CN104993419B - Transmission line of electricity payingoff construction guide rope point rope technique - Google Patents

Transmission line of electricity payingoff construction guide rope point rope technique Download PDF

Info

Publication number
CN104993419B
CN104993419B CN201510304100.8A CN201510304100A CN104993419B CN 104993419 B CN104993419 B CN 104993419B CN 201510304100 A CN201510304100 A CN 201510304100A CN 104993419 B CN104993419 B CN 104993419B
Authority
CN
China
Prior art keywords
rope
traction
guide rope
construction
steel tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510304100.8A
Other languages
Chinese (zh)
Other versions
CN104993419A (en
Inventor
唐志国
方学军
黄磊
邓哲
常子威
武爽
孙玥
于海鑫
邱亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Tianjin Electric Power Transmission and Transformation Engineering Corp
Original Assignee
State Grid Corp of China SGCC
Tianjin Electric Power Transmission and Transformation Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Tianjin Electric Power Transmission and Transformation Engineering Corp filed Critical State Grid Corp of China SGCC
Priority to CN201510304100.8A priority Critical patent/CN104993419B/en
Publication of CN104993419A publication Critical patent/CN104993419A/en
Application granted granted Critical
Publication of CN104993419B publication Critical patent/CN104993419B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Electric Cable Installation (AREA)

Abstract

The present invention relates to a kind of transmission line of electricity payingoff construction guide rope point rope technique, Specific construction technique are as follows:(1) steel tower is arranged according to separated time construction technology;(2) releasing pulley declines, and traction limp is tilted gradually by original vertical Hoisting Position;(3) traction is advanced, and releasing pulley lower end hook is opened, and releasing pulley departs from traction limp, and starting pulling equipment makes pull rope pull traction limp transverse shifting;(4) until traction limp is reached next steel tower position, repeat the above steps (1) to step (3), steel tower is constructed step by step, and guide rope is split automatically and placed in corresponding cable installation site.Transmission line of electricity payingoff construction guide rope of the present invention divides rope process reform traditional unwrapping wire technique, rope is divided to be that pull rope is changed to lightweight, high temperature insulation rope carries out a point rope by original, then row conductor traction is entered by being replaced into pull rope respectively, construction is reduced to tension pay-off machine and the usage quantity of equipment such as is twisted, simplify construction procedure, reduce construction cost, lifting construction efficiency.

