CN104963292B - Construction method of reinforced concrete continuous-span arch bridge or continuous box structure bridge - Google Patents

Construction method of reinforced concrete continuous-span arch bridge or continuous box structure bridge Download PDF

Info

Publication number
CN104963292B
CN104963292B CN201510422795.XA CN201510422795A CN104963292B CN 104963292 B CN104963292 B CN 104963292B CN 201510422795 A CN201510422795 A CN 201510422795A CN 104963292 B CN104963292 B CN 104963292B
Authority
CN
China
Prior art keywords
bridge
arch
pier
flexible cable
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510422795.XA
Other languages
Chinese (zh)
Other versions
CN104963292A (en
Inventor
王华才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Biaowang Integrated House Science And Technology Development Co ltd
Original Assignee
Chongqing Biaowang Integrated House Science And Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Biaowang Integrated House Science And Technology Development Co ltd filed Critical Chongqing Biaowang Integrated House Science And Technology Development Co ltd
Priority to CN201510422795.XA priority Critical patent/CN104963292B/en
Publication of CN104963292A publication Critical patent/CN104963292A/en
Application granted granted Critical
Publication of CN104963292B publication Critical patent/CN104963292B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a construction method of a reinforced concrete continuous-span arch bridge or a continuous box structure bridge, which comprises the following steps: step 1) constructing a lower structure of an arch bridge, wherein the lower structure comprises a foundation, a middle pier and a bridge abutment; step 2) fixing a flexible inhaul cable on a bridge pier of the arch bridge, fixing a ground anchor by the flexible inhaul cable, and fixing the ground anchor on the ground for balancing horizontal force applied to the bridge pier; step 3) erecting an arch support on each span of the bridge; step 4) constructing an upper structure of the arch bridge on the arch center; and 5) dismantling the flexible inhaul cable and the arch support. The construction method has the advantages of simple process, reliable quality, low construction cost, high construction speed and safety risk reduction.

Description

Armored concrete is even across arch bridge or the construction method of continuous box structure bridge
Technical field
The present invention relates to bridge construction field, particularly relate to a kind of armored concrete even across arch bridge or continuous The construction method of box structure bridge.
Background technology
Two across and multispan continuous print arch bridge, continuous box structure bridge construction in, often in pier have quite Height, along with the increase that pier is high, the ability that horizontal thrust is resisted on pier shaft top longitudinally axially is the most weak, This just brings the biggest to the construction (no matter using arch trestle cast-in-place or prefabrication and lifting) of arch bridge main arch ring Puzzlement.
In the continuous box structure of continuous box structure bridge is constructed, generally use " Hanging Basket " construction technology, though This technique is less demanding to the horizontal holding capacity of Y-direction of bridge pier shaft when construction, but complex process, execute Work speed is slow, and security risk is relatively big, and the segmental length that " Hanging Basket " can construct every time is limited, thus causes even The phenomenon that continuous box-beam structure longitudinal prestressing rope is more.
Summary of the invention
It is an object of the invention to overcome the deficiencies in the prior art, it is provided that a kind of armored concrete is even across arch The construction method of bridge or continuously box structure bridge, this construction method technique is simple, reliable in quality, construction cost Low, speed of application is very fast, reduces security risk.
Technical scheme is as follows:
A kind of armored concrete is even across arch bridge or the construction method of continuous box structure bridge, and the method presses following step Suddenly carry out:
Step 1) construction bridge substructure, including pier basic, middle, abutment;
Step 2) one end of fixing flexible drag-line on the middle pier of bridge, the other end of flexible cable is along bridge longitudinally Extending and be fixed on earth anchor, earth anchorage on the ground, props up for the arch suffered by the company's of balance span centre pier Frame is installed and the produced horizontal force longitudinal along bridge of construction loads;
Step 3) set up arch trestle each of bridge across installation;
Step 4) superstructure of bridge of constructing on arch trestle;
Step 5) remove flexible cable, arch trestle.
When described armored concrete even across arch bridge or continuously box structure bridge be two across time, the quantity of described middle pier It it is one, it is preferable that in this, pier is provided with oppositely extending flexible cable, reversely along the two ends that arch bridge is longitudinal The flexible cable extended is by earth anchorage on the ground.
When described armored concrete even across arch bridge or continuously box structure bridge be three across connect above across time, described in The quantity of pier is at least two, it is preferable that the most independent by flexible cable respectively between adjacent middle pier Being fixedly connected to form the pier group of middle pier series connection, pier group is provided with oppositely extending flexibility along the two ends that bridge is longitudinal and draws Rope, oppositely extending flexible cable is by earth anchorage on the ground.
In order to regulate the Suo Li of flexible cable, it is preferable that described flexible cable is provided with for regulating flexibility The tune rope device of Cable power.
In order to horizontal force middle pier suffered by is better balanced, it is preferable that step 3) in, setting up arch Before frame, by Design of Construction Organization, utilize and adjust rope device to be strained by flexible cable.
In order to horizontal force middle pier suffered by is better balanced, it is preferable that during described flexible cable is fixed on The lower section of the arch trestle absolute altitude of pier.
For the ease of flexible cable being fixed on middle pier, it is preferable that be reserved with flexibility on described middle pier and draw The fixing duct of rope.
In order to balance the horizontal force suffered by the big-and-middle pier of width, it is further preferred that reserved on described middle pier Having the fixing duct of multiple flexible cable, each fixing duct longitudinally penetrates along each middle pier and is positioned at same level On face, difference fixing flexible drag-line in each fixing duct.
In order to more easily arrange fixing duct on middle pier, it is further preferred that described fixing duct Method to set up is: in construction during pier, pre-buried body on middle pier, the endoporus of body after middle pier molding Road is the fixing duct of flexible cable.
In order to improve the versatility of arch trestle, reduce construction cost, it is preferable that described arch trestle is standard Change, unitized combination type arch trestle, this arch trestle across footpath, fabric width, radian are adjustable.
Owing to have employed technique scheme, the present invention has a following actual effect:
The company of the present invention is directed to, across arch bridge or the feature of the bridge superstructure construction of box structure bridge continuously, is executing Man-hour, section, effectively can solve at construction period pier shaft on the premise of not increasing pier shaft structure design measure The problem bearing Y-direction horizontal thrust, below middle pier top portion, standardization, generalization are set up in appropriate position Combination type arch trestle, its span, fabric width, radian (ratio of rise to span) is adjustable, and then realizes above bridge type The brand-new construction technology that the integral support of superstructure is the most cast-in-place, after Superstructure Construction completes, removes Set flexible cable, arch trestle;Reserving hole channel to flexible cable carries out grouting envelope if desired Close process.
The inventive method, technique are simple, and construction cost is low, effectively can solve owing to installing in the construction period Construction arch trestle and construction loads are to horizontal thrust produced by pier shaft.And then integral support can be used existing The company of watering is across the continuous box girder of arch bridge main arch ring, even span continuous box structure, thus can lengthen continuous box-beam structure Construction sections, speed of application accelerate, greatly reduce described bridge superstructure construction security risk.
Accompanying drawing explanation
The structural representation of Fig. 1 embodiment of the present invention 1;
Fig. 2 is the structural representation of inventive embodiments 2.
Reference
1 is ground, and 2 is middle pier, and 3 is abutment, and 4 is flexible cable, and 5 is arch trestle, and 6 for adjusting rope dress Putting, 7 is earth anchor.
Detailed description of the invention
Embodiment 1
See Fig. 1, a kind of two across armored concrete even across the arch trestle construction method of arch bridge, the method by with Lower step is carried out:
Step 1) by traditional handicraft, on ground 1, cast-in-place company is across substructure of arch bridge, including basis (figure Upper the most not shown), middle pier 2, abutment 3;
Step 2) it is intended to appropriate location fixing flexible under mounting arch support 5 absolute altitude in company across the middle pier 2 of arch bridge bridge One end of drag-line 4, in order to ensure the intensity of flexible cable 4, described flexible cable 4 uses high strength steel ream Line or high-strength steel cord.The other end of flexible cable 4 is fixed on left and right banks earth anchor 7 along bridge axis direction respectively On, earth anchor 7 is fixed on corresponding on interior ground 1, for the arch trestle 7 suffered by the company's of balance span centre pier 7 Install and the produced horizontal force along bridge axis direction of construction loads;In the present embodiment, pier 2 in described bridge Quantity be one, in this bridge pier 2 along arch bridge longitudinal be respectively arranged at two ends with oppositely extending flexible cable 4, Oppositely extending flexible cable 4 is fixed on ground 1 by earth anchor 7.
For the ease of flexible cable 4 being fixed on middle pier 2, it is preferable that be reserved with on described middle pier 2 The fixing duct of flexible cable 4.In the present embodiment, described middle pier 2 is reserved with multiple flexible cable 4 Fixing duct, each fixing duct by middle pier along arch bridge longitudinally through and be positioned in same level, each solid Flexible cable 4 it is installed with respectively in determining duct.The method to set up in described fixing duct is: pier 2 mistake in construction bridge Cheng Zhong, pre-buried body on Qiao Zhongdun 2, in bridge, after pier 2 molding, the inner duct of body is flexible cable 4 Fixing duct.
For the ease of regulation flexible cable, pier 2 is better balanced in bridge at the water suffered by mounting arch support Horizontal sliding power, described flexible cable 4 is provided with the tune rope device 6 for regulating flexible cable 4 Suo Li.Described Adjust rope device 6 can use the tune rope device of Patent No. ZL200820300288.4.Described flexible cable 4 Connect after fixing duct and adjust rope device 6, make flexible cable 4 be positioned in bridge on pier 2.
Step 3) utilize and adjust rope device 6, by Design of Construction Organization by flexible cable regulation fastening suitably, The bearing of fixed arch support on middle pier, sets up one group of arch between Qiao Zhongdun 2 and two abutments 3 respectively Frame 5;Described arch trestle 5 is standardization, unitized combination type arch trestle 5, its across footpath, fabric width, arc Degree (ratio of rise to span) is adjustable.Described combination type arch trestle 5 can use Patent No. ZL200610051029.8 Combination type steelframe.
Step 4) on arch trestle 5, implement the top knots such as the superstructure (main arch ring) of arch bridge, bridge deck Structure construction (loads in strict accordance with loading procedure on arch trestle).
Step 5) remove flexible cable 4, arch trestle 5 and i.e. complete the Superstructure Construction of arch bridge.
Embodiment 2
See Fig. 2, connect the arch trestle construction method across arch bridge, the present embodiment for a kind of three across armored concrete Difference with embodiment 1 is: in this method, and in described bridge, the quantity of pier 2 is two, pier 2 in two Between be fixedly connected to form pier group by flexible cable 4, pier group is provided with along the two ends that arch bridge is longitudinal reversely prolongs The flexible cable 4 stretched, oppositely extending flexible cable 4 is fixed on ground 1 by earth anchor 7;Step 3) In, between two middle piers 2, set up one group of arch trestle 5.The other technologies feature of the present embodiment and embodiment 1 is identical, repeats no more.
Embodiment 3
A kind of arch trestle construction method of continuous box structure bridge, the present embodiment and embodiment 1, embodiment 2 Difference is: step 3) in need to set up on arch trestle after arch trestle installation vertical with continuous box structure disconnected The conventional bracket that upper thread type is consistent, it is achieved the construction of box structure continuously.
The present invention is not limited solely to above-described embodiment, and in the present embodiment, three across above armored concrete even Construction method across arch bridge or continuous box structure bridge can also be by the method in embodiment 1 by flexible cable 4 Pier in fixed bridge, thus realize the superstructure of bridge described in integral support cast-in-place construction.
Finally illustrate, preferred embodiment above only in order to technical scheme to be described and unrestricted, Although the present invention being described in detail by above preferred embodiment, but people in the art Member should be appreciated that and in the form and details it can be made various change, without departing from this Invention claims limited range.

Claims (9)

1. an armored concrete is even across arch bridge or the construction method of continuous box structure bridge, it is characterised in that should Method sequentially includes the following steps:
Step 1) construction bridge substructure, including pier basic, middle, abutment;
Step 2) one end of fixing flexible drag-line on the middle pier of bridge, the other end of flexible cable is along bridge longitudinally Extending and be fixed on earth anchor, earth anchorage on the ground, props up for the arch suffered by the company's of balance span centre pier Frame is installed and the produced horizontal force longitudinal along bridge of construction loads, and described flexible cable is provided with for adjusting The tune rope device of joint flexible cable Suo Li;
Step 3) set up arch trestle each of bridge across installation;
Step 4) superstructure of bridge of constructing on arch trestle;
Step 5) remove flexible cable, arch trestle.
Armored concrete the most according to claim 1 is even across arch bridge or the construction party of continuous box structure bridge Method, it is characterised in that: the quantity of described middle pier is one, and in this, pier is provided with instead along the two ends that arch bridge is longitudinal To the flexible cable extended, oppositely extending flexible cable is by earth anchorage on the ground.
Armored concrete the most according to claim 1 is even across arch bridge or the construction party of continuous box structure bridge Method, it is characterised in that: the quantity of described middle pier is at least two, respectively by soft between adjacent middle pier Property drag-line be the most individually fixedly connected to form the pier group of middle pier series connection, pier group is provided with instead along the two ends that bridge is longitudinal To the flexible cable extended, oppositely extending flexible cable is by earth anchorage on the ground.
Armored concrete the most according to claim 1 is even across arch bridge or the construction party of continuous box structure bridge Method, it is characterised in that: step 3) in, before setting up arch trestle, by Design of Construction Organization, utilize and adjust Flexible cable is strained by rope device.
5. according to the arbitrary described armored concrete of claims 1 to 3 even across arch bridge or continuous box structure bridge Construction method, it is characterised in that: described flexible cable is fixed on the lower section of the arch trestle absolute altitude of middle pier.
6. according to the arbitrary described armored concrete of claims 1 to 3 even across arch bridge or continuous box structure bridge Construction method, it is characterised in that: be reserved with the fixing duct of flexible cable on described middle pier.
Armored concrete the most according to claim 6 is even across arch bridge or the construction party of continuous box structure bridge Method, it is characterised in that: it is reserved with the fixing duct of multiple flexible cable, each fixing duct on described middle pier Longitudinally penetrate along each middle pier and be positioned in same level, difference fixing flexible drag-line in each fixing duct.
Armored concrete the most according to claim 6 is even across arch bridge or the construction party of continuous box structure bridge Method, it is characterised in that the method to set up in described fixing duct is: in construction during pier, on middle pier Pre-buried body, after middle pier molding, the inner duct of body is the fixing duct of flexible cable.
Armored concrete the most according to claim 1 is even across arch bridge or the construction party of continuous box structure bridge Method, it is characterised in that: described arch trestle is standardization, unitized combination type arch trestle, this arch trestle Across footpath, fabric width, radian are adjustable.
CN201510422795.XA 2015-07-17 2015-07-17 Construction method of reinforced concrete continuous-span arch bridge or continuous box structure bridge Active CN104963292B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510422795.XA CN104963292B (en) 2015-07-17 2015-07-17 Construction method of reinforced concrete continuous-span arch bridge or continuous box structure bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510422795.XA CN104963292B (en) 2015-07-17 2015-07-17 Construction method of reinforced concrete continuous-span arch bridge or continuous box structure bridge

Publications (2)

Publication Number Publication Date
CN104963292A CN104963292A (en) 2015-10-07
CN104963292B true CN104963292B (en) 2017-01-04

Family

ID=54217367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510422795.XA Active CN104963292B (en) 2015-07-17 2015-07-17 Construction method of reinforced concrete continuous-span arch bridge or continuous box structure bridge

Country Status (1)

Country Link
CN (1) CN104963292B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107905114B (en) * 2017-12-07 2019-04-02 中交第三航务工程局有限公司 A kind of construction method of large span Successive interference cancellation
CN111877127B (en) * 2020-08-25 2022-08-30 中交路桥华南工程有限公司 Construction method of continuous arch bridge
CN112726434B (en) * 2020-12-28 2022-05-10 中铁广州工程局集团桥梁工程有限公司 Three-span deck reinforced concrete arch bridge dismantling method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002201609A (en) * 2000-12-28 2002-07-19 Ps Corp Construction method for concrete arch bridge
JP2008196135A (en) * 2007-02-08 2008-08-28 Akio Kitayama Reinforcing structure of bridge
CN101446067B (en) * 2008-12-22 2010-10-06 中铁大桥局集团第五工程有限公司 Construction method for Y-shaped frame of large-span steel box basket arch bridge
CN102493360B (en) * 2011-12-29 2013-09-04 浙江大东吴集团建设有限公司 Reinforced concrete arch bridge construction method
CN102995553B (en) * 2012-11-27 2014-08-27 胜利油田胜利工程建设(集团)有限责任公司 Arch rib of reinforced concrete arch bridge and erection support and manufacture method of arch rib

Also Published As

Publication number Publication date
CN104963292A (en) 2015-10-07

Similar Documents

Publication Publication Date Title
CN103088750B (en) Especial-big span suspension bridge of uniparted hyperboloid space rope net main cable and construction method thereof
CN109972517A (en) A kind of construction method of steel reinforced concrete bondbeam cable-stayed bridge main-beam
US8695142B2 (en) Partially and fully earth-anchored cable-stayed bridges using main-span prestressing unit and method of constructing the same
CN104695341B (en) Non-self-balanced beam string structure for reinforcing large-span continuous beam bridge
CN103938552B (en) Steel truss arched bridge self-balancing cantilever construction method and the spacing bearing of main pier
CN107761542B (en) A kind of arch oblique pull combined system bridge and its construction method
CN104963292B (en) Construction method of reinforced concrete continuous-span arch bridge or continuous box structure bridge
CN106522112A (en) Cable-stayed bridge side span beam section erecting system and method thereof
CN201106155Y (en) Inclined guy cable auxiliary full cantaliver crane trussed steel beam device
CN203080400U (en) Extra-large span suspension bridge with uniparted hyperboloid space cable net main cables
CN105648917A (en) Cable-beam synchronization construction method for composite beam self-anchored suspension bridge
CN102108748B (en) Quadrilateral endless rope chord supporting structure and construction process
CN108999088A (en) A kind of construction method of cable-stayed bridge
CN105040591A (en) Positioning device for waveform steel web and positioning method thereof
CN103835238B (en) A kind of high pier cable stayed bridge No. 0 block non-stand construction method and the structure in constructing
CN206538687U (en) Cable-stayed bridge end bay beam section construction system
CN104562944B (en) Long span steel-concrete composite beam cable-stayed bridge limit steel case anchoring temporarily system
CN207032062U (en) Tower with suspended cable available for Large-span Steel Box Beam construction
CN105603879A (en) Construction technology for large-diameter pipeline crossing construction catwalk
CN101736685A (en) Ground-anchored-self-anchored suspension combined system bridge
CN104499436B (en) The antitorque balance pier of swivel bridges mobile load
CN203741729U (en) Pre-stress supporting system used for bridge incremental launching construction method
CN205171343U (en) Combination beam self anchored suspension bridge
CN106968178B (en) Construction method for main beam of cable-stayed suspension bridge
CN202450450U (en) Reinforcement and reconstruction structure of suspension bridge

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant