- CN104842079A CN104842079A CN201410056359.0A CN201410056359A CN104842079A CN 104842079 A CN104842079 A CN 104842079A CN 201410056359 A CN201410056359 A CN 201410056359A CN 104842079 A CN104842079 A CN 104842079A
- Authority
- CN
- China
- Prior art keywords
- welding
- copper pipe
- copper
- mouth
- pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K31/00—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups
- B23K31/02—Processes relevant to this subclass, specially adapted for particular articles or purposes, but not covered by only one of the preceding main groups relating to soldering or welding
- B23K31/027—Making tubes with soldering or welding
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
- B23K37/0426—Fixtures for other work
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K2103/00—Materials to be soldered, welded or cut
- B23K2103/08—Non-ferrous metals or alloys
- B23K2103/12—Copper or alloys thereof
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Physics & Mathematics (AREA)
- Optics & Photonics (AREA)
- Branch Pipes, Bends, And The Like (AREA)
Abstract
The invention discloses a cable bus opening heating ring and application thereof in cable bus copper pipe welding. The cable bus opening heating ring comprises a left heating ring and a right heating ring, wherein the left heating ring and the right heating ring both comprise red copper pipes, and cooling circulating ice water pipes connected with the red copper pipes; the red copper pipes are semicircular; connecting blocks are arranged in ports of the red copper pipes; and connecting holes are formed in the connecting blocks. The cable bus opening heating ring uses T3 copper pipes of phi 120* phi 80 mm as conductors, so that the heating speed is fast, the heating welding can be performed for straight ways, three-ways and elbows, the heating of the copper pipes in high altitude is realized, the welding temperature is reached, and the welding operation of the copper pipes in high altitude is finished.
Description
Technical field
The present invention relates to the solder technology of large workpiece copper and copper, being specially a kind of cable bus opening heating collar for powering and the application in the welding of cable bus copper pipe thereof.
Background technology
In brazing connects in the past, copper has the characteristics such as excellent electric conductivity, thermal conductivity, corrosion resistance, ductility and certain intensity.Be used widely in electric, electronics, chemical industry, food, power, traffic and aerospace industry.In fine copper (red copper), add more than 10 plant alloying element, form all kinds of copper alloys of solid solution, if zincification is brass; Adding nickel is copper-nickel alloy; Adding silicon is silicon bronze; Adding aluminium is aluminium bronze etc.
Copper and its alloy can realize connecting by the process such as soldering, electric resistance welding, at today, the melting welding dominate of industry prosperity.The welding of Copper and its alloy is easily realized by processes such as SMAW, TIG weldering, MIG welderings.
1, the method for welding red copper has the methods such as gas welding, manual carbon arc welding, manual electric arc welding and manual argon arc welding, and large scale structure also can adopt automatic welding:
(1) what the gas weld joint red copper of red copper was the most frequently used is banjo fixing butt jointing, and lap joint and T-joint are as far as possible few to be adopted.Gas welding can adopt two kinds of welding wires, and a kind of is welding wire containing deoxidant element, as silk 201,202; Another kind is general copper wire and the slitting of mother metal, adopts gas agent 301 to make flux.Neutral flame should be adopted during gas welding red copper.
(2) the manual electric arc welding edge of red copper, when weldment thickness is greater than 4 millimeters, necessary preheating before weldering, preheat temperature is generally at about 400 ~ 500 DEG C.With the welding of copper 107 welding rod, power supply should adopt DC reverse connection.Should use short arc during welding, welding rod should not do teeter.Reciprocal rectilinear motion made by welding rod, can improve the shaping of weld seam.Long weld seam should adopt backstep welding.Speed of welding should be tried one's best hurry up.During multilayer welding, necessary slag thoroughly between scavenger layer.
Welding should be carried out in draughty place, to prevent copper poisoning phenomenon.Postwelding application butt hammer knocks weld seam, eliminates stress and improves weldquality.
(3) manual argon arc welding of red copper is when red copper manual argon arc welding, and the welding wire of employing has silk 201 (special red copper welding wire) and silk 202, also adopts copper wire, as T2.Oxide-film, the wet goods foul of tackling workpiece welding edge and welding wire surface before weldering all must be cleaned out, and avoid producing the defect such as pore, slag inclusion.The method of cleaning has mechanical method of cleaning and soak cleaning method.When banjo fixing butt jointing thickness of slab is less than 3 millimeters, square groove; When thickness of slab is 3 ~ 10 millimeters, open double V-groove, bevel angle is 60 ~ 70 & ordm; ; When thickness of slab is greater than 10 millimeters, open X-type groove, bevel angle is 60 ~ 70 & ordm; ; Lack of penetration for avoiding, generally do not stay root face.According to thickness of slab and groove size, the fit-up gap of banjo fixing butt jointing is chosen within the scope of 0.5 ~ 1.5 millimeter.Red copper manual argon arc welding, normally adopts straight polarity direct current, and namely tungsten electrode connects negative pole.In order to eliminate pore, ensureing that the root of weld fuses and through welding reliably, must speed of welding be improved, reducing argon gas consumption, and preheating weldment.When thickness of slab is less than 3 millimeters, preheat temperature is 150 ~ 300 DEG C; When thickness of slab is greater than 3 millimeters, preheat temperature is 350 ~ 500 DEG C.Preheat temperature is unsuitable too high, otherwise the mechanical performance of welding point is reduced.Also have the carbon arc welding of red copper, the electrode that carbon arc welding uses has carbon electrode and graphite electrode.Red copper carbon arc welding welding wire used is the same with during gas welding, and also can cut bar with mother metal, the flux of available gas welding red copper, as gas agent 301 etc.
(4) ratio-frequency welding is high-frequency induction heating again, and ratio-frequency welding utilizes 10 ~ 500KHz high frequency electric to flow through metal joint face produce resistance heat and apply a kind of welding method that (or not applying) pressure reaches corrupt split.Be characterized in: speed of welding is large, and welding heat affected zone is little, welds and can not clear up workpiece, can weld light-wall pipe, solderable metal pipe, very relatively good to magnetic conductive metal welding, copper is magnetic conduction not.
(5) soldering high temperature furnace welding: can only small workpiece be welded, can not welding be moved.
Comprehensive said method: above-mentioned welding method, owing to all cannot heat copper pipe in high-altitude, reaches institute's welding temperature, so cannot weld φ 120x φ 80mmT3 copper pipe.
Summary of the invention
Technical problem solved by the invention is to provide a kind of cable bus opening heating collar and the application in the welding of cable bus copper pipe thereof, to solve the problem proposed in above-mentioned background technology.
The invention provides following technical scheme:
Cable bus opening heating collar, comprises left heating collar and right heating collar, and wherein left heating collar and right heating collar include copper tube, the down cycles frozen water pipe be connected with copper tube; Described copper tube is set to semicircle, and the port of copper tube is provided with contiguous block; Described contiguous block is provided with connecting hole.
The application of cable bus opening heating collar in the welding of cable bus copper pipe, is included in the welding of straight mouth, vertical tube elbow welding, three-way welding and parallel welding copper bus.
Described straight mouth welding, comprises the following steps:
1) lift, by lifting steel pipes to the position needing welding;
2) beat groove, make the counterpart of copper pipe ensure in same plane;
3) in steel pipe, insert stainless steel tube, guarantee that the internal diameter of stainless steel tube inserted aligns with copper pipe internal diameter, between mouth and mouth gap one to;
4) stainless steel tube is exited 40mm to good mouth, be coated with silver paste;
5) counterpart again, guarantee that counterpart parallel clearance is 5 ~ 10mm, the time is 3 ~ 4 hours;
6) heating collar is installed, with the clamping of fixture balance;
7) install ice water circulation water pipe, ensure that recirculated water water flowing is unimpeded, pressure is 3.5kg/cm
2;
8) starting equipment, Voltage Cortrol is 450V, and electric current is 150A;
9) when φ 120x φ 80mmT3 copper pipe welding position is heated to 730 DEG C, be incubated 20 seconds, turn off equipment, recirculated water continues to keep duty;
10) when temperature is down to 390-410 DEG C, fixture of dismantling, completes the straight mouth welding of copper pipe.
Preferably, described vertical tube elbow welding, comprises the following steps:
1) lift, by lifting steel pipes to the position needing welding;
2) beat groove, make the counterpart of copper pipe ensure in same plane;
3) in steel pipe, insert stainless steel tube, guarantee that the internal diameter of stainless steel tube inserted aligns with copper pipe internal diameter, between mouth and mouth gap one to;
4) stainless steel tube is exited 40mm to good mouth, be coated with silver paste;
5) counterpart again, guarantee that counterpart parallel clearance is 5 ~ 10mm, the time is 6 ~ 7 hours
6) heating collar is installed, with the clamping of fixture balance;
7) install ice water circulation water pipe, ensure that recirculated water water flowing is unimpeded, pressure is 3.5kg/cm
2;
8) starting equipment, Voltage Cortrol is 450V, and electric current is 150A;
9) when copper pipe welding position is heated to 730 DEG C, be incubated 20 seconds, turn off equipment, recirculated water continues to keep duty;
10) when temperature is down to 390-410 DEG C, fixture of dismantling, completes the straight mouth welding of copper pipe.
Preferably, described three-way welding, comprises the following steps:
1) lift, by lifting steel pipes to the position needing welding;
2) beat groove, make the counterpart of copper pipe ensure in same plane;
3) in steel pipe, insert stainless steel tube, guarantee that the internal diameter of stainless steel tube inserted aligns with copper pipe internal diameter, between mouth and mouth gap one to;
4) stainless steel tube is exited 40mm to good mouth, be coated with silver paste;
5) counterpart again, guarantee that counterpart parallel clearance is 5 ~ 10mm, the time is 3 ~ 4 hours;
6) heating collar is installed, with the clamping of fixture balance;
7) install ice water circulation water pipe, ensure that recirculated water water flowing is unimpeded, pressure is 3.5kg/cm
2;
8) starting equipment, Voltage Cortrol is 450V, and electric current is 150A;
9) when φ 120x φ 80mmT3 copper pipe welding position is heated to 730 DEG C, be incubated 20 seconds, turn off equipment, recirculated water continues to keep duty;
10) when temperature is down to 390-410 DEG C, fixture of dismantling, completes the straight mouth welding of copper pipe.
Preferably, described parallel welding copper bus, comprises the following steps:
1) lift, by lifting steel pipes to the position needing welding;
2) copper pipe washing trough, makes the counterpart of copper pipe ensure in same plane;
3) copper bar is put into copper pipe groove, in groove, coats silver paste, guarantee steel row and between copper pipe notch and mouth gap one to;
4) install by two broken rings, the heating collar of a copper bar circle composition, and clamp by fixture balance;
5) install ice water circulation water pipe, ensure that recirculated water water flowing is unimpeded, pressure is 3.5kg/cm
2;
6) starting equipment, Voltage Cortrol is 450V, and electric current is 150A; ;
7) when φ 120x φ 80mmT3 copper pipe welding position is heated to 730 DEG C, weld bond both sides 60% silver solder welds, and is incubated 10 minutes, turns off equipment, and recirculated water continues to keep duty;
8) when temperature is down to 390-410 DEG C, fixture of dismantling, completes the straight mouth welding of copper pipe.
In sum, beneficial effect of the present invention:
The present invention utilizes φ 120x φ 80mmT3 copper pipe to do conductor, and firing rate is fast, can to straight-through, threeway, elbow, add thermal weld, realize high-altitude and copper pipe heated, reach institute's welding temperature, thus complete copper pipe at the aerial weld job of height.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Detailed description of the invention
Below in conjunction with the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
Cable bus opening heating collar provided by the invention, as shown in Figure 1, comprises left heating collar and right heating collar, wherein left heating collar and the right heating collar down cycles frozen water pipe 2 that includes copper tube 1, be connected with copper tube 1; Copper tube 1 is set to semicircle, and the port of copper tube 1 is provided with contiguous block 3; Contiguous block 3 is provided with connecting hole.
The application of cable bus opening heating collar in the welding of cable bus copper pipe, is included in the welding of straight mouth, vertical tube elbow welding, three-way welding and parallel welding copper bus.
Straight mouth welding, comprises the following steps:
1) lift, by lifting steel pipes to the position needing welding, because every bar copper pipe has 400Kg, heavier, when lifting, take care;
2) beat groove, make the counterpart of copper pipe ensure in same plane;
3) in steel pipe, insert the stainless steel tube that specification is φ 80x100x3mm, guarantee that the internal diameter of stainless steel tube inserted is that φ 120x φ 80mmT3 copper pipe internal diameter aligns with specification, keep between mouth and mouth gap one to;
4) stainless steel tube is exited 40mm to good mouth, be coated with silver paste;
5) counterpart again, guarantee that counterpart parallel clearance is 5 ~ 10mm, the time is 3 ~ 4 hours;
6) heating collar is installed, with the clamping of fixture balance;
7) install ice water circulation water pipe, ensure that recirculated water water flowing is unimpeded, pressure is 3.5kg/cm
2;
8) starting equipment, Voltage Cortrol is 450V, and electric current is 150A;
9) when φ 120x φ 80mmT3 copper pipe welding position is heated to 730 DEG C, (heat time is 15 minutes) insulation 20 seconds, turns off equipment, and recirculated water continues to keep duty;
10) when temperature is down to 390-410 DEG C, fixture of dismantling, completes the straight mouth welding of φ 120x φ 80mmT3 copper pipe.
Vertical tube elbow welding, comprises the following steps:
1) lift, by lifting steel pipes to the position needing welding, because every bar copper pipe has 400Kg, heavier, when lifting, take care;
2) beat groove, make the counterpart of copper pipe ensure in same plane;
3) in steel pipe, insert the stainless steel tube that specification is φ 80x100x3mm, guarantee that the internal diameter of stainless steel tube inserted is that φ 120x φ 80mmT3 copper pipe internal diameter aligns with specification, keep between mouth and mouth gap one to;
4) stainless steel tube is exited 40mm to good mouth, be coated with silver paste;
5) counterpart again, guarantee that counterpart parallel clearance is 5 ~ 10mm, the time is 6 ~ 7 hours
6) heating collar is installed, with the clamping of fixture balance;
7) install ice water circulation water pipe, ensure that recirculated water water flowing is unimpeded, pressure is 3.5kg/cm
2;
8) starting equipment, Voltage Cortrol is 450V, and electric current is 150A;
9) when φ 120x φ 80mmT3 copper pipe welding position is heated to 730 DEG C, (heat time is approximately 15 minutes) insulation 20 seconds, turns off equipment, and recirculated water continues to keep duty;
10) when temperature is down to 390-410 DEG C, fixture of dismantling, completes the straight mouth welding of φ 120x φ 80mmT3 copper pipe.
Three-way welding, comprises the following steps:
1) lift, by lifting steel pipes to the position needing welding, because every bar copper pipe has 400Kg, heavier, when lifting, take care;
2) beat groove, make the counterpart of copper pipe ensure in same plane;
3) in steel pipe, insert the stainless steel tube that specification is φ 80x100x3mm, guarantee that the internal diameter of stainless steel tube inserted is that φ 120x φ 80mmT3 copper pipe internal diameter aligns with specification, keep between mouth and mouth gap one to;
4) stainless steel tube is exited 40mm to good mouth, be coated with silver paste;
5) counterpart again, guarantee that counterpart parallel clearance is 5 ~ 10mm, the time is 3 ~ 4 hours;
6) heating collar is installed, with the clamping of fixture balance;
7) install ice water circulation water pipe, ensure that recirculated water water flowing is unimpeded, pressure is 3.5kg/cm
2;
8) starting equipment, Voltage Cortrol is 450V, and electric current is 150A;
9) when φ 120x φ 80mmT3 copper pipe welding position is heated to 730 DEG C, (heat time is approximately 15 minutes) insulation 20 seconds, turns off equipment, and recirculated water continues to keep duty;
10) when temperature is down to 390-410 DEG C, fixture of dismantling, completes the straight mouth welding of φ 120x φ 80mmT3 copper pipe.
Parallel welding copper bus, comprises the following steps:
1) lift, by lifting steel pipes to the position needing welding, because every bar copper pipe has 400Kg, heavier, when lifting, take care;
2) copper pipe washing trough, makes the counterpart of copper pipe ensure in same plane;
3) copper bar is put into φ 120x φ 80mmT3 copper pipe groove, in groove, coats silver paste, guarantee steel row and between φ 120x φ 80mmT3 copper pipe notch and mouth gap one to;
4) install by two broken rings, the heating collar of a copper bar circle composition, and clamp by fixture balance;
5) install ice water circulation water pipe, ensure that recirculated water water flowing is unimpeded, pressure is 3.5kg/cm
2;
6) starting equipment, Voltage Cortrol is 450V, and electric current is 150A; ;
7) when φ 120x φ 80mmT3 copper pipe welding position is heated to 730 DEG C, weld bond both sides 60% silver solder welds, and is incubated 10 minutes, turns off equipment, and recirculated water continues to keep duty;
8) when temperature is down to 390-410 DEG C, fixture of dismantling, completes the straight mouth welding of φ 120x φ 80mmT3 copper pipe.
The present invention utilizes φ 120x φ 80mmT3 copper pipe to do conductor, and firing rate is fast, can to straight-through, threeway, elbow, add thermal weld, realize high-altitude and copper pipe heated, reach institute's welding temperature, thus complete copper pipe at the aerial weld job of height.
To those skilled in the art, obviously the invention is not restricted to the details of above-mentioned one exemplary embodiment, and when not deviating from spirit of the present invention or essential characteristic, the present invention can be realized in other specific forms.Therefore, no matter from which point, all should embodiment be regarded as exemplary, and be nonrestrictive, scope of the present invention is limited by claims instead of above-mentioned explanation, and all changes be therefore intended in the implication of the equivalency by dropping on claim and scope are included in the present invention.
In addition, be to be understood that, although this description is described according to embodiment, but not each embodiment only comprises an independently technical scheme, this narrating mode of description is only for clarity sake, those skilled in the art should by description integrally, and the technical scheme in each embodiment also through appropriately combined, can form other embodiments that it will be appreciated by those skilled in the art that.
Claims (6)
1. cable bus opening heating collar, is characterized in that, comprises left heating collar and right heating collar, and wherein left heating collar and right heating collar include copper tube, the down cycles frozen water pipe be connected with copper tube; Described copper tube is set to semicircle, and the port of copper tube is provided with contiguous block; Described contiguous block is provided with connecting hole.
2. the application of cable bus opening heating collar in the welding of cable bus copper pipe, is characterized in that, is included in the welding of straight mouth, vertical tube elbow welding, three-way welding and parallel welding copper bus.
3. the application of cable bus opening heating collar according to claim 2 in the welding of cable bus copper pipe, is characterized in that, described straight mouth welding, comprises the following steps:
1) lift, by lifting steel pipes to the position needing welding;
2) beat groove, make the counterpart of copper pipe ensure in same plane;
3) in steel pipe, insert stainless steel tube, guarantee that the internal diameter of stainless steel tube inserted aligns with copper pipe internal diameter, between mouth and mouth gap one to;
4) stainless steel tube is exited 40mm to good mouth, be coated with silver paste;
5) counterpart again, guarantee that counterpart parallel clearance is 5 ~ 10mm, the time is 3 ~ 4 hours;
6) heating collar is installed, with the clamping of fixture balance;
7) install ice water circulation water pipe, ensure that recirculated water water flowing is unimpeded, pressure is 3.5kg/cm
2;
8) starting equipment, Voltage Cortrol is 450V, and electric current is 150A;
9) when copper pipe welding position is heated to 730 DEG C, be incubated 20 seconds, turn off equipment, recirculated water continues to keep duty;
10) when temperature is down to 390-410 DEG C, fixture of dismantling, completes the straight mouth welding of copper pipe.
4. the application of cable bus opening heating collar according to claim 2 in the welding of cable bus copper pipe, it is characterized in that, described vertical tube elbow welding, comprises the following steps:
1) lift, by lifting steel pipes to the position needing welding;
2) beat groove, make the counterpart of copper pipe ensure in same plane;
3) in steel pipe, insert stainless steel tube, guarantee that the internal diameter of stainless steel tube inserted aligns with copper pipe internal diameter, between mouth and mouth gap one to;
4) stainless steel tube is exited 40mm to good mouth, be coated with silver paste;
5) counterpart again, guarantee that counterpart parallel clearance is 5 ~ 10mm, the time is 6 ~ 7 hours
6) heating collar is installed, with the clamping of fixture balance;
7) install ice water circulation water pipe, ensure that recirculated water water flowing is unimpeded, pressure is 3.5kg/cm
2;
8) starting equipment, Voltage Cortrol is 450V, and electric current is 150A;
9) when φ 120x φ 80mmT3 copper pipe welding position is heated to 730 DEG C, be incubated 20 seconds, turn off equipment, recirculated water continues to keep duty;
10) when temperature is down to 390-410 DEG C, fixture of dismantling, completes the straight mouth welding of copper pipe.
5. the application of cable bus opening heating collar according to claim 2 in the welding of cable bus copper pipe, it is characterized in that, described three-way welding, comprises the following steps:
1) lift, by lifting steel pipes to the position needing welding;
2) beat groove, make the counterpart of copper pipe ensure in same plane;
3) in steel pipe, insert stainless steel tube, guarantee that the internal diameter of stainless steel tube inserted aligns with copper pipe internal diameter, between mouth and mouth gap one to;
4) stainless steel tube is exited 40mm to good mouth, be coated with silver paste;
5) counterpart again, guarantee that counterpart parallel clearance is 5 ~ 10mm, the time is 3 ~ 4 hours;
6) heating collar is installed, with the clamping of fixture balance;
7) install ice water circulation water pipe, ensure that recirculated water water flowing is unimpeded, pressure is 3.5kg/cm
2;
8) starting equipment, Voltage Cortrol is 450V, and electric current is 150A;
9) when φ 120x φ 80mmT3 copper pipe welding position is heated to 730 DEG C, be incubated 20 seconds, turn off equipment, recirculated water continues to keep duty;
10) when temperature is down to 390-410 DEG C, fixture of dismantling, completes the straight mouth welding of φ 120x φ 80mmT3 copper pipe.
6. the application of cable bus opening heating collar according to claim 2 in the welding of cable bus copper pipe, it is characterized in that, described parallel welding copper bus, comprises the following steps:
1) lift, by lifting steel pipes to the position needing welding;
2) copper pipe washing trough, makes the counterpart of copper pipe ensure in same plane;
3) copper bar is put into copper pipe groove, in groove, coats silver paste, guarantee steel row and between copper pipe notch and mouth gap one to;
4) install by two broken rings, the heating collar of a copper bar circle composition, and clamp by fixture balance;
5) install ice water circulation water pipe, ensure that recirculated water water flowing is unimpeded, pressure is 3.5kg/cm
2;
6) starting equipment, Voltage Cortrol is 450V, and electric current is 150A; ;
7) when copper pipe welding position is heated to 730 DEG C, weld bond both sides 60% silver solder welds, and is incubated 10 minutes, turns off equipment, and recirculated water continues to keep duty;
8) when temperature is down to 390-410 DEG C, fixture of dismantling, completes the straight mouth welding of copper pipe.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410056359.0A CN104842079B (en) | 2014-02-19 | 2014-02-19 | Cable bus opening heating collar and its application in the welding of cable bus copper pipe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410056359.0A CN104842079B (en) | 2014-02-19 | 2014-02-19 | Cable bus opening heating collar and its application in the welding of cable bus copper pipe |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104842079A true CN104842079A (en) | 2015-08-19 |
CN104842079B CN104842079B (en) | 2018-01-09 |
Family
ID=53842265
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410056359.0A Expired - Fee Related CN104842079B (en) | 2014-02-19 | 2014-02-19 | Cable bus opening heating collar and its application in the welding of cable bus copper pipe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104842079B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117283204A (en) * | 2023-11-23 | 2023-12-26 | 江苏镭普森智能装备有限公司 | Pressure gauge welding equipment of response accuse temperature |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1182201A (en) * | 1996-11-08 | 1998-05-20 | 松下电器产业株式会社 | Heat exchanger and method of producing the same |
CN1676261A (en) * | 2004-03-31 | 2005-10-05 | 陈炯 | External counter incision heater |
CN1678423A (en) * | 2002-07-25 | 2005-10-05 | 国际壳牌研究有限公司 | Forge welding of tubulars |
CN2836192Y (en) * | 2005-08-19 | 2006-11-08 | 长春市大东汽车零部件有限公司 | Multi-position solder inductor |
CN1893742A (en) * | 2005-09-26 | 2007-01-10 | 深圳市宝安联华实业有限公司 | Open-mouth type induction-ring device |
CN102126072A (en) * | 2011-04-18 | 2011-07-20 | 中化二建集团有限公司 | Horizontally laid large-section aluminum bus welding construction method |
CN102527768A (en) * | 2010-12-08 | 2012-07-04 | 江苏兴荣高新科技股份有限公司 | Manufacturing method of copper-clad aluminum pipe |
CN202317412U (en) * | 2011-12-05 | 2012-07-11 | 合肥长城制冷科技有限公司 | Welding device |
CN203124886U (en) * | 2013-03-18 | 2013-08-14 | 广东美芝精密制造有限公司 | Apparatus for welding pipeline |
-
2014
- 2014-02-19 CN CN201410056359.0A patent/CN104842079B/en not_active Expired - Fee Related
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1182201A (en) * | 1996-11-08 | 1998-05-20 | 松下电器产业株式会社 | Heat exchanger and method of producing the same |
CN1678423A (en) * | 2002-07-25 | 2005-10-05 | 国际壳牌研究有限公司 | Forge welding of tubulars |
CN1676261A (en) * | 2004-03-31 | 2005-10-05 | 陈炯 | External counter incision heater |
CN2836192Y (en) * | 2005-08-19 | 2006-11-08 | 长春市大东汽车零部件有限公司 | Multi-position solder inductor |
CN1893742A (en) * | 2005-09-26 | 2007-01-10 | 深圳市宝安联华实业有限公司 | Open-mouth type induction-ring device |
CN102527768A (en) * | 2010-12-08 | 2012-07-04 | 江苏兴荣高新科技股份有限公司 | Manufacturing method of copper-clad aluminum pipe |
CN102126072A (en) * | 2011-04-18 | 2011-07-20 | 中化二建集团有限公司 | Horizontally laid large-section aluminum bus welding construction method |
CN202317412U (en) * | 2011-12-05 | 2012-07-11 | 合肥长城制冷科技有限公司 | Welding device |
CN203124886U (en) * | 2013-03-18 | 2013-08-14 | 广东美芝精密制造有限公司 | Apparatus for welding pipeline |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117283204A (en) * | 2023-11-23 | 2023-12-26 | 江苏镭普森智能装备有限公司 | Pressure gauge welding equipment of response accuse temperature |
CN117283204B (en) * | 2023-11-23 | 2024-04-02 | 江苏镭普森智能装备有限公司 | Pressure gauge welding equipment of response accuse temperature |
Also Published As
Publication number | Publication date |
---|---|
CN104842079B (en) | 2018-01-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102962543B (en) | Welding process for red copper and stainless steel dissimilar materials | |
CN102357695A (en) | Method and device for soldering metal parts and components by adopting high-frequency induction brazing | |
CN102303178B (en) | Semi-automatic gas shield welding construction technology for aluminum conductors | |
CN205464747U (en) | Single power mariages submerged arc welding welder | |
CN103801847B (en) | A kind of copper tube welding method | |
CN101323039A (en) | Non-prewarming welding method for thick-wall red copper and low-carbon steel dissimilar metal material | |
CN102581508A (en) | Intermediate-temperature zinc-aluminum soldering wire | |
CN103862147A (en) | Filler wire argon tungsten-arc welding process for molybdenum-copper alloy and nickel-base superalloy | |
CN104668688A (en) | Vacuum resistive brazing method for lap piece | |
CN104289781A (en) | Welding method of electric contact | |
CN103978063B (en) | Dissimilar metal tubing and its preparation method and application | |
CN102581424A (en) | Welding method for copper wire and aluminum wire | |
CN102974925B (en) | A kind of by TIG electric arc collaborative heating optimization aluminium/steel MIG soldered fitting method | |
CN103433631A (en) | Nickel-base brazing process of heating tube | |
CN103056546A (en) | Welding wire for welding titanium alloy and pure aluminum plate in argon tungsten-arc welding (TIG) method | |
CN204094301U (en) | Copper pipe and device for welding aluminium pipe plumb joint in refrigeration plant | |
CN102886589A (en) | Welding process for corrosion-resistant alloy material Monel 400 | |
CN105108259A (en) | Method for compounding copper and aluminum dissimilar metal of zinc electrolysis cathode conductive head | |
CN104842079A (en) | Cable bus opening heating ring and application thereof in cable bus copper pipe welding | |
CN102513635B (en) | Copper/aluminum ultrasonic liquid-phase diffusion brazing process and brazing device | |
CN105983766A (en) | Low-carbon steel and alloy steel welding method | |
CN203462146U (en) | Negative plate compound conductive head for zinc hydrometallurgy | |
CN205967779U (en) | Copper aluminum pipe thermal resistance welding set | |
CN108237284B (en) | Welding method of silver-molybdenum electrode | |
CN108161188A (en) | HAYNES282 high-temperature nickel-base alloy tube welding techniques |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180109 Termination date: 20210219 |
|
CF01 | Termination of patent right due to non-payment of annual fee |