- CN104894936A CN104894936A CN201510162018.6A CN201510162018A CN104894936A CN 104894936 A CN104894936 A CN 104894936A CN 201510162018 A CN201510162018 A CN 201510162018A CN 104894936 A CN104894936 A CN 104894936A
- Authority
- CN
- China
- Prior art keywords
- grouting
- roadbed
- pile
- piles
- lateral
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The invention belongs to the field of road maintenance, and provides a lateral-piling soil-squeezing grouting method for repairing settling roadbeds, and a precast pile in accordance with the problem that local grouting leak is easy to occur in road repair in the prior art. The lateral-piling soil-squeezing grouting method comprises the following steps: making piles: precasting steel pipe piles or reinforced concrete piles with a grouting channel and holes; laterally tamping the precast piles: laterally tamping the precast piles in a roadbed under a settling road surface; grouting through pressure: grouting solid concrete in the precast piles by utilizing hydraulic pressure or air pressure. Each precast pile comprises a hollow pile body, wherein through holes communicated with the hollow structure in the pile body are formed in the pile body; the front end of the pile body is shaped like a cone. According to the method disclosed by the invention, the soil squeezing effect of horizontal lateral tamping and the grouting reinforcement are effectively combined; the roadbed fillers are squeezed compactly through the lateral tamping close to horizontal tamping, so that the roadbed is squeezed high in the vertical direction, and the settlement deformation is resolved; the pressure grouting channel and the holes are reserved in the precast piles, so that the grouting reinforcement is more convenient and effective.
Description
Technical field
The invention belongs to road upkeep field, particularly relate to a kind of side direction piling soil compaction slip casting sedimentation roadbed restorative procedure and preformed pile.
Background technology
Due to the effect of the factors such as filler is uneven, filler is bad, filling compaction is insufficient, water content is too high, earthquake, Construction Vibration, vehicular load, penetration, deadweight, there is the Common Diseases that sedimentation and deformation is road foundation in road foundation.Subgrade settlement must cause the destruction of railroad track and highway pavement, endangers safe traffic.Therefore, the settlement issues of effective Subgrade, has realistic meaning for guarantee traffic safety.And the method for existing reparation roadbed is generally directly fill up sunk area at road surface depression place, this restorative procedure road surface running vehicle when reparation need detour, comparatively inconvenience, and repairing area needs must not drive a vehicle in certain hour, very inconvenient.At present, Some Domestic scholar has carried out research Roadbed Soil being improved to the aspects such as its intensity by grouting, although there is certain effect, because the degree of compaction of Roadbed Soil body is once more than 80%, grouting is just difficult to effectively carry out, and easily forms local and leaks irrigated area.
Summary of the invention
The object of the invention is to repair for existing road easily to form local and leak and fill with and a kind of side direction piling soil compaction slip casting sedimentation roadbed restorative procedure of providing and preformed pile.
The present invention is achieved by the following technical solution:
A kind of side direction piling soil compaction slip casting sedimentation roadbed restorative procedure, comprises the steps,
Step one, stake processed, the steel pipe pile of prefabricated band slip casting passage and hole or reinforced concrete pile;
Step 2, side direction is driven piles, and in the below roadbed having sedimentation road surface, preformed pile is squeezed in side;
Step 3, slip casing by pressure, utilizes hydraulic pressure or air pressure that the slurries that can solidify are injected preformed pile, by preformed pile, slurries is injected roadbed filling deck equably.
The preformed pile squeezed into described in step 2 is at least one.
A kind of preformed pile, comprises the body of hollow structure, body has the through hole be connected with the hollow structure in body.The leading section of body is pyramidal structure.
Beneficial effect of the present invention: horizontal side effectively combines to the soil compaction effect of driving piles and grouting and reinforcing by the present invention.By the compacted roadbed filling of piling of the nearly horizontal direction of side direction, roadbed in the vertical direction is squeezed high, recover sedimentation and deformation.By pre-reservation pressure grouting channel and hole in preformed pile, make grouting and reinforcing more convenient and effective.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Fig. 2 is the structural representation of longitudinal profile of the present invention.
Fig. 3 is the structural representation of horizontal section of the present invention.
Fig. 4 is the structural representation of preformed pile of the present invention.
Detailed description of the invention
Below in conjunction with embodiment, the invention will be further described.
Embodiment
As Figure 1-Figure 4, a kind of side direction piling soil compaction slip casting sedimentation roadbed restorative procedure, comprises the steps,
Step one, stake processed, the steel pipe pile of prefabricated band slip casting passage and hole or reinforced concrete pile;
Step 2, side direction is driven piles, and in the below roadbed having sedimentation road surface 2, preformed pile 1 is squeezed in side;
Step 3, slip casing by pressure, utilizes hydraulic pressure or air pressure that the slurries that can solidify are injected preformed pile 1, by preformed pile 1, slurries is injected roadbed filling deck equably.
The preformed pile squeezed into described in step 2 is at least one.
A kind of preformed pile, comprises the body of hollow structure, body has the through hole 11 be connected with the hollow structure in body.The leading section of body is pyramidal structure.
The present invention squeezes into the preformed pile close to horizontal direction by roadbed side, compacted roadbed filling, reduces space or hole that in roadbed, air and moisture content occupy, improves the compaction rate of roadbed.Preformed pile is squeezed in side direction horizontal direction, can squeeze elevated formation level filler at vertical direction, reaches the object recovering subgrade settlement, the design elevation before making road foundation height mark reach sedimentation.By grouting pipe reserved in preformed pile and hole, for pressure grouting provides passage.The effect of comprehensive side direction piling soil compaction effect and slip casing by pressure, realizes the reparation of sedimentation subgrade strength and distortion, ensures subgrade stability.
More than show and describe general principle of the present invention, principal character and advantage of the present invention.The technician of the industry should understand; the present invention is not restricted to the described embodiments; what describe in above-described embodiment and manual just illustrates principle of the present invention; without departing from the spirit and scope of the present invention, those ordinary skill in the art simple change and replace be all within protection scope of the present invention.
Claims (4)
1. side direction piling soil compaction slip casting sedimentation roadbed restorative procedure and a preformed pile, is characterized in that: comprise the steps,
Step one, stake processed, the steel pipe pile of prefabricated band slip casting passage and hole or reinforced concrete pile;
Step 2, side direction is driven piles, and in the below roadbed having sedimentation road surface, preformed pile is squeezed in side;
Step 3, slip casing by pressure, utilizes hydraulic pressure or air pressure that the slurries that can solidify are injected preformed pile, by preformed pile, slurries is injected roadbed filling deck equably.
2. a kind of side direction piling soil compaction slip casting sedimentation roadbed restorative procedure according to claim 1, is characterized in that: the preformed pile squeezed into described in step 2 is at least one.
3. a preformed pile, is characterized in that: the body comprising hollow structure, and body has the through hole be connected with the hollow structure in body.
4. a kind of preformed pile according to claim 3, is characterized in that: the leading section of body is pyramidal structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510162018.6A CN104894936A (en) | 2015-04-07 | 2015-04-07 | Lateral-piling soil-squeezing grouting method for repairing settling roadbeds, and precast pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510162018.6A CN104894936A (en) | 2015-04-07 | 2015-04-07 | Lateral-piling soil-squeezing grouting method for repairing settling roadbeds, and precast pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104894936A true CN104894936A (en) | 2015-09-09 |
Family
ID=54027866
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510162018.6A Pending CN104894936A (en) | 2015-04-07 | 2015-04-07 | Lateral-piling soil-squeezing grouting method for repairing settling roadbeds, and precast pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104894936A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106012869A (en) * | 2016-05-27 | 2016-10-12 | 青岛林川工程技术咨询有限公司 | Mechanical device for injecting slurry to bottom of approach slab from side face of roadbed |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1032968A (en) * | 1987-11-06 | 1989-05-17 | 张俊生 | The plum blossom stud improves the earth bearing strength device on basis |
CN2540445Y (en) * | 2002-04-25 | 2003-03-19 | 李毓锦 | Reinforced concrete prefibricated pile |
CN101654899A (en) * | 2009-09-17 | 2010-02-24 | 西南交通大学 | Liquified soil foundation-bed shock-resistant strengthening structure of high-speed railway |
CN102352582A (en) * | 2011-08-15 | 2012-02-15 | 铁道第三勘察设计院集团有限公司 | Reinforced soil-cement pile strengthening structure of railway roadbed |
CN102535452A (en) * | 2010-12-15 | 2012-07-04 | 王云艇 | Novel engineering pile |
CN102587372A (en) * | 2012-02-27 | 2012-07-18 | 侯隆飙 | Construction method for burying pile by under reaming and grouting |
CN103174074A (en) * | 2013-03-22 | 2013-06-26 | 浙江鸿安建设有限公司 | Sedimentation control structure of passable road highway roadbed and construction method |
-
2015
- 2015-04-07 CN CN201510162018.6A patent/CN104894936A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1032968A (en) * | 1987-11-06 | 1989-05-17 | 张俊生 | The plum blossom stud improves the earth bearing strength device on basis |
CN2540445Y (en) * | 2002-04-25 | 2003-03-19 | 李毓锦 | Reinforced concrete prefibricated pile |
CN101654899A (en) * | 2009-09-17 | 2010-02-24 | 西南交通大学 | Liquified soil foundation-bed shock-resistant strengthening structure of high-speed railway |
CN102535452A (en) * | 2010-12-15 | 2012-07-04 | 王云艇 | Novel engineering pile |
CN102352582A (en) * | 2011-08-15 | 2012-02-15 | 铁道第三勘察设计院集团有限公司 | Reinforced soil-cement pile strengthening structure of railway roadbed |
CN102587372A (en) * | 2012-02-27 | 2012-07-18 | 侯隆飙 | Construction method for burying pile by under reaming and grouting |
CN103174074A (en) * | 2013-03-22 | 2013-06-26 | 浙江鸿安建设有限公司 | Sedimentation control structure of passable road highway roadbed and construction method |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106012869A (en) * | 2016-05-27 | 2016-10-12 | 青岛林川工程技术咨询有限公司 | Mechanical device for injecting slurry to bottom of approach slab from side face of roadbed |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103334357B (en) | Viaduct road embankment structure with lower pile foundation bearing platform extending in roadbed, and construction method | |
CN203174453U (en) | Light-mass embankment structure for managing bump at bridge head | |
CN104195911B (en) | The one section Widening Embankment structure of suspended wall height barricade embankment near water and construction method | |
CN102359046A (en) | High fill subgrade connection method | |
CN106320121B (en) | A kind of roadbed repairs structure and method | |
CN204940030U (en) | Reconstruction and extension project new-old concrete bond Pavement mosaic structure | |
CN106835880A (en) | Highway lateral support type peg board formula is without earth roadbed | |
CN103711053A (en) | Composite reinforced roadbed and construction method | |
CN103046446A (en) | Treatment structure at joint part of reconstruction and extension project of highway | |
CN104358196B (en) | Highway open to traffic Embankment Subsidence disposes the construction method of structure | |
CN102061694A (en) | Construction method for treating foundation through filling by adopting draining pile tubes | |
CN103790151B (en) | Plugging structure and construction method after a kind of soft soil roadbed draining precompressed | |
CN103334371B (en) | Roadbed subsidence grouting treatment structure and construction method thereof | |
CN210238174U (en) | Old way transformation deep disease combined type micro pile reinforced structure | |
CN203334154U (en) | Embankment structure for preventing bearing platform of pile foundation from stretching in roadbed under viaduct | |
CN210194361U (en) | Splicing structure for widening new and old roadbeds on road | |
CN105926391A (en) | Method for widening shoulder of existing railway subgrade | |
CN204551161U (en) | A kind of roadbed repair structure | |
CN207775645U (en) | A kind of highway soft soil widening of subgrade ruggedized construction | |
CN205776266U (en) | Prestressing combination method High Slope on Expressway supporting construction | |
CN104894936A (en) | Lateral-piling soil-squeezing grouting method for repairing settling roadbeds, and precast pile | |
CN104047237A (en) | Pavement restoration method | |
CN104047213A (en) | Pavement repairing method capable of resolving settlement velocity difference between hard soil and soft soil | |
CN209603113U (en) | A kind of undercrossing tunnel frame bridge foundation-reinforcing device and constructing device | |
CN105926421B (en) | A kind of bumping at bridge-head reparation and prevention method based on load decrement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150909 |
|
WD01 | Invention patent application deemed withdrawn after publication |