CN105544697B - Region burst rainwater based on combined system pipe network shunts, regulated and stored and processing system - Google Patents

Region burst rainwater based on combined system pipe network shunts, regulated and stored and processing system Download PDF

Info

Publication number
CN105544697B
CN105544697B CN201610079048.5A CN201610079048A CN105544697B CN 105544697 B CN105544697 B CN 105544697B CN 201610079048 A CN201610079048 A CN 201610079048A CN 105544697 B CN105544697 B CN 105544697B
Authority
CN
China
Prior art keywords
wall
rainwater
storage tank
treatment
sewage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610079048.5A
Other languages
Chinese (zh)
Other versions
CN105544697A (en
Inventor
李习洪
周超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Shengyu Smart Ecological Environmental Protection Co ltd
Original Assignee
Wuhan Shengyu Drainage Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Shengyu Drainage Systems Co Ltd filed Critical Wuhan Shengyu Drainage Systems Co Ltd
Priority to CN201610079048.5A priority Critical patent/CN105544697B/en
Publication of CN105544697A publication Critical patent/CN105544697A/en
Application granted granted Critical
Publication of CN105544697B publication Critical patent/CN105544697B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E03—WATER SUPPLY; SEWERAGE
    • E03F—SEWERS; CESSPOOLS
    • E03F1/00—Methods, systems, or installations for draining-off sewage or storm water
    • B—PERFORMING OPERATIONS; TRANSPORTING
    • B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01D—SEPARATION
    • B01D35/00—Filtering devices having features not specifically covered by groups B01D24/00 - B01D33/00, or for applications not specifically covered by groups B01D24/00 - B01D33/00; Auxiliary devices for filtration; Filter housing constructions
    • B01D35/02—Filters adapted for location in special places, e.g. pipe-lines, pumps, stop-cocks
    • C—CHEMISTRY; METALLURGY
    • C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F1/00—Treatment of water, waste water, or sewage
    • C02F1/001—Processes for the treatment of water whereby the filtration technique is of importance
    • E—FIXED CONSTRUCTIONS
    • E03—WATER SUPPLY; SEWERAGE
    • E03F—SEWERS; CESSPOOLS
    • E03F3/00—Sewer pipe-line systems
    • E03F3/02—Arrangement of sewer pipe-lines or pipe-line systems
    • E—FIXED CONSTRUCTIONS
    • E03—WATER SUPPLY; SEWERAGE
    • E03F—SEWERS; CESSPOOLS
    • E03F5/00—Sewerage structures
    • E03F5/10—Collecting-tanks; Equalising-tanks for regulating the run-off; Laying-up basins
    • C—CHEMISTRY; METALLURGY
    • C02—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F—TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F2103/00—Nature of the water, waste water, sewage or sludge to be treated
    • C02F2103/001—Runoff or storm water

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Water Supply & Treatment (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Environmental & Geological Engineering (AREA)
  • Organic Chemistry (AREA)
  • Sewage (AREA)

Abstract

本发明公开了一种基于合流制管网的区域分片雨水分流、调蓄及处理系统,它将城市水处理系统划分为若干个独立的面积为0.2~4平方公里的水体处理分区,并在水体处理分区内设置独立的规模较小的雨水处理设施,每个雨水处理设施仅需处理该水体处理分区所对应的雨水支管流出的雨水和污水支管流出的污水,由于水体处理分区面积较小,每个片区内距离雨水处理设施远点与近点的雨水汇流至雨水处理设施的时间差较小,避免了管网远点和近点汇流时间差造成的初雨中包含大量后期雨水的问题,使初雨雨水与后期雨水的混合度大大降低,使雨水的处理效果显著提高,以达到有效持续高效的对合流制管道中过滤净化的目的。

This invention discloses a regional segmented rainwater diversion, storage, and treatment system based on a combined sewer system. It divides the urban water treatment system into several independent water treatment zones with areas ranging from 0.2 to 4 square kilometers, and sets up independent, small-scale rainwater treatment facilities within each zone. Each rainwater treatment facility only needs to treat rainwater flowing from the corresponding rainwater branch pipe and sewage flowing from the corresponding sewage branch pipe. Due to the small area of the water treatment zones, the time difference between the rainwater from the farthest and nearest points within each zone flowing to the rainwater treatment facility is small. This avoids the problem of a large amount of later rainwater being included in the initial rainfall due to the time difference between the farthest and nearest points of the sewer network, greatly reducing the mixing degree of initial and later rainwater and significantly improving the rainwater treatment effect, thereby achieving the purpose of effective, continuous, and efficient filtration and purification of the combined sewer system.

Description

基于合流制管网的区域分片雨水分流、调蓄及处理系统Regional fragmented rainwater diversion, regulation and storage and treatment system based on combined pipe network

技术领域technical field

本发明涉及雨水处理技术领域,具体地指一种基于合流制管网的区域分片雨水分流、调蓄及处理系统。The invention relates to the technical field of rainwater treatment, in particular to a rainwater diversion, regulation and storage and treatment system for regional slices based on a combined pipe network.

背景技术Background technique

当前社会,城市化发展越来越迅速,城市的面积越来越大,城市雨水管网结构越来越复杂,城市雨水处理系统的处理压力越来越大。但是随着城市范围的不断扩展,现有的雨水管网结构存在很大的缺陷,城市管网一般将整个城区结构划分为几个区域,每个区域内设置单独的水体处理系统,但是现有城市水体处理系统对于初期雨水和后期雨水的调控并不合理,不能进行完全的分离。In the current society, urbanization is developing more and more rapidly, the area of the city is getting larger and larger, the structure of the urban rainwater pipe network is becoming more and more complex, and the pressure on the urban rainwater treatment system is increasing. However, with the continuous expansion of the city, the existing rainwater pipe network structure has great defects. The urban pipe network generally divides the entire urban structure into several areas, and a separate water treatment system is set in each area. However, the existing urban The water body treatment system is unreasonable for the regulation of initial rainwater and later rainwater, and cannot be completely separated.

参考图1,传统的各个区域内的合流制管网水体处理系统包括若干个由相互连通的雨水支管1和合流支管2组成的进水支系,雨水通过各个雨水支管1、污水通过合流支管2共同汇入到污水合管3中,经污水合管3再汇集到弃流井4中进行收集和处理,经弃流井4处理筛选后,合格水体进入到自然水体5进行使用,而不合格水体进入到污水处理6厂进行再次处理。Referring to Figure 1, the traditional water treatment system of combined pipe network in each area includes a number of water inlet branches composed of interconnected rainwater branch pipes 1 and confluence branch pipes 2, rainwater passes through each rainwater branch pipe 1, and sewage passes through the confluence branch pipe 2 They are jointly collected into the sewage pipe 3, and then collected and processed in the waste water well 4 through the waste water pipe 3. After being treated and screened by the waste water well 4, the qualified water enters the natural water body 5 for use, and the unqualified The water body enters the sewage treatment plant 6 for further treatment.

采用上述处理系统需要建造规模较大的弃流井进行水体的完全收集和处理,且由于汇水区域过大,远处水体和近处水体流入到弃流井时具有时间差,当远处水体流到弃流井时,近处水体流到弃流井的水体相对干净。如此一来,弃流井所收集的水体实质为相对干净的初期水体与大量混合水体的结合,导致水体的处理效果不理想,无法有效持续高效的对城市合流制管道进行过滤净化。The use of the above-mentioned treatment system requires the construction of large-scale jettison wells to completely collect and treat water bodies, and because the catchment area is too large, there is a time difference between the distant water body and the nearby water body flowing into the jettison well. When arriving at the abandonment well, the water body flowing from the nearby water body to the abandonment well is relatively clean. As a result, the water body collected by the abandoned well is essentially a combination of relatively clean initial water body and a large amount of mixed water body, resulting in unsatisfactory treatment effect of the water body, and it is impossible to effectively, continuously and efficiently filter and purify the urban combined pipeline.

虽然现有的城区合流制管网水体处理系统也设置有多个弃流井,但弃流井设置时也没有考虑因远处水体与进处水体汇流具有时间差,导致水体处理效果不理想的因素,无法有效持续高效的对城市合流制管道进行过滤净化。Although the existing water body treatment system of the combined pipe network in the urban area is also equipped with multiple abandonment wells, the time difference between the confluence of the distant water body and the incoming water body is not considered when setting the abandonment wells, which leads to unsatisfactory water treatment effects. , cannot effectively, continuously and efficiently filter and purify urban combined pipelines.

发明内容Contents of the invention

本发明的目的就是要解决上述背景技术的不足,提供一种基于合流制管网的区域分片雨水分流、调蓄及处理系统,以有效持续高效的对城市合流制管道进行过滤净化。The purpose of the present invention is to solve the shortcomings of the above-mentioned background technology, and provide a regional fragmented rainwater diversion, regulation and storage and treatment system based on the combined pipeline network, so as to effectively, continuously and efficiently filter and purify the urban combined pipeline.

本发明的技术方案为:一种基于合流制管网的区域分片雨水分流、调蓄及处理系统,包括污水总管、雨水支管和污水支管,所述雨水支管和污水支管尾端与污水合管连通,其特征在于:所述区域按0.2~4平方公里划分为多个呈网格状的水体处理分区,各个所述水体处理分区内设置有雨水处理设施,所述雨水处理设施具有进水口、自然水出口和污水出口,所述水体处理分区内的污水合管通过进水口汇集到所述雨水处理设施,所述自然水出口与自然水体连通,所述污水出口与所述污水总管连通;所述雨水处理设施包括缓冲池及所述缓冲池同侧并依次布置的紧急泄洪通道、初雨调蓄池和在线处理调蓄池,所述缓冲池上设置用将所述缓冲池对应与所述紧急泄洪通道、初雨调蓄池和在线处理调蓄池连通的第一进水口、第二进水口和第三进水口,所述第三进水口的最低水位线与所述第二进水口的最高水位线等高;所述第三进水口的最高水位线与所述第一进水口的最低水位线等高;所述紧急泄洪通道具有与所述自然水体连通的自然水出口,所述在线处理调蓄池设置有与所述紧急泄洪通道连通的溢出口。The technical solution of the present invention is: a regional fragmented rainwater diversion, regulation and storage and treatment system based on the combined pipe network, including the sewage main pipe, the rainwater branch pipe and the sewage branch pipe, the tail ends of the rainwater branch pipe and the sewage branch pipe are combined with the sewage pipe Connected, characterized in that: the area is divided into a plurality of grid-shaped water body treatment subregions according to 0.2 to 4 square kilometers, and rainwater treatment facilities are arranged in each of the water treatment subregions, and the rainwater treatment facilities have water inlets, The natural water outlet and the sewage outlet, the sewage pipe in the water body treatment subregion is collected to the rainwater treatment facility through the water inlet, the natural water outlet is connected with the natural water body, and the sewage outlet is connected with the sewage main pipe; The rainwater treatment facility includes a buffer pool and an emergency flood discharge channel arranged sequentially on the same side of the buffer pool, an initial rain storage tank, and an on-line processing storage tank. The first water inlet, the second water inlet and the third water inlet connected to the flood discharge channel, the primary rainwater storage tank and the online treatment storage tank, the lowest water level of the third water inlet is the same as the highest water level of the second water inlet The water level is equal; the highest water level of the third water inlet is equal to the lowest water level of the first water inlet; the emergency flood discharge channel has a natural water outlet connected to the natural water body, and the online treatment The storage tank is provided with an overflow port communicating with the emergency flood discharge channel.

进一步地,所述缓冲池具有与所述紧急泄洪通道、初雨调蓄池和在线处理调蓄池共用的侧壁墙体,所述缓冲池侧壁墙体侧部设置有池体,所述池体由所述侧壁墙体、两个垂直于所述侧壁墙体的第一墙体和第二墙体和一个与所述侧壁墙体平行的第三墙体围成,所述池体内设置有平行于所述侧壁墙体的第四墙体,所述第四墙体一端与所述第一墙体之间具有距离,所述第四墙体另一端与所述第二墙体连接,所述第四墙体与所述侧壁墙体之间设置有两个平行布置的第五墙体和第六墙体,所述紧急泄洪通道为由所述侧壁墙体、第一墙体、第三墙体、第二墙体、第四墙体和第五墙体围成的区域,所述紧急泄洪通道的第三墙体上设置有自然水出口;所述初雨调蓄池为由所述侧壁墙体、第五墙体、第四墙体和第六墙体围成的区域,所述在线处理调蓄池为由所述侧壁墙体、第六墙体、第四墙体和第二墙体围成的区域,所述在线处理调蓄池的第四墙体上设置有溢出口。Further, the buffer pool has a side wall shared with the emergency flood discharge channel, the primary rain storage tank and the online treatment storage tank, and the side wall of the buffer pool is provided with a pool body, and the The pool is surrounded by the side walls, two first and second walls perpendicular to the side walls, and a third wall parallel to the side walls, the The pool body is provided with a fourth wall parallel to the side wall, with a distance between one end of the fourth wall and the first wall, and a distance between the other end of the fourth wall and the second wall. The wall is connected, and two fifth and sixth walls arranged in parallel are arranged between the fourth wall and the side wall, and the emergency flood discharge channel is composed of the side wall, The area surrounded by the first wall, the third wall, the second wall, the fourth wall and the fifth wall, the third wall of the emergency flood discharge channel is provided with a natural water outlet; the first rain The storage tank is an area surrounded by the side wall, the fifth wall, the fourth wall and the sixth wall, and the online processing storage tank is formed by the side wall, the sixth wall body, the fourth wall and the second wall, and the fourth wall of the online treatment storage tank is provided with an overflow port.

进一步地,所述缓冲池底部内壁为向出水端倾斜的斜坡;所述第二进水口和第三进水口上设置有自清理水平格栅。Further, the bottom inner wall of the buffer tank is a slope inclined toward the water outlet; the second water inlet and the third water inlet are provided with self-cleaning horizontal grilles.

优选地,所述第一进水口内设置有与其匹配的第一自开式堰门,所述紧急泄洪通道底部内壁为向自然水出口倾斜的斜坡。Preferably, the first water inlet is provided with a first self-opening weir gate matching it, and the bottom inner wall of the emergency flood discharge channel is a slope inclined to the natural water outlet.

优选地,所述第二进水口内设置有与其匹配的第二自开式堰门;所述初雨调蓄池内靠近第二进水口处设置有低于所述初雨调蓄池底面的集水池,所述初雨调蓄池和集水池底部内壁设置有向第二进水口倾斜的斜坡;所述初雨调蓄池内设置有智能冲洗装置。Preferably, the second water inlet is provided with a second self-opening weir gate matched therewith; a collector lower than the bottom surface of the primary rain storage tank is provided near the second water inlet. For the pool, the inner wall of the bottom of the primary rain storage tank and the sump is provided with a slope inclined to the second water inlet; the primary rain storage tank is provided with an intelligent flushing device.

优选地,所述在线处理调蓄池内靠近第三进水口处设置有低于所述在线处理调蓄池底面的污水廊道,所述在线处理调蓄池底部设置有上端敞口的挡板,所述挡板将所述在线处理调蓄池一分为二并相互连通的过滤段和排放段,所述挡板上设置有拍门式冲洗门,所述过滤段内设置有水力颗粒分离器,所述过滤段和污水廊道的底部内壁设置有向第三进水口倾斜的斜坡,所述溢出口设置在所述排放段端面。Preferably, a sewage corridor lower than the bottom surface of the online treatment storage tank is provided near the third water inlet in the online treatment storage tank, and a baffle with an open upper end is provided at the bottom of the online treatment storage tank. The baffle plate divides the on-line treatment storage tank into two interconnected filter sections and a discharge section. The baffle plate is provided with a flapper-type flushing door, and a hydraulic particle separator is provided in the filter section. , the inner wall of the bottom of the filtering section and the sewage corridor is provided with a slope inclined towards the third water inlet, and the overflow port is arranged on the end surface of the discharge section.

进一步地,所述初雨调蓄池和所述在线处理调蓄池通过闸门连通,所述闸门设置在靠近所述缓冲池处的侧壁。Further, the primary rain storage tank and the online treatment storage tank are connected through a gate, and the gate is arranged on the side wall close to the buffer tank.

进一步地,所述污水总管末端与污水处理厂连通,距离所述污水处理厂最近的水体处理分区与所述污水处理厂之间设置有总调蓄池,所述总调蓄池具有进水口、自然水出口和污水出口,所述总调蓄池的进水口与上游的污水总管连通,所述总调蓄池的自然水出口与自然水体连通,所述总调蓄池的污水出口与下游的所述污水总管连通。Further, the end of the sewage main pipe is connected to the sewage treatment plant, and a general storage tank is arranged between the water body treatment subregion closest to the sewage treatment plant and the sewage treatment plant, and the general storage tank has a water inlet, The natural water outlet and the sewage outlet, the water inlet of the general storage tank is connected with the upstream sewage main pipe, the natural water outlet of the general storage tank is connected with the natural water body, the sewage outlet of the general storage tank is connected with the downstream The sewage main pipe is connected.

本发明将城市水处理系统划分为若干个独立的面积为0.2~4平方公里的水体处理分区,并在水体处理分区内设置独立的规模较小的雨水处理设施,每个雨水处理设施仅需处理该水体处理分区所对应的雨水支管流出的雨水和污水支管流出的污水,由于水体处理分区面积较小,每个片区内距离雨水处理设施远点与近点的雨水汇流至雨水处理设施的时间差较小,避免了管网远点和近点汇流时间差造成的初雨中包含大量后期雨水的问题,使初雨雨水与后期雨水的混合度大大降低,使雨水的处理效果显著提高,以达到有效持续高效的对合流制管道中过滤净化的目的。The present invention divides the urban water treatment system into several independent water body treatment zones with an area of 0.2 to 4 square kilometers, and sets independent smaller-scale rainwater treatment facilities in the water body treatment zones, and each rainwater treatment facility only needs to treat The rainwater flowing out of the rainwater branch pipe and the sewage flowing out of the sewage branch pipe corresponding to the water body treatment partition, due to the small area of the water body treatment partition, the time difference between the rainwater at the far point and the near point of the rainwater treatment facility in each area is converging to the rainwater treatment facility. Small, avoiding the problem that the initial rain contains a large amount of later rainwater caused by the time difference between the far point and the near point of the pipe network, greatly reducing the mixing degree of the initial rainwater and the later rainwater, and significantly improving the treatment effect of rainwater to achieve effective, continuous and efficient For the purpose of filtration and purification in the combined pipeline.

另外,本发明由于将整个管网区域划分为面积较小的水体处理分区,再在水体处理分区内设置独立的小型的雨水处理系统以达到初雨调蓄弃流的目地,相较于在整个区域内修建总的大型的雨水调蓄系统,更具有经济性,以节省大量的人力和物力。In addition, since the present invention divides the entire pipe network area into smaller water body treatment subregions, and then installs an independent small-scale rainwater treatment system in the water body treatment subregion to achieve the purpose of regulating, storing and discarding the first rain, compared with the whole It is more economical to build a large-scale rainwater storage system in the region to save a lot of manpower and material resources.

附图说明Description of drawings

图1为背景技术中传统的合流制管网雨水处理系统布置示意图;Fig. 1 is a schematic layout diagram of a traditional combined pipe network rainwater treatment system in the background technology;

图2为本发明的布置示意图;Fig. 2 is a schematic layout diagram of the present invention;

图3为本发明中雨水处理设施布置示意图;Fig. 3 is the layout schematic diagram of rainwater treatment facility among the present invention;

图4为图3中A剖面示意图;Fig. 4 is a cross-sectional schematic diagram of A in Fig. 3;

图5为图3中B剖面示意图;Fig. 5 is a schematic diagram of section B in Fig. 3;

图6为图3中C剖面示意图;Fig. 6 is a schematic cross-sectional view of C in Fig. 3;

图7为图3中D剖面示意图。FIG. 7 is a schematic cross-sectional view of D in FIG. 3 .

具体实施方式detailed description

下面结合附图和具体实施例对本发明作进一步的详细说明。The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.

本实施例的一种基于合流制管网的区域分片雨水分流、调蓄及处理系统,采用化整为零的方式,将一个大区域的合流制排水系统人为地分成了若干个水体处理分区,各个水体处理分区对应对各个片区的雨水和污水进行处理,以避免背景技术中管网远点和近点汇流时间差造成的初雨中包含大量后期雨水的问题,以有效持续高效的对城市合流制管道进行过滤净化。In this embodiment, a regional rainwater diversion, regulation and storage and treatment system based on the confluence pipe network artificially divides the confluence drainage system in a large area into several water body treatment zones Each water body treatment division should treat the rainwater and sewage in each area, so as to avoid the problem that the initial rain contains a large amount of later rainwater caused by the time difference between the far point and the near point of the pipe network in the background technology, so as to effectively, continuously and efficiently control the urban confluence system. The pipeline is filtered and purified.

参考图2,基于上述思想,本实施例的一种基于合流制管网的区域分片雨水分流、调蓄及处理系统,采用分片处理的办法,按0.2~4平方公里划分为多个呈网格状的水体处理分区,各个水体处理分区在管网沿线建立,每个水体处理分区内设置有雨水处理设施8,雨水处理设施8具有进水口、自然水出口和污水出口,水体处理分区内的雨水支管1和污水支管2尾端与污水合管3连通,雨水经雨水支管1、污水经合流支管2共同汇入到污水合管3中,再通过进水口汇集到雨水处理设施8,雨水处理设施8对该水体处理分区内的雨水和污水进行处理,而自然水出口与自然水体5连通,污水出口与污水总管16连通,污水总管16的末端与污水处理厂7连通。Referring to Fig. 2, based on the above-mentioned idea, a regional fragmented rainwater diversion, regulation and storage and treatment system based on the combined pipe network of this embodiment adopts the method of fragmentation processing, and divides it into multiple regions according to 0.2 to 4 square kilometers. Grid-like water body treatment partitions, each water body treatment partition is established along the pipe network, each water body treatment partition is equipped with rainwater treatment facilities 8, rainwater treatment facilities 8 have water inlets, natural water outlets and sewage outlets, water treatment partitions The tail ends of the rainwater branch pipe 1 and the sewage branch pipe 2 are connected to the sewage pipe 3, and the rainwater flows into the sewage pipe 3 through the rainwater branch pipe 1 and the sewage pipe 2, and then collects into the rainwater treatment facility 8 through the water inlet. The treatment facility 8 treats the rainwater and sewage in the water body treatment area, and the natural water outlet is connected with the natural water body 5 , the sewage outlet is connected with the sewage main pipe 16 , and the end of the sewage main pipe 16 is connected with the sewage treatment plant 7 .

上述方案中,每个雨水处理设施仅需处理该水体处理分区所对应的雨水支管流出的雨水和污水支管流出的污水,由于水体处理分区面积较小,每个片区内距离雨水处理设施远点与近点的雨水汇流至雨水处理设施的时间差较小,使初雨雨水与后期雨水的混合度大大降低,使雨水的处理效果显著提高,以达到有效持续高效的对合流制管道中过滤净化的目的。In the above scheme, each rainwater treatment facility only needs to treat the rainwater flowing out of the rainwater branch pipe corresponding to the water body treatment area and the sewage flowing out of the sewage branch pipe. The time difference between the rainwater at the near point and the rainwater treatment facility is small, which greatly reduces the mixing degree of the initial rainwater and the later rainwater, and significantly improves the treatment effect of the rainwater, so as to achieve the purpose of effective, continuous and efficient filtration and purification of the combined pipeline. .

另外,本实施例由于将整个管网区域划分为面积较小的水体处理分区,再在水体处理分区内设置独立的小型的雨水处理系统以达到初雨调蓄弃流的目地,相较于在整个区域内修建总的大型的雨水调蓄系统,更具有经济性,以节省大量的人力和物力。In addition, in this embodiment, since the entire pipe network area is divided into smaller water body treatment zones, an independent small-scale rainwater treatment system is installed in the water body treatment zone to achieve the purpose of regulating, storing and discarding the first rainwater. It is more economical to build a total large-scale rainwater storage system in the whole area to save a lot of manpower and material resources.

本实施例中,位于源头的水体处理分区内的污水合管3为污水总管16的一段,以节省管材。In this embodiment, the sewage joint pipe 3 located in the water body treatment zone at the source is a section of the sewage main pipe 16 to save pipe materials.

参考图3,本实施例的雨水处理设施8包括缓冲池8.1及缓冲池8.1同侧并依次布置的紧急泄洪通道8.2、初雨调蓄池8.3和在线处理调蓄池8.4,缓冲池8.1上设置用将缓冲池8.1对应与紧急泄洪通道8.2、初雨调蓄池8.3和在线处理调蓄池8.4连通的第一进水口、第二进水口和第三进水口,第一进水口、第二进水口及第三进水口呈中部较低的阶梯状布置,即第三进水口的最低水位线与所述第二进水口的最高水位线等高;第三进水口的最高水位线与所述第一进水口的最低水位线等高;紧急泄洪通道8.2具有与自然水体5连通的自然水出口,在线处理调蓄池8.4设置有与自然水出口连通的溢出口。Referring to Fig. 3, the rainwater treatment facility 8 of this embodiment includes a buffer pool 8.1 and an emergency flood discharge channel 8.2 arranged on the same side of the buffer pool 8.1, an initial rain storage tank 8.3 and an online processing storage tank 8.4, and the buffer pool 8.1 is set Use the buffer pool 8.1 to correspond to the first water inlet, the second water inlet and the third water inlet connected to the emergency flood discharge channel 8.2, the initial rain storage tank 8.3 and the online processing storage tank 8.4, the first water inlet, the second water inlet The water inlet and the third water inlet are arranged in a lower middle step, that is, the lowest water level line of the third water inlet is at the same height as the highest water level line of the second water inlet; The lowest water level contour of a water inlet; the emergency flood discharge channel 8.2 has a natural water outlet connected to the natural water body 5, and the on-line processing storage tank 8.4 is provided with an overflow outlet connected to the natural water outlet.

本实施例的缓冲池8.1具有与紧急泄洪通道8.2、初雨调蓄池8.3和在线处理调蓄池8.4共用的侧壁墙体,在缓冲池8.1侧壁墙体侧部设置有池体,池体由侧壁墙体9、两个垂直于侧壁墙体9的第一墙体10和第二墙体11和一个与侧壁墙体9平行的第三墙体12,池体内设置有平行于侧壁墙体9的第四墙体13,第四墙体13一端与第一墙体10之间具有距离,第四墙体13另一端与第二墙体11连接,第四墙体13与侧壁墙体9之间设置有两个平行布置的第五墙体14和第六墙体15,紧急泄洪通道8.2为侧壁墙体9、第一墙体10、第三墙体12、第二墙体11、第四墙体13和第五墙体14围成的区域,紧急泄洪通道8.2的第三墙体12上设置有与自然水体连通的自然水出口;初雨调蓄池8.3为侧壁墙体9、第五墙体14、第四墙体13和第六墙体15围成的区域,在线处理调蓄池8.4为侧壁墙体9、第六墙体15、第四墙体13和第二墙体11围成的区域,在线处理调蓄池8.4的第四墙体13上设置有溢出口,溢出口与紧急泄洪通道8.2第三墙体上的自然水出口连通,进而与自然水体连通。The buffer pool 8.1 of this embodiment has a side wall body shared with the emergency flood discharge channel 8.2, the initial rain storage tank 8.3 and the online processing storage pool 8.4, and a pool body is arranged on the side of the side wall body of the buffer pool 8.1. The body consists of a side wall body 9, two first walls 10 and a second wall body 11 perpendicular to the side wall body 9, and a third wall body 12 parallel to the side wall body 9, and a parallel wall body is provided in the pool body. In the fourth wall 13 of the side wall 9, there is a distance between one end of the fourth wall 13 and the first wall 10, and the other end of the fourth wall 13 is connected with the second wall 11, and the fourth wall 13 There are two fifth walls 14 and sixth walls 15 arranged in parallel with the side wall 9, and the emergency flood discharge channel 8.2 is the side wall 9, the first wall 10, the third wall 12, In the area surrounded by the second wall 11, the fourth wall 13 and the fifth wall 14, the third wall 12 of the emergency flood discharge channel 8.2 is provided with a natural water outlet connected to the natural water body; the initial rain storage tank 8.3 The area enclosed by the side wall body 9, the fifth body of wall 14, the fourth body of wall 13 and the sixth body of wall 15, the online processing reservoir 8.4 is the side wall body of body 9, the sixth body of wall body 15, the fourth body of wall In the area enclosed by the wall 13 and the second wall 11, an overflow is provided on the fourth wall 13 of the online processing storage tank 8.4, and the overflow is connected with the natural water outlet on the third wall of the emergency flood discharge channel 8.2, And then connect with natural water bodies.

通过上述布置,使雨水处理单元中的雨水处理设施的规模变小,只需要对该区域的初期雨水进行处理,而后期雨水经过在线处理调蓄池8.4在线处理后就近排向自然水体,无法在线处理的后期雨水通过紧急泄洪通道8.2排到自然水体中,这样就能够根据不同的初雨量自动选择不同的初雨净化方法,避免了管网远点和近点汇流时间差造成的初雨中包含后期雨水的问题,以达到有效持续高效的对合流制管道中过滤净化的目的。Through the above arrangement, the scale of the rainwater treatment facilities in the rainwater treatment unit is reduced, and only the initial rainwater in the area needs to be treated, while the later rainwater is discharged to the nearby natural water body after being treated online in 8.4 on-line treatment storage tank, which cannot be processed online. The treated late rainwater is discharged into the natural water body through the emergency flood discharge channel 8.2, so that different initial rain purification methods can be automatically selected according to different initial rainfall, avoiding the late rainwater contained in the early rain caused by the time difference between the far point and the near point of the pipe network In order to achieve the purpose of effective, continuous and efficient filtration and purification in the combined pipeline.

参考图4,本实施例的缓冲池8.1轴向一端为进水口,轴向另一端为排水口,在排水出设置有流量控制阀门8.11,流量控制闸门8.11由流量传感器和电动闸门组成,平时流量控制闸门设定一个恒定的流量,保证污水以一个恒定的流量进入污水总管16;缓冲池8.1底部内壁为向出水端倾斜的斜坡,以使水体中的淤泥杂质通过出水端排出,避免堵塞缓冲池8.1内部通道;第二进水口和第三进水口上设置有自清理水平格栅8.12,参考专利号为201520518807.4的中国专利,该自清洗水平格栅8.12包括沿竖直方向间隔设置的水平栅条及穿插在各水平栅条之间的耙齿,耙齿由设置在水平栅条后方的液压油缸驱动进行转动,以对进入到初雨调蓄池8.3和在线处理调蓄池8.4的水体进行初步处理。Referring to Fig. 4, one axial end of the buffer pool 8.1 of the present embodiment is a water inlet, and the other axial end is a water discharge port, and a flow control valve 8.11 is arranged at the discharge outlet, and the flow control gate 8.11 is composed of a flow sensor and an electric gate, and the normal flow rate Control the gate to set a constant flow rate to ensure that the sewage enters the sewage main pipe 16 at a constant flow rate; the inner wall at the bottom of the buffer pool 8.1 is a slope inclined towards the water outlet, so that the silt impurities in the water body can be discharged through the water outlet to avoid blocking the buffer pool 8.1 Internal channel; the second water inlet and the third water inlet are provided with a self-cleaning horizontal grille 8.12, referring to the Chinese patent No. 201520518807.4, the self-cleaning horizontal grille 8.12 includes horizontal grid bars arranged at intervals along the vertical direction And the rake teeth interspersed between the horizontal grid bars, the rake teeth are driven by the hydraulic cylinders arranged behind the horizontal grid bars to rotate, so as to conduct a preliminary analysis of the water entering the primary rain storage tank 8.3 and the online treatment storage tank 8.4 deal with.

参考图5,本实施例第一进水口内设置有与其匹配的第一自开式堰门8.21,第一自开式堰门8.21可以在水位上升或下降的作用下相对开启或关闭,第一自开式堰门8.21可以选用水力自动闸门,参考专利号为201410304733.4的中国专利,该第一自开式堰门8.21采用浮力式设计,它包括旋转轴、浮箱和堰门板,浮箱通过支撑臂固定在旋转轴的一端,堰门板通过支撑臂固定在旋转轴上,浮箱和堰门板位于旋转轴的同侧,旋转轴设置在第一进水口一侧,其工作原理为:浮箱室进水口高度是通过计算得到的,当浮箱室内的水位高度达到浮箱室进水口高度时,浮箱所受的浮力正好克服其重力,浮箱能够浮起,当下暴雨时,缓冲池8.1内的水位开始上升,当堰门前的水逐渐蓄积的高度漫过浮箱室进水口高度时,需要对雨水进行泄洪,此时雨水瞬间涌进浮箱室,并在瞬间与浮箱室进水口高度平齐,此时浮箱浮力克服其重力,浮箱向上浮起,由于浮箱和堰门板都是固定在旋转轴上的,而旋转轴可以进行旋转,又由于堰门板与浮箱位于旋转轴的同侧,所以堰门板在旋转轴的带动下向上运动,堰门达到瞬间开启,由于采用的是下方位排水,漂浮物都被堰门板拦截,防止了水体的污染,当水道的水位渐渐下降时,浮箱室内不再有水进入,浮箱室内的水通过浮箱室侧壁上的小口径浮箱室出水口缓缓的排出,浮箱室内的液面缓缓下降,浮力逐渐减小,浮箱缓缓下沉,堰门板在旋转轴的带动下缓缓关闭,由于关闭比较缓慢,可以防止堰门板的损坏,关闭后堰门板与堰门密封圈紧密接触,实现了良好的密封。水体浮力将第一自开式堰门8.21开启后,流入紧急泄洪通道6中,随后排放到自然水体中。本实例紧急泄洪通道8.2底部内壁为向自然水出口倾斜的斜坡,可以将水体中的淤泥杂质通过自然水出口排出。Referring to Figure 5, the first water inlet of this embodiment is provided with a first self-opening weir gate 8.21 matching it, and the first self-opening weir gate 8.21 can be relatively opened or closed under the action of rising or falling water level, the first The self-opening weir gate 8.21 can be a hydraulic automatic gate. Refer to the Chinese patent No. 201410304733.4. The first self-opening weir gate 8.21 adopts a buoyancy design, which includes a rotating shaft, a buoyant tank and a weir gate plate. The buoyant tank is supported by The arm is fixed at one end of the rotating shaft, and the weir door plate is fixed on the rotating shaft through the supporting arm. The buoyancy tank and the weir door plate are located on the same side of the rotating shaft, and the rotating shaft is set on the side of the first water inlet. Its working principle is: buoyant tank chamber The height of the water inlet is calculated. When the water level in the pontoon chamber reaches the height of the water inlet of the pontoon chamber, the buoyancy on the pontoon just overcomes its gravity, and the pontoon can float. When there is a heavy rain, the buffer tank 8.1 The water level begins to rise. When the water in front of the weir gate gradually accumulates over the height of the water inlet of the pontoon chamber, the rainwater needs to be flooded. At this time, the buoyancy of the buoyancy box overcomes its gravity, and the buoyancy box floats upwards. Since the buoyancy box and the weir door plate are fixed on the rotating shaft, the rotating shaft can be rotated, and because the weir door plate and the buoyancy box are located on the rotating shaft. The same side of the shaft, so the weir door plate moves upwards under the drive of the rotating shaft, and the weir door opens instantly. Since the drainage is at the lower level, the floating objects are intercepted by the weir door plate, preventing the pollution of the water body. When the water level of the channel gradually When descending, no more water enters the pontoon chamber, and the water in the pontoon chamber is slowly discharged through the small-diameter pontoon chamber water outlet on the side wall of the pontoon chamber. The liquid level in the pontoon chamber drops slowly, and the buoyancy gradually decreases Small, the floating tank sinks slowly, and the weir door plate is slowly closed under the drive of the rotating shaft. Due to the slow closing, it can prevent damage to the weir door plate. After closing, the weir door plate is in close contact with the weir door sealing ring to achieve a good seal . After the buoyancy of the water body opens the first self-opening weir gate 8.21, it flows into the emergency flood discharge channel 6 and is then discharged into the natural water body. In this example, the bottom inner wall of the emergency flood discharge channel 8.2 is a slope inclined to the natural water outlet, which can discharge the silt impurities in the water body through the natural water outlet.

参考图6,本实施例的第二进水口内设置有与其匹配的第二自开式堰门8.31,第二自开式堰门8.31可以选用液压旋转堰门,参考专利号为201410312118.8的中国专利,该第二自开式堰门8.31包括固定设置第二进水口一侧的油缸,油缸驱动端与门板一侧端面铰接;门板另一侧端面通过旋转轴铰接在第二进水口另一侧,通过油缸驱动,门板可以以旋转轴为中心进行摆动,从而使第二进水口开启或关闭,本实施例的油缸还可以配备自动控制系统,自动控制系统可以根据水位的高低自动控制油缸工作与否,进而达到自动控制第二进水口开启或关闭,达到完全自动化的目的;初雨调蓄池8.3内靠近第二进水口处设置有低于初雨调蓄池底面的集水池8.32,初雨调蓄池8.3和集水池8.32底部内壁设置有向第二进水口倾斜的斜坡,以使水体中的淤泥杂质流入到集水池8.32中,再从第二进水口排出;在初雨调蓄池8.3内还设置有智能冲洗装置8.33,参考专利号为“201510259529.X”的中国专利,该智能冲洗装置8.33自动化控制系统、液位传感器、冲洗装置和潜污泵,自动化控制系统控制潜污泵将初雨调蓄池8.3的水向外抽出,将初雨调蓄池8.3水位开始下降时控制冲洗装置对将初雨调蓄池8.3底进行搅拌和固定方向冲洗,当初雨调蓄池8.3内水位下降到预设高度时,自动化控制系统控制冲洗装置对初雨调蓄池8.3进行旋转冲洗,防止初雨调蓄池8.3出现堵塞现象。Referring to Figure 6, the second water inlet of this embodiment is provided with a second self-opening weir gate 8.31 matching it, and the second self-opening weir gate 8.31 can be a hydraulic rotary weir gate. Refer to the Chinese patent No. 201410312118.8 , the second self-opening weir gate 8.31 includes an oil cylinder fixed on one side of the second water inlet, the driving end of the oil cylinder is hinged to the end surface of one side of the door panel; the end surface of the other side of the door panel is hinged to the other side of the second water inlet through a rotating shaft, Driven by the oil cylinder, the door panel can swing around the rotating shaft to open or close the second water inlet. The oil cylinder in this embodiment can also be equipped with an automatic control system, which can automatically control whether the oil cylinder is working or not according to the water level. , and then achieve automatic control of the opening or closing of the second water inlet, and achieve the purpose of complete automation; the first rain storage tank 8.3 is provided with a sump 8.32 lower than the bottom surface of the first rain storage tank near the second water inlet. The inner wall at the bottom of the storage tank 8.3 and the sump 8.32 is provided with a slope inclined towards the second water inlet, so that the silt impurities in the water flow into the sump 8.32 and then discharged from the second water inlet; in the primary rain storage tank 8.3 There is also an intelligent flushing device 8.33, referring to the Chinese patent with the patent number "201510259529.X", the intelligent flushing device 8.33 automatic control system, liquid level sensor, flushing device and submersible sewage pump, the automatic control system controls the submersible sewage pump to The water in the rain storage tank 8.3 is pumped out, and when the water level of the initial rain storage tank 8.3 begins to drop, the flushing device is controlled to stir and flush the bottom of the initial rain storage tank 8.3, and the water level in the initial rain storage tank 8.3 drops. When the preset height is reached, the automatic control system controls the flushing device to rotate and flush the primary rain storage tank 8.3 to prevent the primary rain storage tank 8.3 from clogging.

参考图7,本实施例的在线处理调蓄池8.4和初雨调蓄池8.3通过设置在靠近缓冲池8.1处的侧壁(第六墙体15)的闸门相互连通,在线处理调蓄池8.4内靠近第三进水口处设置有低于在线处理调蓄池8.4底面的污水廊道8.41,在线处理调蓄池8.4底部设置有上端敞口的挡板8.42,挡板8.42将在线处理调蓄池8.4一分为二并相互连通的过滤段和排放段,挡板8.42上设置有拍门式冲洗门8.44,过滤段内设置有水力颗粒分离器8.43,拍门式冲洗门8.44和水力颗粒分离器8.43的结构参考专利号为“201510415907.9”的中国专利,过滤段和污水廊道8.41的底部内壁设置有向第三进水口倾斜的斜坡,溢出口设置在排放段端面,水流进入在线处理调蓄池8.4,经水力颗粒分离器8.43净化后合格水体由溢出口排放至自然水体中;不合格水体被挡板8.42阻挡,随着斜坡流入到污水廊道8.41中,经第三进水口排放至缓冲池8.1中,最后排放至污水处理厂进行处理;选取合适时候将挡板8.4上的拍门式冲洗门8.44打开,对斜坡上淤泥进行处理,达到自清洗的目的。With reference to Fig. 7, the on-line processing storage tank 8.4 of the present embodiment and the initial rain storage tank 8.3 communicate with each other through the gates arranged on the side wall (sixth wall 15) near the buffer pool 8.1, and the online processing storage tank 8.4 A sewage corridor 8.41 lower than the bottom surface of the on-line processing storage tank 8.4 is provided near the third water inlet inside, and a baffle plate 8.42 with an open upper end is provided at the bottom of the online treatment storage tank 8.4, and the baffle plate 8.42 will connect the online treatment storage tank 8.4 A filter section and a discharge section that are divided into two and communicate with each other. A flapper flush door 8.44 is installed on the baffle plate 8.42. A hydraulic particle separator 8.43, a flapper flush door 8.44 and a hydraulic particle separator are installed in the filter section. The structure of 8.43 refers to the Chinese patent with the patent number "201510415907.9". The bottom inner wall of the filter section and the sewage corridor 8.41 is provided with a slope inclined to the third water inlet, and the overflow is provided on the end face of the discharge section, and the water flow enters the online treatment storage tank 8.4, after being purified by the hydraulic particle separator 8.43, the qualified water body is discharged into the natural water body from the overflow port; the unqualified water body is blocked by the baffle plate 8.42, flows into the sewage corridor 8.41 along the slope, and is discharged to the buffer pool through the third water inlet In 8.1, it is finally discharged to the sewage treatment plant for treatment; select the appropriate time to open the flapper-type flushing door 8.44 on the baffle 8.4 to treat the silt on the slope to achieve the purpose of self-cleaning.

本发明的雨水处理设施在使用时:When the rainwater treatment facility of the present invention is in use:

1、晴天时,污水合管4中的水体,通过流量控制闸门3进入污水处理厂进行处理;1. On sunny days, the water in the sewage pipe 4 enters the sewage treatment plant through the flow control gate 3 for treatment;

2、下雨时,雨水合管3和污水合管4中的水体,首先以流量控制闸门8.11设定好的流量进入污水处理厂7处理,处理不了的雨水存在缓冲池8.1中,相应的缓冲池8.1水位就会慢慢上升,当上升到第二进水口最低水位线时,初期雨水就会通过自清理水平格栅8.12和第二自开式堰门8.31(自清理水平格栅8.12可以拦截漂浮物,防止漂浮物进入初雨调蓄池8.3中;此时第二自开式堰门8.31处于全开状态)进入初雨调蓄池8.3进行储存,当上升到第二进水口最高水位线时,第二自开式堰门8.31开始关闭,防止收集到的初雨返回到缓冲池8.1中,此时后期雨水开始从第三进水口处流入在线处理调蓄池8.4中,经处理后排放到自然水体中;2. When it rains, the water bodies in the rainwater collection pipe 3 and the sewage collection pipe 4 first enter the sewage treatment plant 7 for treatment with the flow rate set by the flow control gate 8.11, and the rainwater that cannot be treated is stored in the buffer pool 8.1, and the corresponding buffer The water level of the pond 8.1 will slowly rise, and when rising to the lowest water level line of the second water inlet, the initial rainwater will pass through the self-cleaning horizontal grille 8.12 and the second self-opening weir gate 8.31 (the self-cleaning horizontal grille 8.12 can intercept Floating matter prevents floating matter from entering the initial rain storage tank 8.3; at this time, the second self-opening weir gate 8.31 is in a fully open state) and enters the initial rain storage tank 8.3 for storage. , the second self-opening weir gate 8.31 starts to close to prevent the collected initial rain from returning to the buffer pool 8.1. At this time, the late rainwater begins to flow into the online treatment storage tank 8.4 from the third water inlet, and is discharged after treatment. into natural bodies of water;

如果下雨强度越来越大,那么缓冲池8.1的水位将继续上升,当上升到在第三进水口最高水位线时,第一自开式堰门8.21开启,雨水从第一进水口中进入到紧急泄洪廊道8.1中,再排向自然水体中,当缓冲池8.1的水位下降至第三进水口最高水位线时,第一自开式堰门11关闭。If the rain intensity is getting bigger and bigger, the water level of the buffer tank 8.1 will continue to rise so, when rising to the highest water level line at the third water inlet, the first self-opening weir door 8.21 will be opened, and the rainwater will enter from the first water inlet To the emergency flood discharge corridor 8.1, and then discharged into the natural water body, when the water level of the buffer pool 8.1 drops to the highest water level line of the third water inlet, the first self-opening weir gate 11 is closed.

3、降雨结束后,缓冲池8.1的水位下降,当下降到晴天对应的水位时,初雨调蓄池8.3中的智能冲洗装置8.33开启,将池中的初雨强排到缓冲池8.1中,送入污水处理厂7处理;初雨调蓄池8.3冲洗完毕后,开始对在线处理调蓄池8.4进行冲洗,冲洗前,先打开闸门,使初雨调蓄池8.3和在线处理调蓄池8.4联通,在线处理调蓄池8.4中的雨水先通过闸门抽排到初雨调蓄池8.3中,然后再开启拍门式冲洗门8.44,池底进行冲洗,冲洗后的污水流入污水廊道5d,最后由第一进水口中排放至缓冲池8.1中。3. After the rainfall ends, the water level of the buffer pool 8.1 drops. When it drops to the water level corresponding to sunny days, the intelligent flushing device 8.33 in the initial rain storage tank 8.3 is turned on, and the initial rain in the pool is strongly discharged into the buffer pool 8.1. Sent to sewage treatment plant 7 for processing; after the initial rain storage tank 8.3 has been flushed, the on-line processing storage tank 8.4 is rinsed. China Unicom, the online treatment of the rainwater in the storage tank 8.4 is first pumped through the gate to the primary rain storage tank 8.3, and then the flapper-type flushing door 8.44 is opened to flush the bottom of the pool, and the flushed sewage flows into the sewage corridor 5d. Finally, it is discharged into the buffer pool 8.1 from the first water inlet.

本实施例在距离污水处理厂7最近的水体处理分区与污水处理厂7之间设置有调蓄池6,总调蓄池6具有进水口、自然水出口和污水出口,总调蓄池6的进水口与上游的污水总管16连通,总调蓄池6的自然水出口与自然水体5连通,总调蓄池6的污水出口与下游的污水总管16连通。实际应用时,由于污水处理厂7的处理能力有限,在污水处理厂7前端增设总调蓄池6,总调蓄池6可以收集并处理初期雨水,待污水处理厂7处理压力减小或是降雨停歇后,再将总调蓄池6中的初雨排放到污水处理厂7进行综合处理,以缓冲污水处理厂7的处理压力。In this embodiment, a storage tank 6 is arranged between the water body treatment subregion closest to the sewage treatment plant 7 and the sewage treatment plant 7. The total storage tank 6 has a water inlet, a natural water outlet and a sewage outlet. The water inlet is communicated with the upstream sewage main pipe 16, the natural water outlet of the general storage tank 6 is communicated with the natural water body 5, and the sewage outlet of the general storage tank 6 is communicated with the downstream sewage main pipe 16. In actual application, due to the limited processing capacity of the sewage treatment plant 7, a general storage tank 6 is added at the front end of the sewage treatment plant 7, and the general storage tank 6 can collect and treat initial rainwater. After the treatment pressure of the sewage treatment plant 7 decreases or After the rain stops, the initial rain in the general storage tank 6 is discharged to the sewage treatment plant 7 for comprehensive treatment, so as to buffer the treatment pressure of the sewage treatment plant 7.

以上所述,仅是本发明的较佳实施例而已,并非对本发明的结构做任何形式上的限制。凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均仍属于本发明的技术方案的范围内。The above descriptions are only preferred embodiments of the present invention, and do not limit the structure of the present invention in any form. All simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the present invention still fall within the scope of the technical solutions of the present invention.

Claims (8)

1.一种基于合流制管网的区域分片雨水分流、调蓄及处理系统,包括污水总管(16)、雨水支管(1)和污水支管(2),所述雨水支管(1)和污水支管(2)尾端与污水合管(3)连通,其特征在于:所述区域按0.2~4平方公里划分为多个呈网格状的水体处理分区,各个所述水体处理分区内设置有雨水处理设施(8),所述雨水处理设施(8)具有进水口、自然水出口和污水出口,所述水体处理分区内的污水合管(3)通过进水口汇集到所述雨水处理设施(8),所述自然水出口与自然水体(5)连通,所述污水出口与所述污水总管(16)连通;所述雨水处理设施(8)包括缓冲池(8.1)及所述缓冲池(8.1)同侧并依次布置的紧急泄洪通道(8.2)、初雨调蓄池(8.3)和在线处理调蓄池(8.4),所述缓冲池(8.1)上设置用将所述缓冲池(8.1)对应与所述紧急泄洪通道(8.2)、初雨调蓄池(8.3)和在线处理调蓄池(8.4)连通的第一进水口、第二进水口和第三进水口,所述第三进水口的最低水位线与所述第二进水口的最高水位线等高;所述第三进水口的最高水位线与所述第一进水口的最低水位线等高;所述紧急泄洪通道(8.2)具有与所述自然水体(5)连通的自然水出口,所述在线处理调蓄池(8.4)设置有与所述紧急泄洪通道(8.2)连通的溢出口。1. A regional fragmented rainwater diversion, regulation and storage and treatment system based on a combined pipe network, comprising a sewage main (16), a rainwater branch pipe (1) and a sewage branch pipe (2), and the rainwater branch pipe (1) and sewage The tail end of the branch pipe (2) is connected with the sewage pipe (3), and it is characterized in that: the area is divided into a plurality of grid-shaped water body treatment subregions according to 0.2 to 4 square kilometers, and each water body treatment subregion is provided with A rainwater treatment facility (8), the rainwater treatment facility (8) has a water inlet, a natural water outlet and a sewage outlet, and the sewage pipe (3) in the water body treatment subregion is collected into the rainwater treatment facility ( 8), the natural water outlet is communicated with the natural water body (5), and the sewage outlet is communicated with the sewage main pipe (16); the rainwater treatment facility (8) includes a buffer pool (8.1) and the buffer pool ( 8.1) The emergency flood discharge channel (8.2), the initial rain storage tank (8.3) and the online processing storage tank (8.4) arranged in sequence on the same side, and the buffer tank (8.1) is provided with the buffer tank (8.1 ) corresponds to the first water inlet, the second water inlet and the third water inlet connected with the emergency flood discharge channel (8.2), the initial rain storage tank (8.3) and the online treatment storage tank (8.4), the third water inlet The lowest water level line of the water inlet is equal to the highest water level line of the second water inlet; the highest water level line of the third water inlet is equal to the lowest water level line of the first water inlet; the emergency flood discharge channel ( 8.2) It has a natural water outlet that communicates with the natural water body (5), and the on-line treatment storage tank (8.4) is provided with an overflow outlet that communicates with the emergency flood discharge channel (8.2). 2.根据权利要求1所述的基于合流制管网的区域分片雨水分流、调蓄及处理系统,其特征在于:所述缓冲池(8.1)具有与所述紧急泄洪通道(8.2)、初雨调蓄池(8.3)和在线处理调蓄池(8.4)共用的侧壁墙体(9),所述缓冲池(8.1)侧壁墙体(9)侧部设置有池体,所述池体由所述侧壁墙体(9)、两个垂直于所述侧壁墙体(9)的第一墙体(10)和第二墙体(11)和一个与所述侧壁墙体(9)平行的第三墙体(12)围成,所述池体内设置有平行于所述侧壁墙体(9)的第四墙体(13),所述第四墙体(13)一端与所述第一墙体(10)之间具有距离,所述第四墙体(13)另一端与所述第二墙体(11)连接,所述第四墙体(13)与所述侧壁墙体(9)之间设置有两个平行布置的第五墙体(14)和第六墙体(15),所述紧急泄洪通道(8.2)为由所述侧壁墙体(9)、第一墙体(10)、第三墙体(12)、第二墙体(11)、第四墙体(13)和第五墙体(14)围成的区域,所述紧急泄洪通道(8.2)的第三墙体(12)上设置有自然水出口;所述初雨调蓄池(8.3)为由所述侧壁墙体(9)、第五墙体(14)、第四墙体(13)和第六墙体(15)围成的区域,所述在线处理调蓄池(8.4)为由所述侧壁墙体(9)、第六墙体(15)、第四墙体(13)和第二墙体(11)围成的区域,所述在线处理调蓄池(8.4)的第四墙体(13)上设置有溢出口。2. The regional fragmented rainwater diversion, storage and treatment system based on the confluence pipe network according to claim 1, characterized in that: the buffer pool (8.1) has a The side wall (9) shared by the rain storage tank (8.3) and the online processing storage tank (8.4), the side wall (9) of the buffer pool (8.1) is provided with a pool body, and the pool The body consists of the side wall (9), two first walls (10) and second walls (11) perpendicular to the side wall (9) and a wall connected to the side wall (9) Surrounded by the third parallel wall (12), the fourth wall (13) parallel to the side wall (9) is arranged in the pool body, and the fourth wall (13) There is a distance between one end and the first wall (10), the other end of the fourth wall (13) is connected to the second wall (11), and the fourth wall (13) is connected to the second wall (11). Two fifth walls (14) and sixth walls (15) arranged in parallel are arranged between the side walls (9), and the emergency flood discharge channel (8.2) is provided by the side walls ( 9), the area surrounded by the first wall (10), the third wall (12), the second wall (11), the fourth wall (13) and the fifth wall (14), the emergency The third wall (12) of the flood discharge channel (8.2) is provided with a natural water outlet; the first rain storage tank (8.3) is composed of the side wall (9), the fifth wall (14), The area surrounded by the fourth wall (13) and the sixth wall (15), the on-line processing reservoir (8.4) is composed of the side wall (9), the sixth wall (15), In the area enclosed by the fourth wall (13) and the second wall (11), the fourth wall (13) of the online processing storage pool (8.4) is provided with an overflow port. 3.根据权利要求1或2所述的基于合流制管网的区域分片雨水分流、调蓄及处理系统,其特征在于:所述缓冲池(8.1)底部内壁为向出水端倾斜的斜坡;所述第二进水口和第三进水口上设置有自清理水平格栅(8.12)。3. The regional fragmented rainwater diversion, storage and treatment system based on the confluence pipe network according to claim 1 or 2, characterized in that: the inner wall at the bottom of the buffer pool (8.1) is a slope inclined toward the water outlet; The second water inlet and the third water inlet are provided with self-cleaning horizontal grilles (8.12). 4.根据权利要求1或2所述的基于合流制管网的区域分片雨水分流、调蓄及处理系统,其特征在于:所述第一进水口内设置有与其匹配的第一自开式堰门(8.21),所述紧急泄洪通道(8.2)底部内壁为向自然水出口倾斜的斜坡。4. The regional fragmented rainwater diversion, storage and treatment system based on combined pipe network according to claim 1 or 2, characterized in that: the first water inlet is provided with a matching first self-opening type The weir gate (8.21), the inner wall at the bottom of the emergency flood discharge channel (8.2) is a slope inclined towards the natural water outlet. 5.根据权利要求1或2所述的基于合流制管网的区域分片雨水分流、调蓄及处理系统,其特征在于:所述第二进水口内设置有与其匹配的第二自开式堰门(8.31);所述初雨调蓄池(8.3)内靠近第二进水口处设置有低于所述初雨调蓄池底面的集水池(8.32),所述初雨调蓄池(8.3)和集水池(8.32)底部内壁设置有向第二进水口倾斜的斜坡;所述初雨调蓄池(8.3)内设置有智能冲洗装置(8.33)。5. The regional fragmented rainwater diversion, regulation and storage and treatment system based on combined pipe network according to claim 1 or 2, characterized in that: the second water inlet is provided with a second self-opening type Weir gate (8.31); the first rain storage tank (8.3) is provided with a sump (8.32) lower than the bottom surface of the first rain storage tank near the second water inlet, and the first rain storage tank ( 8.3) and the bottom inner wall of the sump (8.32) are provided with a slope inclined towards the second water inlet; an intelligent flushing device (8.33) is provided in the primary rain storage tank (8.3). 6.根据权利要求1或2所述的基于合流制管网的区域分片雨水分流、调蓄及处理系统,其特征在于:所述在线处理调蓄池(8.4)内靠近第三进水口处设置有低于所述在线处理调蓄池(8.4)底面的污水廊道(8.41),所述在线处理调蓄池(8.4)底部设置有上端敞口的挡板(8.42),所述挡板(8.42)将所述在线处理调蓄池(8.4)一分为二并相互连通的过滤段和排放段,所述挡板(8.42)上设置有拍门式冲洗门(8.44),所述过滤段内设置有水力颗粒分离器(8.43),所述过滤段和污水廊道(8.41)的底部内壁设置有向第三进水口倾斜的斜坡,所述溢出口设置在所述排放段端面。6. The regional fragmented rainwater diversion, regulation and storage and treatment system based on the confluence pipe network according to claim 1 or 2, characterized in that: the online processing storage tank (8.4) is close to the third water inlet A sewage corridor (8.41) lower than the bottom surface of the online treatment storage tank (8.4) is provided, and a baffle plate (8.42) with an open upper end is provided at the bottom of the online treatment storage tank (8.4), and the baffle plate (8.42) Divide the on-line treatment storage pool (8.4) into two and communicate with each other, a filter section and a discharge section, the baffle (8.42) is provided with a flapper type flushing door (8.44), the filter A hydraulic particle separator (8.43) is arranged in the section, the bottom inner wall of the filter section and the sewage gallery (8.41) is provided with a slope inclined to the third water inlet, and the overflow port is arranged on the end face of the discharge section. 7.根据权利要求1或2所述的基于合流制管网的区域分片雨水分流、调蓄及处理系统,其特征在于:所述初雨调蓄池(8.3)和所述在线处理调蓄池(8.4)通过闸门连通,所述闸门设置在靠近所述缓冲池(8.1)处的侧壁。7. The regional fragmented rainwater diversion, regulation and storage and treatment system based on the combined pipe network according to claim 1 or 2, characterized in that: the first rain storage tank (8.3) and the online processing regulation and storage The tanks (8.4) are communicated by means of a gate placed on the side wall close to the buffer tank (8.1). 8.根据权利要求1所述的基于合流制管网的区域分片雨水分流、调蓄及处理系统,其特征在于:所述污水总管(16)末端与污水处理厂(7)连通,距离所述污水处理厂(7)最近的水体处理分区与所述污水处理厂(7)之间设置有总调蓄池(6),所述总调蓄池(6)具有进水口、自然水出口和污水出口,所述总调蓄池(6)的进水口与上游的污水总管(16)连通,所述总调蓄池(6)的自然水出口与自然水体(5)连通,所述总调蓄池(6)的污水出口与下游的所述污水总管(16)连通。8. The regional fragmented rainwater diversion, regulation and storage and treatment system based on the combined pipe network according to claim 1, characterized in that: the end of the sewage main pipe (16) is connected with the sewage treatment plant (7), and the distance from the A general storage tank (6) is arranged between the nearest water body treatment partition of the sewage treatment plant (7) and the sewage treatment plant (7), and the general storage tank (6) has a water inlet, a natural water outlet and Sewage outlet, the water inlet of the general storage tank (6) communicates with the upstream sewage main pipe (16), the natural water outlet of the general storage tank (6) communicates with the natural water body (5), and the general storage tank (6) communicates with the natural water body (5). The sewage outlet of the storage tank (6) communicates with the downstream sewage main pipe (16).
CN201610079048.5A 2016-02-04 2016-02-04 Region burst rainwater based on combined system pipe network shunts, regulated and stored and processing system Active CN105544697B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610079048.5A CN105544697B (en) 2016-02-04 2016-02-04 Region burst rainwater based on combined system pipe network shunts, regulated and stored and processing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610079048.5A CN105544697B (en) 2016-02-04 2016-02-04 Region burst rainwater based on combined system pipe network shunts, regulated and stored and processing system

Publications (2)

Publication Number Publication Date
CN105544697A CN105544697A (en) 2016-05-04
CN105544697B true CN105544697B (en) 2017-10-13

Family

ID=55824214

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610079048.5A Active CN105544697B (en) 2016-02-04 2016-02-04 Region burst rainwater based on combined system pipe network shunts, regulated and stored and processing system

Country Status (1)

Country Link
CN (1) CN105544697B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105625555B (en) * 2016-02-05 2017-11-17 武汉圣禹排水系统有限公司 A kind of rainwater shunting of combined system, regulate and store and processing system
CN107747345B (en) * 2017-05-10 2023-11-17 武汉圣禹排水系统有限公司 Surface pollution control system and method for combined drainage pipe network system
CN207436171U (en) * 2017-05-10 2018-06-01 武汉圣禹排水系统有限公司 A kind of incomplete separate flow system for controlling sewage and initial rainwater pollution
CN107761896B (en) * 2017-05-10 2024-03-26 武汉圣禹排水系统有限公司 Surface pollution control system and method for diversion drainage pipe network system
CN207436170U (en) * 2017-05-10 2018-06-01 武汉圣禹排水系统有限公司 A kind of complete separate flow system for controlling sewage and initial rainwater pollution
CN107806157B (en) * 2017-09-30 2023-10-27 武汉圣禹智慧生态环保股份有限公司 Control system and control method for combined drainage pipe network of sewage-free main pipe
CN107587595A (en) * 2017-10-30 2018-01-16 武汉圣禹排水系统有限公司 A kind of system comprising storage pond and online processing pond
CN107675771A (en) * 2017-10-30 2018-02-09 武汉圣禹排水系统有限公司 A kind of method for controlling the sewage in drainage system in each section rainwater pipeline and plumbing drain to import facility of regulating and storing during rainfall
CN111379305A (en) * 2018-12-27 2020-07-07 中建水务环保有限公司 System for basin treatment and layout method thereof
CN110040867B (en) * 2019-03-20 2021-10-29 中铁四局集团有限公司 A method of on-site sewage treatment
CN113789843A (en) * 2021-09-18 2021-12-14 同济大学建筑设计研究院(集团)有限公司 Integrated cut-off device used in combined system drainage channel

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003278264A (en) * 2002-03-26 2003-10-02 Ngk Insulators Ltd Rainwater treatment equipment
KR20110018758A (en) * 2009-08-18 2011-02-24 (주)예일엔지니어링 Initial excellent separator
JP2013129962A (en) * 2011-12-20 2013-07-04 Nippon Zenith Pipe Co Ltd In-disaster sewage treatment facility
CN204098204U (en) * 2014-09-17 2015-01-14 安徽清环水工科技有限公司 Early-stage rainwater is regulated and stored device
CN104631599A (en) * 2015-02-10 2015-05-20 武汉圣禹排水系统有限公司 Emergency rainfall flood discharge system
CN104975648A (en) * 2015-06-18 2015-10-14 武汉圣禹排水系统有限公司 Combined system underground initial rainwater storage tank
CN204876016U (en) * 2015-04-12 2015-12-16 朱加林 Pipeline formula rain flood regulation utilizes system
CN205637027U (en) * 2016-02-04 2016-10-12 武汉圣禹排水系统有限公司 Reposition of redundant personnel of regional burst rainwater, regulation and processing system based on confluence tubulation net

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003278264A (en) * 2002-03-26 2003-10-02 Ngk Insulators Ltd Rainwater treatment equipment
KR20110018758A (en) * 2009-08-18 2011-02-24 (주)예일엔지니어링 Initial excellent separator
JP2013129962A (en) * 2011-12-20 2013-07-04 Nippon Zenith Pipe Co Ltd In-disaster sewage treatment facility
CN204098204U (en) * 2014-09-17 2015-01-14 安徽清环水工科技有限公司 Early-stage rainwater is regulated and stored device
CN104631599A (en) * 2015-02-10 2015-05-20 武汉圣禹排水系统有限公司 Emergency rainfall flood discharge system
CN204876016U (en) * 2015-04-12 2015-12-16 朱加林 Pipeline formula rain flood regulation utilizes system
CN104975648A (en) * 2015-06-18 2015-10-14 武汉圣禹排水系统有限公司 Combined system underground initial rainwater storage tank
CN205637027U (en) * 2016-02-04 2016-10-12 武汉圣禹排水系统有限公司 Reposition of redundant personnel of regional burst rainwater, regulation and processing system based on confluence tubulation net

Also Published As

Publication number Publication date
CN105544697A (en) 2016-05-04

Similar Documents

Publication Publication Date Title
CN105544697A (en) Area partitioned rainwater flow distribution, storage regulation and processing system based on combined-system pipe network
CN104817209B (en) Buried efficient early-stage rainwater processing means
CN105625545B (en) A kind of region fragment rain processing system based on separate system pipe network
CN106592735A (en) Separate-zone rainwater flow, regulation and storage, and on-line treatment system with obvious initial rainwater feature under separate system and mixed flow system
CN105544698A (en) Separate system pipe network based area fragmented rainwater abandoned flow treatment system
CN110230347A (en) A kind of rain sewage diversion device
CN105569163B (en) Region burst rain processing system based on mixed flow tubulation net
CN105625555B (en) A kind of rainwater shunting of combined system, regulate and store and processing system
CN105714913B (en) A kind of region fragment rainwater shunting processing system based on separate system pipe network
CN205475657U (en) Confluence system is rain regulation processing system just
CN104975648B (en) Combined system underground Rainwater Storage Tank
CN104975649B (en) Separate system Rainwater Storage Tank
CN107587595A (en) A kind of system comprising storage pond and online processing pond
CN205636892U (en) Reposition of redundant personnel of regional burst rainwater, regulation and processing system based on mixed flow tubulation net
CN105672444B (en) Rainwater division processing system based on combined system pipe network
CN207959470U (en) A kind of system including storage pond and online processing pond
CN205475586U (en) Rainwater subregion processing system based on confluence tubulation net
CN205475588U (en) Regional burst rainwater processing system based on reposition of redundant personnel tubulation net
CN104878823B (en) Converging pipeline initial rainwater intercepting, storing and discharging system and method
CN204753798U (en) Confluence system underground initial stage rainwater regulation pond
CN205637027U (en) Reposition of redundant personnel of regional burst rainwater, regulation and processing system based on confluence tubulation net
CN105649142B (en) Region burst rainwater based on mixed flow tubulation net shunts, regulated and stored and processing system
CN205637026U (en) Regional burst rainwater processing system based on mixed flow tubulation net
CN105714912B (en) A kind of rainwater shunting of separate system, regulate and store and processing system
CN205475585U (en) Rainwater reposition of redundant personnel, regulation and processing system of reposition of redundant personnel system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: No. 509 Weihu Road, Shamao Street, Hannan District, Wuhan City, Hubei Province, 430090

Patentee after: Wuhan Shengyu Smart Ecological Environmental Protection Co.,Ltd.