CN104988993A - Steel support node structure and construction method of steel support node structure - Google Patents

Steel support node structure and construction method of steel support node structure Download PDF

Info

Publication number
CN104988993A
CN104988993A CN201510423013.4A CN201510423013A CN104988993A CN 104988993 A CN104988993 A CN 104988993A CN 201510423013 A CN201510423013 A CN 201510423013A CN 104988993 A CN104988993 A CN 104988993A
Authority
CN
China
Prior art keywords
steel
steel pipe
bracing members
plate
node structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510423013.4A
Other languages
Chinese (zh)
Inventor
郑书朝
王军飞
赵立安
王宁
严兴
郑跃
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd
Original Assignee
Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd filed Critical Beijing Rail Transit Engineering Construction Co Ltd of China Railway 16th Bureau Group Co Ltd
Priority to CN201510423013.4A priority Critical patent/CN104988993A/en
Publication of CN104988993A publication Critical patent/CN104988993A/en
Pending legal-status Critical Current

Links

Abstract

The invention discloses a steel support node structure, which comprises steel pipes, wherein one end of each steel pipe is provided with a matched end plate; a matched steel plate is also arranged in the steel pipes; the outer sides of the steel pipes are connected with a matched steel support end plate through a plurality of uniformly distributed steel cushion box fixing plates; and a plurality of water stop steel ring plates are also arranged between the steel plate and the end plate in positions positioned the outer sides of the steel pipes. The steel support node structure has the beneficial effects that the concrete casting quality of the corresponding position can be ensured; the work procedure of later-period casting is avoided; the steel support node structure meets the requirement on the strength of a steel support end part; and the water seepage and leakage phenomenon of the internal structure is effectively reduced.

Description

A kind of bracing members node structure and construction method thereof
Technical field
The present invention relates to a kind of bracing members node structure and construction method thereof.
Background technology
Shanghai belongs to Quaternary system river mouth, strand, shallow sea, drowned valley, paludal facies sedimentary deposit, belongs to typical Soft Clay condition, primarily of saturated clayey soil, silty soil and sand composition, has the feature of stratification distribution.Carry out excavation of foundation pit and internal construction under its geology to return to build there is the unmanageable feature of distortion, and for guaranteeing foundation ditch and safety of surrounding environment, returning in the process of building in internal construction and leaving bracing members.Existing construction technology is primarily of two kinds of forms, the first adopts H profile steel as steel pad case, and at steel pad case periphery welding water-stopping steel sheet, guarantee stagnant water effect, it two is built-in steel sleeves, at sleeve inner erection bracing members, treat that main structure construction is complete, after concrete strength reaches designing requirement, remove sleeve inner bracing members, sleeve inner adopts the concrete of label identical with agent structure to fill; And these two kinds of methods all exist shortcoming, adopt H profile steel as steel pad case way, exist in H profile steel position coagulation grave mould difficulty, very easily occur leaking oar phenomenon, this position vibrating spear affects by steel pad case, and padding case lower concrete cannot vibration compacting, cause internal construction percolating water, and adopt steel bushing form, after bracing members is removed, sleeve inner is owing to building for level, not easily build closely knit, cause percolating water, and construction in later period is numerous and diverse, need formwork again, carry out concreting.
So, develop a kind of bracing members dot structure and the construction method thereof that can solve the bracing members position leakage problem being retained in agent structure inside, just become the problem that insider needs solution badly.
Summary of the invention
For the above-mentioned technical problem in correlation technique, the present invention proposes a kind of bracing members node structure and construction method thereof, can solve the bracing members position leakage problem being retained in agent structure inside.
For realizing above-mentioned technical purpose, technical scheme of the present invention is achieved in that
A kind of bracing members node structure, comprise steel pipe, described steel pipe one end is provided with the end plate matched, the steel plate matched also is provided with in described steel pipe, and the outside of described steel pipe is connected with by the steel pad case fixed head of some even arrangements the bracing members end plate matched, and the outside of wherein said steel pipe is also provided with some water-stopping steel ring flat-plates between described steel plate and described end plate.
A construction method for bracing members node structure, comprises the steps:
Step one: at the end plate of one end of steel pipe welding with ribs, the other end is open type;
Step 2: steel duct distance open end 350mm or 550mm position full weld one piece of thickness be the steel plate of 6mm;
Step 3: outside steel pipe, the bracing members end plate that one piece of thickness is 6mm, width is 120mm is welded in inwall centre position;
Step 4: build the concrete that same internal construction label is identical in described steel pipe between steel plate with end plate;
Step 5: steel pipe is connected on pre-configured bracing members by welding or bolted mode, described bracing members is set up;
Step 6: treat that internal construction concreting is complete, when reaching design strength, cuts off steel pipe pad case, removes and support, and repairs residue 5cm hole.
Further, in step one when inwall thickness is 400mm, described steel pipe length is 650mm, and described concreting thickness is 350mm; When inwall thickness is 600mm, described steel pipe length is 850mm, and described concreting thickness is 550mm.
Beneficial effect of the present invention: the present invention can guarantee the concrete pouring quality of correspondence position, avoid the operation that the later stage builds, and this structure meets the requirement of bracing members termination intensity, effectively decreases the percolating water phenomenon of internal construction.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation of the bracing members node structure according to the embodiment of the present invention.
In figure:
1, steel pipe; 2, end plate; 3, steel plate; 4, steel pad case fixed head; 5, bracing members end plate; 6, water-stopping steel ring flat-plate; 7, concrete; 8, inwall; 9, bracket.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, the every other embodiment that those of ordinary skill in the art obtain, all belongs to the scope of protection of the invention.
As shown in Figure 1, a kind of bracing members node structure according to the embodiment of the present invention, comprise steel pipe 1, described steel pipe 1 one end is provided with the end plate 2 matched, the steel plate 3 matched also is provided with in described steel pipe 1, and the outside of described steel pipe 1 is connected with by the steel pad case fixed head 4 of some even arrangements the bracing members end plate 5 matched, and the outside of wherein said steel pipe 1 is also provided with some water-stopping steel ring flat-plates 6 between described steel plate 3 and described end plate 2.
A construction method for bracing members node structure, comprises the steps:
Step one: at the end plate 2 of one end of steel pipe 1 welding with ribs, the other end is open type;
Step 2: the steel plate 3 at steel pipe 1 inner distance open end 350mm or 550mm position full weld one piece of thickness being 6mm;
Step 3: outside steel pipe 1, the bracing members end plate 5 that one piece of thickness is 6mm, width is 120mm is welded in inwall centre position;
Step 4: build the identical concrete seven of same internal construction label in described steel pipe 1 between steel plate 3 with end plate 2;
Step 5: steel pipe 1 is connected on pre-configured bracing members by welding or bolted mode, described bracing members is set up;
Step 6: treat that internal construction concreting is complete, when reaching design strength, cuts off steel pipe pad case, removes and support, and repairs residue 5cm hole.
In one embodiment, in step one when inwall 8 thickness is 400mm, described steel pipe 1 length is 650mm, and it is 350mm that described concrete seven builds thickness; When inwall 8 thickness is 600mm, described steel pipe 1 length is 850mm, and it is 550mm that described concrete seven builds thickness.
Conveniently understand technique scheme of the present invention, below by way of in concrete mode of occupation, technique scheme of the present invention is described in detail.
When specifically using, according to the construction method of bracing members node structure of the present invention, at the end plate of one end of steel pipe welding with ribs, the other end is open type; Be the steel plate of 6mm at steel duct distance open end 350mm or 550mm position full weld one piece of thickness, play and control concreting thickness and steel duct second sealing defence line; Outside steel pipe, inwall centre position welds that one piece of thickness is 6mm, width is the steel plate of 120mm, plays the outside second sealing defence line of steel pipe; The concrete that same internal construction label is identical is built between steel plate with end plate in described steel pipe; In steel pipe concreting one end, full weld one piece of thickness is 16mm steel plate, plays steel duct and outside first sealing defence line; Steel pipe is connected on pre-configured bracing members by welding or bolted mode, described bracing members is set up; Treat that internal construction concreting is complete, when reaching design strength, steel pipe pad case is cut off, remove and support, and residue 5cm hole is repaired.
In sum, by means of technique scheme of the present invention, the present invention can guarantee the concrete pouring quality of correspondence position, avoids the operation that the later stage builds, and this structure meets the requirement of bracing members termination intensity, effectively decrease the percolating water phenomenon of internal construction.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (3)

1. a bracing members node structure, it is characterized in that, comprise steel pipe (1), described steel pipe (1) one end is provided with the end plate (2) matched, the steel plate (3) matched also is provided with in described steel pipe (1), and the outside of described steel pipe (1) is connected with the bracing members end plate (5) matched by steel pad case fixed head (4) of some even arrangements, the outside of wherein said steel pipe (1) is positioned between described steel plate (3) and described end plate (2) and is also provided with some water-stopping steel ring flat-plates (6).
2. a construction method for bracing members node structure, is characterized in that, comprises the steps:
Step one: at the end plate (2) of one end of steel pipe (1) welding with ribs, the other end is open type;
Step 2: the steel plate (3) at steel pipe (1) inner distance open end 350mm or 550mm position full weld one piece of thickness being 6mm;
Step 3: in steel pipe (1) outside, the bracing members end plate (5) that one piece of thickness is 6mm, width is 120mm is welded in inwall centre position;
Step 4: build the identical concrete (7) of same internal construction label in described steel pipe (1) between steel plate (3) with end plate (2);
Step 5: steel pipe (1) is connected on pre-configured bracing members by welding or bolted mode, described bracing members is set up;
Step 6: treat that internal construction concreting is complete, when reaching design strength, cuts off steel pipe pad case, removes and support, and repairs residue 5cm hole.
3. the construction method of bracing members node structure according to claim 2, is characterized in that, in step one when inwall (8) thickness is 400mm, described steel pipe (1) length is 650mm, and thickness built by described concrete (7) is 350mm; When inwall (8) thickness is 600mm, described steel pipe (1) length is 850mm, and thickness built by described concrete (7) is 550mm.
CN201510423013.4A 2015-07-17 2015-07-17 Steel support node structure and construction method of steel support node structure Pending CN104988993A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510423013.4A CN104988993A (en) 2015-07-17 2015-07-17 Steel support node structure and construction method of steel support node structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510423013.4A CN104988993A (en) 2015-07-17 2015-07-17 Steel support node structure and construction method of steel support node structure

Publications (1)

Publication Number Publication Date
CN104988993A true CN104988993A (en) 2015-10-21

Family

ID=54300874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510423013.4A Pending CN104988993A (en) 2015-07-17 2015-07-17 Steel support node structure and construction method of steel support node structure

Country Status (1)

Country Link
CN (1) CN104988993A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112343171A (en) * 2020-11-02 2021-02-09 中国建筑第八工程局有限公司 Steel pipe column V-shaped steel support construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH093900A (en) * 1995-06-19 1997-01-07 Ohbayashi Corp Earth retaining wall structure with water permeability
CN201605589U (en) * 2009-12-18 2010-10-13 浙江华铁基础工程有限公司 Fixed end
CN202187353U (en) * 2011-06-29 2012-04-11 浙江华铁建筑安全科技股份有限公司 Moveable end head provided with two top seats and used for steel support
CN203113349U (en) * 2013-01-29 2013-08-07 上海市水利工程设计研究院有限公司 Foundation trench shoring lattice type end structure
CN204252145U (en) * 2014-11-27 2015-04-08 中铁第四勘察设计院集团有限公司 The bracing members lattice shaped steel end structure supportted is exempted from down in a kind of deep foundation ditch
CN204876093U (en) * 2015-07-17 2015-12-16 中铁十六局集团北京轨道交通工程建设有限公司 Steel shotcrete node structure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH093900A (en) * 1995-06-19 1997-01-07 Ohbayashi Corp Earth retaining wall structure with water permeability
CN201605589U (en) * 2009-12-18 2010-10-13 浙江华铁基础工程有限公司 Fixed end
CN202187353U (en) * 2011-06-29 2012-04-11 浙江华铁建筑安全科技股份有限公司 Moveable end head provided with two top seats and used for steel support
CN203113349U (en) * 2013-01-29 2013-08-07 上海市水利工程设计研究院有限公司 Foundation trench shoring lattice type end structure
CN204252145U (en) * 2014-11-27 2015-04-08 中铁第四勘察设计院集团有限公司 The bracing members lattice shaped steel end structure supportted is exempted from down in a kind of deep foundation ditch
CN204876093U (en) * 2015-07-17 2015-12-16 中铁十六局集团北京轨道交通工程建设有限公司 Steel shotcrete node structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112343171A (en) * 2020-11-02 2021-02-09 中国建筑第八工程局有限公司 Steel pipe column V-shaped steel support construction method

Similar Documents

Publication Publication Date Title
CN109208737B (en) Construction method for new pipe connection and original pipe plugging in large sewage pipeline relocation
CN109707415B (en) Joint construction method and joint structure of subway shield tunnel and station
CN211038657U (en) Cover encircles based deeply buries loess tunnel deformation control construction structures
CN102535519A (en) I-shaped steel joint structure for underground continuous wall and construction method for I-shaped steel joint structure
CN105544575B (en) A kind of bottom concrete construction method under water of use steel truss reinforcement
CN105239775B (en) A kind of reinforcement installation penetration quality dynamic control method for silo slip form construction
CN110656959B (en) Large-section loess tunnel primary support limit-invasion arch-changing construction method
CN105275097A (en) A post-cast strip water-stop steel plate and demolition-free template net installing method
CN211201162U (en) Post-cast strip cast-in-place concrete intercepting device
CN103741949B (en) Treatment of juncture between vertical structure and horizontal structure
CN110242313A (en) A kind of tunnel portal sealing safeguard construction and construction method
CN204876093U (en) Steel shotcrete node structure
CN104988993A (en) Steel support node structure and construction method of steel support node structure
CN107724349A (en) A kind of seat ring and the method for improving seat ring bottom concrete density
CN110469338B (en) Confined water stratum shield receiving method
CN112593978A (en) Secondary lining vault anti-disengaging device and construction method
CN110004959A (en) Concrete cofferdam rapid constructing method and template under circumstance of flowing water
CN207452840U (en) For the steel template structure of marine concrete perfusion and steel cylinder
CN205711786U (en) Big cross section porous overlength cast-in-place box culvert formwork system
CN211550776U (en) River course flows promotion engineering construction and flows steel pipe guiding device automatically
CN105625202A (en) Construction method of large-cross-section, porous, super-long and cast-in-place box culvert
CN208455615U (en) A kind of prefabricated guide groove structure of concrete cut
CN106638618B (en) Ground-connecting-wall goes along with sb. to guard him the construction method of foundation pit reinforced concrete support construction
CN105156136B (en) Water pipe primary concreting forming panel and forming method
CN207392530U (en) A kind of avoid-dismantle outer wall of basement flange single side formwork device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20151021

RJ01 Rejection of invention patent application after publication