CN104975635A - Construction and installation method of ceramic undercounter - Google Patents
Construction and installation method of ceramic undercounter Download PDFInfo
- Publication number
- CN104975635A CN104975635A CN201510397445.2A CN201510397445A CN104975635A CN 104975635 A CN104975635 A CN 104975635A CN 201510397445 A CN201510397445 A CN 201510397445A CN 104975635 A CN104975635 A CN 104975635A
- Authority
- CN
- China
- Prior art keywords
- basin
- bar
- installation
- moulding
- supporting adjustment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Legs For Furniture In General (AREA)
- Tables And Desks Characterized By Structural Shape (AREA)
Abstract
The invention provides a construction and installation method of a ceramic undercounter, belonging to the technical field of construction and installation of sanitary ware. The construction and installation method comprises the following steps: a preparation step, namely, performing measuring to determine the geometric dimension of an installation bracket to be manufactured by a specially-assigned person; a manufacturing step, namely, manufacturing the installation bracket and processing a countertop by a constructor, wherein the installation bracket comprises a front cross frame, a rear cross frame, a left longitudinal frame, a right longitudinal frame, and a left support adjustment support bar and a right support adjustment support bar of the undercounter; and an installation step, namely, transporting the installation bracket and the countertop to be installed to the installation site, fixing the rear cross frame and a front wall by using an expansion bolt, fixing the left longitudinal frame and a left wall by using an expansion bolt, fixing the right longitudinal frame and a right wall by using an expansion bolt, mounting the ceramic undercounter on the left support adjustment support bar and the right support adjustment support bar of the undercounter, pouring sealing glue on the upper surface of the edge of the ceramic undercounter, the upper surfaces of front and rear upper cross frame bars and the upper surfaces of left and right longitudinal frame bars, and mounting the countertop on the installation bracket. With the adoption of the construction and installation method provided by the invention, the construction speed is accelerated, and the installation quality is improved; due to the excellent clamping and support effects for the ceramic undercounter, the installation speed is accelerated; the appearance and impressions on visitors are improved; and both construction and installation are considered.
Description
Technical field
The invention belongs to sanitaryware construction and installation technical field, be specifically related to the construction and installation method of basin under a kind of ceramics desk.
Background technology
As is known in the industry, to be divided on platform basin under basin and platform as the platform basin of sanitaryware, specifically, what table top given prominence to by platform basin is called basin on platform, and platform basin be depressed in below table top completely be called basin under platform.On platform, the installation of basin is fairly simple, only need foundation installation drawing (Tai Pen production firm has installation drawing when packing with platform basin) on deck plate by precalculated position perforate, then platform basin is placed in hole, with fluid sealant (being generally glass cement), gap is tamped.
Because basin under platform installs rear overall appearance comparatively neatly and easily arrange, thus in public places as hotel, restaurant, airport, station, campus, conference centre etc. use more, and in recent years, be also gradually regarded highly in family.Under platform basin to construction and installation requirement all very strict, such as need in advance by the size fabrication and installation bracket of basin under platform, then implement to install.Installation bracket also claims mounting bracket, usually adopts angle bar, and angle bar and body of wall is fixed.Under platform, basin has strong point easy to use, and such as, water on table top can directly be smeared in tank.
From the above, be configured and at least comprise aforesaid installation bracket (also claiming bracing frame) and deck plate with the facility of basin under erecting bed, at fabrication and installation bracket and itself and body of wall is fixing after, the deck plate offering platform basin hole could be found a place on installation bracket.
The technical information of basin installation bracket under platform can be seen in disclosed Chinese patent literature, as Authorization Notice No. CN2538857Y recommends to have the bracing frame of basin " under the washroom platform ", this patent formula is configured to by after a pair right angle support arm and one in fact, although have the strong point of four aspects that Instructions Page 2 is concluded, but its shortcoming existed is pointed by the 0002 to 0004 section, the manual of Authorization Notice No. CN202990054U, and the technical scheme of this CN202990054U can refer to the 0007 to 0014 section, its manual.Say to a certain extent, this CN202990054U can embody the strong point of following three aspects: one is that each assembly can make in standardization, can realize factorial praluction; Two is that installing/dismounting is relatively convenient; Three is install firmly, and permanent use there will not be obscission.But there is following shortcoming: one, due to the two ends of platform basin fixed bar (a pair) are connected with the connector having elongated slot separately, namely be connected with connector with bolt in the position corresponding to elongated slot, and connector and installation bracket solid welding, thus not only trouble is processed, and rigidity that is loaded down with trivial details and platform basin fixed bar is installed is difficult to ensure, can be out of shape because platform basin fixed bar is also corresponding when connector produces deflection deformation, finally occur or make platform basin loosening or undermine the situation of platform basin; Its two, patent do not provide to fix installation bracket with body of wall and not provide deck plate self structure, processing method and the enlightenment that matches with installation bracket thereof; Its three, due to installation bracket be generally angle steel make, if thus rationally do not decorated the length direction of installation bracket side toward the outside after installing, so certainly will for impact sight effect.
Application for a patent for invention publication No. CN104452916A provides " adjustable basin fastening devices and mounting method thereof ", and this patent application scheme exists the shortcoming of aforementioned CN202990054U equally.
For above-mentioned prior art, be necessary rational modification in addition, the applicant has done positive and useful exploration for this reason, defines technical scheme described below.
Summary of the invention
Task of the present invention is to provide the construction and installation method of basin under a kind of ceramics desk, the method contributes to meeting batch production processing and uses and improve construction and installation progress and quality assurance with installing the requirement that combines on the spot, be conducive to guaranteeing a left side, right supporting adjustment holder bar directly regulates and uses embodiment seizing on both sides by the arms and support effects the excellence of platform basin on installation bracket, be of value to implementing to cover to the length direction of installation bracket side toward the outside and protect and use and embody excellent sight, have to be convenient to take into account and the globality embodying construction and installation operation is used to the making of deck plate.
Task of the present invention has been come like this, and a kind of construction and installation method of basin under ceramics desk, comprises the following steps:
A) previous step, the physical dimension determining fabrication and installation bracket is measured by special messenger basin erecting bed to Taiwan, this physical dimension comprises the installation bracket length of the installation bracket of suitable for making, installation bracket width and installation bracket height, obtains the data on the spot of erecting bed;
B) construction sequence, by constructor according to steps A) installation bracket on the spot described in data creating that obtains and the deck plate of the ceramics desk basin adaptation with required installation is processed, described installation bracket comprises a front transverse frame body, one rear transverse frame body, one left vertical framework, one right vertical frame body, a basin left supporting adjustment holder bar and a basin right supporting adjustment holder bar, the length of front transverse frame body and rear transverse frame body is steps A) described in installation bracket length, and the length of left vertical framework and right vertical frame body is steps A) described in installation bracket width, described front transverse frame body comprises front upper horizontal moulding and front bottom rail moulding, this is front upper, bottom rail moulding self walks abreast, and this is front upper, spacing between bottom rail moulding is steps A) described in installation bracket height, wherein, adjusting hole before bar is held in the palm in adjusting hole and a right supporting adjustment of basin before the central region of front upper horizontal moulding length direction offers a basin left supporting adjustment holder bar, described rear transverse frame body comprises rear upper transverse frame bar and rear bottom rail moulding, on this is rear, bottom rail moulding self walks abreast, and on this is rear, spacing between bottom rail moulding and described front upper, spacing between bottom rail moulding is identical, upper transverse frame bar body of wall fixed bolt hole after the sidepiece of the length direction of rear upper transverse frame bar is offered with space state, and adjusting hole after bar is held in the palm in adjusting hole and a right supporting adjustment of basin after the central region on the top of the length direction of rear upper transverse frame bar offers a basin left supporting adjustment holder bar, by the position of adjusting hole after left for platform basin supporting adjustment holder bar and described platform basin left support adjust hold in the palm bar before adjusting hole keep corresponding, and by right to the position of adjusting hole after right for platform basin supporting adjustment holder bar and described basin support adjust hold in the palm bar before adjusting hole keep corresponding, bottom rail sheth body of wall fixed bolt hole after the length direction of rear bottom rail moulding is offered with space state, a described left side is indulged the top of the front end of framework and the left end solid welding of described front upper horizontal moulding, and the left end solid welding of bottom and described front bottom rail moulding, a left side is indulged the top of the rear end of framework and the left end solid welding of described rear upper transverse frame bar simultaneously, and the left end solid welding of bottom and described rear bottom rail moulding, and indulge on a left side in framework and offer left body of wall fixed bolt hole, by the right-hand member solid welding of the top of the front end of described right vertical frame body and front upper horizontal moulding, and the right-hand member solid welding of bottom and front bottom rail moulding, simultaneously by the right-hand member solid welding of the top of the rear end of right vertical frame body and rear upper transverse frame bar, and the right-hand member solid welding of bottom and rear bottom rail moulding, and on right vertical frame body, offer right body of wall fixed bolt hole, the position of the front end of described basin left supporting adjustment holder bar by the first attachment screw adjusting hole before corresponding to described basin left supporting adjustment holder bar is connected with front upper horizontal moulding, and rear end is connected with rear upper transverse frame bar by the position of the second attachment screw adjusting hole after corresponding to described basin left supporting adjustment holder bar, the position of the front end of right for described basin supporting adjustment holder article by the 3rd attachment screw adjusting hole before corresponding to described basin right supporting adjustment holder article is connected with front upper horizontal moulding, and rear end is by the position of the 4th attachment screw adjusting hole after corresponding to described basin right supporting adjustment holder article and rear upper transverse frame article, then the deck plate with described ceramics desk basin adaptation is constructed, according to the bore size on the product description of ceramics desk basin and by bore size draw on computers Autocad figure, by this Autocad figure software typing high pressure waterjet equipment, on deck plate, ceramics desk basin hole and water tap resigning hole is cut out by high pressure waterjet equipment, wherein, the width of deck plate is greater than the width of described installation bracket and uses the front side making the deck plate forward position of deck plate lean out the length direction of described installation bracket, obtain installation bracket to be installed and deck plate,
C) installation steps, first by by step B) installation bracket to be installed that obtains and deck plate transport erecting bed to, with the position that expansion bolt is corresponding to described rear upper transverse frame bar body of wall fixed bolt hole and rear bottom rail moulding body of wall fixed bolt hole, described rear transverse frame body and front body of wall are fixed again, and same expansion bolt, in the position corresponding to described left body of wall fixed bolt hole, framework is indulged on a left side and left body of wall is fixed, and with the position that expansion bolt is corresponding to right body of wall fixed bolt hole, right vertical frame body and right body of wall are fixed, then described ceramics desk basin is being corresponded to a described basin left side, position between right supporting adjustment holder bar is found a place on platform basin left supporting adjustment holder bar and platform basin right supporting adjustment holder bar simultaneously, and be in by making a platform basin left side support bar to the adjustment respectively before described basin left supporting adjustment holder bar after adjusting hole and platform basin left supporting adjustment holder bar in adjusting hole of described first attachment screw and the second attachment screw and bearing state is seized on both sides by the arms to the left side of ceramics desk basin, by making a platform basin right side support article be in the adjustment respectively before described basin right supporting adjustment holder article after adjusting hole and platform basin right supporting adjustment holder article in adjusting hole of described 3rd attachment screw and the 4th attachment screw on both sides by the arms bearing state is seized to the right side of ceramics desk basin simultaneously, then at the basin of described ceramics desk basin along upper surface, the upper surface of described front upper horizontal moulding, the upper surface of described rear upper transverse frame, the upper surface note of upper surface and described right vertical frame bar that framework is indulged on a described left side covers fluid sealant, finally described deck plate is being kept finding a place on installation bracket under the state corresponding with ceramics desk basin of the described ceramics desk basin hole on it.
In a specific embodiment of the present invention, plaque support foot is protected before being fixed with space state in the bottom of the length direction of bottom rail moulding before described, the position of the front side corresponding to described front upper horizontal moulding and front bottom rail moulding is provided with one before front upper horizontal moulding and front bottom rail moulding are covered, protects plaque, protect the upper surface of the length direction of plaque before this to match with the soffit in the deck plate forward position of described deck plate, and front protect the length direction of plaque bottom and towards interior side be supported on described before protect on plaque support foot.
In another specific embodiment of the present invention, the bottom protecting the length direction of plaque before described towards interior side and correspond to described before protect plaque support foot position offer support foot caulking groove, front plaque support foot and this support foot caulking groove of protecting is inserted scarf and is closed.
In another specific embodiment of the present invention, described deck plate is natural marble slab or artificial marble plate.
In another specific embodiment of the present invention, described ceramics desk basin left side basin along and described basin left support adjust hold in the palm between bar be provided with the submissive liner in a platform basin left side, and the basin edge, right side of ceramics desk basin and described basin right support to adjust to hold in the palm between bar be provided with the submissive liner in the platform basin right side.
Also have in a specific embodiment of the present invention, the left submissive liner of described platform basin and the right submissive liner of platform basin are rubber pad.
More of the present invention and in a specific embodiment, protecting plaque before described is natural marble slab or artificial parian plate.
In an of the present invention and then specific embodiment, before described platform basin left supporting adjustment holder bar before adjusting hole, platform basin right supporting adjustment holder bar after adjusting hole, platform basin left supporting adjustment holder bar after adjusting hole and platform basin right supporting adjustment holder bar the length of adjusting hole be 5-7 ㎝, and width is 7-8 ㎜.
Of the present invention again more and in a specific embodiment, described front upper horizontal moulding, front bottom rail moulding, rear upper transverse frame bar, rear bottom rail moulding, left vertical framework and right vertical frame body by shape of cross section be L-shaped and the making of the steel of plating zinc on surface.
In an again of the present invention and then specific embodiment, protect plaque support foot before described by welding or fixed by securing member and described front bottom rail moulding.
One of technique effect of technical scheme provided by the invention, owing to obtaining the length of installation bracket and the data of width and height by previous step in erecting bed, thus can meet batch production processing and the requirement combined is installed on the spot, not only can improve speed of application, and can installation quality be ensured; Two, due to adjusting hole before offered platform basin left and right supporting adjustment holder bar on front upper horizontal moulding and offered platform basin left and right supporting adjustment hold in the palm adjusting hole after bar on rear upper transverse frame bar, thus platform basin left and right supporting adjustment holder bar can be made directly to regulate on installation bracket, not only can embody seizing on both sides by the arms and support effects the excellence of ceramics desk basin, and good rigidity can be ensured, and be conducive to improving installation rate; Three, before having set up, protect plaque, thus effectively can cover the length direction of installation bracket side toward the outside and protect, promote sight property; Four, because the processing of deck plate can complete equally in shop, thus taken into account whole factors of construction and installation operation all sidedly, avoided situation of attending to one thing and lose sight of another.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of the installation bracket that made by factorial construction of the inventive method and deck plate.
Fig. 2 is that the inventive method completes the schematic diagram after installing ceramics desk basin.
Detailed description of the invention
Embodiment 1:
Refer to Fig. 1 and Fig. 2, the inventive method comprises the following steps:
A) previous step, the physical dimension determining fabrication and installation bracket 1 is measured by special messenger such as technician and/or constructor basin erecting bed to Taiwan, this physical dimension comprises the installation bracket length of the installation bracket 1 of suitable for making, installation bracket width and installation bracket height, obtain the data on the spot of erecting bed, because the length of installation bracket 1, width are different along with the difference of fabric structure, thus do not need in the present embodiment to be particularly limited to, installation bracket height also can be different because of concrete condition;
B) construction sequence, by constructor according to steps A) the aforesaid installation bracket of data creating on the spot 1 that obtains and the deck plate 2 of ceramics desk basin 3 adaptation with required installation is processed, the structural system of installation bracket 1 comprises a front transverse frame body 11, one rear transverse frame body 12, one left vertical framework 13, one right vertical frame body 14, a basin left supporting adjustment holder bar 15 and a basin right supporting adjustment holder bar 16, the length of front transverse frame body 11 and rear transverse frame body 12 is steps A) described in installation bracket length, and the length of left vertical framework 13 and right vertical frame body 14 is steps A) described in installation bracket width, as shown in Figure 1, front transverse frame body 11 comprises front upper horizontal moulding 111 and front bottom rail moulding 112, this is front upper, bottom rail moulding 111, 112 self walk abreast, and this is front upper, bottom rail moulding 111, spacing between 112 is steps A) described in installation bracket height, wherein, basin left side adjusting hole 1111 and adjusting hole 1112 before bar is held in the palm in the right supporting adjustment of a basin on the right side of adjusting hole 1111 before being positioned at platform basin left supporting adjustment holder bar before adjustment holder bar is offered in the central region of front upper horizontal moulding 111 length direction, aforementioned rear transverse frame body 12 comprises rear upper transverse frame bar 121 and rear bottom rail moulding 122, on this is rear, bottom rail moulding 121, 122 self walk abreast, and on this is rear, bottom rail moulding 121, spacing between 122 and aforementioned front upper, bottom rail moulding 111, spacing between 112 is identical, upper transverse frame bar body of wall fixed bolt hole 1211 after the sidepiece of the length direction of rear upper transverse frame bar 121 is offered with space state, and adjusting hole 1213 after bar is held in the palm in adjusting hole 1212 and a right supporting adjustment of basin after the central region on the top of the length direction of rear upper transverse frame bar 121 offers a basin left supporting adjustment holder bar, by left to the position of adjusting hole 1212 after left for platform basin supporting adjustment holder bar and aforesaid basin support adjust hold in the palm bar before adjusting hole 1111 keep corresponding, and by right to the position of adjusting hole 1213 after right for platform basin supporting adjustment holder bar and aforementioned basin support adjust hold in the palm bar before adjusting hole 1112 keep corresponding, bottom rail sheth body of wall fixed bolt hole 1221 after the length direction of rear bottom rail moulding 122 is offered with space state, a left side is indulged the top of the front end of framework 13 and the left end solid welding of aforementioned front upper horizontal moulding 111, and the left end solid welding of bottom and aforementioned front bottom rail moulding 112, a left side is indulged the top of the rear end of framework 13 and the left end solid welding of aforementioned rear upper transverse frame bar 121 simultaneously, and the left end solid welding of bottom and aforementioned rear bottom rail moulding 122, and indulge on a left side in framework 13 and offer left body of wall fixed bolt hole 131, by the right-hand member solid welding of the top of the front end of aforementioned right vertical frame body 14 and front upper horizontal moulding 111, and the right-hand member solid welding of bottom and front bottom rail moulding 112, simultaneously by the right-hand member solid welding of the top of the rear end of right vertical frame body 14 and rear upper transverse frame bar 121, and the right-hand member solid welding of bottom and rear bottom rail moulding 122, and on right vertical frame body 14, offer right body of wall fixed bolt hole 141, the position of the front end of aforementioned basin left supporting adjustment holder bar 15 by the first attachment screw 151 adjusting hole 1111 before corresponding to aforementioned basin left supporting adjustment holder bar is connected with front upper horizontal moulding 111, and rear end is connected with rear upper transverse frame bar 121 by the position of the second attachment screw 152 adjusting hole 1212 after corresponding to aforementioned basin left supporting adjustment holder bar, the position of the front end of right for described basin supporting adjustment holder articles 16 by the 3rd attachment screw 161 adjusting hole 1112 before corresponding to aforementioned basin right supporting adjustment holder article is connected with front upper horizontal moulding 111, and rear end is connected by the position of the 4th attachment screw 162 adjusting hole 1213 after corresponding to aforementioned basin right supporting adjustment holder article and rear upper transverse frame articles 121, then the deck plate 2 with foregoing ceramic platform basin 3 adaptation is constructed, according to the bore size on the product description (being positioned at ceramics desk basin packing case) of ceramics desk basin 3 and by bore size draw on computers Autocad figure, by this Autocad figure software typing (namely inputting) high pressure waterjet equipment, on deck plate 2, ceramics desk basin hole 21 and water tap resigning hole 22 is cut out by high pressure waterjet equipment, wherein, the width of deck plate 2 is greater than the width of aforementioned installation bracket 1 and uses the front side making the deck plate forward position 23 of deck plate 2 lean out the length direction of aforementioned installation bracket 1, obtain installation bracket 1 to be installed and deck plate 2, from above-mentioned explanation and composition graphs 1, before, rear transverse frame body 11, 12 geometries and length are identical, left, right vertical frame body 13, the structure of 14 is identical, the mouth shape be all rectangle,
C) installation steps, first by by step B) installation bracket 1 to be installed that obtains and deck plate 2 transport erecting bed to, with the position that expansion bolt 9 is corresponding to aforesaid rear upper transverse frame bar body of wall fixed bolt hole 1211 and rear bottom rail moulding body of wall fixed bolt hole 1221, aforementioned rear transverse frame body 12 is fixed with front body of wall 4 again, and in the position corresponding to aforementioned left body of wall fixed bolt hole 131, framework 13 is indulged on a left side with expansion bolt 9 equally to fix with left body of wall 5, and with the position that expansion bolt 9 is corresponding to right body of wall fixed bolt hole 141, right vertical frame body 14 and right body of wall 6 are fixed, then foregoing ceramic platform basin 3 is being corresponded to an aforementioned basin left side, right supporting adjustment holder bar 15, position between 16 is found a place on platform basin left supporting adjustment holder bar 15 and platform basin right supporting adjustment holder bar 16 simultaneously, and be in by making a platform basin left side support bar 15 to the adjustment respectively before aforementioned basin left supporting adjustment holder bar after adjusting hole 1111 and platform basin left supporting adjustment holder bar in adjusting hole 1212 of aforementioned first attachment screw 151 and the second attachment screw 152 and bearing state is seized on both sides by the arms to the left side of ceramics desk basin 3, by making a platform basin right side support articles 16 be in the adjustment respectively before aforementioned basin right supporting adjustment holder article after adjusting hole 1112 and platform basin right supporting adjustment holder article in adjusting hole 1213 of aforementioned 3rd attachment screw 161 and the 4th attachment screw 162 on both sides by the arms bearing state is seized to the right side of ceramics desk basin 3 simultaneously, then at the basin of aforesaid ceramics desk basin 3 along upper surface, the upper surface of aforementioned front upper horizontal moulding 111, the upper surface of aforementioned rear upper transverse frame 121, the upper surface note of upper surface and aforementioned right vertical frame bar 14 that framework 13 is indulged on an aforementioned left side covers (namely injecting) fluid sealant 7, fluid sealant 7 is mildew-resistant weather proofing sealant, finally aforementioned deck plate 2 is being kept finding a place on installation bracket 1 under the state corresponding with ceramics desk basin 3 of the ceramics desk basin hole 21 on it, thus complete whole installation work.
After above-mentioned installation work completes, taken on the installation (Fig. 2 shows) of angle valve 10, water tap 20 and sewer pipe 30 by pipeliner.
In the present embodiment, plaque support foot 1121 is protected before the bottom of the length direction of aforesaid front bottom rail moulding 112 is fixed with space state, the position of the front side corresponding to aforementioned front upper horizontal moulding 111 and front bottom rail moulding 112 is provided with one before front upper horizontal moulding 111 and front bottom rail moulding 112 are covered, protects plaque 8, the upper surface protecting the length direction of plaque 8 before this matches (Fig. 2 shows) with the soffit in the deck plate forward position 23 of aforementioned deck plate 2, and front protect the length direction of plaque 8 bottom and towards interior side be supported on aforesaid before protect on plaque support foot 1121.
The bottom protecting the length direction of plaque 8 before aforementioned towards interior side and correspond to aforementioned before protect plaque support foot 1121 position offer support foot caulking groove 81, the front plaque support foot 1121 that protects is inserted scarf with this support foot caulking groove 81 and is closed.
In the present embodiment, aforesaid deck plate 2 is natural marble slab, but also can use artificial marble plate, protects plaque 8 with example before aforesaid.
Preferably, aforesaid ceramics desk basin 3 left side basin along and aforementioned basin left support to adjust to hold in the palm between bar 15 be provided with the submissive liner 31 in a platform basin left side, and ceramics desk basin 3 right side basin along and aforementioned basin right support adjust hold in the palm between bar 16 be provided with the submissive liner 32 in the platform basin right side, the submissive liner 32 of the platform basin submissive liner 31 in a left side and the platform basin right side is rubber pad.
Before aforesaid basin left supporting adjustment holder bar before adjusting hole 1111, platform basin right supporting adjustment holder bar after adjusting hole 1112, platform basin left supporting adjustment holder bar after adjusting hole 1212 and platform basin right supporting adjustment holder bar the length of adjusting hole 1213 be 5-7 ㎝, width is 7-9 ㎜, and the length in the present embodiment is 6 ㎝ and width is 8 ㎜.
Aforesaid front upper horizontal moulding 111, front bottom rail moulding 112, rear upper transverse frame bar 121, rear bottom rail moulding 122, left vertical framework 13 and right vertical frame body 14 by shape of cross section be L-shaped and the making of the steel of plating zinc on surface.
In the present embodiment, protect plaque support foot 1121 before aforesaid namely to be fixed by screw 11211 and aforementioned front bottom rail moulding 112 by securing member, but also can abandon screw 11211 and will front protect plaque support foot 1121 and the solid welding of front bottom rail moulding 112 by welding manner.
In sum, technical scheme provided by the invention overcomes the deficiency in prior art, successfully completes invention task, embodies the technique effect referred in the superincumbent technique effect hurdle of applicant objectively.
Claims (10)
1. the construction and installation method of basin under ceramics desk, is characterized in that comprising the following steps:
A) previous step, the physical dimension determining fabrication and installation bracket (1) is measured by special messenger basin erecting bed to Taiwan, this physical dimension comprises the installation bracket length of the installation bracket (1) of suitable for making, installation bracket width and installation bracket height, obtains the data on the spot of erecting bed;
B) construction sequence, by constructor according to steps A) installation bracket (1) on the spot described in data creating that obtains and the deck plate (2) adaptive to the ceramics desk basin (3) with required installation process, described installation bracket (1) comprises a front transverse frame body (11), one rear transverse frame body (12), one left vertical framework (13), one right vertical frame body (14), basin left supporting adjustment holder bar (15) and right supporting adjustment holder bar (16) of basin, the length of front transverse frame body (11) and rear transverse frame body (12) is steps A) described in installation bracket length, and the length of left vertical framework (13) and right vertical frame body (14) is steps A) described in installation bracket width, described front transverse frame body (11) comprises front upper horizontal moulding (111) and front bottom rail moulding (112), this is front upper, bottom rail moulding (111, 112) self walks abreast, and this is front upper, bottom rail moulding (111, 112) spacing between is steps A) described in installation bracket height, wherein, adjusting hole (1112) before bar is held in the palm in adjusting hole (1111) and a right supporting adjustment of basin before the central region of front upper horizontal moulding (111) length direction offers a basin left supporting adjustment holder bar, described rear transverse frame body (12) comprises rear upper transverse frame bar (121) and rear bottom rail moulding (122), on this is rear, bottom rail moulding (121, 122) self walks abreast, and on this is rear, bottom rail moulding (121, 122) spacing between and described front upper, bottom rail moulding (111, 112) spacing between is identical, rear upper transverse frame bar body of wall fixed bolt hole (1211) is offered with space state at the sidepiece of the length direction of rear upper transverse frame bar (121), and adjusting hole (1213) after bar is held in the palm in adjusting hole (1212) and a right supporting adjustment of basin after the central region on the top of the length direction of rear upper transverse frame bar (121) offers a basin left supporting adjustment holder bar, by the position of adjusting hole (1212) after left for platform basin supporting adjustment holder bar and described platform basin left support adjust hold in the palm bar before adjusting hole (1111) keep corresponding, and by right to the position of adjusting hole (1213) after right for platform basin supporting adjustment holder bar and described basin support adjust hold in the palm bar before adjusting hole (1112) keep corresponding, rear bottom rail sheth body of wall fixed bolt hole (1221) is offered with space state at the length direction of rear bottom rail moulding (122), a described left side is indulged the top of the front end of framework (13) and the left end solid welding of described front upper horizontal moulding (111), and the left end solid welding of bottom and described front bottom rail moulding (112), a left side is indulged the top of the rear end of framework (13) and the left end solid welding of described rear upper transverse frame bar (121) simultaneously, and the left end solid welding of bottom and described rear bottom rail moulding (122), and indulge on a left side in framework (13) and offer left body of wall fixed bolt hole (131), by the top of the front end of described right vertical frame body (14) and the right-hand member solid welding of front upper horizontal moulding (111), and the right-hand member solid welding of bottom and front bottom rail moulding (112), simultaneously by the right-hand member solid welding of the top of the rear end of right vertical frame body (14) and rear upper transverse frame bar (121), and the right-hand member solid welding of bottom and rear bottom rail moulding (122), and on right vertical frame body (14), offer right body of wall fixed bolt hole (141), the position of the front end of described left supporting adjustment holder bar (15) of basin by the first attachment screw (151) adjusting hole (1111) before corresponding to described basin left supporting adjustment holder bar is connected with front upper horizontal moulding (111), and rear end is connected with rear upper transverse frame bar (121) by the position of the second attachment screw (152) adjusting hole (1212) after corresponding to described basin left supporting adjustment holder bar, the position of the front end of right for described basin supporting adjustment holder article (16) by the 3rd attachment screw (161) adjusting hole (1112) before corresponding to described basin right supporting adjustment holder article is connected with front upper horizontal moulding (111), and rear end is connected with rear upper transverse frame article (121) by the position of the 4th attachment screw (162) adjusting hole (1213) after corresponding to described basin right supporting adjustment holder article, then the deck plate (2) adaptive with described ceramics desk basin (3) is constructed, according to the bore size on the product description with ceramics desk basin (3) and by bore size draw on computers Autocad figure, by this Autocad figure software typing high pressure waterjet equipment, on deck plate (2), ceramics desk basin hole (21) and water tap resigning hole (22) is cut out by high pressure waterjet equipment, wherein, the width of deck plate (2) is greater than the width of described installation bracket (1) and uses the front side making the deck plate forward position (23) of deck plate (2) lean out the length direction of described installation bracket (1), obtain installation bracket (1) to be installed and deck plate (2),
C) installation steps, first by by step B) installation bracket (1) to be installed that obtains and deck plate (2) transport erecting bed to, with the position that expansion bolt is corresponding to described rear upper transverse frame bar body of wall fixed bolt hole (1211) and rear bottom rail moulding body of wall fixed bolt hole (1221), described rear transverse frame body (12) and front body of wall (4) are fixed again, and a left side is indulged framework (13) in the position corresponding to described left body of wall fixed bolt hole (131) and is fixed with left body of wall (5) by same expansion bolt, and with the position that expansion bolt is corresponding to right body of wall fixed bolt hole (141), right vertical frame body (14) and right body of wall (6) are fixed, then described ceramics desk basin (3) is being corresponded to a described basin left side, right supporting adjustment holder bar (15,16) position between is found a place in platform basin left supporting adjustment holder bar (15) and right supporting adjustment holder bar (16) of platform basin simultaneously, and be in by making the left support bar (15) that props up of platform basin to the adjustment respectively before described basin left supporting adjustment holder bar after adjusting hole (1111) and platform basin left supporting adjustment holder bar in adjusting hole (1212) of described first attachment screw (151) and the second attachment screw (152) bearing state is seized on both sides by the arms to the left side of ceramics desk basin (3), simultaneously by making the right support article (16) of propping up of platform basin be in and seize bearing state on both sides by the arms to the right side of ceramics desk basin (3) to the adjustment respectively before described basin right supporting adjustment holder article after adjusting hole (1112) and platform basin right supporting adjustment holder article in adjusting hole (1213) of described 3rd attachment screw (161) and the 4th attachment screw (162), then at the basin of described ceramics desk basin (3) along upper surface, the upper surface of described front upper horizontal moulding (111), the upper surface of described rear upper transverse frame (121), the upper surface note of upper surface and described right vertical frame bar (14) that framework (13) is indulged on a described left side covers fluid sealant (7), finally described deck plate (2) is being kept finding a place on installation bracket (1) under the state corresponding with ceramics desk basin (3) of the described ceramics desk basin hole (21) on it.
2. the construction and installation method of basin under ceramics desk according to claim 1, it is characterized in that plaque support foot (1121) is protected before being fixed with space state in the bottom of the length direction of bottom rail moulding (112) before described, the position of the front side corresponding to described front upper horizontal moulding (111) and front bottom rail moulding (112) is provided with one before front upper horizontal moulding (111) and front bottom rail moulding (112) are covered, protects plaque (8), protect the upper surface of the length direction of plaque (8) before this to match with the soffit in the deck plate forward position (23) of described deck plate (2), and front protect the length direction of plaque (8) bottom and towards interior side be supported on described before protect on plaque support foot (1121).
3. the construction and installation method of basin under ceramics desk according to claim 2, the bottom that it is characterized in that protecting before described the length direction of plaque (8) towards interior side and correspond to described before protect plaque support foot (1121) position offer support foot caulking groove (81), the front plaque support foot (1121) that protects is inserted scarf with this support foot caulking groove (81) and is closed.
4. the construction and installation method of basin under ceramics desk according to claim 1 and 2, is characterized in that described deck plate (2) is natural marble slab or artificial marble plate.
5. the construction and installation method of basin under ceramics desk according to claim 1, it is characterized in that described ceramics desk basin (3) left side basin along and described basin left support adjust hold in the palm between bar (15) be provided with the platform basin submissive liner in a left side (31), and the basin edge, right side of ceramics desk basin (3) and described basin right support to adjust to hold in the palm between bar (16) be provided with the platform basin submissive liner in the right side (32).
6. the construction and installation method of basin under ceramics desk according to claim 5, is characterized in that the left submissive liner (31) of described platform basin and the platform basin submissive liner in the right side (32) are rubber pad.
7. the construction and installation method of basin under the ceramics desk according to Claims 2 or 3, it is characterized in that described before protect plaque (8) for natural marble slab or artificial parian plate.
8. the construction and installation method of basin under ceramics desk according to claim 1, before it is characterized in that described platform basin left supporting adjustment holder bar, before adjusting hole (1111), platform basin right supporting adjustment holder bar, after adjusting hole (1112), platform basin left supporting adjustment holder bar, adjusting hole (1212) and the right supporting adjustment of platform basin ask the length of adjusting hole (1213) after bar to be 5-7 ㎝, and width is 7-8 ㎜.
9. the construction and installation method of basin under ceramics desk according to claim 1, it is characterized in that described front upper horizontal moulding (111), front bottom rail moulding (112), rear upper transverse frame bar (121), rear bottom rail moulding (122), left vertical framework (13) and right vertical frame body (14) by shape of cross section be L-shaped and the making of the steel of plating zinc on surface.
10. the construction and installation method of basin under ceramics desk according to claim 2, it is characterized in that described before protect plaque support foot (1121) by welding or fixing by securing member and described front bottom rail moulding (112).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510397445.2A CN104975635B (en) | 2015-07-08 | 2015-07-08 | The construction of basin and installation method under ceramics desk |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510397445.2A CN104975635B (en) | 2015-07-08 | 2015-07-08 | The construction of basin and installation method under ceramics desk |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104975635A true CN104975635A (en) | 2015-10-14 |
CN104975635B CN104975635B (en) | 2016-08-17 |
Family
ID=54272565
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510397445.2A Active CN104975635B (en) | 2015-07-08 | 2015-07-08 | The construction of basin and installation method under ceramics desk |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104975635B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105832008A (en) * | 2016-05-03 | 2016-08-10 | 浙江爱尔卡厨卫科技有限公司 | Sink structure for integrated sink |
CN108177226A (en) * | 2017-12-25 | 2018-06-19 | 广东佳居乐厨房科技有限公司 | A kind of preparation method of water proof type basin groove body |
CN110025140A (en) * | 2019-05-27 | 2019-07-19 | 佛山市高明成丽厨饰有限公司 | A kind of installation method of the kitchen table panel with water-trough plate |
CN112681459A (en) * | 2020-12-23 | 2021-04-20 | 杭州群核信息技术有限公司 | Method, device and system for generating counter basin and installing multiple taps |
CN113123413A (en) * | 2021-03-22 | 2021-07-16 | 中国五冶集团有限公司 | Construction method of stone table top spliced by pure stone |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100999904A (en) * | 2006-01-09 | 2007-07-18 | 毛国政 | Water-saving connecting structure for domestic sanitary ware and apparatus |
JP2009007907A (en) * | 2007-06-29 | 2009-01-15 | Cleanup Corp | Sink |
JP2010053603A (en) * | 2008-08-28 | 2010-03-11 | Inax Corp | Structure and method for mounting bolt leg of waterproof pan |
CN203174697U (en) * | 2013-02-05 | 2013-09-04 | 王章明 | Multi-purpose washing pool |
CN103485395A (en) * | 2013-08-02 | 2014-01-01 | 厦门金牌厨柜股份有限公司 | Countertop with water tank and installation method thereof |
-
2015
- 2015-07-08 CN CN201510397445.2A patent/CN104975635B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN100999904A (en) * | 2006-01-09 | 2007-07-18 | 毛国政 | Water-saving connecting structure for domestic sanitary ware and apparatus |
JP2009007907A (en) * | 2007-06-29 | 2009-01-15 | Cleanup Corp | Sink |
JP2010053603A (en) * | 2008-08-28 | 2010-03-11 | Inax Corp | Structure and method for mounting bolt leg of waterproof pan |
CN203174697U (en) * | 2013-02-05 | 2013-09-04 | 王章明 | Multi-purpose washing pool |
CN103485395A (en) * | 2013-08-02 | 2014-01-01 | 厦门金牌厨柜股份有限公司 | Countertop with water tank and installation method thereof |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105832008A (en) * | 2016-05-03 | 2016-08-10 | 浙江爱尔卡厨卫科技有限公司 | Sink structure for integrated sink |
CN108177226A (en) * | 2017-12-25 | 2018-06-19 | 广东佳居乐厨房科技有限公司 | A kind of preparation method of water proof type basin groove body |
CN110025140A (en) * | 2019-05-27 | 2019-07-19 | 佛山市高明成丽厨饰有限公司 | A kind of installation method of the kitchen table panel with water-trough plate |
CN112681459A (en) * | 2020-12-23 | 2021-04-20 | 杭州群核信息技术有限公司 | Method, device and system for generating counter basin and installing multiple taps |
CN112681459B (en) * | 2020-12-23 | 2022-04-01 | 杭州群核信息技术有限公司 | Method, device and system for generating counter basin and installing multiple taps |
CN113123413A (en) * | 2021-03-22 | 2021-07-16 | 中国五冶集团有限公司 | Construction method of stone table top spliced by pure stone |
Also Published As
Publication number | Publication date |
---|---|
CN104975635B (en) | 2016-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104975635A (en) | Construction and installation method of ceramic undercounter | |
CN103967386B (en) | External window of building first closing in antiseep Node Processing Method | |
GR1004343B (en) | Mortar-compacting and-smoothening device | |
CN106351450B (en) | A kind of construction centre mounted type pours leveling unit and casting method | |
CN102733596A (en) | Construction method of fair-faced concrete structure node templates | |
CN202090569U (en) | Plastering screed template | |
CN107803944A (en) | A kind of auxiliary wall perforating device of puncher for building | |
CN204781207U (en) | Installing support that basin was used under pottery platform | |
CN203839870U (en) | Wall-mounted concealed distribution box | |
CN106437093B (en) | Building decoration concealed installation ceramic tile baseboard structure and construction process thereof | |
CN103899072A (en) | Hanging member for wet hanging of stone or tiles and wet hanging method | |
CN203905374U (en) | Hanging piece for hanging stones or tiles in wet hanging mode | |
CN105089184A (en) | Multi-curved concrete hollow modelling wall construction method and rhombic hollow structure formwork | |
CN205063052U (en) | Newly build a wall to personally experience sth. part of body and end water bar structure in bathroom | |
CN104653036A (en) | Moisture-proof and mildew-proof installation method for door pocket line and doorsill stone | |
CN202214939U (en) | Marble closing-in wall facade including embedded part | |
CN104619927A (en) | Built-in device for installation into a worktop | |
CN205063277U (en) | Zero clearance mounting structure between marble or ceramic tile skirting line and wall body | |
CN113123413A (en) | Construction method of stone table top spliced by pure stone | |
CN208363593U (en) | A kind of novel shear wall formwork positioning back cover tool | |
CN104131697B (en) | Tool type formwork system for kitchen and bath concrete waterproof guide wall and construction method of tool type formwork system | |
CN204753751U (en) | Embedded basin steelframe reinforcing apparatus under platform | |
CN206722186U (en) | Board keel hanging piece | |
CN109025147A (en) | A kind of micro- gradient terrace in toilet and construction method | |
CN204126256U (en) | A kind of kitchen guarding's concrete water-proof leads the tool-typed formwork system of wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |