CN104950921B - Building leveling safety monitoring system - Google Patents

Building leveling safety monitoring system Download PDF

Info

Publication number
CN104950921B
CN104950921B CN201510354950.9A CN201510354950A CN104950921B CN 104950921 B CN104950921 B CN 104950921B CN 201510354950 A CN201510354950 A CN 201510354950A CN 104950921 B CN104950921 B CN 104950921B
Authority
CN
China
Prior art keywords
data
building
module
leveling
monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510354950.9A
Other languages
Chinese (zh)
Other versions
CN104950921A (en
Inventor
于广明
袁长丰
高丽艳
李冰冰
袁子晋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao University of Technology
Original Assignee
Qingdao University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao University of Technology filed Critical Qingdao University of Technology
Priority to CN201510354950.9A priority Critical patent/CN104950921B/en
Publication of CN104950921A publication Critical patent/CN104950921A/en
Application granted granted Critical
Publication of CN104950921B publication Critical patent/CN104950921B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Emergency Alarm Devices (AREA)
  • Alarm Systems (AREA)

Abstract

The invention relates to the technical field of building safety monitoring, in particular to a building leveling safety monitoring system, wherein a data acquisition module comprises a foundation bottom strain gauge, a displacement sensor, a pressure sensor, a level gauge and a hydraulic jacking device, the data acquisition module automatically acquires deformation data of a building and stores the acquired data in a system database, the data acquired by the data acquisition module is transmitted to a data analysis module through a data communication module, a monitoring alarm module establishes an alarm model according to the data calculated by the data analysis module for calculation and analysis, an alarm is given when the calculation and analysis result exceeds a specified limit value, and a visual management module displays the data in the system database; the system has the advantages of simple structure, reliable principle, convenient operation, low cost, high automation degree, labor saving and capability of ensuring the safety of the building leveling process.

Description

A kind of building leveling safety monitoring system
Technical field:
Building safety monitoring technical field of the present invention, it is related to a kind of building leveling safety monitoring system, realizes building The leveling of thing is simultaneously monitored in real time to leveling process.
Background technology:
As the fast development of society, the quickening of urbanization process, city size constantly expand, big city and megalopolis Center it is densely populated, building stands in great numbers, and space is crowded, traffic jam, seriously constrains the further hair of economic society Exhibition.For a long time, the expansion of urban transportation, infrastructure and urban capacity is mainly to be realized by extending urban land, But the shortage of the increase of population and the growth of life requirement and urban land oneself turn into the focus of contradiction.To realize sustainable development Strategy, except developing to high-altitude, sight is also invested the development and utilization to the underground space by people, is wanted soil to underground, is wanted sky Between oneself turn into urban development historical inevitability.There is scholar's prophesy, 21 century is by as the century of the human development underground space.
An important ring of the subway as underground space development, it is a kind of effective hand for solving Traffic Problems Section, underground route are typically located at the bustling section in city, and nearby buildings are intensive, and the excavation of subway tunnel can cause stratum to be moved Dynamic and surface subsidence, so as to which formula building produces differential settlement, when differential settlement of buildings reaches a certain numerical value, building Thing will produce destruction.At present, at home and abroad in the engineering of numerous jacking leveling buildings, used is that hand-hydraulic is very heavy Top or mechanical jack, by spirit level or chi measurement then is surveyed, is shown by manual operation, the rise of jacking device (jack) completely So this method employment is more, efficiency is low, speed is slow, costly, and inaccurately, it can not realize peace of the building during leveling Full monitoring, makes the leveling process of building not have safety guarantee.Therefore, a kind of building leveling safety monitoring system is designed, is adopted Jacking leveling is surged with multiple spot and building reinforces the technology that is combined, enables to deform and inclined building righting and extensive It is multiple, it is lower section that multiple jacking devices are reasonably placed in building basis using the multiple spot jacking device leveling building that surges, leads to Crossing the displacement of control jacking device makes each position of building produce required lift, and suitably corrects the deformation on basis, makes building Thing is able to appropriate recovery.During using above method leveling, safety monitoring is carried out to building, each jacking device displacement must be protected Coordination is held, the collar tie beam on basis is in a horizontal plane all the time, otherwise building can be made to bear new additional load and aggravate brokenly Damage, for that purpose it is necessary to be monitored to the safety of building during leveling, the displacement and pressure to each jacking device be monitored with Processing, allow an operator to, according to adjustment situation, reasonably correct leveling parameter and leveling scheme in good time, while also to realize wall The monitoring of interior key position ess-strain, ensure the safety of building.
The content of the invention:
The shortcomings that it is an object of the invention to overcome prior art to exist, seek design and a kind of building leveling safety is provided Monitoring system, for the correction during foundation uneven settlement building leveling above excavation area, so as to realize that building is adjusted Safety monitoring during flat.
To achieve these goals, the agent structure of building leveling safety monitoring system of the present invention is adopted including data Collect five module, data communication module, data analysis module, monitoring, alarming module and visualized management module modules, data are adopted Collection module includes foundation bottom foil gauge, displacement transducer, pressure sensor, spirit level and hydraulic lifting device, hydraulic lifting device Be uniformly arranged on the bottom of building foundation ring girder, wherein the node of building foundation ring girder, be equipped with hydraulic lifting at flex point Device, the setting of hydraulic lifting device determines according to the stressing conditions of building foundation ring girder, and acts on basic circle according to building Beam action power and the shearing strength of foundation ring girder determine the number of hydraulic lifting device, and the active force of hydraulic lifting device makes basic circle Beam each several part uniform force, prevents foundation ring girder to be destroyed;Hydraulic lifting device is provided with displacement transducer and pressure sensor, builds Post foundation bottom foil gauge, the deformation and displacement that sensing foundation ring girder occurs, building basis in the bottom for building thing foundation ring girder The embedding spirit level in middle part of collar tie beam;The deformation data of data acquisition module automatic data collection building, and the data collected are deposited Enter in system database, data are pre-processed in real time, reorganized, assay and measured value forecast work;Data communication mould Between communication and monitoring station computer and external administrative center between block data acquisition module and monitoring station computer The data collected are sent to the serial ports of monitoring station computer by communication, data acquisition module using serial interface cable by serial ports On, used when communication distance is no more than 100m using the communication modes of RS232 serial ports, communication distance when being 100m-3000m RS232 turns RS422/RS485 communication modes, and communication distance uses optical-fibre communications mode when being more than 3000m;Monitoring station computer With administrative center by the way of optical-fibre communications, telephone wire communication or wireless telecommunications, during using wireless telecommunications, in monitoring station and pipe Reason center sets wireless digital broadcasting station respectively, is communicated by air and frequency electromagnetic waves, and monitoring station also can with administrative center Communicated by internet or satellite;Data collecting module collected to data transmitted by data communication module to data Analysis module, data analysis module are carried out to building each position sedimentation value, slope and building masonry wall internal stress strain value Calculate, while analyze the harmony to be worked between each hydraulic lifting device during building leveling, ensure to build during leveling The safety of thing;The data that monitoring, alarming module is calculated according to data analysis module establish alarm model and carry out calculating analysis, Alarmed when the result for calculating analysis exceeds defined limit value, alarm is supplied to correlation in real time by modern means of communication Technical staff and administrative staff, so as to timely processing;Visualized management module is, system database associated with system database In raw monitored information data, materials compilation data, information analysis data and prediction data can be transferred through visualizing Management module is passed on, user by visualized management module dynamic, intuitively know monitoring information and whole building thing Safety profile.
Serial interface cable of the present invention includes 5 core shielded cables, 7 core shielded cables and 8 core shielded cables;Displacement transducer Measurement Resolution be less than 0.1mm, and zero point is unable to drift.
The present invention operation principle be:Hydraulic lifting device is to act on building foundation bottom by steel plate, allows basis to enclose Beam is evenly load by the active force of jacking device, and steel plate is identical with the width of building foundation ring girder, during leveling, two Differential settlement between individual hydraulic lifting device is less than its distanceOnce exceeding limit value, then computer is alarmed;Foundation bottom The deformation that the foundation ring girder sensed occurs is transmitted to computer with displacement and monitored in real time by foil gauge, passes through data analysis mould Block optimized integration is subjected to displacement front and rear displacement difference and calculated, and is shown in the form of data and image, operating personnel according to The leveling work of Monitoring Data operation hydraulic lifting device optimized integration, and spirit level is passed through by visualized management mould by camera Block, which is shown, is easy to staff to observe, it is ensured that building is on a horizontal plane, and whole system is carried out to leveling process automatically Monitored over time, according to existing code requirement, the limit value of differential settlement is 0.0015L between building adjacent pillars, when uneven When sedimentation reaches the 60% of control standard, monitoring, alarming module sends early warning, when differential settlement value exceedes control standard Monitoring, alarming module then automatic alarm, while provide various information for Levelling operation, assists leveling personnel to correct leveling when 80% Parameter and leveling scheme.
The present invention compared with prior art, by the displacement to leveling process and the real-time measurement of pressure and is handled, to adjust It is flat to submit necessary information, instruct leveling to work, once building area deforms more than safe limit value, system automatic alarm will simultaneously be adjusted Flat amount is transferred to leveling staff, and staff carries out leveling to ensure people's life safety, avoids economic loss, use The rise of hydraulic lifting device fully achieves automation and calculates and control, and leveling overall process is monitored in real time, effectively Prevent building from being suffered damage during leveling;Its system architecture is simple, and principle is reliable, easy to operate, and cost is low, automatically Change degree is high, saves manpower, and ensure that the safety of building leveling process.
Brief description of the drawings:
Fig. 1 is the agent structure schematic block diagram of the present invention.
Embodiment:
The invention will be further described by way of example and in conjunction with the accompanying drawings.
Embodiment:
Building leveling safety monitoring system described in the present embodiment includes data acquisition module, data communication module, data Five analysis module, monitoring, alarming module and visualized management module modules, data acquisition module include foundation bottom foil gauge, Displacement transducer, pressure sensor, spirit level and hydraulic lifting device, hydraulic lifting device are uniformly arranged on building foundation ring girder Hydraulic lifting device is equipped with bottom, the wherein node of building foundation ring girder, flex point, the setting of hydraulic lifting device is according to building The stressing conditions of thing foundation ring girder determine, and the shearing resistance for acting on according to building the active force and foundation ring girder of foundation ring girder is strong Degree determines the number of hydraulic lifting device, and the active force of hydraulic lifting device makes foundation ring girder each several part uniform force, prevents basic circle Beam is destroyed;Hydraulic lifting device is provided with displacement transducer and pressure sensor, and basis is posted in the bottom of building foundation ring girder Bottom foil gauge, the deformation and displacement that sensing foundation ring girder occurs, the embedding spirit level in middle part of building foundation ring girder;Data are adopted Collect the deformation data of module automatic data collection building, and the data collected are stored in system database, in real time to data Pre-processed, reorganized, assay and measured value forecast work;Data communication module data acquisition module and monitoring station computer Between communication and monitoring station computer and external administrative center between communication, the number that data acquisition module will collect It is sent to according to using serial interface cable by serial ports on the serial ports of monitoring station computer, communication distance uses when being no more than 100m The communication modes of RS232 serial ports, communication distance turn RS422/RS485 communication modes using RS232 when being 100m-3000m, lead to News distance uses optical-fibre communications mode when being more than 3000m;Monitoring station computer is led to administrative center using optical-fibre communications, telephone wire News or the mode of wireless telecommunications, during using wireless telecommunications, wireless digital broadcasting station is set respectively in monitoring station and administrative center, passed through Air and frequency electromagnetic waves are communicated, and monitoring station can also be communicated with administrative center by internet or satellite;Data The data that acquisition module collects are transmitted each to building to data analysis module, data analysis module by data communication module Position sedimentation value, slope and building masonry wall internal stress strain value are calculated, while are analyzed each during building leveling The harmony to be worked between hydraulic lifting device, ensure the safety of building during leveling;Monitoring, alarming module is according to data point The data that analysis module is calculated establish alarm model and carry out calculating analysis, when the result for calculating analysis exceeds defined limit value Alarmed, alarm is supplied to the technical staff and administrative staff of correlation by modern means of communication in real time, so as to timely processing; Visualized management module is, raw monitored information data, materials compilation number in system database associated with system database Visualized management module is can be transferred through according to, information analysis data and prediction data to pass on, user passes through visualized management Module dynamic, the safety profile for intuitively knowing monitoring information and whole building thing.
Serial interface cable described in the present embodiment includes 5 core shielded cables, 7 core shielded cables and 8 core shielded cables;Displacement sensing The Measurement Resolution of device is less than 0.1mm, and zero point is unable to drift.
The operation principle of the present embodiment is:Hydraulic lifting device is to act on building foundation bottom by steel plate, allows basis Collar tie beam is evenly load by the active force of jacking device, and steel plate is identical with the width of building foundation ring girder, during leveling, Differential settlement between two hydraulic lifting devices is less than its distanceOnce exceeding limit value, then computer is alarmed;Basic bottom The deformation that the foundation ring girder sensed occurs is transmitted to computer with displacement and monitored in real time by portion's foil gauge, passes through data analysis Module optimized integration is subjected to displacement front and rear displacement difference and calculated, and is shown in the form of data and image, operating personnel's root Worked according to the leveling of Monitoring Data operation hydraulic lifting device optimized integration, and spirit level is passed through by visualized management by camera Module, which is shown, is easy to staff to observe, it is ensured that building is on a horizontal plane, and whole system is entered to leveling process automatically Row monitored over time, according to existing code requirement, the limit value of differential settlement is 0.0015L between building adjacent pillars, works as inequality When even sedimentation reaches the 60% of control standard, monitoring, alarming module sends early warning, when differential settlement value exceedes control standard Monitoring, alarming module then automatic alarm, while provide various information for Levelling operation, assists leveling personnel to correct leveling when 80% Parameter and leveling scheme.

Claims (2)

1. a kind of building leveling safety monitoring system, it is characterised in that agent structure includes data acquisition module, data communication Five module, data analysis module, monitoring, alarming module and visualized management module modules, data acquisition module include basic bottom Portion's foil gauge, displacement transducer, pressure sensor, spirit level and hydraulic lifting device, hydraulic lifting device are uniformly arranged on building Hydraulic lifting device is equipped with the bottom of foundation ring girder, the wherein node of building foundation ring girder, flex point, hydraulic lifting device is set Put and determined according to the stressing conditions of building foundation ring girder, and the active force and basis circle of foundation ring girder are acted on according to building The shearing strength of beam determines the number of hydraulic lifting device, and the active force of hydraulic lifting device makes foundation ring girder each several part uniform force, Foundation ring girder is prevented to be destroyed;Hydraulic lifting device is provided with displacement transducer and pressure sensor, the bottom of building foundation ring girder Post foundation bottom foil gauge, the deformation and displacement that sensing foundation ring girder occurs, the embedding water in middle part of building foundation ring girder in portion Quasi- instrument;The deformation data of data acquisition module automatic data collection building, and the data collected are stored in system database, it is real When data are pre-processed, reorganized, assay and measured value forecast work;For data communication module, data acquisition module The communication between communication and monitoring station computer and external administrative center between block and monitoring station computer, data acquisition The data collected are sent on the serial ports of monitoring station computer by module using serial interface cable by serial ports, and communication distance does not surpass Using the communication modes of RS232 serial ports when crossing 100m, RS422/RS485 is turned using RS232 when communication distance is 100m-3000m Communication modes, communication distance uses optical-fibre communications mode when being more than 3000m;Monitoring station computer uses optical fiber with administrative center The mode of communication, telephone wire communication or wireless telecommunications, during using wireless telecommunications, set respectively wirelessly in monitoring station and administrative center Data radio station, communicated by air and frequency electromagnetic waves, monitoring station can also pass through internet or satellite with administrative center Communicated;Data collecting module collected to data transmitted by data communication module to data analysis module, data analysis Module is calculated building each position sedimentation value, slope and building masonry wall internal stress strain value, while analyzes building The harmony to be worked during thing leveling between each hydraulic lifting device, ensure the safety of building during leveling;Monitoring, alarming The data that module is calculated according to data analysis module establish alarm model and carry out calculating analysis, when the result for calculating analysis surpasses Alarmed as defined in going out during limit value, alarm is supplied to the technical staff and custodian of correlation by modern means of communication in real time Member, so as to timely processing;Visualized management module is associated with system database, the raw monitored Information Number in system database According to, materials compilation data, information analysis data and prediction data can be transferred through visualized management module and pass on, Yong Hutong Cross visualized management module dynamic, intuitively know the safety profile of monitoring information and whole building thing;The building The operation principle of leveling safety monitoring system is:Hydraulic lifting device is to act on building foundation bottom by steel plate, allows basis Collar tie beam is evenly load by the active force of jacking device, and steel plate is identical with the width of building foundation ring girder, during leveling, Differential settlement between two hydraulic lifting devices is less than its distanceOnce exceeding limit value, then computer is alarmed;Basic bottom The deformation that the foundation ring girder sensed occurs is transmitted to computer with displacement and monitored in real time by portion's foil gauge, passes through data analysis Module realizes that building foundation bottom is subjected to displacement front and rear displacement difference and calculated, and is shown in the form of data and image, Operating personnel operate hydraulic lifting device according to Monitoring Data and realize that the leveling of building foundation bottom works, and will by camera Spirit level is shown by visualized management module is easy to staff to observe, it is ensured that building is on a horizontal plane, entirely System carries out monitored over time to leveling process automatically, according to existing code requirement, differential settlement between building adjacent pillars Limit value is 0.0015L, and when differential settlement reaches the 60% of control standard, monitoring, alarming module sends early warning, when uneven Monitoring, alarming module then automatic alarm, while various information are provided for Levelling operation when sedimentation value exceedes the 80% of control standard, Leveling personnel are assisted to correct leveling parameter and leveling scheme.
2. building leveling safety monitoring system according to claim 1, it is characterised in that the serial interface cable includes 5 core screens Cover cable, 7 core shielded cables and 8 core shielded cables;The Measurement Resolution of displacement transducer is less than 0.1mm, and zero point can not float Move.
CN201510354950.9A 2015-06-24 2015-06-24 Building leveling safety monitoring system Expired - Fee Related CN104950921B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510354950.9A CN104950921B (en) 2015-06-24 2015-06-24 Building leveling safety monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510354950.9A CN104950921B (en) 2015-06-24 2015-06-24 Building leveling safety monitoring system

Publications (2)

Publication Number Publication Date
CN104950921A CN104950921A (en) 2015-09-30
CN104950921B true CN104950921B (en) 2018-01-12

Family

ID=54165640

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510354950.9A Expired - Fee Related CN104950921B (en) 2015-06-24 2015-06-24 Building leveling safety monitoring system

Country Status (1)

Country Link
CN (1) CN104950921B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018071593A1 (en) 2016-10-12 2018-04-19 Vuyk Technology Holdings, LLC Method and apparatus for keeping foundations flat
CN107728499A (en) * 2017-11-18 2018-02-23 衡阳县海得利网络技术有限公司 Presetting system intelligent detection device and building member
US11280444B2 (en) * 2019-07-10 2022-03-22 Mantosh Isanchandra Bhattacharya Stiffening device for a base frame of rotating machines
CN112412098B (en) * 2020-10-28 2021-12-07 中国矿业大学(北京) Intelligent multi-foot hydraulic type supporting structure capable of resisting three-dimensional movement deformation
CN113466891B (en) * 2021-05-31 2024-05-28 中国南方电网有限责任公司超高压输电公司 Integral lifting construction process monitoring system and method based on image recognition technology
CN114119292B (en) * 2022-01-27 2022-04-26 天津风霖物联网科技有限公司 Building management system based on Internet of things and big data
CN117405024B (en) * 2023-10-25 2024-08-09 国网四川省电力公司电力科学研究院 Power equipment displacement detection restoration device and method based on visual recognition

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383620A (en) * 2010-09-03 2012-03-21 上海天演建筑物移位工程有限公司 Integral translation method of high-rise building and synchronous pushing control system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100807810B1 (en) * 2007-11-28 2008-02-27 주식회사고려이엔시 Structure lifting method by foundation strengthening
US8887451B2 (en) * 2013-03-18 2014-11-18 Gregory Enterprises, Inc. Pivoting bracket for foundation support system

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383620A (en) * 2010-09-03 2012-03-21 上海天演建筑物移位工程有限公司 Integral translation method of high-rise building and synchronous pushing control system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
上塘高架顶升纠偏监控过程研究;朱勐等;《山西建筑》;20091130;第35卷(第32期);全文 *
昆明阳光花园小区9#住宅楼顶升纠偏工程设计与施工实践;卢锐;《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》;20090615(第06期);论文第16-23、55-66页 *

Also Published As

Publication number Publication date
CN104950921A (en) 2015-09-30

Similar Documents

Publication Publication Date Title
CN104950921B (en) Building leveling safety monitoring system
CN102943459B (en) Remote smart monitoring and three-dimensional early warning method and system for deformation stability of deep foundation pit
CN104879169B (en) Underground engineering and the unattended real time monitoring early warning system of deep basal pit and its working method
CN108180885B (en) Automatic monitoring system and method for tunnel deformation
CN108050952B (en) Method for monitoring tunnel section deformation by using tunnel section deformation monitoring system
CN201811722U (en) Tunnel surrounding rock deformation monitoring and alarm device
CN201993108U (en) On-line intelligent monitoring system of tailing pond
CN110145369B (en) Ultra-shallow buried bias tunnel structure full-life monitoring and early warning method
CN101441802A (en) Safe monitoring early-warning system of ore tailings warehouse
CN202688979U (en) Integrated monitoring system for foundation pit under construction
CN102979071B (en) Remote intelligent monitoring and three-dimensional early warning method and system for stress stability of deep foundation pit
CN108280969A (en) A kind of high slope surface deformation monitoring and warning system and its method for early warning
CN203759859U (en) Deep foundation pit deformation wireless test device and deep foundation pit deformation test system
CN109655036B (en) Transformer substation subsides and pole stress monitoring system
CN106323223B (en) Highway cutting slope deformation monitoring and early warning system
CN110307036B (en) Variable cross-section tunnel structure full-life monitoring and early warning method
WO2019196771A1 (en) System and method for measuring deformation of foundation pit
CN116233191B (en) Intelligent foundation pit monitoring system
CN103061322B (en) Deep foundation ditch stability remote intelligent monitoring 3-dimensional digital comprehensive pre-warning method and system
CN110173305B (en) Method for monitoring and early warning whole service life of tunnel structure at fault
CN202969361U (en) Remote intelligent monitoring and three-dimensional pre-warning system for deformation stability of deep foundation pit
CN115637743A (en) Method for intelligently monitoring deformation during construction of deep and large foundation pit
CN103046525A (en) Facility and method for mechanical stability remote intelligent monitoring and three-dimensional early warning of deep foundation pit
CN203034434U (en) Remote intelligent monitoring three-dimensional digital comprehensive early warning system for stability of deep foundation pit
CN110984255A (en) Foundation pit support structure horizontal displacement monitoring and early warning system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180112

Termination date: 20210624