steps:
(a) the small pilot tunnel in multiple inner sides (6), is opened up in the boundary for excavating cavern cross section, the border in cavern cross section is being excavated Medial strand hole is offered between the outer small pilot tunnel in outside (7) for accordingly opening up identical quantity, the small pilot tunnel of adjacent inboard (6), it is adjacent Lateral funiculus hole is offered between the small pilot tunnel in outside (7), radial cable is offered between the small pilot tunnel in inner side and the small pilot tunnel in corresponding outside Hole, and medial strand hole, lateral funiculus hole and radial cable hole offered along the bearing of trend compartment of terrain for excavating cavern it is multiple;
(b) inner side anchoring beam (1), is set in the small pilot tunnel in inner side (6), anchoring beam in outside is set in the small pilot tunnel in outside (7) (2), it is equipped with each medial strand hole in medial strand (3), each lateral funiculus hole and is equipped with lateral funiculus (4), each radial cable hole Radial cable (5) is inside equipped with, two ends, the inner of radial cable (5) of medial strand (3) are anchored in corresponding inner side anchoring beam (1), outside Two ends, the outer end of radial cable (5) of funiculus lateralis (4) are anchored on corresponding outside anchoring beam (2);
(c) full face tunneling or two step constructions, are carried out to underground structure;
(d) combined bolting and shotcrete, is carried out to underground structure.
7. the construction method of integral tension formula big cross section underground structure according to claim 6, it is characterised in that:Also include Step (e), carries out lining construction after combined bolting and shotcrete.
CN201510477881.0A 2015-08-06 2015-08-06 Integral tension formula big cross section underground structure and its construction method Active CN105019463B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510477881.0A CN105019463B (en) 2015-08-06 2015-08-06 Integral tension formula big cross section underground structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510477881.0A CN105019463B (en) 2015-08-06 2015-08-06 Integral tension formula big cross section underground structure and its construction method

Publications (2)

Publication Number Publication Date
CN105019463A CN105019463A (en) 2015-11-04
CN105019463B true CN105019463B (en) 2017-10-03

Family

ID=54409734

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510477881.0A Active CN105019463B (en) 2015-08-06 2015-08-06 Integral tension formula big cross section underground structure and its construction method

Country Status (1)

Country Link
CN (1) CN105019463B (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08218378A (en) * 1995-02-15 1996-08-27 Taisei Corp Earth retaining method
CN201224864Y (en) * 2008-07-15 2009-04-22 张国志 Suspension cable type pedestrian overpass
CN103306682B (en) * 2013-06-26 2015-03-25 中国电建集团中南勘测设计研究院有限公司 Long-span and high-side-wall underground space building and excavation support method thereof
CN104632246B (en) * 2014-09-01 2017-07-14 中车建设工程有限公司 A kind of UNDERGROUND STRUCTURES
CN204825917U (en) * 2015-08-06 2015-12-02 北车建设工程有限责任公司 Big section underground structure of whole stretch -draw formula

Also Published As

Publication number Publication date
CN105019463A (en) 2015-11-04

Similar Documents

Publication Publication Date Title
CN101806217B (en) Tunneling method for three-line parallel small-distance shallow-buried and unsymmetrical-pressure tunnel groups
CN102226399A (en) Soft rock four-line large-span tunnel three-bench cable-bracing excavation construction method
CN102226398A (en) Soft rock four-line large-span tunnel compound double-side wall bracing cable conversion excavation construction method
CN104806252B (en) Underground dome excavation construction arrangement and excavation method
CN102121385B (en) Tunnel excavation method for extending existing single-hole tunnel into double-arch tunnel
CN101725358A (en) Excavation construction method of ultra-shallow buried uneven weathered stratum of tunnel
CN105134269B (en) Control method for roadway surrounding rock achieving cooperative load bearing by enabling anchor cables to penetrate through sheds
CN107143338B (en) A kind of coal mine roadway driving and method for protecting support
CN102312672A (en) Fast large-cross-section tunnel construction method adapting to complicated and variable geological conditions
CN104405411B (en) Oversized variable cross section tunnel supporting structure
CN109763827B (en) Shaft shield construction method and shaft shield machine
CN103306713A (en) Networking reinforcement method for cross drilling holes of outburst coal seam
CN105909263A (en) Eolian sand stratum highway tunnel structure and construction method thereof
CN109026012A (en) Vertical shaft surrounding rock supporting structure and its excavation supporting method
CN104632227A (en) Subway station excavation technology of single-layer beam arch structure
CN202500582U (en) Tunnel supporting structure and tunnel
JP2007303155A (en) Construction method of underground cavity and tunnel construction method
CN104533431A (en) Construction method for multiple-arch tunnel without middle walls
CN105019463B (en) Integral tension formula big cross section underground structure and its construction method
CN205805546U (en) A kind of drift-sand stratum highway tunnel structure
CN204825917U (en) Big section underground structure of whole stretch -draw formula
CN104453915A (en) Large-section vertical shaft pre-grouting reinforcement quick excavation method
CN106640118B (en) A kind of underground cavern crown structure, underground chamber and Cavity Construction method
CN109594993A (en) A kind of tunnel enlarging construction method in the case of uninterrupted traffic
CN105065032A (en) Large cross-section tunnel supporting system construction method applicable to steep dip layered rock mass

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 100078 Beijing city Fengtai District park is a district 15 building five floor 501, 503

Applicant after: CRRC CONSTRUCTION ENGINEERING Co.,Ltd.

Address before: 100078 Beijing city Fengtai District park is a district 15 building five floor 501, 503

Applicant before: CNR CONSTRUCTION ENGINEERING Co.,Ltd.

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 100078 501, 503, 5th floor, building 15, fangchengyuan 1st District, Fengtai District, Beijing

Patentee after: CRRC Intelligent Transportation Engineering Technology Co.,Ltd.

Address before: 100078 501, 503, 5th floor, building 15, fangchengyuan 1st District, Fengtai District, Beijing

Patentee before: CRRC CONSTRUCTION ENGINEERING Co.,Ltd.

CP01 Change in the name or title of a patent holder