CN104975649A - Separate system type initial rainwater regulation and storage pool - Google Patents
Separate system type initial rainwater regulation and storage pool Download PDFInfo
- Publication number
- CN104975649A CN104975649A CN201510341254.4A CN201510341254A CN104975649A CN 104975649 A CN104975649 A CN 104975649A CN 201510341254 A CN201510341254 A CN 201510341254A CN 104975649 A CN104975649 A CN 104975649A
- Authority
- CN
- China
- Prior art keywords
- storage tank
- buffer
- hydraulic automatic
- pool
- tank
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Sewage (AREA)
Abstract
Description
技术领域technical field
本发明涉及排水系统,具体地指一种分流制初期雨水调蓄池。The invention relates to a drainage system, in particular to an initial stage rainwater storage tank of diversion system.
背景技术Background technique
初期雨水冲刷空气和地表后,会携带大量的有毒有害物质,如果初期雨水未经处理直接排放,会使水体遭受严重污染。分流制排水系统将城市污水全部送至污水处理厂进行处理,但初期雨水未加处理就直接排入水体,对城市水体也会造成严重污染。After the initial rainwater scours the air and the surface, it will carry a large amount of toxic and harmful substances. If the initial rainwater is discharged directly without treatment, the water body will be seriously polluted. The separate drainage system sends all urban sewage to the sewage treatment plant for treatment, but the initial rainwater is directly discharged into the water body without treatment, which will also cause serious pollution to the urban water body.
降雨初期,路面粉尘、泥砂、油污,甚至垃圾随着初期雨水迅速汇流至排水管涵(渠),其BOD、COD、SS等主要污染物浓度指标甚至接近和达到污水处理厂入水标准。鉴于上述情况,随着国内城市对污染物削减比例的提高及对河道、湖泊水质改善的迫切要求,在实行雨污分流体制及不断提高截流式截污区截流倍数改造的同时,有必要对初期雨水进行蓄滞,以削减污染排放。因此,建立分流制初期雨水调蓄池,将初期雨水收集到调蓄池中,经过处理后再排放,可以有效防止水体污染,改善水环境。现有初期雨水调蓄池存在以下缺点:1)在调蓄池的进水口处,需要对进水水位进行控制,国内主要采用的是手动或电动闸门,但这种控制方式存在着启闭时间长、工作不可靠等缺点,对雨水调控存在滞后,容易形成积水,导致城镇内涝时有发生;2)对初期雨水截流流量控制模糊粗放,如果初雨分离不充分,就会对自然水体产生污染,如果截流初雨过多,就会造成雨水调蓄池有限资源的浪费和不合理应用,另外对污水厂处理量要求也很高。In the early stage of rainfall, road dust, mud, sand, oil, and even garbage quickly flow into the drainage pipes (canals) along with the initial rainwater, and the concentration indicators of major pollutants such as BOD, COD, and SS are even close to and reach the water inlet standard of the sewage treatment plant. In view of the above situation, with the increase of the reduction ratio of pollutants in domestic cities and the urgent requirement for the improvement of water quality of rivers and lakes, it is necessary to carry out the rain and sewage diversion system and continuously improve the interception multiple of the interception type sewage interception area. Rainwater is stored and stagnated to reduce pollution emissions. Therefore, establishing an initial rainwater storage tank with diversion system, collecting the initial rainwater into the storage tank, and then discharging it after treatment can effectively prevent water pollution and improve the water environment. The existing initial rainwater storage tank has the following disadvantages: 1) At the water inlet of the storage tank, the water level needs to be controlled. In China, manual or electric gates are mainly used, but this control method has opening and closing time. Shortcomings such as long and unreliable work, there is a lag in the regulation of rainwater, and it is easy to form waterlogging, resulting in urban waterlogging; 2) The control of initial rainwater interception flow is vague and extensive. Pollution, if there is too much initial rain in the interception, it will cause waste and unreasonable use of the limited resources of the rainwater storage tank. In addition, the treatment capacity of the sewage plant is also very high.
发明内容Contents of the invention
本发明的目的就是要解决上述背景技术的不足,提供一种分流制初期雨水调蓄池,及时调控将初期雨水进行收集,避免了城镇积水,经过处理后再排放,防止水体污染、改善水环境。The purpose of the present invention is to solve the shortcomings of the above-mentioned background technology, to provide a diversion-based initial rainwater storage tank, which can be regulated in time to collect the initial rainwater, avoid urban water accumulation, and discharge it after treatment, prevent water pollution and improve water quality. environment.
