CN104818809B - Construction method for combined plate staircase - Google Patents

Construction method for combined plate staircase Download PDF

Info

Publication number
CN104818809B
CN104818809B CN201510178530.XA CN201510178530A CN104818809B CN 104818809 B CN104818809 B CN 104818809B CN 201510178530 A CN201510178530 A CN 201510178530A CN 104818809 B CN104818809 B CN 104818809B
Authority
CN
China
Prior art keywords
template
stair
time
plate
marking time
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201510178530.XA
Other languages
Chinese (zh)
Other versions
CN104818809A (en
Inventor
荣彬
刘睿
吴辽
荣成
卓孝领
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201510178530.XA priority Critical patent/CN104818809B/en
Publication of CN104818809A publication Critical patent/CN104818809A/en
Application granted granted Critical
Publication of CN104818809B publication Critical patent/CN104818809B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention relates to a construction method for a combined plate staircase. The construction method comprises the following steps that: a corresponding number of steel templates with the corresponding dimensions are manufactured according to the dimension of the staircase, wherein the steel templates comprise a bottom integral steel plate (1), middle standard pedaling templates (2) with the same number as the staircase steps, an upper pedaling template (3) and a lower pedaling template (4); the bottom integral steel plate (1) is manufactured according to the dimension of the staircase; the two ends of the bottom integral steel plate are bent; the bent upper end is used for being connected with an upper platform plate, and the bent lower end is used for being connected with a lower platform plate; the length of the bent upper end is identical to the width of the upper pedaling template (3), and the length of the bent lower end is identical to the width of the lower pedaling template (4); the staircase template is installed; a hoisting ring (6) is fixed; hanging to proper positions are performed, the upper pedaling template (3) is fixed on an upper platform beam through screw bolts, and the lower pedaling template (4) is fixed on a lower platform beam through screw bolts; and concrete is cast. The construction method has the advantages that the staircase construction operation can be simple; the staircase quality is improved; and the cost is reduced.

Description

A kind of construction method of compoboard stair
Art
The invention belongs to building engineering field, and in particular to a kind of stair construction method.
Background technology
Stair are the vertical transportation facilities in building, its quality for it is normal use and emergency case process have to Close important effect.At present stair are generally dissipated using wooden template and spell construction, and formwork rigidity stability is poor, Jing often occur race mould, The phenomenons such as displacement, affect construction quality;And the formwork time is long, installation and removal inconvenience may make when concrete strength is inadequate Into destruction, construction is complicated, and efficiency is low;It is less that plank sheathing makes material source, welding and relatively costly.Therefore, wooden template is used The method that scattered spelling carries out stair construction has much room for improvement.
The content of the invention
The present invention provides a kind of stair construction method to solve the above-mentioned problems in the prior art.This can make Obtain stair constructing operation simply and stair quality and reduces cost can be improved.The technical solution used in the present invention is:
A kind of construction method of compoboard stair, comprises the following steps:
1) size of stair is determined, main width including stair, length, step number of marking time, the width marked time.
2) steel form of corresponding size and quantity is made, including bottom integral plate (1), stair exponent number Central Standard are stepped on Step template (2), template (3) of marking time on, template (4) of marking time under;The bottom overall steel is made according to stair size Plate (1), the bottom integral plate two ends bending, the upper end after bending is used to be connected with upper mounting plate plate, and lower end is used for flat with lower Platen is connected, the top and bottom length after bending respectively with mark time the width phase of template (4) under template of above marking time (3) and one When;
3) stair template is installed:Each adjacent Central Standard is marked time between template (2), Central Standard template (2) with Be fixedly connected between the bottom integral plate (1), template of marking time by (3) and under mark time template (4) respectively with it is corresponding in Ministerial standard template (2) of marking time is fixedly connected;The mark time both sides of template (2) of each Central Standard are right-angled trapezium, and trapezoidal is oblique The slope on side is consistent with stair slope, and the slope of bottom integral plate (1) is consistent with stair slope;
4) guarantee stair template during lifting can fixed hoisting ring (6) in place of held stationary, lift by crane ring diameter Lifting load requirement must be met.
5) the stair template lifting for connecting step (3) is in place, template of above marking time (3) and under mark time template (4) and bottom The anchor hole of portion integral plate junction should reserve anchor hole aligned in position with upper mounting plate beam and lower platform beam respectively, use crab-bolt Template of marking time by (3) and under template (4) of marking time be separately fixed on upper mounting plate beam and lower platform beam, cut away after the completion of lifting Suspension ring;
6) casting concrete:Mark time template penetration concrete from the intermediate standard of stair template the top, upper level is marked time After template is poured completely, under gravity, concrete automatically flows into next stage and marks time in template, until whole stair template is poured Till full.
The present invention has the advantages and positive effects that:
(1) punching block panel stiffness stability is strong, and concrete is unlikely to deform, and presentation quality is good, it is ensured that construction quality;
(2) steel form can be mounted directly in place, simple to operate without the need for dismounting, saving work as permanent formwork during construction When, construction safety;
(3) timber, environmental protection are saved;
(4) steel form and concrete can bond integral cooperation, so as to effectively increase the bearing capacity of stair.
Description of the drawings
Fig. 1 is the structural representation of this combined staircase;
Fig. 2 is that standard is marked time template schematic diagram;
Fig. 3 is template schematic diagram of marking time up and down;
In figure:1- integral plates, 2- standards mark time mark time on template, 3- mark time under template, 4- template, 5a, high-strength bolt, 5b- crab-bolts, 6- hoisting rings, 7- bolts hole, 8- anchor holes.
Specific embodiment
Embodiments of the invention are described in detail below in conjunction with the accompanying drawings.
Referring to Fig. 1, the stair process of the present invention is as follows:
(1) size of stair is measured and is checked, main width including stair, length, step number of marking time, marked time Width etc..
(2) template is made.According to data make corresponding size and the steel form of quantity, the steel form includes integral plate 1st, stair exponent number Central Standard being marked time template 4, high-strength bolt 5a, the crab-bolt of mark time under template 3, of mark time in template 2, 5b and hoisting ring 6.
Template concrete construction method is as follows:
First the bottom integral plate 1 is made according to stair size, the integral plate two ends are marked time up and down template width Degree carries out bending at position, and bending angle is consistent with the slope of stairs, and in the bolt position being connected with the template 2,3,4 of marking time Open bolt hole in place;
Make respectively the standard mark time template 2, on mark time template 3 and under mark time template 4, and open spiral shell in relevant position Keyhole, as shown in Figures 2 and 3;
To be connected with the high-strength bolt 5a between the standard form 2, between standard form 2 and the bottom steel plate 1, The template 3,4 of marking time up and down is connected respectively with the standard form 2, is now not connected to mark time up and down template 3,4 and bottom steel Plate 1;
Hoisting ring 6 is welded in relevant position, lifting ring diameter must meet lifting load requirement, and welding position must carry out moment of flexure Mechanics Calculation, it is ensured that stair template being capable of held stationary during lifting.
(3) installation form.Steel form is lifted it is in place, template of marking time up and down and the anchor hole of steel plate junction should with it is upper and lower Anchor hole aligned in position is reserved on landing beam, template of marking time up and down is separately fixed on upper and lower landing beam with crab-bolt 5b, lifted After the completion of cut away hoisting ring.Note fitting stair step absolute altitude, original position and levelness in model sheetinstallat work progress When adjustment.
(4) casting concrete.From the template penetration concrete of marking time of stair template the top, upper level template of marking time is poured Man Hou, under gravity, concrete automatically flows into next stage and marks time in template, till whole steel form is poured completely.Pour After the completion of building, concrete surface is automatically smooth, and outward appearance is good.
(5) concrete curing.Note the destruction artificial to concrete, until can normally use, without the need for dismantling template, steel Template is stayed in stair as permanent template, the arrangement of reinforcement in the steel plate of concrete base can replace concrete, is effectively improved The bearing capacity of concrete.
The present invention has the advantages and positive effects that:Punching block panel stiffness stability is strong, and concrete is unlikely to deform, outward appearance matter Measure, it is ensured that construction quality;Steel form can be mounted directly as permanent formwork, during construction it is in place, without the need for dismounting, operation letter It is single, save man-hour, construction safety;Save timber, environmental protection;Steel form and concrete can bond integral cooperation, So as to effectively increase the bearing capacity of stair.
Although being described to the preferred embodiments of the present invention above in conjunction with accompanying drawing, the invention is not limited in The specific embodiment stated, above-mentioned specific embodiment is only schematic, be not it is restricted, this area it is common Technical staff in the case of without departing from present inventive concept and scope of the claimed protection, may be used also under the enlightenment of the present invention To make many forms, these are belonged within protection scope of the present invention.

Claims (1)

1. a kind of construction method of compoboard stair, comprises the following steps:
1) size of stair is determined, main width including stair, length, step number of marking time, the width marked time;
2) steel form of corresponding size and quantity is made, including bottom integral plate (1), stair exponent number Central Standard are marked time mould Plate (2), template (3) of marking time on, template (4) of marking time under;The bottom integral plate is made according to stair size (1), the bottom integral plate two ends bending, the upper end after bending is used to be connected with upper mounting plate plate, and lower end is used for and lower platform Plate is connected, the top and bottom length after bending respectively with mark time the width phase of template (4) under template of above marking time (3) and one When;
3) stair template is installed:Each adjacent Central Standard is marked time between template (2), Central Standard mark time template (2) with Be fixedly connected between the bottom integral plate (1), template of marking time by (3) and under mark time template (4) respectively with it is corresponding in Ministerial standard template (2) of marking time is fixedly connected;The mark time both sides of template (2) of each Central Standard are right-angled trapezium, and trapezoidal is oblique The slope on side is consistent with stair slope, and the slope of bottom integral plate (1) is consistent with stair slope;
4) guarantee stair template during lifting can fixed hoisting ring (6) in place of held stationary, lifting ring diameter must expire Foot lifting load requirement;
5) the stair template lifting for connecting step (3) is in place, template of above marking time (3) and under template (4) of marking time it is whole with bottom The anchor hole of body steel plate junction should reserve anchor hole aligned in position with upper mounting plate beam and lower platform beam respectively, will be upper with crab-bolt Template of marking time (3) and under template (4) of marking time be separately fixed on upper mounting plate beam and lower platform beam, lifting is cut away after the completion of lifting Ring;
6) casting concrete:Mark time template penetration concrete from the Central Standard of stair template the top, upper level is marked time template After pouring completely, under gravity, concrete automatically flows into next stage and marks time in template, until whole stair template pours and is completely Only.
CN201510178530.XA 2015-04-15 2015-04-15 Construction method for combined plate staircase Expired - Fee Related CN104818809B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510178530.XA CN104818809B (en) 2015-04-15 2015-04-15 Construction method for combined plate staircase

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510178530.XA CN104818809B (en) 2015-04-15 2015-04-15 Construction method for combined plate staircase

Publications (2)

Publication Number Publication Date
CN104818809A CN104818809A (en) 2015-08-05
CN104818809B true CN104818809B (en) 2017-04-19

Family

ID=53729270

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510178530.XA Expired - Fee Related CN104818809B (en) 2015-04-15 2015-04-15 Construction method for combined plate staircase

Country Status (1)

Country Link
CN (1) CN104818809B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505747A (en) * 2017-02-27 2018-09-07 五冶集团上海有限公司 A kind of stair concreting steel form
CN107283606A (en) * 2017-08-22 2017-10-24 程丹松 Stair pour mould and stair
CN109763647A (en) * 2019-03-13 2019-05-17 中国五冶集团有限公司 Adjustable entirety stair tread formwork and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2345624Y (en) * 1998-12-01 1999-10-27 黑龙江省第一建筑工程公司 Shaping formwork for cast-in-place concrete stairs
CN102251664A (en) * 2011-04-26 2011-11-23 湖南省沙坪建筑有限公司 One-time forming construction method for cast-in-place stair tread template
CN202220439U (en) * 2011-08-26 2012-05-16 河南省大成建设工程有限公司 Combined steel template of integral stair plate
CN102747837A (en) * 2012-07-06 2012-10-24 中国十七冶集团有限公司 Cleaning method for cast-in-place reinforced concrete stair segment timber template
CN103195215A (en) * 2013-04-11 2013-07-10 北京工业大学 Reinforced concrete stringer stairway with slidable end structures and method for constructing reinforced concrete stringer stairway
JP5378877B2 (en) * 2009-05-20 2013-12-25 寛 石川 Steel frame stair tread manufacturing method
CN103669840A (en) * 2013-11-29 2014-03-26 重庆智锐德科技有限公司 Stair tread for building construction reinforcement

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2345624Y (en) * 1998-12-01 1999-10-27 黑龙江省第一建筑工程公司 Shaping formwork for cast-in-place concrete stairs
JP5378877B2 (en) * 2009-05-20 2013-12-25 寛 石川 Steel frame stair tread manufacturing method
CN102251664A (en) * 2011-04-26 2011-11-23 湖南省沙坪建筑有限公司 One-time forming construction method for cast-in-place stair tread template
CN202220439U (en) * 2011-08-26 2012-05-16 河南省大成建设工程有限公司 Combined steel template of integral stair plate
CN102747837A (en) * 2012-07-06 2012-10-24 中国十七冶集团有限公司 Cleaning method for cast-in-place reinforced concrete stair segment timber template
CN103195215A (en) * 2013-04-11 2013-07-10 北京工业大学 Reinforced concrete stringer stairway with slidable end structures and method for constructing reinforced concrete stringer stairway
CN103669840A (en) * 2013-11-29 2014-03-26 重庆智锐德科技有限公司 Stair tread for building construction reinforcement

Also Published As

Publication number Publication date
CN104818809A (en) 2015-08-05

Similar Documents

Publication Publication Date Title
CN103938796B (en) Cast-in-situ reinforced concrete column construction
CN104141383B (en) A kind of Bailey beam pendent form support system and construction thereof
CN204266590U (en) Sump, hoistway formwork bed die anti-floating system
CN104818809B (en) Construction method for combined plate staircase
CN109025291A (en) A kind of construction method of separate type precast stair
CN105464216B (en) Construction method based on integral lifting formwork-strengthening system superelevation super-section batter post
CN205476467U (en) Prefabricated steel stair template with adjustable
CN107806019A (en) Large-span suspension bridge gate Sarasota construction method
CN105804395A (en) Staircase one-step continuous casting forming construction method based on integral shaped formwork
CN102900024A (en) Overturning die plate for large-scale concrete structure and using method for overturning die plate
CN201738250U (en) Arch culvert and arch ring steel die trolley
CN202064281U (en) Slip form frame
CN109025275A (en) A kind of shear wall side regularization stair punching block and installation method
CN208456122U (en) A kind of stair, which pour, uses steel form
CN104499706A (en) Elevator well template platform and construction method thereof
CN111663455A (en) Trackless light hydraulic creeping formwork
CN206189607U (en) Rag bolt location structure
CN216551573U (en) Built-in steel tower column splicing construction assembly structure
CN203113515U (en) Slip form jacking integrated device
CN105480842B (en) Equipment support beam and its construction method are poured after one kind
CN205742982U (en) A kind of printing opacity template for building
CN212359061U (en) PC staircase safety protection operation platform
CN205314539U (en) Large -scale cantilever type combination steel form
CN114856195A (en) Post-pouring construction method for floor slab at building pipe well
CN212836352U (en) Be applicable to subway station Z type stair structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 300350 District, Jinnan District, Tianjin Haihe Education Park, 135 beautiful road, Beiyang campus of Tianjin University

Patentee after: Tianjin University

Address before: 300072 Tianjin City, Nankai District Wei Jin Road No. 92

Patentee before: Tianjin University

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170419

Termination date: 20210415