CN104947677B - Rapid cofferdam filling construction method for pit in pit - Google Patents

Rapid cofferdam filling construction method for pit in pit Download PDF

Info

Publication number
CN104947677B
CN104947677B CN201410121611.1A CN201410121611A CN104947677B CN 104947677 B CN104947677 B CN 104947677B CN 201410121611 A CN201410121611 A CN 201410121611A CN 104947677 B CN104947677 B CN 104947677B
Authority
CN
China
Prior art keywords
pit
cofferdam
hole
cofferdam device
cheated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410121611.1A
Other languages
Chinese (zh)
Other versions
CN104947677A (en
Inventor
杨前
王新
陶荣江
陈凯
张永峰
丁丽祯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201410121611.1A priority Critical patent/CN104947677B/en
Publication of CN104947677A publication Critical patent/CN104947677A/en
Application granted granted Critical
Publication of CN104947677B publication Critical patent/CN104947677B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)
  • Revetment (AREA)

Abstract

The invention relates to cofferdam filling construction, and discloses a rapid cofferdam filling construction method for a pit in a pit. The rapid cofferdam filling construction method includes the steps that a cofferdam device is manufactured; a frame is welded through reinforcements to be in the specification slightly larger than that of the pit in the pit; then a dense-mesh steel plate mesh and a connecting water collecting well are paved on the periphery of the frame, and a steel tube or a structural steel support is used inside the frame; the pit in the pit is excavated, wherein the pit in the pit is excavated at the place where the elevation needs to be adjusted; the cofferdam device is installed and adjusted, after excavation of the pit in the pit is finished, the cofferdam device is instantly placed into the excavated pit, and the cofferdam device is adjusted along with resetting of soil flow or drift sand; after adjustment is finished, concrete is poured on the periphery of the cofferdam device, a water pump is installed in the water collecting well for water pumping after the concrete solidifies, a water isolation mold, a pouring pad layer, the assembling reinforcements, a formwork and the pouring concert are paved to the bottom of the cofferdam device after the water level falls, and then construction can be completed. By means of the rapid cofferdam filling construction method, the containment effect is stable, and the overall schedule of construction of the pit in the pit is guaranteed; influences on the peripheral construction environment of the pit in the pit are avoided.

Description

Quick cofferdam filling construction method is cheated in hole
Technical field
The present invention relates to cofferdam filling construction, more particularly to hole Zhong Keng cofferdam filling construction method.
Background technology
With the development of China's building cause, engineering land used day is becoming tight, and has many construction lands to be in and soft region Or shoal area, it is when the region carries out all kinds of foundation pit constructions, it may appear that the different phenomenon of bottom of foundation ditch absolute altitude height, i.e., secondary to open Dig pit middle hole, excavation is cheated in this region is cheated can cause excavation slope stream soil and drift sand, and to foundation pit construction difficulty is brought.
The content of the invention
It is contemplated that overcoming the defect of prior art, there is provided cheat quick cofferdam filling construction method in one kind hole.This It is bright to go along with sb. to guard him effect stability, it is ensured that construction overall progress in hole in hole;Hole periphery construction environment in hole is avoided to be affected.
In order to solve above-mentioned technical problem, the present invention provides and quick cofferdam filling construction method is cheated in a kind of hole, and it includes:
Cofferdam device making step:The framework of specification is cheated in slightly larger than hole using reinforcement welding;Then in frame peripheral Close mesh expanded metal lath, connection sump are laid, lower portion uses steel pipe or type steel support;
Excavation step is cheated in hole:After cofferdam device is made, hole is excavated in being cheated where adjustment absolute altitude is needed, and is opened The size of digging is slightly larger than cofferdam device with depth;
Cofferdam device mounting and adjusting step, after hole excavation is finished in hole, immediately puts into cofferdam device in the hole of excavation, With stream soil or the reset adjustment cofferdam device of drift sand;
Concreting step:In cofferdam device periphery casting concrete after adjusting, the soil body and entirety for making periphery encloses Shield is stable, installs water pump in sump after concrete setting and is drawn water, and spreads in the bottom of cofferdam device after water level decreasing If water-separating film, pouring bed course, assembling reinforcement, formwork, casting concrete, you can the xoncrete structure for completing to be cheated in cheating inside is applied Work.
Quick cofferdam filling construction method is cheated in described hole, in the cofferdam device making step, the reinforcing bar is used Reinforcing bar residue waste material in engineering.
The present invention is welded into slightly larger than the framework that specification is cheated in hole, then outside framework using remaining reinforcing bar waste material in engineering Enclose and lay close mesh expanded metal lath, connection sump, lower portion cheats the size and depth of excavation using steel pipe or type steel support in hole Slightly larger than cofferdam device, after excavation, cofferdam device is put in the hole of excavation immediately, with the reset adjustment of stream soil or drift sand Cofferdam device, in peripheral casting concrete after adjusting, installs water pump and is drawn water after concrete setting in sump, treats water Lay water-separating film, pour bed course, assembling reinforcement, formwork, casting concrete in the bottom of cofferdam device after declining in position, you can complete The concrete structure construction of inside is cheated in hole.The principle of the invention is simple, is easy to operation;Cofferdam device integrally goes along with sb. to guard him effect stability; Construction overall progress in hole in hole can be ensured;Hole periphery construction environment in hole can be prevented to be affected.
Description of the drawings:
Below in conjunction with the accompanying drawings, invention is further described:
Fig. 1 is elevational schematic view of the present invention;
Fig. 2 is the top view of the present invention.
Specific embodiment
As shown in figure 1, cheating quick cofferdam filling construction method in a kind of hole, it includes:
The making step of cofferdam device 11:It is welded into slightly larger than the framework that specification is cheated in hole using reinforcing bar 1;Then outside framework Enclose and lay close mesh expanded metal lath 5, connection sump 6, lower portion uses steel pipe or type steel support 4;
Excavation step is cheated in hole:After cofferdam device is made, hole is excavated in being cheated where adjustment absolute altitude is needed, and is opened The size of digging is slightly larger than cofferdam device with depth;
Cofferdam device mounting and adjusting step, after hole excavation is finished in hole, immediately puts into cofferdam device in the hole of excavation, With stream soil or the reset adjustment cofferdam device of drift sand;
Concreting step:In cofferdam device periphery casting concrete 2 after adjusting, the soil body and entirety for making periphery encloses Shield is stable, installs water pump in sump after concrete setting and is drawn water, and spreads in the bottom of cofferdam device after water level decreasing If water-separating film 3, pouring bed course, assembling reinforcement, formwork, casting concrete, you can the xoncrete structure for completing to be cheated in cheating inside is applied Work.
Quick cofferdam filling construction method is cheated in described hole, in the cofferdam device making step, the reinforcing bar is used Reinforcing bar residue waste material in engineering.

Claims (2)

1. quick cofferdam filling construction method is cheated in a kind of hole, it is characterised in that it includes:
Cofferdam device making step:The framework of specification is cheated in slightly larger than hole using reinforcement welding;Then lay in frame peripheral Close mesh expanded metal lath, connection sump, lower portion uses steel pipe or type steel support;
Excavation step is cheated in hole:After cofferdam device is made, hole is excavated in being cheated where adjustment absolute altitude is needed, excavation Size is slightly larger than cofferdam device with depth;
Cofferdam device mounting and adjusting step, after hole excavation is finished in hole, immediately puts into cofferdam device in the hole of excavation, with The reset adjustment cofferdam device of stream soil or drift sand;
Concreting step:In cofferdam device periphery casting concrete after adjusting, the soil body and entirety for making periphery is gone along with sb. to guard him surely It is fixed, water pump is installed in sump after concrete setting and is drawn water, after water level decreasing cofferdam device bottom laying every Moisture film, pour bed course, assembling reinforcement, formwork, casting concrete, you can complete the concrete structure construction that inside is cheated in cheating.
2. quick cofferdam filling construction method is cheated in hole according to claim 1, it is characterised in that the cofferdam device system In making step, the reinforcing bar uses reinforcing bar residue waste material in engineering.
CN201410121611.1A 2014-03-28 2014-03-28 Rapid cofferdam filling construction method for pit in pit Active CN104947677B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410121611.1A CN104947677B (en) 2014-03-28 2014-03-28 Rapid cofferdam filling construction method for pit in pit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410121611.1A CN104947677B (en) 2014-03-28 2014-03-28 Rapid cofferdam filling construction method for pit in pit

Publications (2)

Publication Number Publication Date
CN104947677A CN104947677A (en) 2015-09-30
CN104947677B true CN104947677B (en) 2017-04-19

Family

ID=54162695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410121611.1A Active CN104947677B (en) 2014-03-28 2014-03-28 Rapid cofferdam filling construction method for pit in pit

Country Status (1)

Country Link
CN (1) CN104947677B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542157A (en) * 2016-06-28 2018-01-05 五冶集团上海有限公司 A kind of rapid shaping construction method of underground catch pit
CN107780418A (en) * 2016-08-29 2018-03-09 中国二十冶集团有限公司 The rapid constructing method cheated in Deep Foundation Pit
CN108343066B (en) * 2018-04-24 2023-11-17 中铁二局第一工程有限公司 Subway transfer station tie line pit in pit supporting structure and excavation method
CN112878332A (en) * 2020-10-11 2021-06-01 安徽中擎建设发展有限公司 Basement elevator shaft sump construction structure and method thereof
CN113202119A (en) * 2021-05-20 2021-08-03 中国水利水电第十一工程局有限公司 Combined cofferdam for strong-flow sand-ground layer gabion construction of linear river channel and construction method thereof
CN116180761A (en) * 2023-04-06 2023-05-30 中国十七冶集团有限公司 Method for excavating foundation pit of firefighting elevator of building basement in coastal area

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0220720A (en) * 1988-07-07 1990-01-24 Taisei Corp Underground construction method by muddy water excavation
CN100572686C (en) * 2008-03-13 2009-12-23 浙江中联建设集团有限公司 The construction technology of hole support system in the hole
CN101545260B (en) * 2008-03-27 2011-03-30 中国二十冶集团有限公司 Method for supporting bored filling pile driven by stirring pile in foundation pit, group pit and middle pit
CN102162250B (en) * 2010-02-24 2012-10-10 中国二十冶集团有限公司 Protective construction method of excavating large area deep foundation pit in running sand confined water soil layer
CN103015456B (en) * 2011-09-21 2015-05-06 五冶集团上海有限公司 Rapid pit-in-pit form erecting method in foundation slab of buried concrete structure

Also Published As

Publication number Publication date
CN104947677A (en) 2015-09-30

Similar Documents

Publication Publication Date Title
CN104947677B (en) Rapid cofferdam filling construction method for pit in pit
CN100476142C (en) Construction method for combined V-shape steel pipe concrete pile
CN205242419U (en) Steel sheet caisson of usefulness that secretly blocks water
CN105649197A (en) Post-pouring belt construction method conducted under green-landscape-first condition
CN108330764B (en) Shallow layer solidified pile bearing type embankment and construction method
CN112227502B (en) Drainage inspection well construction method
CN106759439A (en) For the tower crane and its construction method of foundation ditch
CN104213565A (en) Die supporting system for large deep pit steep slope surface cushion layer and supporting die casting construction method thereof
CN109235493A (en) Basement beam slab is backbreak and short formwork construction method in a kind of contrary sequence method
CN109372018A (en) Soft base Self-sinking type underground space structure construction and construction technology
CN107268650A (en) A kind of industrial swirling flow precipitates pool structure not drainage open caisson method
CN107964976A (en) Steel pipe-conversion steel platform tower crane top-down construction method
CN104652495B (en) Internal support of foundation pit column and base plate node waterproof construction technology
CN106988339B (en) Sandy gravel stratum piping lane construction technology
CN108824240A (en) A kind of pipe culvert construction method and auxiliary device
CN106567365B (en) Earth and rockfill dam longitudinal reinforcement construction method
CN207727603U (en) Big cushion cap deep basal pit formwork supporting system
KR101884663B1 (en) Construction method for soil retaining wall using cap slab
CN106120853B (en) A kind of inverted construction method of frame bridge
CN106436721B (en) The construction method of diaphram wall built-in type steel purlin plug system
CN109680722A (en) The construction method for setting external building access port is directly stayed on outer wall of basement body
CN211447000U (en) Foundation pit backfill area construction elevator foundation
CN103821149A (en) Large-scale deep foundation pit slope remaining soil digging and pit-in-pit concrete post casting construction method
CN108978697B (en) Terrace template system and construction method
CN205804405U (en) A kind of frame bridge structure of hysterology construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant