CN104842079B - Cable bus opening heating collar and its application in the welding of cable bus copper pipe - Google Patents
Cable bus opening heating collar and its application in the welding of cable bus copper pipe Download PDFInfo
- Publication number
- CN104842079B CN104842079B CN201410056359.0A CN201410056359A CN104842079B CN 104842079 B CN104842079 B CN 104842079B CN 201410056359 A CN201410056359 A CN 201410056359A CN 104842079 B CN104842079 B CN 104842079B
- Authority
- CN
- China
- Prior art keywords
- copper
- copper pipe
- welding
- heating collar
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K31/00—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
- B23K31/02—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
- B23K31/027—Making tubes with soldering or welding
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
- B23K37/0426—Fixtures for other work
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K2103/00—Materials to be soldered, welded or cut
- B23K2103/08—Non-ferrous metals or alloys
- B23K2103/12—Copper or alloys thereof
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Branch Pipes, Bends, And The Like (AREA)
Abstract
A kind of application the invention discloses cable bus opening heating collar and its in the welding of cable bus copper pipe, cable bus opening heating collar, including left heating collar and right heating collar, wherein the down cycles frozen water pipe that left heating collar and right heating collar include copper tube, be connected with copper tube;Copper tube is set to semicircle, and contiguous block is provided with the port of copper tube;Contiguous block is provided with connecting hole.The present invention does conductor using φ 120x φ 80mmT3 copper pipes, and firing rate is fast, straight-through, threeway, elbow, heating can be welded, realize that high-altitude is heated to copper pipe, reach institute's welding temperature, so as to complete copper pipe in high aerial weld job.
Description
Technical field
The present invention relates to the welding technique of big workpiece copper and copper, specially a kind of cable bus opening heating for being used to power
Circle and its application in the welding of cable bus copper pipe.
Background technology
In conventional brazing connects, copper has excellent electric conductivity, thermal conductivity, corrosion resistance, ductility and certain intensity
Etc. characteristic.It is used widely in electric, electronics, chemical industry, food, power, traffic and aerospace industry.In fine copper(It is purple
Copper)Alloying element is planted in middle addition more than 10, all kinds of copper alloys of solid solution is formed, if zincification is brass;It is copper-nickel alloy to add nickel;The silicon is added to be
Silicon bronze;Add aluminium for aluminium bronze etc..
Copper and copper alloy can use the processes such as soldering, electric resistance welding to realize connection, account for today, melting welding in industry prosperity
According to leading position.The welding of copper and copper alloy is easily realized with processes such as SMAW, TIG welderings, MIG welderings.
1st, the method for welding red copper has the methods of gas welding, manual carbon arc welding, manual electric arc welding and manual argon arc welding, large-scale knot
Structure can also use automatic welding:
(1)The gas weld joint red copper of red copper is most commonly used that banjo fixing butt jointing, lap joint and T-joint few use as far as possible.
Gas welding can use two kinds of welding wires, and a kind of is the welding wire containing deoxidant element, such as silk 201,202;Another kind is in general copper wire
With the slitting of mother metal, fluxing agent is made using gas agent 301.Neutral flame should be used during gas welding red copper.
(2)The manual electric arc welding edge of red copper, when weldment thickness is more than 4 millimeters, it must be preheated before weldering, preheating temperature typically exists
400~500 DEG C or so.Welded with the welding rod of copper 107, power supply should use DC reverse connection.Short arc should be used during welding, welding rod should not be made
Horizontal swing.Welding rod makees reciprocal linear motion, can improve the shaping of weld seam.Long weld seam should use backstep welding.Welding
Speed should be as far as possible quicker.During multilayer welding, it is necessary to thoroughly remove the slag of interlayer.
Welding should be carried out in draughty place, to prevent copper poisoning phenomenon.Postwelding application butt hammer taps weld seam, disappears
De-stress and improvement weldquality.
(3)For the manual argon arc welding of red copper in red copper manual argon arc welding, the welding wire of use has silk 201 (special red copper welding wire)
With silk 202, also using copper wire, such as T2.The foul such as the oxide-film of reply workpiece welding edge and welding wire surface, oil all must before weldering
It must clean out, the defects of avoiding producing stomata, slag inclusion.The method of cleaning has mechanical method of cleaning and soak cleaning method.Docking connects
When head plate thickness is less than 3 millimeters, square groove;When thickness of slab is 3~10 millimeters, double V-groove is opened, bevel angle is 60~70º
When thickness of slab is more than 10 millimeters, X-type groove is opened, bevel angle is 60~70ºIt is lack of penetration to avoid, root face is not stayed typically.Root
According to thickness of slab and groove size, the fit-up gap of banjo fixing butt jointing is chosen in the range of 0.5~1.5 millimeter.Red copper manual argon arc welding, lead to
It is often to use straight polarity direct current, i.e. tungsten electrode connects negative pole.In order to eliminate stomata, ensure the root of weld reliably fusion and through welding, it is necessary to
Speed of welding is improved, reduces argon gas consumption, and preheat weldment.When thickness of slab is less than 3 millimeters, preheating temperature is 150~300 DEG C;
When thickness of slab is more than 3 millimeters, preheating temperature is 350~500 DEG C.Preheating temperature is unsuitable too high, otherwise makes the mechanicalness of welding point
It can reduce.The also carbon arc welding of red copper, the electrode that carbon arc welding uses have carbon electrode and graphite electrode.Used in red copper carbon arc welding
Welding wire is as during gas welding, it is also possible to which mother metal cuts bar, can use the fluxing agent of gas welding red copper, such as gas agent 301.
(4)Ratio-frequency welding is called high-frequency induction heating, and ratio-frequency welding is to flow through metal connection using 10~500KHz high frequency electrics
Face produces resistance heat and applied(Or do not apply)Pressure reaches a kind of welding method of metal combination.It is characterized in:Speed of welding
Greatly, welding heat affected zone is small, and welding can not clear up workpiece, solderable light-wall pipe, solderable metal pipe, and very magnetic conductive metal is welded
It is relatively good, copper not magnetic conduction.
(5) soldering high temperature furnace welds:Small workpiece can only be welded, it is impossible to mobile welding.
Summary method:Above-mentioned welding method reaches institute's welding temperature, institute due to can not be heated in high-altitude to copper pipe
So that φ 120x φ 80mmT3 copper pipes can not be welded.
The content of the invention
Technical problem solved by the invention is to provide a kind of cable bus opening heating collar and its in cable bus copper pipe
Application in welding, to solve the problems mentioned in the above background technology.
The present invention provides following technical scheme:
Cable bus opening heating collar, including left heating collar and right heating collar, wherein left heating collar and right heating collar wrap
Copper tube is included, the down cycles frozen water pipe being connected with copper tube;The copper tube is set to semicircle, is provided with the port of copper tube
Contiguous block;The contiguous block is provided with connecting hole.
Application of the cable bus opening heating collar in the welding of cable bus copper pipe, is included in straight mouth welding, and vertical tube is curved
Head welding, three-way welding and parallel welding copper bus.
The straight mouth welding, comprises the following steps:
1) lift, the position that lifting steel pipes are welded to needs;
2) groove is beaten, the counterpart of copper pipe is ensured in the same plane;
3) stainless steel tube is inserted in steel pipe, it is ensured that the internal diameter of the stainless steel tube of insertion aligns with internal diameter of copper pipe, mouth and mouth
Between gap one to;
4) stainless steel tube is exited into 40mm to good mouth, applies silver paste;
5) counterpart again, it is ensured that counterpart parallel clearance is 5~10mm, and the time is 3~4 hours;
6) heating collar is installed, is balanced and clamped with fixture;
7) ice water circulation water pipe is installed, ensures that recirculated water water flowing is unimpeded, pressure 3.5kg/cm2;
8) starting device, voltage are adjusted to 450V, electric current 150A;
9) when φ 120x φ 80mmT3 copper pipes welding position is heated to 730 DEG C, 20 seconds are incubated, turns off equipment, recirculated water after
Working condition is held in continuation of insurance;
10) when temperature is down to 390-410 DEG C, fixture of dismantling, the straight mouth welding of copper pipe is completed.
Preferably, the vertical tube elbow welding, comprises the following steps:
1) lift, the position that lifting steel pipes are welded to needs;
2) groove is beaten, the counterpart of copper pipe is ensured in the same plane;
3) stainless steel tube is inserted in steel pipe, it is ensured that the internal diameter of the stainless steel tube of insertion aligns with internal diameter of copper pipe, mouth and mouth
Between gap one to;
4) stainless steel tube is exited into 40mm to good mouth, applies silver paste;
5) counterpart again, it is ensured that counterpart parallel clearance is 5~10mm, and the time is 6~7 hours
6) heating collar is installed, is balanced and clamped with fixture;
7) ice water circulation water pipe is installed, ensures that recirculated water water flowing is unimpeded, pressure 3.5kg/cm2;
8) starting device, voltage are adjusted to 450V, electric current 150A;
9) when copper pipe welding position is heated to 730 DEG C, equipment is turned off in insulation 20 seconds, and recirculated water continues to keep working condition;
10) when temperature is down to 390-410 DEG C, fixture of dismantling, the straight mouth welding of copper pipe is completed.
Preferably, the three-way welding, comprises the following steps:
1) lift, the position that lifting steel pipes are welded to needs;
2) groove is beaten, the counterpart of copper pipe is ensured in the same plane;
3) stainless steel tube is inserted in steel pipe, it is ensured that the internal diameter of the stainless steel tube of insertion aligns with internal diameter of copper pipe, mouth and mouth
Between gap one to;
4) stainless steel tube is exited into 40mm to good mouth, applies silver paste;
5) counterpart again, it is ensured that counterpart parallel clearance is 5~10mm, and the time is 3~4 hours;
6) heating collar is installed, is balanced and clamped with fixture;
7) ice water circulation water pipe is installed, ensures that recirculated water water flowing is unimpeded, pressure 3.5kg/cm2;
8) starting device, voltage are adjusted to 450V, electric current 150A;
9) when φ 120x φ 80mmT3 copper pipes welding position is heated to 730 DEG C, 20 seconds are incubated, turns off equipment, recirculated water after
Working condition is held in continuation of insurance;
10) when temperature is down to 390-410 DEG C, fixture of dismantling, the straight mouth welding of copper pipe is completed.
Preferably, the parallel welding copper bus, comprises the following steps:
1) lift, the position that lifting steel pipes are welded to needs;
2) copper pipe washing trough, the counterpart of copper pipe is made to ensure in the same plane;
3) copper bar is put into copper pipe groove, silver paste is coated in groove, it is ensured that steel arranges the gap one between copper pipe notch and mouth
Extremely;
4) installation is by two broken rings, the heating collar of a copper bar circle composition, and is balanced and clamped with fixture;
5) ice water circulation water pipe is installed, ensures that recirculated water water flowing is unimpeded, pressure 3.5kg/cm2;
6) starting device, voltage are adjusted to 450V, electric current 150A;
7) when φ 120x φ 80mmT3 copper pipes welding position is heated to 730 DEG C, weld bond both sides are welded with 60% silver solder
Connect, be incubated 10 minutes, turn off equipment, recirculated water continues to keep working condition;
8) when temperature is down to 390-410 DEG C, fixture of dismantling, the straight mouth welding of copper pipe is completed.
In summary, beneficial effect of the present invention:
The present invention using φ 120x φ 80mmT3 copper pipes does conductor, and firing rate is fast, can to straight-through, threeway, elbow, add
Thermal weld, realize that high-altitude is heated to copper pipe, reach institute's welding temperature, so as to complete copper pipe in high aerial weld job.
Brief description of the drawings
Fig. 1 is schematic structural view of the invention.
Embodiment
Below in conjunction with the embodiment of the present invention, the technical scheme in the embodiment of the present invention is clearly and completely described,
Obviously, described embodiment is only part of the embodiment of the present invention, rather than whole embodiments.Based on the reality in the present invention
Example is applied, the every other embodiment that those of ordinary skill in the art are obtained under the premise of creative work is not made, is all belonged to
In the scope of protection of the invention.
Cable bus opening heating collar provided by the invention, as shown in figure 1, including left heating collar and right heating collar, wherein
The down cycles frozen water pipe 2 that left heating collar and right heating collar include copper tube 1, be connected with copper tube 1;Copper tube 1 is set to half
Circle, contiguous block 3 is provided with the port of copper tube 1;Contiguous block 3 is provided with connecting hole.
Application of the cable bus opening heating collar in the welding of cable bus copper pipe, is included in straight mouth welding, and vertical tube is curved
Head welding, three-way welding and parallel welding copper bus.
Straight mouth welding, comprises the following steps:
1) lift, the position that lifting steel pipes are welded to needs is heavier because every copper pipe has 400Kg, is lifting
When, take care;
2) groove is beaten, the counterpart of copper pipe is ensured in the same plane;
3) in steel pipe insert specification be φ 80x100x3mm stainless steel tube, it is ensured that the internal diameter of the stainless steel tube of insertion with
Specification be φ 120x φ 80mmT3 internal diameter of copper pipe alignment, between mouth and mouth keep gap one to;
4) stainless steel tube is exited into 40mm to good mouth, applies silver paste;
5) counterpart again, it is ensured that counterpart parallel clearance is 5~10mm, and the time is 3~4 hours;
6) heating collar is installed, is balanced and clamped with fixture;
7) ice water circulation water pipe is installed, ensures that recirculated water water flowing is unimpeded, pressure 3.5kg/cm2;
8) starting device, voltage are adjusted to 450V, electric current 150A;
9) when φ 120x φ 80mmT3 copper pipes welding position is heated to 730 DEG C,(Heat time is 15 minutes)Insulation 20 seconds,
Turn off equipment, recirculated water continues to keep working condition;
10) when temperature is down to 390-410 DEG C, fixture of dismantling, the straight mouth welding of φ 120x φ 80mmT3 copper pipes is completed.
Vertical tube elbow welding, comprises the following steps:
1) lift, the position that lifting steel pipes are welded to needs is heavier because every copper pipe has 400Kg, is lifting
When, take care;
2) groove is beaten, the counterpart of copper pipe is ensured in the same plane;
3) in steel pipe insert specification be φ 80x100x3mm stainless steel tube, it is ensured that the internal diameter of the stainless steel tube of insertion with
Specification be φ 120x φ 80mmT3 internal diameter of copper pipe alignment, between mouth and mouth keep gap one to;
4) stainless steel tube is exited into 40mm to good mouth, applies silver paste;
5) counterpart again, it is ensured that counterpart parallel clearance is 5~10mm, and the time is 6~7 hours
6) heating collar is installed, is balanced and clamped with fixture;
7) ice water circulation water pipe is installed, ensures that recirculated water water flowing is unimpeded, pressure 3.5kg/cm2;
8) starting device, voltage are adjusted to 450V, electric current 150A;
9) when φ 120x φ 80mmT3 copper pipes welding position is heated to 730 DEG C,(Heat time is about 15 minutes)Insulation
20 seconds, turn off equipment, recirculated water continues to keep working condition;
10) when temperature is down to 390-410 DEG C, fixture of dismantling, the straight mouth welding of φ 120x φ 80mmT3 copper pipes is completed.
Three-way welding, comprise the following steps:
1) lift, the position that lifting steel pipes are welded to needs is heavier because every copper pipe has 400Kg, is lifting
When, take care;
2) groove is beaten, the counterpart of copper pipe is ensured in the same plane;
3) in steel pipe insert specification be φ 80x100x3mm stainless steel tube, it is ensured that the internal diameter of the stainless steel tube of insertion with
Specification be φ 120x φ 80mmT3 internal diameter of copper pipe alignment, between mouth and mouth keep gap one to;
4) stainless steel tube is exited into 40mm to good mouth, applies silver paste;
5) counterpart again, it is ensured that counterpart parallel clearance is 5~10mm, and the time is 3~4 hours;
6) heating collar is installed, is balanced and clamped with fixture;
7) ice water circulation water pipe is installed, ensures that recirculated water water flowing is unimpeded, pressure 3.5kg/cm2;
8) starting device, voltage are adjusted to 450V, electric current 150A;
9) when φ 120x φ 80mmT3 copper pipes welding position is heated to 730 DEG C,(Heat time is about 15 minutes)Insulation
20 seconds, turn off equipment, recirculated water continues to keep working condition;
10) when temperature is down to 390-410 DEG C, fixture of dismantling, the straight mouth welding of φ 120x φ 80mmT3 copper pipes is completed.
Parallel welding copper bus, comprises the following steps:
1) lift, the position that lifting steel pipes are welded to needs is heavier because every copper pipe has 400Kg, is lifting
When, take care;
2) copper pipe washing trough, the counterpart of copper pipe is made to ensure in the same plane;
3) copper bar is put into φ 120x φ 80mmT3 copper pipe grooves, silver paste is coated in groove, it is ensured that steel is arranged and φ 120x φ
Between 80mmT3 copper pipes notch and mouth gap one to;
4) installation is by two broken rings, the heating collar of a copper bar circle composition, and is balanced and clamped with fixture;
5) ice water circulation water pipe is installed, ensures that recirculated water water flowing is unimpeded, pressure 3.5kg/cm2;
6) starting device, voltage are adjusted to 450V, electric current 150A;
7) when φ 120x φ 80mmT3 copper pipes welding position is heated to 730 DEG C, weld bond both sides are welded with 60% silver solder
Connect, be incubated 10 minutes, turn off equipment, recirculated water continues to keep working condition;
8) when temperature is down to 390-410 DEG C, fixture of dismantling, the straight mouth welding of φ 120x φ 80mmT3 copper pipes is completed.
The present invention using φ 120x φ 80mmT3 copper pipes does conductor, and firing rate is fast, can to straight-through, threeway, elbow, add
Thermal weld, realize that high-altitude is heated to copper pipe, reach institute's welding temperature, so as to complete copper pipe in high aerial weld job.
It is obvious to a person skilled in the art that the invention is not restricted to the details of above-mentioned one exemplary embodiment, Er Qie
In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, embodiment all should be regarded as exemplary, and be nonrestrictive, the scope of the present invention is by appended power
Profit requires rather than described above limits, it is intended that all in the implication and scope of the equivalency of claim by falling
Change is included in the present invention.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped
Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity
Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
It is appreciated that other embodiment.
Claims (4)
1. application of the cable bus opening electric heating coil in the welding of cable bus copper pipe, it is characterized in that, the heating of cable bus opening
Circle, including left heating collar and right heating collar, wherein left heating collar and right heating collar include copper tube, the drop being connected with copper tube
Temperature circulation frozen water pipe;The copper tube is set to semicircle, and contiguous block is provided with the port of copper tube:The contiguous block, which is provided with, to be connected
Connect hole;The straight mouth welding of copper pipe, comprises the following steps:
1) lift, copper pipe is lifted into the position for needing to weld;
2) groove is beaten, the counterpart of copper pipe is ensured in the same plane;
3) stainless steel tube is inserted in copper pipe, it is ensured that the internal diameter of the stainless steel tube of insertion aligns with internal diameter of copper pipe, between mouth and mouth
Gap is consistent;
4) stainless steel tube is exited into 40mm to good mouth, applies silver paste;
5) counterpart again, it is ensured that counterpart parallel clearance is 5-10mm, and the time is 3-4 hours;
6) heating collar is installed, is balanced and clamped with fixture;
7) ice water circulation water pipe is installed, ensures that recirculated water water flowing is unimpeded, pressure 3.5kg/cm2;
8) starting device, voltage are adjusted to 450V, electric current 150A;
9) when copper pipe welding position is heated to 730 DEG C, equipment is turned off in insulation 20 seconds, and recirculated water continues to keep working condition;
10) when temperature is down to 390-410 DEG C, fixture of dismantling, the straight mouth welding of copper pipe is completed.
2. application of the cable bus opening electric heating coil in the welding of cable bus copper pipe, it is characterized in that, the heating of cable bus opening
Circle, including left heating collar and right heating collar, wherein left heating collar and right heating collar include copper tube, the drop being connected with copper tube
Temperature circulation frozen water pipe;The copper tube is set to semicircle, and contiguous block is provided with the port of copper tube:The contiguous block, which is provided with, to be connected
Connect hole;Copper pipe vertical tube elbow welding, comprises the following steps:
1) lift, copper pipe is lifted into the position for needing to weld;
2) groove is beaten, the counterpart of copper pipe is ensured in the same plane;
3) stainless steel tube is inserted in copper pipe, it is ensured that the internal diameter of the stainless steel tube of insertion aligns with internal diameter of copper pipe, between mouth and mouth
Gap is consistent;
4) stainless steel tube is exited into 40mm to good mouth, applies silver paste;
5) counterpart again, it is ensured that counterpart parallel clearance is 5-10mm, and the time is 6-7 hours;
6) heating collar is installed, is balanced and clamped with fixture;
7) water circulation water pipe is frozen in installation, ensures that recirculated water water flowing is unimpeded, pressure 3.5kg/cm2;
8) starting device, voltage are adjusted to 450V, electric current 150A;
9) when φ 120x φ 80rmm T3 copper pipes welding position is heated to 730 DEG C, equipment is turned off in insulation 20 seconds, and recirculated water continues
Keep working condition;
10) when temperature is down to 390-410 DEG C, fixture of dismantling, copper pipe vertical tube elbow welding is completed.
3. application of the cable bus opening electric heating coil in the welding of cable bus copper pipe, it is characterized in that, the heating of cable bus opening
Circle, including left heating collar and right heating collar, wherein left heating collar and right heating collar include copper tube, the drop being connected with copper tube
Temperature circulation frozen water pipe;The copper tube is set to semicircle, and contiguous block is provided with the port of copper tube:The contiguous block, which is provided with, to be connected
Connect hole;Copper pipe three-way welding, comprises the following steps:
1) lift, copper pipe is lifted into the position for needing to weld;
2) groove is beaten, the counterpart of copper pipe is ensured in the same plane;
3) stainless steel tube is inserted in copper pipe, it is ensured that the internal diameter of the stainless steel tube of insertion aligns with internal diameter of copper pipe, between mouth and mouth
Gap is consistent;
4) stainless steel tube is exited into 40mm to good mouth, applies silver paste;
5) counterpart again, it is ensured that counterpart parallel clearance is 5-10mm, and the time is 3-4 hours;
6) heating collar is installed, is balanced and clamped with fixture;
7) water circulation water pipe is frozen in installation, ensures that recirculated water water flowing is unimpeded, pressure 3.5kg/cm2;
8) starting device, voltage are adjusted to 450V, electric current 150A;
9) when φ 120x φ 80mm T3 copper pipes welding position is heated to 730 DEG C, 20 seconds is incubated, turns off equipment, recirculated water continues to protect
Hold working condition;
10) when temperature is down to 390-410 DEG C, fixture of dismantling, φ 120x φ 80mm T3 copper pipe three-way weldings are completed.
4. application of the cable bus opening electric heating coil in the welding of cable bus copper pipe, it is characterized in that, the heating of cable bus opening
Circle, including left heating collar and right heating collar, wherein left heating collar and right heating collar include copper tube, the drop being connected with copper tube
Temperature circulation frozen water pipe;The copper tube is set to semicircle, and contiguous block is provided with the port of copper tube:The contiguous block, which is provided with, to be connected
Connect hole;The parallel welding copper bus of copper pipe, comprises the following steps:
1) lift, the position that lifting steel pipes are welded to needs;
2) copper pipe washing trough, the counterpart of copper pipe is made to ensure in the same plane;
3) copper bar is put into copper pipe groove, silver paste is coated in groove, it is ensured that steel row is consistent with gap between copper pipe notch and mouth;
4) installation is by two broken rings, the heating collar of a copper bar circle composition, and is balanced and clamped with fixture;
5) ice water circulation water pipe is installed, ensures that recirculated water water flowing is unimpeded, pressure 3.5kg/cm2;
6) starting device, voltage are adjusted to 450V, electric current 150A;
7) when copper pipe welding position is heated to 730 DEG C, weld bond both sides are welded with 60% silver solder, are incubated 10 minutes, are turned off
Equipment, recirculated water continue to keep working condition;
8) when temperature is down to 390-410 DEG C, fixture of dismantling, the parallel welding copper bus of copper pipe is completed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410056359.0A CN104842079B (en) | 2014-02-19 | 2014-02-19 | Cable bus opening heating collar and its application in the welding of cable bus copper pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410056359.0A CN104842079B (en) | 2014-02-19 | 2014-02-19 | Cable bus opening heating collar and its application in the welding of cable bus copper pipe |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104842079A CN104842079A (en) | 2015-08-19 |
CN104842079B true CN104842079B (en) | 2018-01-09 |
Family
ID=53842265
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410056359.0A Expired - Fee Related CN104842079B (en) | 2014-02-19 | 2014-02-19 | Cable bus opening heating collar and its application in the welding of cable bus copper pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104842079B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117283204B (en) * | 2023-11-23 | 2024-04-02 | 江苏镭普森智能装备有限公司 | Pressure gauge welding equipment of response accuse temperature |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1182201A (en) * | 1996-11-08 | 1998-05-20 | 松下电器产业株式会社 | Heat exchanger and method of producing the same |
CN1676261A (en) * | 2004-03-31 | 2005-10-05 | 陈炯 | External counter incision heater |
CN1678423A (en) * | 2002-07-25 | 2005-10-05 | 国际壳牌研究有限公司 | Forge welding of tubulars |
CN2836192Y (en) * | 2005-08-19 | 2006-11-08 | 长春市大东汽车零部件有限公司 | Multi-position solder inductor |
CN1893742A (en) * | 2005-09-26 | 2007-01-10 | 深圳市宝安联华实业有限公司 | Open-mouth type induction-ring device |
CN102126072A (en) * | 2011-04-18 | 2011-07-20 | 中化二建集团有限公司 | Horizontally laid large-section aluminum bus welding construction method |
CN102527768A (en) * | 2010-12-08 | 2012-07-04 | 江苏兴荣高新科技股份有限公司 | Manufacturing method of copper-clad aluminum pipe |
CN202317412U (en) * | 2011-12-05 | 2012-07-11 | 合肥长城制冷科技有限公司 | Welding device |
CN203124886U (en) * | 2013-03-18 | 2013-08-14 | 广东美芝精密制造有限公司 | Apparatus for welding pipeline |
-
2014
- 2014-02-19 CN CN201410056359.0A patent/CN104842079B/en not_active Expired - Fee Related
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1182201A (en) * | 1996-11-08 | 1998-05-20 | 松下电器产业株式会社 | Heat exchanger and method of producing the same |
CN1678423A (en) * | 2002-07-25 | 2005-10-05 | 国际壳牌研究有限公司 | Forge welding of tubulars |
CN1676261A (en) * | 2004-03-31 | 2005-10-05 | 陈炯 | External counter incision heater |
CN2836192Y (en) * | 2005-08-19 | 2006-11-08 | 长春市大东汽车零部件有限公司 | Multi-position solder inductor |
CN1893742A (en) * | 2005-09-26 | 2007-01-10 | 深圳市宝安联华实业有限公司 | Open-mouth type induction-ring device |
CN102527768A (en) * | 2010-12-08 | 2012-07-04 | 江苏兴荣高新科技股份有限公司 | Manufacturing method of copper-clad aluminum pipe |
CN102126072A (en) * | 2011-04-18 | 2011-07-20 | 中化二建集团有限公司 | Horizontally laid large-section aluminum bus welding construction method |
CN202317412U (en) * | 2011-12-05 | 2012-07-11 | 合肥长城制冷科技有限公司 | Welding device |
CN203124886U (en) * | 2013-03-18 | 2013-08-14 | 广东美芝精密制造有限公司 | Apparatus for welding pipeline |
Also Published As
Publication number | Publication date |
---|---|
CN104842079A (en) | 2015-08-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102962543B (en) | Welding process for red copper and stainless steel dissimilar materials | |
CN103706928B (en) | The straight seam buried arc welding method of corrosion resistance metallurgical composite bimetal steel tube | |
CN102357695A (en) | Method and device for soldering metal parts and components by adopting high-frequency induction brazing | |
CN102500853A (en) | Cold metal transfer connection method of aluminum/steel dissimilar metal | |
CN101323039A (en) | Non-prewarming welding method for thick-wall red copper and low-carbon steel dissimilar metal material | |
KR20160051563A (en) | Welding methods and applications for copper and steel | |
CN1228167C (en) | Method for red copper transition welding without preheating metal alloy | |
CN109396612A (en) | A kind of UNS N08825 nickel-base material pipeline solid core welding wire consumable electrode pulse MIG welding procedure | |
CN102581424A (en) | Welding method for copper wire and aluminum wire | |
CN108237280B (en) | Welding method of copper-tungsten electrode | |
CN109175562B (en) | TIG brazing process for copper-aluminum dissimilar metal | |
CN101774055B (en) | Blind area welding method | |
CN103056546A (en) | Welding wire for welding titanium alloy and pure aluminum plate in argon tungsten-arc welding (TIG) method | |
CN101323044A (en) | Thick-wall red copper and austenitic stainless steel non-prewarming arc melting and welding method | |
CN101774062B (en) | Lamination composite material and stainless steel argon arc melt-brazing method | |
CN102886589A (en) | Welding process for corrosion-resistant alloy material Monel 400 | |
CN204094301U (en) | Copper pipe and device for welding aluminium pipe plumb joint in refrigeration plant | |
CN104842079B (en) | Cable bus opening heating collar and its application in the welding of cable bus copper pipe | |
CN105983766A (en) | Low-carbon steel and alloy steel welding method | |
CN112170996A (en) | Welding method for butt joint of T2 red copper and S32168 stainless steel tube | |
CN205967779U (en) | Copper aluminum pipe thermal resistance welding set | |
CN108237284B (en) | Welding method of silver-molybdenum electrode | |
CN108161188A (en) | HAYNES282 high-temperature nickel-base alloy tube welding techniques | |
CN108544058A (en) | A kind of High Efficiency Welding Process for titanium or titanium alloy thin plate | |
CN110465717B (en) | TIG arc brazing welding method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180109 Termination date: 20210219 |