本发明的技术方案为:一种分流制初期雨水调蓄池,其特征在于,包括沿水流方向设置、相连通的自然水体排放单元和缓冲调蓄单元,所述自然水体排放单元包括第一缓冲池及设置在第一缓冲池内的第一水力自动闸门,所述第一缓冲池内第一水力自动闸门上游设有进水管,所述第一缓冲池内第一水力自动闸门下游设有自然水体排放口;The technical solution of the present invention is: an initial stage rainwater storage tank of diversion system, which is characterized in that it includes a natural water body discharge unit and a buffer regulation and storage unit arranged along the direction of water flow and connected to each other, and the natural water body discharge unit includes a first buffer Pool and the first hydraulic automatic gate set in the first buffer pool, the first hydraulic automatic gate in the first buffer pool is provided with a water inlet pipe upstream, and the first hydraulic automatic gate in the first buffer pool is provided with a natural water outlet downstream ;
所述缓冲调蓄单元包括与第一缓冲池连通的第二缓冲池及调蓄池,所述第二缓冲池与调蓄池之间通过常态为开启的第二水力自动闸门连通,所述调蓄池位于第二水力自动闸门的下游,所述第二缓冲池底部高于或平齐于调蓄池最大拦蓄水位高度,所述调蓄池内设有潜污泵。The buffer storage unit includes a second buffer pool and a storage pool connected to the first buffer pool, the second buffer pool and the storage pool are connected through a second hydraulic automatic gate that is normally open, and the storage tank The pool is located downstream of the second hydraulic automatic gate, the bottom of the second buffer pool is higher than or equal to the maximum storage water level of the storage tank, and a submersible sewage pump is installed in the storage tank.
优选的,所述第一水力自动闸门为常态为关闭的感应式水力自动闸门,所述第一水力自动闸门开启水位高度为第二缓冲池底部高度。Preferably, the first hydraulic automatic gate is an inductive hydraulic automatic gate that is normally closed, and the opening water level of the first hydraulic automatic gate is equal to the bottom height of the second buffer pool.
优选的,所述第二水力自动闸门为浮箱式下游控制堰门,所述第二水力自动闸门的关闭水位高度为调蓄池的最大拦蓄水位高度。Preferably, the second hydraulic automatic gate is a buoyant box type downstream control weir gate, and the closing water level of the second hydraulic automatic gate is the maximum storage water level of the storage tank.
优选的,所述调蓄池内设有冲洗装置和高清摄像头。Preferably, a flushing device and a high-definition camera are installed in the storage tank.
进一步的,还包括控制单元,潜污泵的信号输入端、高清摄像头信号输出端均与控制单元连接,所述调蓄池内设有液位传感器,所述液位传感器的信号输出端通过控制单元与冲洗装置信号输入端连接。Further, it also includes a control unit, the signal input end of the submersible sewage pump and the signal output end of the high-definition camera are all connected to the control unit, a liquid level sensor is provided in the storage tank, and the signal output end of the liquid level sensor passes through the control unit Connect with the signal input terminal of the flushing device.
进一步的,所述冲洗装置和高清摄像头分别设置在调蓄池左右两侧。冲洗装置和高清摄像头的数量与位置可根据实际情况进行调整布置。Further, the flushing device and the high-definition camera are respectively arranged on the left and right sides of the storage tank. The number and position of the flushing device and high-definition cameras can be adjusted and arranged according to the actual situation.
优选的,所述第二缓冲池内第二水力自动闸门前方设有自清洗水平格栅,所述自清洗水平格栅包括沿竖直方向间隔设置的水平栅条及穿插在各水平栅条之间的耙齿,所述耙齿由设置在水平格栅后方的液压油缸驱动。设置具有自清洗功能的水平格栅拦截进入调蓄池雨水中的漂浮物和悬浮物。在降雨过程中,设备不间断自动运行,将卡在水平格栅上的杂物刮除,让漂浮物和悬浮物随着水流进入下游再集中处理。Preferably, a self-cleaning horizontal grid is provided in front of the second hydraulic automatic gate in the second buffer pool, and the self-cleaning horizontal grid includes horizontal grid bars arranged at intervals in the vertical direction and interspersed between each horizontal grid bar. The rake teeth are driven by hydraulic cylinders arranged behind the horizontal grille. The horizontal grille with self-cleaning function is set to intercept the floating and suspended matter entering the rainwater of the storage tank. During the rainfall process, the equipment operates continuously and automatically, scraping off the sundries stuck on the horizontal grille, allowing the floating and suspended matter to enter the downstream with the water flow for centralized treatment.
优选的,所述第一缓冲池与第二缓冲池通过连接管连通,所述连接管底部与第二缓冲池底部高度平齐。Preferably, the first buffer pool communicates with the second buffer pool through a connecting pipe, and the bottom of the connecting pipe is at the same height as the bottom of the second buffer pool.
进一步的,所述第一缓冲池底部与第二缓冲池底部高度平齐,进水管底部与第一缓冲池底部高度平齐。Further, the bottom of the first buffer tank is at the same height as the bottom of the second buffer tank, and the bottom of the water inlet pipe is at the same height as the bottom of the first buffer tank.
优选的,所述调蓄池边缘底部下凹形成集水区,所述潜污泵位于集水区内。Preferably, the bottom of the storage tank is concave to form a catchment area, and the submersible sewage pump is located in the catchment area.
本发明中,缓冲调蓄单元第二水力自动闸门安装在调蓄池入口,处于常开状态,当调蓄池的水位达到最大拦蓄水位时,第二水力自动闸门关闭,从而可以防止调蓄池内的初期雨水倒流进入管网。自然水体排放单元第一水力自动闸门安装在自然水体排放口上游,开启水位高度为为第二缓冲池底部高度,用于在调蓄池的水位达到最大拦蓄水位后将进入第二缓冲池的后期雨水全部排放到自然水体。在污水厂有处理能力时,潜污泵开始将调蓄池内雨水通过污水管道排放到污水处理厂进行处理。In the present invention, the second hydraulic automatic gate of the buffer storage unit is installed at the entrance of the storage tank and is in a normally open state. When the water level of the storage tank reaches the maximum storage level, the second hydraulic automatic gate is closed, thereby preventing the water in the storage tank from The initial rainwater flows back into the pipe network. The first hydraulic automatic gate of the natural water body discharge unit is installed upstream of the natural water body discharge port, and the height of the opening water level is the height of the bottom of the second buffer pool, which is used to enter the later stage of the second buffer pool after the water level of the storage pool reaches the maximum storage level All rainwater is discharged to natural water bodies. When the sewage plant has processing capacity, the submersible sewage pump starts to discharge the rainwater in the storage tank through the sewage pipe to the sewage treatment plant for treatment.
本发明将初期雨水收集至调蓄池内,避免了初期雨水对自然水体的危害;通过自然水体排放单元和缓冲调蓄单元相配合,将调蓄池满后的中后期雨水及时排放至自然水体,进而防止了城镇积水;降雨结束后,潜污泵开始将调蓄池内雨水通过污水管道排放到污水处理厂进行处理;冲洗装置对调蓄池底进行搅拌冲洗,冲洗完后通过高清摄像头采集调蓄池底部画面,对未冲洗干净的位置进行定点冲洗,将调蓄池冲洗干净。整个冲洗过程无需外部水源,冲洗效果要好于拍门式冲洗门和水力翻斗,并且水中泥沙含量小,不会淤积缓冲池和管渠。The invention collects the initial rainwater into the storage tank, avoiding the harm of the initial rainwater to the natural water body; through the cooperation of the natural water discharge unit and the buffer storage unit, the middle and late rainwater after the storage tank is full is discharged to the natural water body in time, In turn, urban water accumulation was prevented; after the rainfall ended, the submersible sewage pump began to discharge the rainwater in the storage tank through the sewage pipe to the sewage treatment plant for treatment; the flushing device stirred and washed the bottom of the storage tank, and collected and adjusted it through a high-definition camera after washing. On the screen at the bottom of the storage tank, perform fixed-point flushing on the unwashed positions to clean the storage tank. The entire flushing process does not require an external water source, and the flushing effect is better than that of the flap flushing door and hydraulic dumping bucket, and the sediment content in the water is small, so it will not silt the buffer pool and pipes.
本发明实现初期雨水分离,根据降雨雨量的不同,对雨水的排放进行有序控制和调蓄,有效的防止了初期雨水直接排放的污染及城镇的积水,且结构简单,成本低,可全自动控制,无需人工操作,调蓄安全可靠。The invention realizes the separation of initial rainwater, controls and regulates the discharge of rainwater in an orderly manner according to the difference in rainfall and rainfall, effectively prevents the pollution of direct discharge of initial rainwater and the accumulation of water in cities and towns, and has a simple structure, low cost, and can be fully distributed. Automatic control, no manual operation, safe and reliable regulation and storage.
附图说明Description of drawings
图1为本发明结构示意图Fig. 1 is a structural representation of the present invention
图2为图1中A-A剖视图Figure 2 is a sectional view of A-A in Figure 1
图3为自清洗水平格栅俯视图Figure 3 is a top view of the self-cleaning horizontal grille
图4为自清洗水平格栅侧视图Figure 4 is a side view of the self-cleaning horizontal grille
图5为第一水力自动闸门结构示意图Figure 5 is a structural schematic diagram of the first hydraulic automatic gate
图6为第一水力自动闸门结构俯视图Figure 6 is a top view of the structure of the first hydraulic automatic gate
图7为第一水力自动闸门浮箱室开启结构示意图Figure 7 is a schematic diagram of the opening structure of the buoyant chamber of the first hydraulic automatic gate
图8为第一水力自动闸门闸门开启示意图Figure 8 is a schematic diagram of opening the first hydraulic automatic gate
图9为第一水力自动闸门浮箱室关闭结构示意图Figure 9 is a schematic diagram of the closing structure of the buoyant chamber of the first hydraulic automatic gate
图10为第一水力自动闸门闸门关闭示意图Figure 10 is a schematic diagram of closing the gate of the first hydraulic automatic gate
其中:1.第一缓冲池2.第二缓冲池3.进水管4.自然水体排放口5.第一水力自动闸门6.调蓄池7.第二水力自动闸门8.潜污泵9.冲洗装置10.高清摄像头11.液位传感器12.自清洗水平格栅13.连接管14.第一水力自动闸门开启水位高度15.第二水力自动闸门关闭水位高度16.集水区501.旋转轴502.浮箱503.闸门504.浮箱室505.浮子室Among them: 1. The first buffer pool 2. The second buffer pool 3. Inlet pipe 4. Natural water outlet 5. The first hydraulic automatic gate 6. Storage tank 7. The second hydraulic automatic gate 8. Submersible sewage pump 9. Flushing device 10. HD camera 11. Liquid level sensor 12. Self-cleaning horizontal grid 13. Connecting pipe 14. The first hydraulic automatic gate opening water level height 15. The second hydraulic automatic gate closing water level height 16. Water collection area 501. Rotation Shaft 502. Float 503. Gate 504. Float chamber 505. Float chamber
506.浮子507.进水口508.出水孔509.配重块510.第一滑轮511.第二滑轮512.钢丝绳121.水平格栅122.耙齿123.液压油缸。506. Float 507. Water inlet 508. Water outlet 509. Counterweight 510. First pulley 511. Second pulley 512. Wire rope 121. Horizontal grid 122. Rake teeth 123. Hydraulic cylinder.
具体实施方式Detailed ways
下面结合附图和具体实施例对本发明作进一步的详细说明。The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
如图1-2所示,本发明包括相连通的自然水体排放单元和缓冲调蓄单元,自然水体排放单元包括第一缓冲池1及设置在第一缓冲池1内的第一水力自动闸门5;缓冲调蓄单元包括第二缓冲池2及调蓄池6,第二缓冲池2与调蓄池6之间通过常态为开启的第二水力自动闸门7连通。第一缓冲池1和第二缓冲池2通过连接管13连通,连接管13底部与第二缓冲池2平齐。第一缓冲池1左侧(第一水力自动闸门5上游处)设有进水管3,第一缓冲池1底部与第二缓冲池2底部平齐,进水管3底部与第一缓冲池1底部平齐。第一缓冲池1后方(第一水力自动闸门5下游处)设有自然水体排放口4。As shown in Figure 1-2, the present invention includes a connected natural water body discharge unit and a buffer storage unit, the natural water body discharge unit includes a first buffer pool 1 and a first hydraulic automatic gate 5 arranged in the first buffer pool 1 ; The buffer storage unit includes a second buffer pool 2 and a storage tank 6, and the second buffer pool 2 and the storage pool 6 are connected through a second hydraulic automatic gate 7 that is normally open. The first buffer tank 1 and the second buffer tank 2 are connected through a connecting pipe 13 , and the bottom of the connecting pipe 13 is flush with the second buffer tank 2 . The left side of the first buffer tank 1 (upstream of the first hydraulic automatic gate 5) is provided with a water inlet pipe 3, the bottom of the first buffer tank 1 is flush with the bottom of the second buffer tank 2, and the bottom of the water inlet pipe 3 is in line with the bottom of the first buffer tank 1 flush. The rear of the first buffer pool 1 (downstream of the first hydraulic automatic gate 5 ) is provided with a natural water discharge port 4 .
图1中左右方对应本实施例的左右侧,上下方对应本实施例后前方。第一水力自动闸门5为常态为关闭、感应调蓄池6内水位到达开启水位时自动开启的感应式水力自动闸门,第一水力自动闸门开启水位高度14为第二缓冲池2底部高度。如图5-10所示,感应式水力自动闸门,包括固定在第一缓冲池1两壁间的旋转轴501以及分别设置在旋转轴501两侧的浮箱502和闸门503,浮箱502位于浮箱室504中,调蓄池6内设有浮子室505,浮子室505的下部开有与调蓄池6相通的水流过孔;浮子室505中设有浮子506;临近第一缓冲池1的浮箱室504侧壁底部开有进水口507,临近调蓄池6的浮箱室侧壁底部开有出水孔508,进水口507口径远大于出水孔508;浮箱室进水口507处设有封堵进水口507的配重块509,配重块509与浮子506间通过联动装置进行联动,联动装置包括位于调蓄池6内浮子室505上方的第一滑轮510和位于浮箱室504上方的第二滑轮511,浮子506与配重块509之间连接有钢丝绳512,钢丝绳512的一端连接浮子506,另一端穿过第一滑轮510、第二滑轮511连接配重块509;浮子506的质量大于配重块509的质量。浮子室505进水水位高度为调蓄池6最大拦蓄水位高度。浮箱室进水口507进水水位高度为第二缓冲池2底部高度,同为第一缓冲池1底部高度。The left and right sides in Fig. 1 correspond to the left and right sides of this embodiment, and the up and down correspond to the rear and front of this embodiment. The first hydraulic automatic gate 5 is an inductive hydraulic automatic gate that is normally closed and automatically opened when the water level in the induction regulating storage tank 6 reaches the opening water level. As shown in Figure 5-10, the inductive hydraulic automatic gate includes a rotating shaft 501 fixed between the two walls of the first buffer pool 1, and a floating tank 502 and a gate 503 respectively arranged on both sides of the rotating shaft 501. The floating tank 502 is located at In the buoyancy tank chamber 504, a float chamber 505 is provided in the adjustment storage tank 6, and the lower part of the float chamber 505 has a water flow hole communicating with the adjustment storage tank 6; the float chamber 505 is provided with a float 506; adjacent to the first buffer tank 1 There is a water inlet 507 at the bottom of the side wall of the pontoon chamber 504, and there is a water outlet 508 near the bottom of the side wall of the pontoon chamber of the storage tank 6, and the diameter of the water inlet 507 is much larger than the water outlet 508; There is a counterweight 509 to block the water inlet 507. The counterweight 509 and the float 506 are linked through a linkage. The linkage includes a first pulley 510 located above the float chamber 505 in the adjustment storage tank 6 and a first pulley located in the buoy chamber 504. The second pulley 511 above, the steel wire rope 512 is connected between the float 506 and the counterweight 509, and one end of the steel rope 512 is connected to the float 506, and the other end passes through the first pulley 510 and the second pulley 511 to connect the counterweight 509; the float 506 The quality of is greater than the quality of counterweight 509. The height of the water inlet water level of the float chamber 505 is the height of the maximum storage water level of the storage tank 6 . The height of the water level at the water inlet 507 of the buoyancy tank chamber is the height of the bottom of the second buffer pool 2, which is also the height of the bottom of the first buffer pool 1.
调蓄池6位于第二缓冲池2后方(第二水力自动闸门7下游),第二水力自动闸门7为浮箱式下游控制堰门(结构已被公开号为CN204001177的实用新型公开),第二水力自动闸门7常用状态为开启,第二水力自动闸门关闭水位高度15为调蓄池6的最大拦蓄水位高度。第二缓冲池2底部高于调蓄池6底部使调蓄池有足够的蓄水空间,第二缓冲池2底部可以选择高于或平齐于调蓄池6最大拦蓄水位高度,本实施例中第二缓冲池2底部高于调蓄池6最大拦蓄水位高度。调蓄池6边缘底部下凹形成集水区16,调蓄池6内设有位于集水区16内的潜污泵8,潜污泵8排水端通向污水处理厂。The storage tank 6 is located behind the second buffer tank 2 (downstream of the second hydraulic automatic gate 7), and the second hydraulic automatic gate 7 is a buoyant box type downstream control weir gate (the structure has been disclosed by the utility model CN204001177). The common state of the second hydraulic automatic gate 7 is to open, and the closing water level height 15 of the second hydraulic automatic gate is the maximum retention water level height of the storage tank 6 . The bottom of the second buffer tank 2 is higher than the bottom of the storage tank 6 so that the storage tank has enough water storage space. The bottom of the second buffer tank 2 can be selected to be higher than or flush with the maximum water level of the storage tank 6. In this embodiment The bottom of the second buffer tank 2 is higher than the maximum water level of the storage tank 6. The bottom of the storage tank 6 is concave to form a catchment area 16, and the storage tank 6 is provided with a submersible sewage pump 8 located in the water collection area 16, and the discharge end of the submersible sewage pump 8 leads to a sewage treatment plant.
第二缓冲池2内第二水力自动闸门7前方设有自清洗水平格栅12。自清洗水平格栅12包括沿竖直方向间隔设置的水平栅条121及穿插在各格栅121之间的耙齿122,耙齿122由设置在水平栅条121后方的液压油缸123驱动。液压油缸123驱动耙齿122在水平栅条121间来回运动,将水平栅条121间的杂物清除。调蓄池6内左右两侧对称设有冲洗装置9和高清摄像头10,冲洗装置9为智能喷射器。A self-cleaning horizontal grid 12 is provided in front of the second hydraulic automatic gate 7 in the second buffer pool 2 . The self-cleaning horizontal grid 12 includes horizontal grid bars 121 arranged at intervals along the vertical direction and rake teeth 122 interspersed between each grid 121 , and the rake teeth 122 are driven by a hydraulic cylinder 123 arranged behind the horizontal grid bars 121 . The hydraulic cylinder 123 drives the rake teeth 122 to move back and forth between the horizontal grid bars 121 to remove the sundries between the horizontal grid bars 121 . A flushing device 9 and a high-definition camera 10 are arranged symmetrically on the left and right sides of the storage tank 6, and the flushing device 9 is an intelligent injector.
本发明还包括控制单元(图中未标出),控制单元包括PLC控制器及SCADA系统,控制单元对潜污泵8、冲洗装置9、高清摄像头10、液位传感器11、自清洗水平格栅12进行监控,潜污泵8的信号输入端与控制单元连接,调蓄池6内设有液位传感器11,液位传感器11的信号输出端通过控制单元与冲洗装置9信号输入端、高清摄像头10信号输入端连接。自清洗水平格栅12还包括格栅液位传感器(未标出),格栅液位传感器信号输出端与控制单元连接,液压油缸信号输入端与控制单元连接,当第二缓冲池2内液位到达最下端水平格栅时,格栅液位传感器将信号通过控制单元传递给液压油缸,液压油缸运动驱动耙齿运动,设备不间断自动运行,将卡在水平栅条上的杂物刮除,让漂浮物和悬浮物随着水流进入下游再集中处理。The present invention also includes a control unit (not shown in the figure), the control unit includes a PLC controller and a SCADA system, and the control unit controls the submersible sewage pump 8, the flushing device 9, the high-definition camera 10, the liquid level sensor 11, and the self-cleaning horizontal grid. 12 for monitoring, the signal input end of the submersible sewage pump 8 is connected to the control unit, the storage tank 6 is provided with a liquid level sensor 11, and the signal output end of the liquid level sensor 11 passes through the control unit and the signal input end of the flushing device 9, a high-definition camera 10 signal input connections. The self-cleaning horizontal grid 12 also includes a grid liquid level sensor (not shown), the signal output end of the grid liquid level sensor is connected to the control unit, and the signal input end of the hydraulic cylinder is connected to the control unit. When the liquid level reaches the lowermost horizontal grille, the grille liquid level sensor transmits the signal to the hydraulic cylinder through the control unit, and the movement of the hydraulic cylinder drives the rake teeth to move, and the equipment runs automatically without interruption to scrape off the sundries stuck on the horizontal grille , Let the floating and suspended solids enter the downstream with the water flow and then concentrate on treatment.
上述分流制初期雨水调蓄池仅针对城市雨水,雨水管道与城市水体连通,为了使城市水体不受污染,雨水管道内的初期雨水要全部收集到调蓄池中;城市污水由污水管道与污水处理厂连通。The initial rainwater storage tank of the above-mentioned diversion system is only for urban rainwater, and the rainwater pipeline is connected with the urban water body. In order to prevent the urban water body from being polluted, all the initial rainwater in the rainwater pipeline must be collected into the storage tank; the urban sewage is treated by the sewage pipeline and sewage factory connected.
上述分流制初期雨水调蓄池的工作过程如下:初期雨水从进水管3流经第一缓冲池1、连接管13进入第二缓冲池2中,此时第一水力自动闸门5处于常用的关闭状态,第二水力自动闸门7处于常用的开启状态,雨水由第二水力自动闸门7进入调蓄池6中,自清洗格栅12拦截进入调蓄池6雨水中的漂浮物和悬浮物,在降雨过程中,设备不间断自动运行,将卡在水平栅条121上的杂物刮除,让漂浮物和悬浮物随着水流进入下游再集中处理。待调蓄池6中水位到达最大拦蓄水位高度时,如图2中第二水力自动闸门关闭水位15所示,第二水力自动闸门7中的浮箱室进水,浮箱带动闸门关闭,雨水无法继续从第二缓冲池2进入调蓄池6中。此时第一水力自动闸门5浮子室505内进水,浮子506上浮,配重块509通过钢丝绳512与浮子506联动下降后打开进水口507,如图7-8所示,水流进入后迅速涌进浮箱室504,浮箱502上浮带动闸门503开启,雨水通过自然水体排放口4进入自然水体中。第一水力自动闸门5的开启水位高度为第二缓冲池2底部高度,目的是为了保证后期雨水全部排放到自然水体,避免在第二缓冲池2内产生积水。连接管13、第二缓冲池2、第一缓冲池1、进水管3底部均平齐,彻底避免了第二缓冲池2内积水。The working process of the initial rainwater storage tank of the above-mentioned diversion system is as follows: the initial rainwater flows from the inlet pipe 3 through the first buffer tank 1, and the connecting pipe 13 enters the second buffer tank 2. At this time, the first hydraulic automatic gate 5 is in the usual closed state. state, the second hydraulic automatic gate 7 is in the usual open state, and the rainwater enters the storage tank 6 by the second hydraulic automatic gate 7, and the self-cleaning grid 12 intercepts the floating and suspended matter in the rainwater of the storage tank 6. During the rainfall process, the equipment operates automatically without interruption, scraping off the sundries stuck on the horizontal grid bar 121, and allowing the floating and suspended matter to enter the downstream along with the water flow and then be concentrated for treatment. When the water level in the storage tank 6 reaches the maximum water level, as shown in Fig. 2, the closing water level 15 of the second hydraulic automatic gate, the buoyant tank chamber in the second hydraulic automatic gate 7 enters the water, and the buoyant tank drives the gate to close, and the rainwater Can't continue to enter in the storage pool 6 from the second buffer pool 2. At this time, water enters the float chamber 505 of the first hydraulic automatic gate 5, and the float 506 floats up. The counterweight 509 descends in conjunction with the float 506 through the wire rope 512 and then opens the water inlet 507. As shown in Figure 7-8, the water flows rapidly after entering. Enter the buoyancy tank chamber 504, the buoyancy tank 502 floats up to drive the gate 503 to open, and the rainwater enters the natural water body through the natural water body discharge port 4. The opening water level height of the first hydraulic automatic gate 5 is the height of the bottom of the second buffer pool 2. The purpose is to ensure that all rainwater is discharged to the natural water body in the later stage and avoid water accumulation in the second buffer pool 2. The connecting pipe 13 , the second buffer pool 2 , the first buffer pool 1 , and the bottom of the water inlet pipe 3 are all in the same level, completely avoiding the accumulation of water in the second buffer pool 2 .
降雨结束后,在污水处理厂有处理能力时,再将调蓄池6的雨水用潜污泵8抽到污水管道,通过污水管道排放到污水处理厂进行处理。通过控制单元开启潜污泵8,液位传感器11实时监测调蓄池6内水位。当调蓄池6水位下降,浮子506通过滑轮510、滑轮511将配重块509拉至最上方处,如图7所示,进水口507关闭,浮箱室504内水慢慢从出水孔508流出,浮箱502下沉后带动第一水力自动闸门503关闭,如图9-10所示。调蓄池6水位下降时液位传感器11将信号通过控制单元传输至冲洗装置9,冲洗装置9智能喷射器开始搅拌,使沉积在池底的部分泥沙被雨水一起带走,当调蓄池6的水位下降到见池底时,液位传感器11将信号通过控制单元传输至冲洗装置9,智能喷射器开始对池底进行冲洗,冲洗完之后通过高清摄像头10采集调蓄池6底部画面,并将该图像信号传递给控制单元,控制单元对调蓄池池底进行智能化网格区域划分,若调蓄池6底部存在污点,则根据污点位置与冲洗装置9的坐标关系,控制冲洗装置9水泵出水扬程和旋转所需角度,使冲洗装置9对污点位置进行点对点清洗,将调蓄池6冲洗干净。整个冲洗过程无需外部水源,冲洗效果要好于拍门式冲洗门和水力翻斗,并且水中泥沙含量小,不会淤积缓冲池和管渠。调蓄池系统以PLC为核心控制器,自动控制时,对现场设备进行控制信号输出,同时采集设备状态的实时数据,形成稳定可靠的闭环控制。After the rainfall ends, when the sewage treatment plant has the processing capacity, the rainwater in the storage tank 6 is pumped to the sewage pipe with the submersible sewage pump 8, and is discharged to the sewage treatment plant by the sewage pipe for processing. The submersible sewage pump 8 is turned on by the control unit, and the liquid level sensor 11 monitors the water level in the storage tank 6 in real time. When the water level of the adjustment storage tank 6 drops, the float 506 pulls the counterweight 509 to the top through the pulley 510 and the pulley 511. After flowing out, the buoyancy tank 502 sinks and drives the first hydraulic automatic gate 503 to close, as shown in Figure 9-10. When the water level of the storage tank 6 drops, the liquid level sensor 11 transmits the signal to the flushing device 9 through the control unit, and the intelligent injector of the flushing device 9 starts to stir, so that part of the sediment deposited at the bottom of the pool is taken away by the rainwater, and when the storage tank When the water level of 6 drops to the bottom of the pool, the liquid level sensor 11 transmits the signal to the flushing device 9 through the control unit, and the intelligent injector starts to flush the bottom of the pool. And the image signal is transmitted to the control unit, and the control unit divides the bottom of the storage tank into an intelligent grid area. If there is a stain at the bottom of the storage tank 6, the flushing device is controlled according to the coordinate relationship between the position of the stain and the flushing device 9. 9. The head of the water pump and the required angle of rotation enable the flushing device 9 to perform point-to-point cleaning on the stain position, and rinse the storage tank 6 clean. The entire flushing process does not require an external water source, and the flushing effect is better than that of the flap flushing door and hydraulic dumping bucket, and the sediment content in the water is small, so it will not silt the buffer pool and pipes. The storage tank system uses PLC as the core controller. During automatic control, it outputs control signals to field equipment and collects real-time data of equipment status to form a stable and reliable closed-loop control.
以上所述,仅为本发明的具体实施方式,应当指出,任何熟悉本领域的技术人员在本发明所揭露的技术范围内,可轻易想到的变化或替换,都应涵盖在本发明的保护范围之内。The above is only a specific embodiment of the present invention. It should be pointed out that any changes or substitutions that can be easily conceived by those skilled in the art within the technical scope disclosed in the present invention shall be covered by the protection scope of the present invention. within.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510341254.4A CN104975649B (en) | 2015-06-18 | 2015-06-18 | Separate system Rainwater Storage Tank |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201510341254.4A CN104975649B (en) | 2015-06-18 | 2015-06-18 | Separate system Rainwater Storage Tank |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN104975649A true CN104975649A (en) | 2015-10-14 |
| CN104975649B CN104975649B (en) | 2017-03-01 |
Family
ID=54272579
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201510341254.4A Active CN104975649B (en) | 2015-06-18 | 2015-06-18 | Separate system Rainwater Storage Tank |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN104975649B (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105544702A (en) * | 2016-02-05 | 2016-05-04 | 武汉圣禹排水系统有限公司 | Separate system first rain regulation and storage treatment system |
| CN105714913A (en) * | 2016-02-15 | 2016-06-29 | 武汉圣禹排水系统有限公司 | Zone partition rainwater flow dividing treatment system based on separate system pipe network |
| CN111792753A (en) * | 2020-07-15 | 2020-10-20 | 天水长城电工起重电气有限公司 | Storage tank self-adjusting control device and adjusting method |
| CN112922085A (en) * | 2021-03-18 | 2021-06-08 | 江苏欣昌建设工程有限公司 | Rainwater reposition of redundant personnel, regulation and processing system of reposition of redundant personnel system |
| CN115726459A (en) * | 2022-11-25 | 2023-03-03 | 安徽新华学院 | Intelligent rainwater and sewage flow dividing system and device with double buffer tanks |
| CN116145784A (en) * | 2023-02-20 | 2023-05-23 | 中国一冶集团有限公司 | A rain and sewage intelligent diversion system and diversion method |
Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20110018758A (en) * | 2009-08-18 | 2011-02-24 | (주)예일엔지니어링 | Initial excellent separator |
| CN202730928U (en) * | 2012-08-29 | 2013-02-13 | 中国瑞林工程技术有限公司 | Novel rainwater collection system |
| KR101296566B1 (en) * | 2011-06-15 | 2013-08-13 | 진두남 | A prevention apparatus of rain and sand inflow for a manhole |
| CN203569667U (en) * | 2013-09-02 | 2014-04-30 | 中国市政工程华北设计研究总院 | Initial rainwater collection device |
| CN104563274A (en) * | 2014-12-04 | 2015-04-29 | 洼石环境工程(上海)有限公司 | Initial rainwater overflow grille for water collecting well |
| CN104612235A (en) * | 2014-12-16 | 2015-05-13 | 陆建华 | Intelligent rainwater and sewage dividing system |
| CN204983119U (en) * | 2015-06-18 | 2016-01-20 | 武汉圣禹排水系统有限公司 | Reposition of redundant personnel system initial stage rainwater regulation pond |
-
2015
- 2015-06-18 CN CN201510341254.4A patent/CN104975649B/en active Active
Patent Citations (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20110018758A (en) * | 2009-08-18 | 2011-02-24 | (주)예일엔지니어링 | Initial excellent separator |
| KR101296566B1 (en) * | 2011-06-15 | 2013-08-13 | 진두남 | A prevention apparatus of rain and sand inflow for a manhole |
| CN202730928U (en) * | 2012-08-29 | 2013-02-13 | 中国瑞林工程技术有限公司 | Novel rainwater collection system |
| CN203569667U (en) * | 2013-09-02 | 2014-04-30 | 中国市政工程华北设计研究总院 | Initial rainwater collection device |
| CN104563274A (en) * | 2014-12-04 | 2015-04-29 | 洼石环境工程(上海)有限公司 | Initial rainwater overflow grille for water collecting well |
| CN104612235A (en) * | 2014-12-16 | 2015-05-13 | 陆建华 | Intelligent rainwater and sewage dividing system |
| CN204983119U (en) * | 2015-06-18 | 2016-01-20 | 武汉圣禹排水系统有限公司 | Reposition of redundant personnel system initial stage rainwater regulation pond |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105544702A (en) * | 2016-02-05 | 2016-05-04 | 武汉圣禹排水系统有限公司 | Separate system first rain regulation and storage treatment system |
| CN105714913A (en) * | 2016-02-15 | 2016-06-29 | 武汉圣禹排水系统有限公司 | Zone partition rainwater flow dividing treatment system based on separate system pipe network |
| CN105714913B (en) * | 2016-02-15 | 2018-07-13 | 武汉圣禹排水系统有限公司 | A kind of region fragment rainwater shunting processing system based on separate system pipe network |
| CN111792753A (en) * | 2020-07-15 | 2020-10-20 | 天水长城电工起重电气有限公司 | Storage tank self-adjusting control device and adjusting method |
| CN112922085A (en) * | 2021-03-18 | 2021-06-08 | 江苏欣昌建设工程有限公司 | Rainwater reposition of redundant personnel, regulation and processing system of reposition of redundant personnel system |
| CN115726459A (en) * | 2022-11-25 | 2023-03-03 | 安徽新华学院 | Intelligent rainwater and sewage flow dividing system and device with double buffer tanks |
| CN116145784A (en) * | 2023-02-20 | 2023-05-23 | 中国一冶集团有限公司 | A rain and sewage intelligent diversion system and diversion method |
Also Published As
| Publication number | Publication date |
|---|---|
| CN104975649B (en) | 2017-03-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104975649B (en) | Separate system Rainwater Storage Tank | |
| CN105544697B (en) | Region burst rainwater based on combined system pipe network shunts, regulated and stored and processing system | |
| CN105625545B (en) | A kind of region fragment rain processing system based on separate system pipe network | |
| CN105714913B (en) | A kind of region fragment rainwater shunting processing system based on separate system pipe network | |
| CN105064494A (en) | Rainwater closure system | |
| CN105625555B (en) | A kind of rainwater shunting of combined system, regulate and store and processing system | |
| CN205475657U (en) | Confluence system is rain regulation processing system just | |
| CN204781084U (en) | Processing system is collected from cleaning function's first rain in area | |
| CN104975648B (en) | Combined system underground Rainwater Storage Tank | |
| CN114457890B (en) | Municipal drainage rain and sewage split-flow treatment device | |
| CN105569163B (en) | Region burst rain processing system based on mixed flow tubulation net | |
| CN204753798U (en) | Confluence system underground initial stage rainwater regulation pond | |
| CN105604176A (en) | Combined-system first rain regulation and storage treatment system | |
| CN205475588U (en) | Regional burst rainwater processing system based on reposition of redundant personnel tubulation net | |
| CN205475586U (en) | Rainwater subregion processing system based on confluence tubulation net | |
| CN105672444B (en) | Rainwater division processing system based on combined system pipe network | |
| CN205636892U (en) | Reposition of redundant personnel of regional burst rainwater, regulation and processing system based on mixed flow tubulation net | |
| CN205475587U (en) | Regional burst rainwater reposition of redundant personnel processing system based on reposition of redundant personnel tubulation net | |
| CN106958287A (en) | A kind of the biological of early-stage rainwater that handle is detained cell system | |
| CN205637026U (en) | Regional burst rainwater processing system based on mixed flow tubulation net | |
| CN110397142A (en) | A system and method for flushing and diverting municipal sewage pipes | |
| CN212772580U (en) | Rainwater collecting and recycling system convenient for remote control | |
| CN204983119U (en) | Reposition of redundant personnel system initial stage rainwater regulation pond | |
| CN205475585U (en) | Rainwater reposition of redundant personnel, regulation and processing system of reposition of redundant personnel system | |
| CN105714912B (en) | A kind of rainwater shunting of separate system, regulate and store and processing system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address |
Address after: No. 509 Weihu Road, Shamao Street, Hannan District, Wuhan City, Hubei Province, 430090 Patentee after: Wuhan Shengyu Smart Ecological Environmental Protection Co.,Ltd. Address before: 430056 zhuanyang science and Technology Industrial Park, Wuhan Economic and Technological Development Zone, Wuhan City, Hubei Province Patentee before: WUHAN SHENGYU DRAINAGE SYSTEM Co.,Ltd. |
|
| CP03 | Change of name, title or address |