CN104806252B - Underground dome excavation construction arrangement and excavation method - Google Patents

Underground dome excavation construction arrangement and excavation method Download PDF

Info

Publication number
CN104806252B
CN104806252B CN201510206255.8A CN201510206255A CN104806252B CN 104806252 B CN104806252 B CN 104806252B CN 201510206255 A CN201510206255 A CN 201510206255A CN 104806252 B CN104806252 B CN 104806252B
Authority
CN
China
Prior art keywords
annular base
excavation
tunnels
dome
face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510206255.8A
Other languages
Chinese (zh)
Other versions
CN104806252A (en
Inventor
刘建友
赵勇
田四明
唐国荣
王德福
陈学峰
吕刚
马福东
王婷
李力
杨甲豹
朱敏
郭磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Engineering Consulting Group Co Ltd
Original Assignee
China Railway Engineering Consulting Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Engineering Consulting Group Co Ltd filed Critical China Railway Engineering Consulting Group Co Ltd
Priority to CN201510206255.8A priority Critical patent/CN104806252B/en
Publication of CN104806252A publication Critical patent/CN104806252A/en
Application granted granted Critical
Publication of CN104806252B publication Critical patent/CN104806252B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The present invention relates to underground engineering technical field is and in particular to underground dome excavation construction arrangement and excavation method.This Construction Arrangement structure includes:Centre strut and construction passage;Construction passage extends to centre strut from outside the dome of underground;Centre strut is the step-like column construction successively decreasing from bottom to top;The excavation that the side of centre strut arranges III annular base tunnel from bottom to top uncovers face, and the excavation of I 3 annular base tunnels uncovers face, and the excavation of I 1 annular base tunnels uncover face, the excavation of II annular base tunnel of face, the excavation of I 2 annular base tunnels that uncover uncovers face;In centre strut, setting " ten " font excavates the face that uncovers.First reserve centre strut in excavation, then excavate dome annular base tunnel country rock, then central excavation pillar.This Construction Arrangement and excavation method can reduce temporary support, save construction costs, improve the safety of the stability of country rock and construction in dome digging process simultaneously.

Description

Underground dome excavation construction arrangement and excavation method
Technical field
The present invention relates to underground engineering technical field is and in particular to underground dome excavation construction arrangement and excavation side Method.
Background technology
At present, the digging construction method in tunnel is more, including full section method, benching tunnelling method, two side-wall pilot tunnel, median septum method etc., Technical comparing is ripe, disclosure satisfy that the tunnel excavation of different section size under the conditions of different surrounding rock.And for large-scale underground vault Roof construction, because moulding is special, force-bearing of surrounding rock mass state is also complex, there is presently no the excavation method of maturation, needs to increase Excessive temporary support.
Content of the invention
Embodiments of the invention provide a kind of underground dome excavation construction arrangement and excavation method, can solve the problem that tradition Excavation method difficulty or ease adapt to the construction of Large Span Underground dome, and excessive temporary support increases the problem excavating cost.
A kind of underground dome excavation construction arrangement is provided according to an aspect of the present invention, including:Centre strut and Construction passage;Described construction passage extends to described centre strut from outside the dome of underground;Described centre strut is to pass from bottom to top The step-like column construction subtracting;The excavation that the side of described centre strut arranges III annular base tunnel from bottom to top uncovers face, I 3 rings The excavation of shape base tunnel uncovers face, and uncover face, the excavation of I 2 annular base tunnels of the excavation of I 1 annular base tunnels uncovers face, II annular base tunnel Excavation uncovers face;In described centre strut, setting " ten " font excavates the face that uncovers.
In certain embodiments, preferably, described I 1 annular base tunnels than described I 2 annular base tunnels advanced 3-5 rice, described I 2 Annular base tunnel advanced 3-5 rice than described I 3 annular base tunnels.
In certain embodiments, preferably, described I 1 annular base tunnels, I 2 annular base tunnels, I 3 annular base tunnels, described II Annular base tunnel, the described III annular face of base tunnel, the face at described centre strut top be sprayed with successively from inside to outside concrete layer, Steel fiber reinforced concrete layer;Described steel fiber reinforced concrete layer hangs bar-mat reinforcement, and described concrete layer anchors the first hollow bolt, in second Spare anchor bar;The length of described first anchor pole is more than the length of described second anchor pole, and described first anchor pole and described second anchor pole are handed over For arrangement.
In certain embodiments, preferably, described underground dome excavation construction arrangement also includes the first prestressing force Anchor cable is arranged, and described first prestress anchorage cable is arranged as circulus, is surrounded by multiple the first uniformly alternate prestress anchorage cables, each One end of described first prestress anchorage cable is anchored in the face of described I 3 annular base tunnels;Two neighboring first prestressed anchor grommet It is setting value to spacing.
In certain embodiments, preferably, described underground dome excavation construction arrangement also includes the second prestressing force Anchor cable is arranged, and described second prestress anchorage cable is arranged as circulus, is surrounded by multiple the second uniformly alternate prestress anchorage cables, each One end of described second prestress anchorage cable is anchored in the face of described III annular base tunnel;Two neighboring second prestressed anchor grommet It is setting value to spacing.
Present invention also offers a kind of dome excavation method of underground, it includes:
Step 1, reserved centre strut supports annular base tunnel country rock on dome;
Step 2, excavates dome annular base tunnel country rock, and carries out support reinforcement;Described dome annular base tunnel includes:From lower and On III annular base tunnel, I 3 annular base tunnels, I 1 annular base tunnels, I 2 annular base tunnels, II annular base tunnel;
Step 3, excavates annular base tunnel core column in center " ten " cabinet frame of described centre strut, carries out support reinforcement;
Step 4, excavates described centre strut remaining annular base tunnel, carries out support reinforcement.
In certain embodiments, preferably, described step 2 includes:
Step 21, benching tunnelling method excavates I 1 annular base tunnels, I 2 annular base tunnels, I 3 annular base tunnels, carries out support reinforcement, and wherein I 1 Annular base tunnel is between I 2 annular base tunnels and I 3 annular base tunnels;
Step 22, excavates II annular base tunnel above I 2 annular base tunnels, carries out support reinforcement;
Step 23, excavates III annular base tunnel below I 3 annular base tunnels, carries out support reinforcement.
In certain embodiments, preferably, described step 21 includes:
I 1 annular base tunnels, I 2 annular base tunnels, I 3 annular base tunnels are excavated successively using benching tunnelling method, described I 1 annular base tunnels compare institute State I 2 annular base tunnel advanced 3-5 rice, described I 2 annular base tunnels advanced 3-5 rice than described I 3 annular base tunnels;
Just stir cement and soft soil in deep ground, then hangs bar-mat reinforcement;
Pneumatically placed concrete again, annular anchoring the first hollow bolt, the second hollow bolt, the length of described first anchor pole is more than institute State the length of the second anchor pole, described first anchor pole and described second anchor pole are alternately arranged;
Annular anchors multiple first prestress anchorage cables.
In certain embodiments, preferably, described step 3 includes:
In described centre strut " ten " font to wearing in excavation annular base tunnel core column;
Just stir cement and soft soil in deep ground, then hangs bar-mat reinforcement;
Pneumatically placed concrete again, annular anchoring the first hollow bolt, the second hollow bolt, the length of described first anchor pole is more than institute State the length of the second anchor pole, described first anchor pole and described second anchor pole are alternately arranged;
Annular anchors multiple second prestress anchorage cables.
In certain embodiments, preferably, after described step 4, the dome excavation method of described underground also includes:
Remove gib;
Benching tunnelling method excavates remaining rock mass successively, builds tunnel floor and paving.
The underground dome excavation construction arrangement being provided by embodiments of the invention and excavation method, with prior art Compare, using reserved centre strut region, dome country rock is supported with the core column reserved to dome central authorities, improves stablizing of country rock Property;Neutral pillar is reduce successively from top to bottom step-like, carries out annular excavation with guide pit, carry out supporting in digging process and add Gu, last central excavation pillar, and progressively carry out support reinforcement.This Construction Arrangement and excavation method can reduce interim Support, saves construction costs, improves the safety of the stability of country rock and construction in dome digging process simultaneously.
Brief description
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing The accompanying drawing having required use in technology description is described it is clear that combining the technical scheme that accompanying drawing is described being only Some embodiments of the present invention, for those of ordinary skills, on the premise of not paying creative work, also may be used To obtain other embodiments and its accompanying drawing according to these accompanying drawing illustrated embodiments.
Fig. 1 is underground dome excavation construction arrangement generalized section in one embodiment of the invention;
Fig. 2 is underground dome excavation construction arrangement floor map in Fig. 1 of the present invention;
Fig. 3 is to excavate I 1 annular base tunnels, I 2 annular base tunnels, the excavation structure of I 3 annular base tunnels in one embodiment of the invention Generalized section;
Fig. 4 is Fig. 3 of the present invention corresponding excavation plane graph;
Fig. 5 is the excavation structural profile schematic diagram excavating II annular base tunnel in one embodiment of the invention;
Fig. 6 is Fig. 4 of the present invention corresponding excavation plane graph;
Fig. 7 is the excavation structural profile schematic diagram excavating III annular base tunnel in one embodiment of the invention;
Fig. 8 is Fig. 7 of the present invention corresponding excavation plane graph;
Fig. 9 is that the excavation structural profile of central excavation pillar " ten " font annular base tunnel in one embodiment of the invention shows It is intended to;
Figure 10 is Fig. 9 of the present invention corresponding excavation plane graph;
Figure 11 is that in one embodiment of the invention, the remaining cross section of central excavation pillar is opening of fan-shaped annular base tunnel Digging structure generalized section;
Figure 12 is Figure 11 of the present invention corresponding excavation plane graph.
Specific embodiment
Below with reference to accompanying drawing, clearly complete description is carried out it is clear that being retouched to the technical scheme of various embodiments of the present invention The embodiment stated is only a part of embodiment of the present invention, rather than whole embodiments.Based on the embodiment in the present invention, this The obtained all other embodiment on the premise of not needing creative work of field those of ordinary skill, all in institute of the present invention In the range of protection.
Need, using excessive gib, to open when considering that ultra-large type underground dome is using existing dome excavation technology up till now Scrape out this increase, and excavate the problem that safety is difficult to ensure that, present embodiments provide a kind of underground dome excavation construction arrangement knot Structure and excavation method.
A kind of underground dome excavation construction arrangement, including:Centre strut and construction passage;Construction passage is from underground vault Top is outer to extend to centre strut;Centre strut is the step-like column construction successively decreasing from bottom to top;The side of centre strut under And the excavation of the annular base tunnel of upper setting III uncovers face, the excavation of I 3 annular base tunnels uncovers face, the excavation of I 1 annular base tunnels uncover face, Uncover face, the excavation of II annular base tunnel of the excavation of I 2 annular base tunnels uncovers face;In centre strut, setting " ten " font excavates and uncovers Face.
A kind of dome excavation method of underground, including:Step 1, reserved centre strut supports annular base tunnel country rock on dome;Step Rapid 2, excavate dome annular base tunnel country rock, and carry out support reinforcement;Dome annular base tunnel includes:III annular from bottom to top is led Hole, I 3 annular base tunnels, I 1 annular base tunnels, I 2 annular base tunnels, II annular base tunnel;Step 3, center " ten " word of central excavation pillar In frame, annular base tunnel core column, carries out support reinforcement;Step 4, central excavation pillar remaining annular base tunnel, carry out supporting and add Gu.
Using reserved centre strut region, dome country rock is supported with the core column reserved to dome central authorities, improves country rock Stability;Neutral pillar is reduce successively from top to bottom step-like, carries out annular excavation with guide pit, carry out in digging process Shield is reinforced, last central excavation pillar, and progressively carries out support reinforcement.This Construction Arrangement and excavation method can reduce temporarily Support, save construction costs, improve the safety of the stability of country rock and construction in dome digging process simultaneously.
Next each technical scheme is described in detail:
The present invention, in order to reduce the use of falsework, reserves centre strut region first, supports dome with centre strut Upper annular base tunnel country rock, subsequently carries out the dome annular excavation of base tunnel and supporting, subsequently central excavation pillar again.Applied based on this Work core concept, inventor carries out the arrangement of structure first to underground dome excavation construction, such as Fig. 1, shown in 2:
Including:Centre strut and construction passage 1;Centre strut is to be reserved, and construction passage 1 is to enter vault outside the dome of underground The main thoroughfare excavated in top, construction passage 1 extends to centre strut from outside the dome of underground.This passage is unobstructed be two with On, and with centre strut for symmetrical centre symmetrically, excavate from symmetrical direction and can keep integrally-built stable.Center Pillar is different from the basically identical cylinder of conventional diameter of section up and down, and this centre strut is the step-like post successively decreasing from bottom to top Shape structure, forms bottom greatly, and the little structure in top can improve the support force of central area further.The side of centre strut is certainly The excavation of the annular base tunnel of lower and upper setting III uncovers face, and the excavation of I 3 annular base tunnels uncovers face, and the excavation of I 1 annular base tunnels uncovers Uncover face, the excavation of II annular base tunnel of face, the excavation of I 2 annular base tunnels uncovers face, and in centre strut, setting " ten " font excavates and connects Show up, construction passage 1 all has duck eye (working tunnel) to extend to these excavations corresponding to uncover face.
Based on the centre strut of above-mentioned step-like structure, I 1 annular base tunnels advanced 3-5 rice than I 2 annular base tunnels, I 2 annulars are led Hole advanced 3-5 rice than I 3 annular base tunnels, I 1 annular base tunnels are between I 2 annular base tunnels and I 3 annular base tunnels, I 3 annular base tunnels and The I 1 annular excavation with guide pits face that uncovers is same step side, and the excavation of the I 2 annular base tunnels face that uncovers is that I 1 annular excavation with guide pits uncover Face place step upper level step.
Need to carry out in time support reinforcement after annular excavation with guide pit, therefore, I 1 annular base tunnels, I 2 annular base tunnels, I 3 rings Shape base tunnel, II annular base tunnel, the III annular face of base tunnel, the face at centre strut top are sprayed with concrete from inside to outside successively Layer, steel fiber reinforced concrete layer;Spray the steel fiber reinforced concrete layer of C30 first, thickness, at 5 centimetres, subsequently sprays C25 concrete layer, thick Degree is at 20 centimetres.Wherein steel fiber reinforced concrete layer hangs Φ 6 bar-mat reinforcement, and steel fiber reinforced concrete layer is reinforced further.Coagulation Soil layer anchors the first hollow bolt, the second hollow bolt;The length of the first anchor pole 2 is more than the length of the second anchor pole 3, the first anchor pole 2 and second anchor pole 3 be alternately arranged.First anchor pole 2 is Φ 28 first hollow anchor bar, L=6m;Second anchor pole 3 is that Φ 22 second is empty Heart anchor pole, L=3m.
In order to reinforce further, in the technology of technique scheme, inventor has and has carried out Design of Reinforcement further, should Arrangement also includes prestress anchorage cable row, (does not carry out the first prestressing force by multiple uniformly alternate prestress anchorage cables herein Anchor cable, the differentiation of the second prestress anchorage cable, what it adopted is all prestress anchorage cable, and numbering is intended merely to say in detail in the claims Bright becomes apparent from) surround, one end of each prestress anchorage cable is anchored in face (the specifically face of I 3 annular base tunnels The concrete layer of spray);Because I 3 annular base tunnels are loop configuration, therefore prestress anchorage cable is arranged as circulus, two neighboring pre- Stress anchor cable circumferential distance be setting value, setting value can according to the size specifically descending dome, and prestress anchorage cable diameter, Determining, those skilled in the art can implement according to general knowledge for number, length.
Similar with technique scheme, also include prestress anchorage cable row, surrounded by multiple uniformly alternate prestress anchorage cables, Each prestress anchorage cable (does not carry out the first prestress anchorage cable, the differentiation of the second prestress anchorage cable, what it adopted is all pre- herein Stress anchor cable, what numbering was intended merely to illustrate in detail in the claims becomes apparent from) one end be anchored in the area of III annular base tunnel The concrete layer in face;Its support reinforcement is carried out to III annular base tunnel.Prestress anchorage cable is arranged as circulus, two neighboring prestressed anchor Rope circumferential distance is setting value, setting value can according to the size specifically descending dome, and the diameter of prestress anchorage cable, number, Determining, those skilled in the art can implement length according to general knowledge.
In addition, reinforce the first anchor pole 2 in III annular excavation with guide pit, after the second anchor pole 3, also carried out annular collar tie beam plus Gu.The width of annular collar tie beam and high all according to the size of dome, highly determining, those skilled in the art can be real according to existing knowledge Apply.
This Construction Arrangement structure dome above centre strut has similarly sprayed steel fiber reinforced concrete layer, concrete layer, Hang bar-mat reinforcement in steel fiber reinforced concrete layer simultaneously, anchor the first anchor pole 2, the second anchor pole 3 in concrete layer, the two length is different, Distribute alternately.
Next, digging in-situ is carried out based on underground dome excavation construction arrangement in above-mentioned each technical scheme:
Step 101, reserved centre strut supports annular base tunnel country rock on dome;
Step 102, excavates dome annular base tunnel country rock, and carries out support reinforcement;
Dome annular base tunnel includes:The annular base tunnel of III from bottom to top, I 3 annular base tunnels, I 1 annular base tunnels, I 2 annulars are led Hole, II annular base tunnel;
Step 103, in center " ten " cabinet frame of central excavation pillar, annular base tunnel core column, carries out support reinforcement;
Step 104, central excavation pillar remaining annular base tunnel, carry out support reinforcement.
Next, being illustrated to above-mentioned excavation method by a specific embodiment:
The first step, as shown in Figure 3,4, adopts little pilot tunnel to enter collecting and distributing hall by main channel, excavates I successively using benching tunnelling method 1st, I 2, I 3 annular base tunnel, wherein I 1 annular base tunnels 3-5m more advanced than I 2 annular base tunnels, I 2 annular base tunnels are more advanced than I 3 annular base tunnels 3-5m;5cm thickness C30 steel fiber reinforced concrete is just sprayed after excavation;After hanging Φ 6 bar-mat reinforcement@20cm × 20cm, then it is mixed to spray 20cm thickness C25 Solidifying soil;Perform Φ 28 ,@1.5 × 1.5m, L=6m hollow bolt 22;Φ 22 ,@1.5 × 1.5m, L=3m hollow bolt 3, length It is alternately arranged;Perform first row 1000KN prestress anchorage cable 4, long 20m, circumferential distance 2.5m.Using Φ 28 ,@1.5 × 1.5m, L =6m grouting rock bolt 5 anchors.
Second step, excavates II annular base tunnel rock mass, as shown in Figure 5,6;5cm thickness C30 steel fiber reinforced concrete is just sprayed after excavation; After hanging Φ 6 bar-mat reinforcement@20cm × 20cm, then spray 20cm thickness C25 concrete;Perform Φ 28 hollow bolt 2@1.5 × 1.5m, L= 6m;Φ 22 hollow bolt 3@1.5 × 1.5m, L=3m, anchor pole length is alternately arranged.
3rd step, excavates III annular base tunnel rock mass, as shown in Figure 7,8;5cm thickness C30 steel fiber reinforced concrete is just sprayed after excavation; After hanging Φ 6 bar-mat reinforcement@20cm × 20cm, then spray 20cm thickness C25 concrete;Perform Φ 28 hollow bolt 2@1.5 × 1.5m, L= 6m;Φ 22 hollow bolt 3@1.5 × 1.5m, L=3m, anchor pole length is alternately arranged;Perform second row 1000KN prestress anchorage cable 4, long 20m, circumferential distance 2.5m;Perform annular collar tie beam, collar tie beam width 1.0m, high 1.35m.
4th step, " cross " to wearing in excavation annular base tunnel core column, as shown in Fig. 9,10;After excavation, just spray 5cm is thick C30 steel fiber reinforced concrete;After hanging Φ 6 bar-mat reinforcement@20cm × 20cm, then spray 20cm thickness C25 concrete;Perform Φ 28 hollow bolt 2@1.5 × 1.5m, L=6m;Φ 22 hollow bolt 3@1.5 × 1.5m, L=3m, anchor pole length is alternately arranged.
5th step, excavates V annular base tunnel rock mass, as shown in Figure 11,12;5cm thickness C30 steel fibre coagulation is just sprayed after excavation Soil;After hanging Φ 6 bar-mat reinforcement@20cm × 20cm, then spray 20cm thickness C25 concrete;Perform Φ 28 hollow bolt 2@1.5 × 1.5m, L =6m;Φ 22 hollow bolt 3@1.5 × 1.5m, L=3m, anchor pole length is alternately arranged.
6th step, after just Zhi Wending, removes gib, benching tunnelling method excavates remaining rock mass successively, performs tunnel floor And paving.
The core concept of the technical program is first Ring Cutting dome surrounding country rock, and reserved central nucleuss stem supports on dome Annular base tunnel country rock, makes full use of the reserved core column in dome central authorities and supports dome country rock, to ensure the stability of country rock, treat vault After top apical ring shape base tunnel support construction completes and stablizes, then excavate core column.The arrangement of this excavation sequence can be fully sharp With the supporting role of central nucleuss stem, thus significantly reducing temporary support, saving construction costs, improve dome simultaneously and open The safety of the stability of country rock and construction during digging.
The various embodiments that the present invention provides can be mutually combined as needed in any way, is obtained by this combination Technical scheme, also within the scope of the invention.
Obviously, without departing from the spirit and scope of the present invention, those skilled in the art can enter to the present invention Row is various to be changed and modification.If changing to these of the present invention and modification being in the claim of the present invention and its equivalent Within the scope of, then the present invention also will comprise these changes and modification.

Claims (10)

1. a kind of underground dome excavation construction arrangement is it is characterised in that include:Centre strut and construction passage;Described apply Work passage extends to described centre strut from outside the dome of underground, and described passage is two or more, and with centre strut be symmetrically in The heart is symmetrical;Described centre strut is the step-like column construction successively decreasing from bottom to top, and bottom is big, and top is little;Described center The excavation that the side of pillar arranges III annular base tunnel from bottom to top uncovers face, and the excavation of I 3 annular base tunnels uncovers face, and I 1 annulars are led The excavation in hole uncover face, the excavation of II annular base tunnel of face, the excavation of I 2 annular base tunnels that uncover uncovers face;Set in described centre strut Put " ten " font and excavate the face that uncovers.
2. underground as claimed in claim 1 dome excavation construction arrangement is it is characterised in that described I 1 annular base tunnels compare institute State I 2 annular base tunnel advanced 3-5 rice, described I 2 annular base tunnels advanced 3-5 rice than described I 3 annular base tunnels.
3. underground as claimed in claim 2 dome excavation construction arrangement is it is characterised in that described I 1 annulars are led Hole, I 2 annular base tunnels, I 3 annular base tunnels, described II annular base tunnel, the face of described III annular base tunnel, described centre strut top The face in portion is sprayed with concrete layer, steel fiber reinforced concrete layer from inside to outside successively;Described steel fiber reinforced concrete layer hangs bar-mat reinforcement, described Concrete layer anchors the first hollow bolt, the second hollow bolt;The length of described first anchor pole is more than the length of described second anchor pole Degree, described first anchor pole and described second anchor pole are alternately arranged.
4. the underground dome excavation construction arrangement as described in any one of claim 1-3 is it is characterised in that also include first Prestress anchorage cable is arranged, and described first prestress anchorage cable is arranged as circulus, is enclosed by multiple the first uniformly alternate prestress anchorage cables Become, one end of each described first prestress anchorage cable is anchored in the face of described I 3 annular base tunnels;Two neighboring first in advance should Power anchor cable circumferential distance is setting value.
5. underground as claimed in claim 4 dome excavation construction arrangement is it is characterised in that also include the second prestressed anchor Rope is arranged, and described second prestress anchorage cable is arranged as circulus, is surrounded by multiple the second uniformly alternate prestress anchorage cables, each institute The one end stating the second prestress anchorage cable is anchored in the face of described III annular base tunnel;Two neighboring second prestress anchorage cable ring Spacing is setting value.
6. a kind of dome excavation method of underground is it is characterised in that include:
Step 1, reserved centre strut supports annular base tunnel country rock on dome;
Step 2, excavates dome annular base tunnel country rock, and carries out support reinforcement;Described dome annular base tunnel includes:From bottom to top III annular base tunnel, I 3 annular base tunnels, I 1 annular base tunnels, I 2 annular base tunnels, II annular base tunnel;
Step 3, excavates annular base tunnel core column in center " ten " cabinet frame of described centre strut, carries out support reinforcement;
Step 4, excavates described centre strut remaining annular base tunnel, carries out support reinforcement.
7. underground as claimed in claim 6 dome excavation method is it is characterised in that described step 2 includes:
Step 21, benching tunnelling method excavates I 1 annular base tunnels, I 2 annular base tunnels, I 3 annular base tunnels, carries out support reinforcement, wherein I 1 annulars Base tunnel is between I 2 annular base tunnels and I 3 annular base tunnels;
Step 22, excavates II annular base tunnel above I 2 annular base tunnels, carries out support reinforcement;
Step 23, excavates III annular base tunnel below I 3 annular base tunnels, carries out support reinforcement.
8. underground as claimed in claim 7 dome excavation method is it is characterised in that described step 21 includes:
I 1 annular base tunnels, I 2 annular base tunnels, I 3 annular base tunnels, described I 1 annular base tunnel ratios described I 2 are excavated successively using benching tunnelling method The advanced 3-5 rice of annular base tunnel, described I 2 annular base tunnels advanced 3-5 rice than described I 3 annular base tunnels;
Just stir cement and soft soil in deep ground, then hangs bar-mat reinforcement;
Pneumatically placed concrete again, annular anchoring the first hollow bolt, the second hollow bolt, the length of described first anchor pole is more than described the The length of two anchor poles, described first anchor pole and described second anchor pole are alternately arranged;
Annular anchors multiple first prestress anchorage cables.
9. the underground dome excavation method as described in any one of claim 6-8 is it is characterised in that described step 3 includes:
In described centre strut " ten " font to wearing in excavation annular base tunnel core column;
Just stir cement and soft soil in deep ground, then hangs bar-mat reinforcement;
Pneumatically placed concrete again, annular anchoring the first hollow bolt, the second hollow bolt, the length of described first anchor pole is more than described the The length of two anchor poles, described first anchor pole and described second anchor pole are alternately arranged;
Annular anchors multiple second prestress anchorage cables.
10. underground as claimed in claim 9 dome excavation method is it is characterised in that after described step 4, described underground vault Top excavation method also includes:
Remove gib;
Benching tunnelling method excavates remaining rock mass successively, builds tunnel floor and paving.
CN201510206255.8A 2015-04-28 2015-04-28 Underground dome excavation construction arrangement and excavation method Active CN104806252B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510206255.8A CN104806252B (en) 2015-04-28 2015-04-28 Underground dome excavation construction arrangement and excavation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510206255.8A CN104806252B (en) 2015-04-28 2015-04-28 Underground dome excavation construction arrangement and excavation method

Publications (2)

Publication Number Publication Date
CN104806252A CN104806252A (en) 2015-07-29
CN104806252B true CN104806252B (en) 2017-03-01

Family

ID=53691404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510206255.8A Active CN104806252B (en) 2015-04-28 2015-04-28 Underground dome excavation construction arrangement and excavation method

Country Status (1)

Country Link
CN (1) CN104806252B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105003271B (en) * 2015-08-17 2017-03-08 长江勘测规划设计研究有限责任公司 Underground nuclear power station nuclear reactor cavern large-span domes excavate structure and excavation method
CN105201532B (en) * 2015-09-11 2017-09-22 中铁九局集团第二工程有限公司 The Ring Cutting construction method of underground Long span spherical crown shape dome under weak surrounding rock
CN106246192A (en) * 2016-08-22 2016-12-21 北京市政路桥股份有限公司 Large-scale karst cave treatment under a kind of tunnel basis and base plate and tunnel excavation method
CN106246191B (en) * 2016-08-22 2018-10-30 北京市市政工程研究院 A kind of hole body is dredged, fills plentiful large-scale karst cave treatment and tunnel excavation method deeply
CN106640093A (en) * 2017-01-11 2017-05-10 中铁四局集团第工程有限公司 Tunnel excavating face blasting construction method
CN107130977B (en) * 2017-06-27 2023-10-10 长江勘测规划设计研究有限责任公司 Hollow guide excavation structure and excavation method for ultra-large span dome of underground nuclear reactor cavity
CN107288654A (en) * 2017-06-27 2017-10-24 长江勘测规划设计研究有限责任公司 Super-span dome hollow ring in underground nuclear reactor cavern excavates structure and excavation method
CN111550249B (en) * 2020-05-14 2021-10-22 中国水利水电第五工程局有限公司 Method for excavating hyperbolic inverted suspension dome in vertical shaft
CN112129183A (en) * 2020-09-23 2020-12-25 中铁四局集团有限公司 Hyperboloid cave depot dome accurate and rapid forming blasting excavation method
CN113969796B (en) * 2021-11-02 2023-08-11 中铁二十四局集团有限公司 Sector excavation and support method for large-span tank room dome cross pilot tunnel
CN114109449B (en) * 2021-11-22 2023-08-08 中国电建集团成都勘测设计研究院有限公司 Large-span underground cavern dome supporting structure

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4370077A (en) * 1980-08-04 1983-01-25 Colgate Stirling A Method of pressurizing and stabilizing rock by periodic and repeated injections of a settable fluid of finite gel strength
CN103174429B (en) * 2013-03-01 2015-05-20 河海大学 Underground cavity extra-large dome excavating construction method
CN103256053B (en) * 2013-05-21 2015-07-22 中铁十六局集团第四工程有限公司 Excavation and construction method of underground cavity ball coronary dome
CN203867584U (en) * 2014-05-13 2014-10-08 中国水电顾问集团华东勘测设计研究院有限公司 Large diameter underground cavity dome supporting strengthening structure
CN203962002U (en) * 2014-06-13 2014-11-26 长江勘测规划设计研究有限责任公司 The reserved center of underground nuclear reactor cavern super-span dome rock pillar Construction Arrangement
CN204532356U (en) * 2015-04-28 2015-08-05 中铁工程设计咨询集团有限公司 Underground dome excavation construction arrangement

Also Published As

Publication number Publication date
CN104806252A (en) 2015-07-29

Similar Documents

Publication Publication Date Title
CN104806252B (en) Underground dome excavation construction arrangement and excavation method
CN104453921B (en) A kind of Soft Rock Tunnel Excavation construction technology
CN105443132B (en) Shallow buried covered excavation cross stull method for tunnel construction
CN102128035B (en) Construction method of bilateral biased small-clear distance tunnel
CN105041349B (en) A kind of excavating construction method that station is digged on the basis of Subway Tunnel shield tunnel
CN106337686B (en) Three layers of subway station canopy structure of rocky stratum tunneling and construction method
CN104612698B (en) A kind of shallow-depth-excavation tunnel top bar interval wall construction method
CN102226399A (en) Soft rock four-line large-span tunnel three-bench cable-bracing excavation construction method
CN105201532B (en) The Ring Cutting construction method of underground Long span spherical crown shape dome under weak surrounding rock
CN102226398A (en) Soft rock four-line large-span tunnel compound double-side wall bracing cable conversion excavation construction method
CN105781571A (en) Construction method for soft rock deformation tunnel lining support dismantling-replacing arch
CN106320346A (en) Construction method for supporting deep foundation pit through grouting after pile arrangement and anchor cable mounting
CN102606162A (en) Quick construction method for weak surrounding rock shallowly-buried easily-collapsed area of tunnel
CN107288653A (en) A kind of the benching tunnelling method excavation supporting structure of weak surrounding rock large cross-section tunnel double -side approach three and construction method
CN112855223A (en) Integrated grouting method for coal roadway penetrating through goaf wall rear-advance curtain space
CN108131145A (en) A kind of construction method of super-span tunnel excavation support
CN110043269A (en) A kind of excavation construction process of freeway tunnel barrel
CN111502696A (en) Dense-mesh type advanced support system of underground excavation tunnel and construction method
CN107965341A (en) A kind of large-section underground pipe canopy pipe network concrete support method
CN107143338A (en) A kind of coal mine roadway driving and method for protecting support
CN101487258B (en) Bearing rope anchor of cable crane and its construction method
CN107575237A (en) A kind of subsurface excavation method is combined the construction method of construction subway station with shield method
CN105649091A (en) High slope support method and structure
CN107339109A (en) The construction method of existing road is worn under super Shallow tunnel with large cross-section
CN107091092A (en) The approximate full face tunneling structure of mountain highway tunnel neutrality country rock and method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant