CN104821510A - Tool for replacing first and last insulator on tension tower of power transmission line - Google Patents

Tool for replacing first and last insulator on tension tower of power transmission line Download PDF

Info

Publication number
CN104821510A
CN104821510A CN201510203756.0A CN201510203756A CN104821510A CN 104821510 A CN104821510 A CN 104821510A CN 201510203756 A CN201510203756 A CN 201510203756A CN 104821510 A CN104821510 A CN 104821510A
Authority
CN
China
Prior art keywords
maintenance
manhole
connecting plate
tool
replacing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510203756.0A
Other languages
Chinese (zh)
Inventor
张建俊
葛岩
沈炜
文俊
朱力
顾冰
怀春苗
朱建斌
周宗晔
王利亭
张昕
温镇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiaxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
Jiaxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical Jiaxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority to CN201510203756.0A priority Critical patent/CN104821510A/en
Publication of CN104821510A publication Critical patent/CN104821510A/en
Pending legal-status Critical Current

Links

Landscapes

  • Insulators (AREA)

Abstract

The invention relates to a tool for replacing the first and last insulator on a tension tower of a power transmission line. The tool at least comprises two strip-shaped connection plates; a plurality of maintenance holes are formed in each strip-shaped connection plate; the two connection plates are fixedly connected with each other through the maintenance holes and by means of bolts so as to a replacement clamping tool, wherein the two connection plates intersect with each other with angles formed therebetween; one of the two connection plates is a transverse connection plate which is transversely arranged and is provided with the maintenance holes with the connection bolts; the maintenance hole at one end of the transverse connection plate is connected with the vertical connection plate with the maintenance holes through the bolt; and the maintenance hole at the other end of the transverse connection plate is connected with a vertical connection plate bar with connection holes through the bolt. The tool has the advantages of simple structure and convenient operation, and can assist in reducing the workload of maintenance personnel replacing the first and last insulator on the tension tower, and improving maintenance efficiency and ensuring the reliability of power supply.

Description

A kind of power line tension insulator tower first and last sheet changes instrument
Technical field
What the present invention relates to is a kind of for when ultra-high-tension power transmission line upkeep operation, and the monolithic changing 110kV, 220kV power line tension insulator head (end) sheet changes instrument, belongs to power construction or grasps action tool technical field.
Background technology
On transmission line, strain insulator changes monolithic insulator is modal work in electric power overhaul work, the method of current replacing strain tower head (end) sheet insulator is: use corresponding machete card, bottle-holding rack, operate replacing, concrete operating process is basic is the same with the method for replacing bunch of insulator, and the human and material resources of needs are more.
Summary of the invention
The object of the invention is to the deficiency overcoming prior art existence, and provide a kind of structure simple, use easy to operate, the workload of upkeep operation personnel at strain tower head (end) replacing insulator can be alleviated, improve overhaul efficiency, guarantee that the power line tension insulator tower first and last sheet of power supply reliability changes instrument.
The object of the invention is to have come by following technical solution, a kind of power line tension insulator tower first and last sheet changes instrument, which comprises at least two strip connecting plates, every bar connecting plate offers multiple manhole respectively, and two described connecting plates are fixedly connected into the replacing jig being in crossing angle by manhole bolt.
A described connecting plate be horizontal, with the horizontal connecting plate of the manhole of connecting bolt, in one end manhole of this horizontal connecting plate, be bolted another vertical connecting plate with manhole described, in the other end manhole of described horizontal connecting plate, be bolted the meeting stile with connecting hole that another is vertical.
It is simple that the present invention has structure, uses easy to operate, can alleviate the workload of upkeep operation personnel at strain tower head (end) replacing insulator, improves overhaul efficiency, guarantee the features such as power supply reliability.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Fig. 2 is use operation chart of the present invention.
Embodiment
Below in conjunction with accompanying drawing, the present invention will be described in detail: shown in Fig. 1, a kind of power line tension insulator tower first and last sheet of the present invention changes instrument, which comprises at least two strip connecting plates 1,2, every bar connecting plate offers multiple manhole 3 respectively, and described two connecting plates 1,2 are fixedly connected into the replacing jig being in crossing angle with bolt 4 by manhole 3.
Shown in figure, a described connecting plate 1 be horizontal, with the horizontal connecting plate of the manhole 3 of connecting bolt 4, in one end manhole 3 of this horizontal connecting plate 1, connect another vertical connecting plate 2 with manhole 3 described by bolt 4, in the other end manhole 3 of described horizontal connecting plate 1, be connected with another vertical meeting stile 6 with connecting hole 5 by bolt 4.In other embodiments, described lath is equivalent to a vertical connecting plate 2, also namely multiple manholes of a horizontal connecting plate 1 can configure many vertical connecting plates 2 or many meeting stiles, these vertical connecting plates 2 or meeting stile 6 are arranged vertically relative to horizontal connecting plate, for connecting strain insulator tower first and last sheet 7, as shown in Figure 2.
The present invention mainly utilizes the manhole of two connecting plates, makes it reliably to connect; Finally reach the same with general jig, can the replacing instrument of one man operation.

Claims (2)

1. a power line tension insulator tower first and last sheet changes instrument, which comprises at least two strip connecting plates, every bar connecting plate offers multiple manhole respectively, it is characterized in that two described connecting plates are fixedly connected into the replacing jig being in crossing angle by manhole bolt.
2. power line tension insulator tower first and last sheet according to claim 1 changes instrument, it is characterized in that a described connecting plate be horizontal, with the horizontal connecting plate of the manhole of connecting bolt, in one end manhole of this horizontal connecting plate, be bolted another vertical connecting plate with manhole described, in the other end manhole of described horizontal connecting plate, be bolted the meeting stile with connecting hole that another is vertical.
CN201510203756.0A 2015-04-27 2015-04-27 Tool for replacing first and last insulator on tension tower of power transmission line Pending CN104821510A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510203756.0A CN104821510A (en) 2015-04-27 2015-04-27 Tool for replacing first and last insulator on tension tower of power transmission line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510203756.0A CN104821510A (en) 2015-04-27 2015-04-27 Tool for replacing first and last insulator on tension tower of power transmission line

Publications (1)

Publication Number Publication Date
CN104821510A true CN104821510A (en) 2015-08-05

Family

ID=53731725

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510203756.0A Pending CN104821510A (en) 2015-04-27 2015-04-27 Tool for replacing first and last insulator on tension tower of power transmission line

Country Status (1)

Country Link
CN (1) CN104821510A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106877235A (en) * 2017-03-07 2017-06-20 国家电网公司 The extra-high voltage general service kit of strain insulator wire side end and operating method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008113527A (en) * 2006-10-31 2008-05-15 Tokyo Electric Power Co Inc:The Technique for rewiring electric wire and construction yoke used in the rewiring technique
CN201584702U (en) * 2009-12-15 2010-09-15 云南电网公司大理供电局 Yoke plate capable of live replacement of 220 kV double-bundle conductor tension insulators
CN102074912A (en) * 2010-12-02 2011-05-25 河南省电力公司南阳供电公司 Special tool for fixing disconnecting switch porcelain insulators
CN202353094U (en) * 2011-11-28 2012-07-25 安徽省电力公司铜陵供电公司 Closed fixture for replacing insulator
CN204680988U (en) * 2015-04-27 2015-09-30 国网浙江省电力公司嘉兴供电公司 Power line tension insulator tower first and last sheet changes instrument

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008113527A (en) * 2006-10-31 2008-05-15 Tokyo Electric Power Co Inc:The Technique for rewiring electric wire and construction yoke used in the rewiring technique
CN201584702U (en) * 2009-12-15 2010-09-15 云南电网公司大理供电局 Yoke plate capable of live replacement of 220 kV double-bundle conductor tension insulators
CN102074912A (en) * 2010-12-02 2011-05-25 河南省电力公司南阳供电公司 Special tool for fixing disconnecting switch porcelain insulators
CN202353094U (en) * 2011-11-28 2012-07-25 安徽省电力公司铜陵供电公司 Closed fixture for replacing insulator
CN204680988U (en) * 2015-04-27 2015-09-30 国网浙江省电力公司嘉兴供电公司 Power line tension insulator tower first and last sheet changes instrument

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106877235A (en) * 2017-03-07 2017-06-20 国家电网公司 The extra-high voltage general service kit of strain insulator wire side end and operating method
CN106877235B (en) * 2017-03-07 2018-06-22 国家电网公司 The general service kit in extra-high voltage strain insulator conducting wire side end and operating method

Similar Documents

Publication Publication Date Title
CN202291523U (en) Sandwich plate drilling device
CN203674624U (en) Sleeve-type combination tool for live-line jumper clamp fastening
CN203352052U (en) Live-line fastening tool for bolt of strain clamp of power transmission line
CN204680988U (en) Power line tension insulator tower first and last sheet changes instrument
CN104821510A (en) Tool for replacing first and last insulator on tension tower of power transmission line
CN203531483U (en) Tower body connection structure of single-pipe tower and single-pipe tower
CN203014270U (en) A triangular connecting plate connector used for a double bundled conductor in a power transmission line
CN202726783U (en) Universal tool plate
CN204241323U (en) Insulation ropes test unit
CN103001152A (en) Overhead ground wire lifter of power transmission line
CN105680784B (en) The reinforcement means of double glass solar energy photovoltaic panel ruggedized constructions
CN203961026U (en) The syndeton of a kind of crossbeam and post
CN103825222A (en) Tool for changing 220kV narrow base tower strain insulator string with charges
CN203813334U (en) Right-angle yoke plate clamp for live exchange of 220 kV strain insulator string
CN204112205U (en) The enhancing structure in large span prestressed concrete box beam cross section
CN203188885U (en) Portable insulated ladder
CN202994492U (en) T-shaped bridge static loading test rack
CN202144631U (en) Corbel connecting piece for steel structure
CN201639243U (en) Special clip for double-L and double-V cross arms of extra-high voltage power transmission lines
CN205005002U (en) T type tile photovoltaic adaptor
CN204940528U (en) A kind of steel structure platform beam syndeton
CN204590617U (en) The universal connection boots of large form support system
CN203813335U (en) Triangular yoke plate clamp for live exchange of 220 kV strain insulator string
CN103825223A (en) Tool and working method for live change of 220KV narrow base tower strain insulator string
CN203918880U (en) Action bars box socket set

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150805