CN104818809B - Construction method for combined plate staircase - Google Patents

Construction method for combined plate staircase Download PDF

Info

Publication number
CN104818809B
CN104818809B CN201510178530.XA CN201510178530A CN104818809B CN 104818809 B CN104818809 B CN 104818809B CN 201510178530 A CN201510178530 A CN 201510178530A CN 104818809 B CN104818809 B CN 104818809B
Authority
CN
China
Prior art keywords
formwork
stair
steel plate
stairs
step formwork
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510178530.XA
Other languages
Chinese (zh)
Other versions
CN104818809A (en
Inventor
荣彬
刘睿
吴辽
荣成
卓孝领
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201510178530.XA priority Critical patent/CN104818809B/en
Publication of CN104818809A publication Critical patent/CN104818809A/en
Application granted granted Critical
Publication of CN104818809B publication Critical patent/CN104818809B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

本发明涉及一种组合板楼梯的施工方法,包括:根据楼梯尺寸,制作相应尺寸及数量的钢模板,包括底部整体钢板(1)、楼梯阶数个中部标准踏步模板(2)、一个上踏步模板(3)、一个下踏步模板(4);根据楼梯尺寸制作所述底部整体钢板(1),所述底部整体钢板两端弯折,弯折后的上端用于与上平台板衔接,下端用于与下平台板衔接,弯折后的上端和下端长度分别与上踏步模板(3)和一个下踏步模板(4)的宽度相当;安装楼梯模板;固定起吊环(6);吊装就位,用锚栓将上踏步模板(3)和下踏步模板(4)分别固定在上平台梁和下平台梁上;浇筑混凝土。本发明可以使得楼梯施工操作简单且能提高楼梯质量并降低成本。

The invention relates to a construction method of a composite slab staircase, comprising: making steel formwork of corresponding size and quantity according to the size of the staircase, including an integral steel plate (1) at the bottom, several standard step formworks (2) in the middle of the stair steps, an upper step Formwork (3), a lower step formwork (4); the bottom integral steel plate (1) is made according to the size of the stairs, the two ends of the bottom integral steel plate are bent, the upper end after bending is used to connect with the upper platform plate, and the lower end Used to connect with the lower platform slab, the length of the upper end and the lower end after bending is equivalent to the width of the upper step formwork (3) and one lower step formwork (4); install the stair formwork; fix the lifting ring (6); hoist it in place , the upper step formwork (3) and the lower step formwork (4) are respectively fixed on the upper platform beam and the lower platform beam with anchor bolts; pouring concrete. The invention can make the stair construction operation simple, improve the stair quality and reduce the cost.

Description

一种组合板楼梯的施工方法A construction method of composite slab stairs

所属技术领域Technical field

本发明属于建筑工程领域,具体涉及一种楼梯施工方法。The invention belongs to the field of construction engineering, and in particular relates to a stair construction method.

背景技术Background technique

楼梯是建筑中的垂直交通设施,其质量对于正常使用以及突发情况的处理有着至关重要的作用。目前楼梯通常采用木质模板散拼施工,模板刚度稳定性差,经常发生跑模、移位等现象,影响工程质量;而且支模时间长,安装和拆卸不便,混凝土强度不够时可能造成破坏,施工复杂,效率低;木模板制作材源较少,破坏环境且成本较高。因此,用木质模板散拼进行楼梯施工的方法有待改进。Stairs are vertical transportation facilities in buildings, and their quality plays a vital role in normal use and handling of emergencies. At present, the stairs are usually constructed with wooden formwork. The rigidity and stability of the formwork are poor, and mold runout and displacement often occur, which affects the quality of the project. Moreover, it takes a long time to set up the formwork, which is inconvenient to install and disassemble. When the concrete strength is not enough, it may cause damage, and the construction is complicated. , low efficiency; wooden formwork has fewer sources of materials, which damages the environment and costs more. Therefore, the method for carrying out stair construction with wooden formwork loosely assembled needs to be improved.

发明内容Contents of the invention

本发明为解决现有技术中存在的上述问题而提供一种楼梯施工方法。本发可以使得楼梯施工操作简单且能提高楼梯质量并降低成本。本发明所采取的技术方案是:The present invention provides a stair construction method in order to solve the above-mentioned problems existing in the prior art. The invention can make the stair construction operation simple, improve the stair quality and reduce the cost. The technical scheme that the present invention takes is:

一种组合板楼梯的施工方法,包括下列步骤:A construction method for composite slab stairs, comprising the following steps:

1)确定楼梯的尺寸,主要包括楼梯的宽度、长度、踏步步数、踏步的宽度。1) Determine the size of the stairs, mainly including the width, length, number of steps, and width of the steps.

2)制作相应尺寸及数量的钢模板,包括底部整体钢板(1)、楼梯阶数个中部标准踏步模板(2)、一个上踏步模板(3)、一个下踏步模板(4);根据楼梯尺寸制作所述底部整体钢板(1),所述底部整体钢板两端弯折,弯折后的上端用于与上平台板衔接,下端用于与下平台板衔接,弯折后的上端和下端长度分别与上踏步模板(3)和一个下踏步模板(4)的宽度相当;2) Make steel formwork of corresponding size and quantity, including the overall steel plate at the bottom (1), several standard step formworks in the middle of the stair steps (2), one upper step formwork (3), and one lower step formwork (4); according to the size of the stairs Making the bottom integral steel plate (1), the two ends of the bottom integral steel plate are bent, the bent upper end is used for connecting with the upper platform plate, and the lower end is used for connecting with the lower platform plate, the length of the bent upper end and the lower end is Respectively with the width of the upper step template (3) and a lower step template (4);

3)安装楼梯模板:将各个相邻的中部标准踏步模板(2)之间、中部标准模板(2)与所述底部整体钢板(1)之间固定连接,将上踏步模板(3)和下踏步模板(4)分别与相应的中部标准踏步模板(2)固定连接;每个中部标准踏步模板(2)的两侧均为直角梯形,梯形的斜边的斜率与楼梯斜率一致,底部整体钢板(1)的斜率与楼梯斜率一致;3) Install the stair formwork: between each adjacent central standard step formwork (2), the central standard formwork (2) and the bottom integral steel plate (1) are fixedly connected, and the upper step formwork (3) and the lower The step formwork (4) is respectively fixedly connected with the corresponding central standard step formwork (2); the two sides of each central standard step formwork (2) are right-angled trapezoids, the slope of the trapezoidal slope is consistent with the slope of the stairs, and the overall steel plate at the bottom (1) The slope is consistent with the slope of the stairs;

4)在确保楼梯模板在起吊过程中能够保持平稳之处固定起吊环(6),起吊环直径须满足吊装荷载要求。4) Fix the hoisting ring (6) at the place where the stair formwork can be kept stable during the hoisting process, and the diameter of the hoisting ring must meet the hoisting load requirements.

5)将步骤(3)连接好的楼梯模板吊装就位,上踏步模板(3)和下踏步模板(4)与底部整体钢板连接处的锚栓孔应分别与上平台梁和下平台梁上预留锚栓孔位置对齐,用锚栓将上踏步模板(3)和下踏步模板(4)分别固定在上平台梁和下平台梁上,吊装完成后切掉起吊环;5) Lift the stair formwork connected in step (3) into place, and the anchor bolt holes at the connection between the upper step formwork (3) and the lower step formwork (4) and the bottom integral steel plate should be connected with the upper platform beam and the lower platform beam respectively. Align the positions of reserved anchor bolt holes, fix the upper step formwork (3) and lower step formwork (4) on the upper platform beam and the lower platform beam respectively with anchor bolts, and cut off the hoisting ring after the hoisting is completed;

6)浇筑混凝土:从楼梯模板最上端的中间标准踏步模板灌入混凝土,上一级踏步模板浇筑满后,在重力作用下,混凝土自动流入下一级踏步模板中,直至整个楼梯模板浇筑满为止。6) Pouring concrete: Pour concrete from the middle standard step formwork at the top of the stair formwork. After the upper step formwork is poured, under the action of gravity, the concrete will automatically flow into the next step formwork until the entire stair formwork is poured.

本发明具有的优点和积极效果是:The advantages and positive effects that the present invention has are:

(1)钢模板刚度稳定性强,混凝土不易变形,外观质量好,保证了工程质量;(1) The rigidity and stability of the steel formwork are strong, the concrete is not easily deformed, and the appearance quality is good, which ensures the quality of the project;

(2)钢模板作为永久性模板,施工时可直接安装就位,无需拆卸,操作简单,节约工时,施工安全;(2) The steel formwork is used as a permanent formwork, which can be directly installed in place during construction without disassembly, easy to operate, save man-hours, and safe in construction;

(3)节约木材,保护环境;(3) Save wood and protect the environment;

(4)钢模板与混凝土能够粘结成整体共同工作,从而有效提高了楼梯的承载力。(4) The steel formwork and the concrete can be bonded to work together as a whole, thereby effectively improving the bearing capacity of the stairs.

附图说明Description of drawings

图1是本组合楼梯的结构示意图;Fig. 1 is the structural representation of this composite staircase;

图2是标准踏步模板示意图;Fig. 2 is a schematic diagram of a standard step template;

图3是上下踏步模板示意图;Fig. 3 is a schematic diagram of step templates up and down;

图中:1-整体钢板、2-标准踏步模板、3-上踏步模板、4-下踏步模板、5a、高强螺栓、5b-锚栓、6-起吊环、7-螺栓孔、8-锚栓孔。In the figure: 1-integral steel plate, 2-standard step formwork, 3-upper step formwork, 4-lower step formwork, 5a, high-strength bolt, 5b-anchor bolt, 6-lifting ring, 7-bolt hole, 8-anchor bolt hole.

具体实施方式detailed description

下面结合附图对本发明的实施例进行详细说明。Embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings.

参见图1,本发明的楼梯过程如下:Referring to Fig. 1, the staircase process of the present invention is as follows:

(1)对楼梯的尺寸进行量测及核对,主要包括楼梯的宽度、长度、踏步步数、踏步的宽度等。(1) Measure and check the size of the stairs, mainly including the width, length, number of steps, and width of the steps.

(2)制作模板。根据资料制作相应尺寸及数量的钢模板,所述钢模板包括整体钢板1、楼梯阶数个中部标准踏步模板2、一个上踏步模板3、一个下踏步模板4、高强螺栓5a、锚栓5b以及起吊环6。(2) Make a template. According to the data, the steel formwork of corresponding size and quantity is made, and the steel formwork includes an integral steel plate 1, several standard step formworks 2 in the middle of the stair steps, an upper step formwork 3, a lower step formwork 4, high-strength bolts 5a, anchor bolts 5b and Lifting ring 6.

模板具体施工方法如下:The specific construction method of the formwork is as follows:

首先根据楼梯尺寸制作所述底部整体钢板1,所述整体钢板两端上下踏步模板宽度位置处进行折弯,折弯角度与楼梯坡度一致,并在与所述踏步模板2、3、4连接的螺栓位置处开螺栓孔;First, make the bottom integral steel plate 1 according to the size of the stairs, bend at the width position of the upper and lower step templates at both ends of the integral steel plate, the bending angle is consistent with the gradient of the stairs, and connect with the step templates 2, 3, 4 Bolt holes are opened at the bolt position;

分别制作所述标准踏步模板2、上踏步模板3以及下踏步模板4,并在相应位置开螺栓孔,如图2和图3所示;Make described standard step template 2, upper step template 3 and lower step template 4 respectively, and open bolt holes at corresponding positions, as shown in Figure 2 and Figure 3;

将所述标准模板2之间、标准模板2与所述底部钢板1之间用所述高强螺栓5a连接,所述上下踏步模板3、4分别与所述标准模板2连接,此时不连接上下踏步模板3、4与底部钢板1;Connect the standard formwork 2, the standard formwork 2 and the bottom steel plate 1 with the high-strength bolt 5a, and the upper and lower step formworks 3, 4 are respectively connected with the standard formwork 2, and the upper and lower formworks are not connected at this time. Step templates 3, 4 and bottom steel plate 1;

在相应位置焊接起吊环6,起吊环直径须满足吊装荷载要求,焊接位置须进行弯矩力学计算,确保楼梯模板在起吊过程中能够保持平稳。Weld the hoisting ring 6 at the corresponding position, the diameter of the hoisting ring must meet the hoisting load requirements, and the welding position must be calculated by bending moment mechanics to ensure that the stair formwork can remain stable during the hoisting process.

(3)安装模板。将钢模板吊装就位,上下踏步模板与钢板连接处的锚栓孔应与上下平台梁上预留锚栓孔位置对齐,用锚栓5b将上下踏步模板分别固定在上下平台梁上,吊装完成后切掉起吊环。模板安装施工过程中注意对楼梯踏步标高、起始位置及水平度进行适当的调整。(3) Install the template. Hoist the steel formwork in place, the anchor bolt holes at the connection between the upper and lower step formwork and the steel plate should be aligned with the positions of the anchor bolt holes reserved on the upper and lower platform beams, fix the upper and lower step formworks on the upper and lower platform beams respectively with anchor bolts 5b, and the hoisting is completed Then cut off the lifting ring. During the formwork installation and construction process, pay attention to the appropriate adjustment of the stair step elevation, starting position and levelness.

(4)浇筑混凝土。从楼梯模板最上端的踏步模板灌入混凝土,上一级踏步模板浇筑满后,在重力作用下,混凝土自动流入下一级踏步模板中,直至整个钢模板浇筑满为止。浇筑完成后,混凝土表面自动平整,外观良好。(4) Pouring concrete. Concrete is poured from the uppermost step formwork of the staircase formwork. After the upper step formwork is poured, under the action of gravity, the concrete will automatically flow into the next step formwork until the entire steel formwork is poured. After the pouring is completed, the concrete surface is automatically leveled and the appearance is good.

(5)混凝土养护。注意对混凝土人为的破坏,直至可以正常使用,无需拆卸模板,钢模板作为永久模板留在楼梯中,在混凝土底部的钢板可以代替混凝土中的配筋,有效提高混凝土的承载力。(5) Concrete maintenance. Pay attention to the artificial damage to the concrete until it can be used normally. There is no need to disassemble the formwork. The steel formwork remains in the stairs as a permanent formwork. The steel plate at the bottom of the concrete can replace the reinforcement in the concrete, effectively improving the bearing capacity of the concrete.

本发明具有的优点和积极效果是:钢模板刚度稳定性强,混凝土不易变形,外观质量好,保证了工程质量;钢模板作为永久性模板,施工时可直接安装就位,无需拆卸,操作简单,节约工时,施工安全;节约木材,保护环境;钢模板与混凝土能够粘结成整体共同工作,从而有效提高了楼梯的承载力。The advantages and positive effects of the present invention are: the rigidity and stability of the steel formwork is strong, the concrete is not easily deformed, the appearance quality is good, and the quality of the project is guaranteed; the steel formwork is used as a permanent formwork, and it can be directly installed in place during construction without disassembly, and the operation is simple , save man-hours, construction safety; save wood, protect the environment; steel formwork and concrete can be bonded to work together as a whole, thus effectively improving the bearing capacity of the stairs.

尽管上面结合附图对本发明的优选实施例进行了描述,但是本发明并不局限于上述的具体实施方式,上述的具体实施方式仅仅是示意性的,并不是限制性的,本领域的普通技术人员在本发明的启示下,在不脱离本发明宗旨和权利要求所保护的范围情况下,还可以做出很多形式,这些均属于本发明的保护范围之内。Although the preferred embodiments of the present invention have been described above in conjunction with the accompanying drawings, the present invention is not limited to the above-mentioned specific embodiments. The above-mentioned specific embodiments are only illustrative and not restrictive. Those of ordinary skill in the art Under the enlightenment of the present invention, people can also make many forms without departing from the purpose of the present invention and the scope of protection of the claims, and these all belong to the protection scope of the present invention.

Claims (1)

1.一种组合板楼梯的施工方法,包括下列步骤:1. A construction method for composite slab stairs, comprising the following steps: 1)确定楼梯的尺寸,主要包括楼梯的宽度、长度、踏步步数、踏步的宽度;1) Determine the size of the stairs, mainly including the width, length, number of steps, and width of the steps; 2)制作相应尺寸及数量的钢模板,包括底部整体钢板(1)、楼梯阶数个中部标准踏步模板(2)、一个上踏步模板(3)、一个下踏步模板(4);根据楼梯尺寸制作所述底部整体钢板(1),所述底部整体钢板两端弯折,弯折后的上端用于与上平台板衔接,下端用于与下平台板衔接,弯折后的上端和下端长度分别与上踏步模板(3)和一个下踏步模板(4)的宽度相当;2) Make steel formwork of corresponding size and quantity, including the overall steel plate at the bottom (1), several standard step formworks in the middle of the stair steps (2), one upper step formwork (3), and one lower step formwork (4); according to the size of the stairs Making the bottom integral steel plate (1), the two ends of the bottom integral steel plate are bent, the bent upper end is used for connecting with the upper platform plate, and the lower end is used for connecting with the lower platform plate, the length of the bent upper end and the lower end is Respectively with the width of the upper step template (3) and a lower step template (4); 3)安装楼梯模板:将各个相邻的中部标准踏步模板(2)之间、中部标准踏步模板(2)与所述底部整体钢板(1)之间固定连接,将上踏步模板(3)和下踏步模板(4)分别与相应的中部标准踏步模板(2)固定连接;每个中部标准踏步模板(2)的两侧均为直角梯形,梯形的斜边的斜率与楼梯斜率一致,底部整体钢板(1)的斜率与楼梯斜率一致;3) Install the stair formwork: between each adjacent standard step formwork (2) in the middle, between the standard step formwork (2) in the middle part and the integral steel plate (1) at the bottom, fix and connect the upper step formwork (3) and The lower step formwork (4) is fixedly connected with the corresponding middle standard step formwork (2) respectively; both sides of each middle standard step formwork (2) are right-angled trapezoids, and the slope of the trapezoid's hypotenuse is consistent with the slope of the stairs, and the bottom as a whole The slope of the steel plate (1) is consistent with the slope of the stairs; 4)在确保楼梯模板在起吊过程中能够保持平稳之处固定起吊环(6),起吊环直径须满足吊装荷载要求;4) Fix the hoisting ring (6) at the place where the stair formwork can be kept stable during the hoisting process, and the diameter of the hoisting ring must meet the hoisting load requirements; 5)将步骤(3)连接好的楼梯模板吊装就位,上踏步模板(3)和下踏步模板(4)与底部整体钢板连接处的锚栓孔应分别与上平台梁和下平台梁上预留锚栓孔位置对齐,用锚栓将上踏步模板(3)和下踏步模板(4)分别固定在上平台梁和下平台梁上,吊装完成后切掉起吊环;5) Lift the stair formwork connected in step (3) into place, and the anchor bolt holes at the connection between the upper step formwork (3) and the lower step formwork (4) and the bottom integral steel plate should be connected with the upper platform beam and the lower platform beam respectively. Align the positions of reserved anchor bolt holes, fix the upper step formwork (3) and lower step formwork (4) on the upper platform beam and the lower platform beam respectively with anchor bolts, and cut off the hoisting ring after the hoisting is completed; 6)浇筑混凝土:从楼梯模板最上端的中部标准踏步模板灌入混凝土,上一级踏步模板浇筑满后,在重力作用下,混凝土自动流入下一级踏步模板中,直至整个楼梯模板浇筑满为止。6) Pouring concrete: Pour concrete from the standard step formwork at the top of the stair formwork. After the upper step formwork is poured, under the action of gravity, the concrete will automatically flow into the next step formwork until the entire stair formwork is poured.
CN201510178530.XA 2015-04-15 2015-04-15 Construction method for combined plate staircase Expired - Fee Related CN104818809B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510178530.XA CN104818809B (en) 2015-04-15 2015-04-15 Construction method for combined plate staircase

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510178530.XA CN104818809B (en) 2015-04-15 2015-04-15 Construction method for combined plate staircase

Publications (2)

Publication Number Publication Date
CN104818809A CN104818809A (en) 2015-08-05
CN104818809B true CN104818809B (en) 2017-04-19

Family

ID=53729270

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510178530.XA Expired - Fee Related CN104818809B (en) 2015-04-15 2015-04-15 Construction method for combined plate staircase

Country Status (1)

Country Link
CN (1) CN104818809B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505747A (en) * 2017-02-27 2018-09-07 五冶集团上海有限公司 A kind of stair concreting steel form
CN107283606A (en) * 2017-08-22 2017-10-24 程丹松 Stair pour mould and stair
CN109763647A (en) * 2019-03-13 2019-05-17 中国五冶集团有限公司 Adjustable integral stair step formwork and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2345624Y (en) * 1998-12-01 1999-10-27 黑龙江省第一建筑工程公司 Shaping formwork for cast-in-place concrete stairs
CN102251664A (en) * 2011-04-26 2011-11-23 湖南省沙坪建筑有限公司 One-time forming construction method for cast-in-place stair tread template
CN202220439U (en) * 2011-08-26 2012-05-16 河南省大成建设工程有限公司 Combined steel formwork of integral stair tread
CN102747837A (en) * 2012-07-06 2012-10-24 中国十七冶集团有限公司 Cleaning method for cast-in-place reinforced concrete stair segment timber template
CN103195215A (en) * 2013-04-11 2013-07-10 北京工业大学 Reinforced concrete stringer stairway with slidable end structures and method for constructing reinforced concrete stringer stairway
JP5378877B2 (en) * 2009-05-20 2013-12-25 寛 石川 Steel frame stair tread manufacturing method
CN103669840A (en) * 2013-11-29 2014-03-26 重庆智锐德科技有限公司 Stair tread for building construction reinforcement

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2345624Y (en) * 1998-12-01 1999-10-27 黑龙江省第一建筑工程公司 Shaping formwork for cast-in-place concrete stairs
JP5378877B2 (en) * 2009-05-20 2013-12-25 寛 石川 Steel frame stair tread manufacturing method
CN102251664A (en) * 2011-04-26 2011-11-23 湖南省沙坪建筑有限公司 One-time forming construction method for cast-in-place stair tread template
CN202220439U (en) * 2011-08-26 2012-05-16 河南省大成建设工程有限公司 Combined steel formwork of integral stair tread
CN102747837A (en) * 2012-07-06 2012-10-24 中国十七冶集团有限公司 Cleaning method for cast-in-place reinforced concrete stair segment timber template
CN103195215A (en) * 2013-04-11 2013-07-10 北京工业大学 Reinforced concrete stringer stairway with slidable end structures and method for constructing reinforced concrete stringer stairway
CN103669840A (en) * 2013-11-29 2014-03-26 重庆智锐德科技有限公司 Stair tread for building construction reinforcement

Also Published As

Publication number Publication date
CN104818809A (en) 2015-08-05

Similar Documents

Publication Publication Date Title
CN104695337B (en) Self-lifting sliding and turnover construction system and construction method
CN106192758A (en) Construction method for constructing large high pier column by using cantilever formwork
CN103452126B (en) Light combined hanging box with recyclable baseplate steels and construction technology thereof
CN106400951A (en) Synchronous construction method for horizontal and vertical structures of super high-rise building
CN202055516U (en) Integral mold board elevating system of vertical shaft
CN103758348B (en) Profile steel framework structure concrete floor slab suspension mould pouring construction method
CN206487087U (en) A kind of scissor stairs of sectional
CN206722250U (en) A kind of precast stair of lightweight
CN104818809B (en) Construction method for combined plate staircase
CN115653095A (en) Method for quickly building assembled frame structure
CN104499706B (en) Hoistway formwork platform and construction method thereof
CN101298796A (en) Self-bearing type preprocessing component, self-bearing type preprocessing concrete structure and construction method thereof
CN104989092A (en) Construction method of high-altitude overhang superposition type steel truss bearing platform
CN202064281U (en) Slip form frame
CN208039864U (en) The attached lift-type discharging platform of Guiding Support Elevating Scaffold
CN212359061U (en) PC staircase safety protection operation platform
CN107965193B (en) Roof construction method for large diameter silo structure
CN104818808A (en) Permanent stair steel template
CN208152583U (en) A kind of high-building construction ancillary equipment
CN206554485U (en) Hoisting type operating platform in a kind of vertical shaft
CN218714838U (en) Self-lifting heavy-load construction platform
CN203320922U (en) Supporting device for forming of elevator shaft template
CN203701465U (en) Prefabrication type assembled stairway
CN115821770A (en) A Construction Method for Covering Girder of a Sea-Crossing Bridge
CN207314793U (en) Operating platform between a kind of regularization precast stair

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 300350 District, Jinnan District, Tianjin Haihe Education Park, 135 beautiful road, Beiyang campus of Tianjin University

Patentee after: Tianjin University

Address before: 300072 Tianjin City, Nankai District Wei Jin Road No. 92

Patentee before: Tianjin University

CP02 Change in the address of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170419

Termination date: 20210415

CF01 Termination of patent right due to non-payment of annual fee