Description

Transmission line of electricity payingoff construction guide rope point rope technique
Technical field
The invention belongs to field of electricity construction, is related to high-altitude Setting-out Technique between steel tower, especially a kind of transmission line of electricity unwrapping wire Guide rope of constructing divides rope technique.
Background technology
At present, transmission line construction technique is that laying type unfolds pull rope, is easily disturbed in work progress by external coordination, then enter Row one leads four band pull ropes, unfolding process and needs to use tension pay-off machine during coaster of point restricting and steel tower all needs step by step More than 2 are twisted progress.
By retrieving, the patent document of following analogous technical fields is found:
" one leads two " unfolding construction technologies (CN102593759A) to a kind of large-section lead, it is characterised in that including following step Suddenly:1., preparation of construction:Enter row conductor, the crimping experiment of ground wire, setting tension field and traction field place, cleaning construction passage; 2., suspension coaster;3., crossing construction;4., tension stringing, unfolding ground wire, wire, face anchor in time;5., crimping lead wire, carry out tight Line, observation sag, hanging wire, complete whole construction.This invention ensures that having identical laying tension with mutually each sub-conductor, ensure that Poling Construction quality;And optimize wire winding pulley suspension, wire messenger and pull rope unfolding, unfolding conductor, stringing, annex peace The construction technologies such as dress, effectively improve tension stringing efficiency of construction;Manpower, waste of time are reduced, and needs number of devices Few, floor space is small, has higher social economy's property.
A kind of laying tension machine actuation means (CN203269220U), there is the remote control of control laying tension machine running Case, remote control case is connected with the relay on all laying tension machines simultaneously, by the control system of remote control case to each Laying tension machine is controlled, and is only needed one can manipulate more machines simultaneously, is reduced personnel cost;Meanwhile one man operation keeps away Exempt from difficult and trouble caused by more people's cooperations.There is larger distance between remote control case and laying tension machine, on the one hand can keep away Exempt from huge noise and a large amount of dusts caused by by laying tension machine, avoid the health of operating personnel from being affected;On the other hand, grasp Make personnel suitable distance may be selected to be manipulated, sight will not be because hindered by laying tension machine, and the operator that is more convenient for Observation and control of the member to payingoff construction scene.
Comparative analysis, compared with the application technology contents claimed, it is wanted above disclosed prior art Relatively big difference be present in the technical problem of solution, the technological means used.
The content of the invention
It is an object of the invention in place of overcome the deficiencies in the prior art, there is provided a kind of simple in construction, reasonable in design, use Convenient, process transmission line of electricity payingoff construction guide rope point rope technique.
The present invention solves its technical problem and takes following technical scheme to realize:
A kind of transmission line of electricity payingoff construction guide rope point rope technique, it is characterised in that:All construction is all carried out in high-altitude, i.e., Separated time construction is carried out on tower, Specific construction technique is as follows:
(1) steel tower is arranged according to separated time construction technology, Lever Blocks is installed in the upper center of steel tower 1, outside steel tower upper end Lifting block is lifted with along position, Lever Blocks is connected with a releasing pulley, Lever Blocks control unwrapping wire by the lifting block Coaster moves up and down;
Pull rope is coated with releasing pulley, the front end of the traction limp of one end connection one of the pull rope, the pull rope The direction of from the other end to cable to be laid extend and be connected to the pulling equipment for drawing take-up;Between the rear end for drawing limp Every uniformly connecting a plurality of guide rope,
Interval is provided with multiple upturned tackles on steel tower corresponding to releasing pulley obliquely downward, upturned tackle is used for spacing branch Guide rope is supportted, upturned tackle corresponds with guide rope, can need to increase and decrease the quantity of upturned tackle according to construction;
Guide rope earthward extends, and is connected to cable, and guide rope traction cable advances, and cable, which is drawn, to be risen on steel tower It is and spacing in upturned tackle;
(2) releasing pulley declines, and Lever Blocks operation loosens downwards releasing pulley, and releasing pulley declines until tow out The height of plate is less than upturned tackle, and now the weight of guide rope is pressed in upturned tackle, and guide rope laterally pulls traction limp, leads Carrying-off plate is tilted gradually by original vertical Hoisting Position, and releasing pulley declines process and remained a constant speed stably;
(3) traction is advanced, and releasing pulley lower end hook is opened, and releasing pulley departs from traction limp, and starting pulling equipment makes Pull rope pulls traction limp transverse shifting;
Pulling equipment continuous firing, pull rope drive traction limp, and tow out strip moves a plurality of guiding line locking to waiting to apply Next steel tower movement in work direction;
(4) draw limp and reach next steel tower position, the front end of the releasing pulley mounting traction limp on next steel tower Then rise to the initial position (1) up to step, repeat the above steps (1) to step (3), steel tower is constructed step by step, by guide rope Automatic split is placed in corresponding cable installation site, is constructed and is carried out continuously in the air in height.
Moreover, limp is drawn in the technique draws limp using light-duty guide rope made of lightweight, heat-resistant insulation material, Guide rope point is separately customized to different colours.
Moreover, the traction limp connects four guide ropes, guide rope is using lightweight, heat-resisting, insulation guide rope.
The advantages and positive effects of the present invention are:
1st, this technique is incorporated into the opening and closing technique of releasing pulley, realizes in the case where avoiding using machinery, by guide rope Split in each releasing pulley.
2nd, all construction is all carried out this technique in high-altitude, is greatly avoided external coordination interference, is significantly shortened the unwrapping wire duration.
3rd, this technique saves the mechanical usage quantity of big machinery and each steel tower, and effect is extremely obvious.
4th, this technique saves the input of workmen work high above the ground personnel, reduces work high above the ground risk, strengthens constructor The security of member.
5th, lightweight of this technique due to use, heat-resisting, insulation guide rope, in work progress, personal safety and unexpected break Substantially reduced etc. danger degree.
6th, transmission line of electricity payingoff construction guide rope of the present invention divides rope process reform traditional unwrapping wire technique, will originally divide rope It is that pull rope is changed to lightweight, high temperature insulation rope carries out a point rope, then enters row conductor traction by being replaced into pull rope respectively, reduction is applied Work is to tension pay-off machine and the usage quantity of equipment such as is twisted, and simplifies construction procedure, reduces construction cost, lifting construction efficiency.
Brief description of the drawings
Fig. 1 is construction procedure one of the present invention;
Fig. 2 is construction procedure two of the present invention;
Fig. 3 is construction procedure three of the present invention.
Embodiment
Below in conjunction with the accompanying drawings and the invention will be further described by specific embodiment, and following examples are descriptive , it is not limited, it is impossible to which protection scope of the present invention is limited with this.
A kind of transmission line of electricity payingoff construction guide rope point rope technique, Specific construction technique are as follows:
Construction procedure one, steel tower is arranged according to separated time construction technology, referring to accompanying drawing 1, is provided with the upper center of steel tower 1 Lever Blocks 2, steel tower upper end outer position are lifted with lifting block 3, and Lever Blocks is connected with a unwrapping wire by the lifting block Coaster 4, Lever Blocks control releasing pulley move up and down;
Pull rope 5, the front end of the traction limp 6 of one end connection one of the pull rope, this technique are coated with releasing pulley Middle traction limp is using lightweight, light-duty guide rope traction limp made of heat-resistant insulation material, and the other end of the pull rope is to treating The direction for laying cable extends and is connected to the pulling equipment (not shown) for drawing take-up;
The rear end of traction limp connects a plurality of guide rope uniformly at intervals, is connection in the conventional construction technology in the present embodiment Four guide ropes, guide rope are counted using lightweight, heat-resisting, insulation guide rope, the specification of guide rope according to practice of construction requirement Calculate and obtain,
For the ease of distinguishing phase sequence, guide rope point is separately customized to different colours, effectively improves efficiency of construction, avoids wiring wrong By mistake.
Interval is provided with multiple upturned tackles 7 on steel tower corresponding to releasing pulley obliquely downward, upturned tackle is used for spacing Guide rope is supported, upturned tackle corresponds with guide rope, can need to increase and decrease the quantity of upturned tackle according to construction;
Guide rope earthward extends, and is connected to cable, and guide rope traction cable advances, and cable, which is drawn, to be risen on steel tower It is and spacing in upturned tackle;
Construction procedure two, releasing pulley declines, and referring to accompanying drawing 2, Lever Blocks operation loosens downwards releasing pulley, unwrapping wire Coaster declines until the height of traction limp is less than upturned tackle, and now the weight of guide rope is pressed in upturned tackle, guide rope Traction limp is laterally pullled, traction limp is tilted gradually by original vertical Hoisting Position, and releasing pulley declines process and keeps even Speed is stable;
Construction procedure three, traction are advanced, and referring to accompanying drawing 3, releasing pulley lower end hook is opened, releasing pulley and traction limp Depart from, starting pulling equipment makes pull rope pull traction limp transverse shifting;
Pulling equipment continuous firing, pull rope drive traction limp, and tow out strip moves a plurality of guiding line locking to waiting to apply Next steel tower movement in work direction;
Until the next steel tower position of traction limp arrival, before the releasing pulley mounting traction limp on next steel tower End then rises to initial position up to step 1, repeats the above steps one to step 3, and steel tower is constructed step by step, will be guided Automatic split of rope is placed in corresponding cable installation site, is constructed and is carried out continuously in the air in height, is obviously improved efficiency of construction.
The present invention is only presented as change of the pull rope using position and quantity in description, but such change is to overcome The technological innovation of industry traditional construction technique for many years, and its effect highly significant, suitable for being pushed away extensively in the art Wide application.
Although disclosing embodiments of the invention and accompanying drawing for the purpose of illustration, those skilled in the art can manage Solution:Do not departing from the present invention and spirit and scope of the appended claims in, it is various replace, change and modifications all be it is possible, Therefore, the scope of the present invention is not limited to embodiment and accompanying drawing disclosure of that.

Claims (3)

  1. A kind of 1. transmission line of electricity payingoff construction guide rope point rope technique, it is characterised in that:Specific construction technique is as follows:
    (1) steel tower is arranged:Lever Blocks is installed in the upper center of steel tower, steel tower upper end outer position is lifted with lifting block, Lever Blocks is connected with a releasing pulley by the lifting block, and Lever Blocks control releasing pulley moves up and down;
    Pull rope is coated with releasing pulley, the front end of the traction limp of one end of pull rope connection one, the pull rope it is another One end extends to the direction of cable to be laid and is connected to the pulling equipment for drawing take-up;The rear end interval for drawing limp is equal Cloth connects a plurality of guide rope,
    Interval is provided with multiple upturned tackles on steel tower corresponding to releasing pulley obliquely downward, upturned tackle is led for limited support Messenger, upturned tackle correspond with guide rope;Needed to increase and decrease the quantity of upturned tackle according to construction;
    Guide rope earthward extends, and is connected to cable, and guide rope traction cable advances, and cable, which is drawn, to be risen on steel tower and limit Position is in upturned tackle;
    (2) releasing pulley declines:Lever Blocks operation loosens downwards releasing pulley, and releasing pulley declines until drawing limp Highly it is less than upturned tackle, now the weight of guide rope is pressed in upturned tackle, and guide rope laterally pulls traction limp, tow out Plate is tilted gradually by original vertical Hoisting Position, and releasing pulley declines process and remained a constant speed stably;
    (3) traction is advanced:Releasing pulley lower end hook is opened, and releasing pulley departs from traction limp, and starting pulling equipment makes traction Rope pulls traction limp transverse shifting;
    Pulling equipment continuous firing, pull rope drive traction limp, and it is synchronous to side to be onstructed that tow out strip moves a plurality of guide rope To next steel tower move;
    (4) draw limp and reach next steel tower position, the front end of the releasing pulley mounting traction limp on next steel tower is then Rise to and reach the initial position of step (1), repeat the above steps (1) to step (3), steel tower is constructed step by step, and guide rope is automatic Split and place in corresponding cable installation site, construct and be carried out continuously in the air in height.
  2. 2. transmission line of electricity payingoff construction guide rope point rope technique according to claim 1, it is characterised in that:Led in the technique Carrying-off plate is customized to different colours respectively using lightweight guide rope traction limp, guide rope made of lightweight, heat-resistant insulation material.
  3. 3. transmission line of electricity payingoff construction guide rope point rope technique according to claim 1, it is characterised in that:The traction limp Four guide ropes are connected, guide rope is using lightweight, heat-resisting, insulation guide rope.
CN201510304100.8A 2015-06-05 2015-06-05 Transmission line of electricity payingoff construction guide rope point rope technique Active CN104993419B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510304100.8A CN104993419B (en) 2015-06-05 2015-06-05 Transmission line of electricity payingoff construction guide rope point rope technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510304100.8A CN104993419B (en) 2015-06-05 2015-06-05 Transmission line of electricity payingoff construction guide rope point rope technique

Publications (2)

Publication Number Publication Date
CN104993419A CN104993419A (en) 2015-10-21
CN104993419B true CN104993419B (en) 2018-04-03

Family

ID=54305194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510304100.8A Active CN104993419B (en) 2015-06-05 2015-06-05 Transmission line of electricity payingoff construction guide rope point rope technique

Country Status (1)

Country Link
CN (1) CN104993419B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110752550B (en) * 2019-10-25 2020-11-06 四川电力送变电建设有限公司 Multi-pulley arrangement method for steering field
CN115241798B (en) * 2022-08-26 2024-01-19 国网山东省电力公司潍坊供电公司 Ground wire paying-off pulley structure

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU997158A1 (en) * 1981-04-29 1983-02-15 Проектно-Конструкторское Бюро Главстроймеханизации Министерства Транспортного Строительства Wire uncoiling device
JPH01248914A (en) * 1988-03-28 1989-10-04 Kyushu Denki Kensetsu Koji Kk Snatch block device for wire extension
CN101436764A (en) * 2008-11-13 2009-05-20 江苏省电力公司宜兴市供电公司 Crossover stringing method for overhead line and stringing sheave pulley
CN201388013Y (en) * 2009-03-06 2010-01-20 辽宁省电力有限公司盘锦供电公司 Multi-purpose overturning sheave pulley
CN101697403A (en) * 2009-10-23 2010-04-21 江苏省电力公司句容市供电公司 Construction method for spreading lead wire and earth wire in transmission line
CN102593759A (en) * 2012-02-16 2012-07-18 湖北省输变电工程公司 One-pulling-two expansion and construction process of large-section lead
CN103663237A (en) * 2014-01-24 2014-03-26 国家电网公司 Supporting and orientating guide pulley which can rise and fall and has smoothing function

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU997158A1 (en) * 1981-04-29 1983-02-15 Проектно-Конструкторское Бюро Главстроймеханизации Министерства Транспортного Строительства Wire uncoiling device
JPH01248914A (en) * 1988-03-28 1989-10-04 Kyushu Denki Kensetsu Koji Kk Snatch block device for wire extension
CN101436764A (en) * 2008-11-13 2009-05-20 江苏省电力公司宜兴市供电公司 Crossover stringing method for overhead line and stringing sheave pulley
CN201388013Y (en) * 2009-03-06 2010-01-20 辽宁省电力有限公司盘锦供电公司 Multi-purpose overturning sheave pulley
CN101697403A (en) * 2009-10-23 2010-04-21 江苏省电力公司句容市供电公司 Construction method for spreading lead wire and earth wire in transmission line
CN102593759A (en) * 2012-02-16 2012-07-18 湖北省输变电工程公司 One-pulling-two expansion and construction process of large-section lead
CN103663237A (en) * 2014-01-24 2014-03-26 国家电网公司 Supporting and orientating guide pulley which can rise and fall and has smoothing function

Also Published As

Publication number Publication date
CN104993419A (en) 2015-10-21

Similar Documents

Publication Publication Date Title
CN104993419B (en) Transmission line of electricity payingoff construction guide rope point rope technique
CN106451208A (en) A method for laying out a leading rope by a helicopter
CN205187498U (en) Steel strand wires conveyor
CN205650612U (en) Copper wire unwrapping wire wire drawing device
CN112072560B (en) Method for vertically laying super high-rise shaft cable in air through relay lifting
CN102482056A (en) Method for reeving an elevator, rope reel and method for installing an overspeed governor rope or a trailing cable
CN104818858B (en) Indoor heavy electrical cabinet hanging method
CN211142840U (en) Suspension bridge main push-towing rope erects system
CN102593759A (en) One-pulling-two expansion and construction process of large-section lead
CN104377603B (en) Device for laying cables in horizontal cable trays and application method of device
CN214734029U (en) Safe cable hoisting device for cable laying of super high-rise building
CN205870849U (en) Steel strand wires threading device
CN106229894A (en) Crane span structure threading traction apparatus
CN108899803A (en) A kind of electrification aerial cable moving trolley
CN106703418B (en) The installation of large span latticed shell structure roofing hangs method with moving type security net
CN208820356U (en) A kind of electrification aerial cable moving trolley
CN104929377B (en) For the Load System that large stadium curtain wall decoration panel is vertically transported
CN104393524B (en) Avoid setting up using aerial earth wire extension pulley group job and cross over frame construction method
CN219992195U (en) Rope penetrating system
CN203774686U (en) Multi-wheel pulley set tension line laying apparatus
CN201874572U (en) Pipe-cable tensioning mechanism for coal-mining machines
CN104600623A (en) High-altitude crossover releasing device for lifting type heavy power cable
CN205740097U (en) A kind of derrick crane wiring system
CN108899802A (en) A kind of electrification aerial cable moving trolley being provided with thread-laying mechanism
CN205489282U (en) Quick plug bush device of enlightening nima rope

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant