CN104973087A - Method for repairing bullet train bogie assembly line - Google Patents

Method for repairing bullet train bogie assembly line Download PDF

Info

Publication number
CN104973087A
CN104973087A CN201510331575.6A CN201510331575A CN104973087A CN 104973087 A CN104973087 A CN 104973087A CN 201510331575 A CN201510331575 A CN 201510331575A CN 104973087 A CN104973087 A CN 104973087A
Authority
CN
China
Prior art keywords
module
bogie truck
repairing
framework
bogie
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510331575.6A
Other languages
Chinese (zh)
Inventor
黄染之
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201510331575.6A priority Critical patent/CN104973087A/en
Publication of CN104973087A publication Critical patent/CN104973087A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61KAUXILIARY EQUIPMENT SPECIALLY ADAPTED FOR RAILWAYS, NOT OTHERWISE PROVIDED FOR
    • B61K11/00Serving peculiar to locomotives, e.g. filling with, or emptying of, water, sand, or the like at the depots

Abstract

The invention relates to a method for repairing a bullet train bogie assembly line. The bullet train bogie assembly line comprises seven repairing modules and 16 repairing procedures according to repairing content. The seven repairing modules comprise a pre-dismounting module, a cleaning module, a dismounting module, a framework repairing module, an assembling module, a testing module and an inspection and acceptance module. The 16 repairing procedures are included in the seven repairing modules, the assembly line is formed by the seven repairing modules and the 16 repairing procedures according to the repairing operation sequence, a convenient component conveying mode is set, and higher-quality higher-efficiency repairing of motor train unit bogies is achieved.

Description

A kind of flow line detection method for bullet train bogie
Technical field
The present invention relates to guideway vehicle maintenance field, especially a kind of motor-car inspection and repair of vehicle bogie technology.
Background technology
Bogie truck is one of most important component of guideway vehicle, play supporting body, turn to and brake, bear and transmit car body to the various load between wheel, wheel track to car body and application force, make wheel be converted into the translation of car body along circuit along the rolling of rail by bearing arrangement, getting on the bus safely and smoothly to run to track plays crucial guarantee effect.The maintenance of rail vehicle truck has critical role in whole car inspection and maintenance, particularly, has the motor train unit bogie complex structure of driving effect, technology is most advanced and sophisticated, the core of the maintenance of motor-car bogie of car overhaul of train-set especially.
At present, comprise the overhaul of train-set of the motor-car bogie of car at home still for blank, the bogie technique structure of general fast locomotive and vehicle is simple, limited to the referentiability of Highs-speed motor train unit bogie repair method, therefore, when China Express Railway build fast-developing, supporting high speed motor car Maintenance Bases want synchronization implementation, be badly in need of the method for suitable high speed motor car bogie truck maintenance, so that the maintenance completing motor car bogie of high quality and high efficiency, ensure the safe operation of EMU.
Summary of the invention
For the deficiencies in the prior art, the invention provides a kind of flow line detection method for bullet train bogie to overcome the deficiencies in the prior art part.
A kind of flow line detection method for bullet train bogie, seven are divided into overhaul module and 16 road overhaul process according to maintenance content, seven maintenance modules comprise predecomposition module, cleaning module, decomposing module, framework repair module, Knockdown block, tentative module and examination module, 16 road overhaul process are included in seven maintenance modules, and seven maintenance modules and 16 road overhaul process form conveyor line according to upkeep operation order, 16 road overhaul process comprise: the motor on operation 1-decomposition bogie truck, bolster and the protection operation before carrying out bogie truck cleaning, dry up after operation 2-bogie truck entirety is cleaned and cleaned, operation 3-decomposition bogie truck bottom traction mechanism, operation 4-decomposition secondary suspension parts, single stage suspension parts are decomposed in operation 5-pressurization, operation 6-framework ball blast, operation 7-framework is detected a flaw, operation 8-framework is measured, operation 9-framework sprays paint, operation 10-installation single stage suspension parts, operation 11-installation secondary suspension parts, operation 12-mounted motor, bolster, operation 13-electrical test, operation 14-brake test, operation 15-static test, operation 16-bogie truck is checked and accepted, described operation 1 to operation 5, bogie truck is traveling on ground rail, motor-driven carrier is adopted to drive steering framing wheel pair, described operation 6 to operation 9, framework adopts and hangs mode of movement in the air, described operation 10 to operation 16, bogie truck is traveling on ground rail, motor-driven carrier is adopted to drive steering framing wheel to carry bogie truck to mode, described operation 1, operation 3, operation 4, operation 5 all have decomposes from bogie truck the parts got off and needs to be delivered to outside conveyor line, adopts the mode of movement of self-supporting hoisting crane, described operation 10, operation 11, operation 12 belong to Knockdown block, and component feed intact for quality on conveyor line, is carried out the installation of parts by the mode of movement of employing self-supporting hoisting crane.
Technical scheme of the present invention has following beneficial effect:
Flow line detection method for bullet train bogie involved in the present invention is made up of seven maintenance modules and 16 overhaul process, by orderly flow arrangement, upkeep operation content order is formed conveyor line, and be equipped with component feed mode easily, realize the maintenance of motor-car bogie of car high quality and high efficiency more.
Detailed description of the invention
In order to have a clear understanding of technical scheme of the present invention, its detailed structure will be proposed in the following description.Obviously, the concrete execution of the embodiment of the present invention also not enough specific details being limited to those skilled in the art and haveing the knack of.The preferred embodiments of the present invention are described in detail as follows, and except these embodiments described in detail, can also have other embodiments.
The present embodiment just technical scheme of the present invention is described further, be divided into seven to overhaul module and 16 overhaul process according to the flow line detection method for bullet train bogie that maintenance content is involved in the present invention, seven maintenance modules and 16 road overhaul process form conveyor line according to upkeep operation order.
Seven maintenance modules are: predecomposition module, cleaning module, decomposing module, framework repair module, Knockdown block, tentative module.16 road overhaul process are: the motor on operation 1-decomposition bogie truck, bolster and the protection operation before carrying out bogie truck cleaning; Operation 2-clean bogie truck entirety, dries up after cleaning; Operation 3-decomposition bogie truck bottom traction mechanism; Operation 4-decomposition secondary suspension parts; Single stage suspension parts are decomposed in operation 5-pressurization; Operation 6-framework ball blast; Operation 7-framework is detected a flaw; Operation 8-framework is measured; Operation 9-framework sprays paint; Operation 10-installation single stage suspension parts; Operation 11-installation secondary suspension parts; Operation 12-mounted motor, bolster; Operation 13-electrical test; Operation 14-brake test; Operation 15-static test; Operation 16-bogie truck is checked and accepted, and carries out an acceptance inspection, be delivered for use after acceptance(check) according to acceptance criterion to the bogie truck after maintenance.
Operation 1 to operation 5, bogie truck is traveling on ground rail, bogie truck weight about 10 tons, and adopt motor-driven carrier to drive steering framing wheel pair, bogie truck moves convenient.Operation 6 to operation 9, job content is framework repair, and framework adopts and hangs mode of movement in the air.Aerial suspension mode of movement can control to carry framework automatically, also in suspension situation, can carry out upkeep operation.
Operation 10 to operation 16, bogie truck is traveling on ground rail, adopts motor-driven carrier to drive steering framing wheel to carry bogie truck to mode.
Operation 1, operation 3, operation 4, operation 5 all have decomposes from bogie truck the parts got off and needs to be delivered to outside conveyor line, adopts the mode of movement of self-supporting hoisting crane.Self-supporting hoisting crane can cover whole operation scope, and in decomposable process, self-supporting hoisting crane not only can participate in apportioned effort, also can by the component feed of decomposing to outside conveyor line.
Operation 10, operation 11, operation 12 belong to Knockdown block, by component feed intact for quality on conveyor line, carry out the installation of parts, adopt the mode of movement of self-supporting hoisting crane.
Finally should be noted that: above embodiment is only in order to illustrate that technical scheme of the present invention is not intended to limit; although with reference to above-described embodiment to invention has been detailed description; those of ordinary skill in the field still can modify to the specific embodiment of the present invention or equivalent replacement; these do not depart from any amendment of spirit and scope of the invention or equivalent replacement, are all applying within the claims awaited the reply.

Claims (1)

1. a flow line detection method for bullet train bogie, it is characterized in that: be divided into seven to overhaul module and 16 road overhaul process according to maintenance content, seven maintenance modules comprise predecomposition module, cleaning module, decomposing module, framework repair module, Knockdown block, tentative module and examination module, 16 road overhaul process are included in seven maintenance modules, and seven maintenance modules and 16 road overhaul process form conveyor line according to upkeep operation order, 16 road overhaul process comprise: the motor on operation 1-decomposition bogie truck, bolster and the protection operation before carrying out bogie truck cleaning, dry up after operation 2-bogie truck entirety is cleaned and cleaned, operation 3-decomposition bogie truck bottom traction mechanism, operation 4-decomposition secondary suspension parts, single stage suspension parts are decomposed in operation 5-pressurization, operation 6-framework ball blast, operation 7-framework is detected a flaw, operation 8-framework is measured, operation 9-framework sprays paint, operation 10-installation single stage suspension parts, operation 11-installation secondary suspension parts, operation 12-mounted motor, bolster, operation 13-electrical test, operation 14-brake test, operation 15-static test, operation 16-bogie truck is checked and accepted, described operation 1 to operation 5, bogie truck is traveling on ground rail, motor-driven carrier is adopted to drive steering framing wheel pair, described operation 6 to operation 9, framework adopts and hangs mode of movement in the air, described operation 10 to operation 16, bogie truck is traveling on ground rail, motor-driven carrier is adopted to drive steering framing wheel to carry bogie truck to mode, described operation 1, operation 3, operation 4, operation 5 all have decomposes from bogie truck the parts got off and needs to be delivered to outside conveyor line, adopts the mode of movement of self-supporting hoisting crane, described operation 10, operation 11, operation 12 belong to Knockdown block, and component feed intact for quality on conveyor line, is carried out the installation of parts by the mode of movement of employing self-supporting hoisting crane.
CN201510331575.6A 2015-06-16 2015-06-16 Method for repairing bullet train bogie assembly line Pending CN104973087A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510331575.6A CN104973087A (en) 2015-06-16 2015-06-16 Method for repairing bullet train bogie assembly line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510331575.6A CN104973087A (en) 2015-06-16 2015-06-16 Method for repairing bullet train bogie assembly line

Publications (1)

Publication Number Publication Date
CN104973087A true CN104973087A (en) 2015-10-14

Family

ID=54270193

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510331575.6A Pending CN104973087A (en) 2015-06-16 2015-06-16 Method for repairing bullet train bogie assembly line

Country Status (1)

Country Link
CN (1) CN104973087A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110842466A (en) * 2019-11-30 2020-02-28 中车大连机车车辆有限公司 Repairing process for deformation of locomotive bogie frame
CN111661106A (en) * 2020-06-23 2020-09-15 广州电力机车有限公司 Wheel drive maintenance flexible production process
CN111874034A (en) * 2020-07-16 2020-11-03 中铁第四勘察设计院集团有限公司 Bogie maintenance process and system based on component cleaning center

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003011795A (en) * 2001-06-29 2003-01-15 Central Japan Railway Co Vehicle washing device capable of washing connecting part of rolling stock
CN102275596A (en) * 2011-05-23 2011-12-14 铁道第三勘察设计院集团有限公司 Flow line detection method for bullet train bogie
CN102954871A (en) * 2011-08-26 2013-03-06 北京新联铁科技股份有限公司 Motor train unit bogie assembling test flow line maintenance system and maintenance method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003011795A (en) * 2001-06-29 2003-01-15 Central Japan Railway Co Vehicle washing device capable of washing connecting part of rolling stock
CN102275596A (en) * 2011-05-23 2011-12-14 铁道第三勘察设计院集团有限公司 Flow line detection method for bullet train bogie
CN102954871A (en) * 2011-08-26 2013-03-06 北京新联铁科技股份有限公司 Motor train unit bogie assembling test flow line maintenance system and maintenance method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110842466A (en) * 2019-11-30 2020-02-28 中车大连机车车辆有限公司 Repairing process for deformation of locomotive bogie frame
CN110842466B (en) * 2019-11-30 2020-11-27 中车大连机车车辆有限公司 Repairing process for deformation of locomotive bogie frame
CN111661106A (en) * 2020-06-23 2020-09-15 广州电力机车有限公司 Wheel drive maintenance flexible production process
CN111661106B (en) * 2020-06-23 2021-10-15 广州电力机车有限公司 Wheel drive maintenance flexible production process
CN111874034A (en) * 2020-07-16 2020-11-03 中铁第四勘察设计院集团有限公司 Bogie maintenance process and system based on component cleaning center

Similar Documents

Publication Publication Date Title
CN102275596A (en) Flow line detection method for bullet train bogie
CN104554326B (en) A kind of straddle-type monorail Operation Van bogie
CN104973087A (en) Method for repairing bullet train bogie assembly line
CN206984013U (en) A kind of independent wheeled bogie examination and repair system of tramcar
CN101475091A (en) Floor plate chain conveying system
CN201413239Y (en) Comprehensive test device for railroad locomotive wheelset
Muradian et al. Methodological fundamentals of determination of unpowered rolling stock maintenance characteristics
CN209159720U (en) A kind of administrative region of a city rolling stock builds the base structure of combination
CN204368173U (en) Meter-gage motor train unit motor car bogie
CN103612644A (en) Bo steering frame used for electric shunting locomotive
CN104512700B (en) A kind of railway goods train bogie overhauls pipeline
CN203543987U (en) Bo bogie for electric shunting locomotive
CN201633814U (en) Vehicle body conveying line
CN206185144U (en) Unipolar to four -axis combination formula numerical control underfloor wheel lathe
CN100534890C (en) Bridge type lifting composite device for car body transportation
CN211364541U (en) Rail transit passenger-cargo dual-purpose electric vehicle
CN109291955B (en) Base structure for repairing and manufacturing urban railway vehicles
CN203020321U (en) Wheel-lifting device of syntonic type train running part for fault rescue
CN207275550U (en) A kind of novel automatic hangs sky pipeline
CN202414612U (en) Rail transit locomotive wheelset supporting wheel drive device
CN112373515A (en) Comprehensive maintenance process flow method for suspension type monorail train
CN105253165A (en) Multi-station separating monorail wheel-changing system and method
CN106043345B (en) A kind of safety device for preventing rail traffic vehicles derailed
CN215706335U (en) Framework vehicle with translation device for railway
CN204605800U (en) Modular combined track transport trolley

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20151014