CN104818809A - Construction method for combined plate staircase - Google Patents
Construction method for combined plate staircase Download PDFInfo
- Publication number
- CN104818809A CN104818809A CN201510178530.XA CN201510178530A CN104818809A CN 104818809 A CN104818809 A CN 104818809A CN 201510178530 A CN201510178530 A CN 201510178530A CN 104818809 A CN104818809 A CN 104818809A
- Authority
- CN
- China
- Prior art keywords
- template
- stair
- time
- steel plate
- staircase
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Steps, Ramps, And Handrails (AREA)
Abstract
The invention relates to a construction method for a combined plate staircase. The construction method comprises the following steps that: a corresponding number of steel templates with the corresponding dimensions are manufactured according to the dimension of the staircase, wherein the steel templates comprise a bottom integral steel plate (1), middle standard pedaling templates (2) with the same number as the staircase steps, an upper pedaling template (3) and a lower pedaling template (4); the bottom integral steel plate (1) is manufactured according to the dimension of the staircase; the two ends of the bottom integral steel plate are bent; the bent upper end is used for being connected with an upper platform plate, and the bent lower end is used for being connected with a lower platform plate; the length of the bent upper end is identical to the width of the upper pedaling template (3), and the length of the bent lower end is identical to the width of the lower pedaling template (4); the staircase template is installed; a hoisting ring (6) is fixed; hanging to proper positions are performed, the upper pedaling template (3) is fixed on an upper platform beam through screw bolts, and the lower pedaling template (4) is fixed on a lower platform beam through screw bolts; and concrete is cast. The construction method has the advantages that the staircase construction operation can be simple; the staircase quality is improved; and the cost is reduced.
Description
Art
The invention belongs to building engineering field, be specifically related to a kind of stair construction method.
Background technology
Stair are the vertical transportation facilities in building, and its quality has vital effect for the process of normal use and emergency case.Current stair adopt loose spelling of wooden template to construct usually, and formwork rigidity poor stability often occurs to run the phenomenon such as mould, displacement, affects workmanship; And the formwork time is long, installation and removal inconvenience, may damage when concrete strength is inadequate, and construction is complicated, and efficiency is low; It is less that wooden form makes material source, welding and cost is higher.Therefore, fall apart by wooden template and spell the method for carrying out stair construction and have much room for improvement.
Summary of the invention
The present invention provides a kind of stair construction method for solving the above-mentioned problems in the prior art.This can make stair constructing operation simple and can improve stair quality and reduce costs.The technical solution used in the present invention is:
A construction method for compoboard stair, comprises the following steps:
1) determine the size of stair, mainly comprise the width of stair, length, step number of marking time, the width of marking time.
2) make the steel form of corresponding size and quantity, comprise bottom integrated steel plate (1), a stair exponent number Central Standard marks time template (2), template (3) that is marked time, template (4) of marking time under; Described bottom integrated steel plate (1) is made according to stair size, the bending of described bottom integrated steel plate two ends, upper end after bending is used for being connected with upper mounting plate plate, lower end is used for being connected with lower platform plate, and the top and bottom length after bending is suitable with the mark time width of template (4) under template of above marking time (3) and respectively;
3) stair template is installed: marked time by each adjacent Central Standard between template (2), between Central Standard template (2) with described bottom integrated steel plate (1) and be fixedly connected with, by mark time template (3) with under template (4) template (2) of marking time with corresponding Central Standard respectively of marking time be fixedly connected with; The mark time both sides of template (2) of each Central Standard are right-angled trapezium, and the slope of trapezoidal hypotenuse is consistent with stair slope, and the slope of bottom integrated steel plate (1) is consistent with stair slope;
4) guaranteeing that stair template can held stationary part fixed hoisting ring (6) in lifting process, hoisting ring diameter must meet lifting load requirement.
5) by stair template hoisted in position that step (3) connects, on mark time template (3) and under mark time template (4) and bottom integrated steel plate junction anchor hole should respectively with reserved anchor hole aligned in position on upper mounting plate beam and lower platform beam, with crab-bolt by mark time template (3) and under template (4) of marking time be separately fixed on upper mounting plate beam and lower platform beam, cut away hoisting ring after having lifted;
6) concreting: to mark time template penetration concrete from stair template intermediate standard topmost, upper level mark time template build full after, under gravity, concrete automatically flows into next stage and marks time in template, until whole stair template build full till.
The advantage that the present invention has and good effect are:
(1) steel form rigidity stability is strong, and concrete is not yielding, and presentation quality is good, ensure that workmanship;
(2) steel form is as permanent formwork, can direct installation in position during construction, without the need to dismounting, simple to operate, saves man-hour, construction safety;
(3) timber is saved, protection of the environment;
(4) steel form and concrete can be bonded to overall co-operation, thus effectively improve the bearing capacity of stair.
Accompanying drawing explanation
Fig. 1 is the structural representation of this combined staircase;
Fig. 2 is that standard is marked time template schematic diagram;
Fig. 3 is template schematic diagram of marking time up and down;
In figure: 1-integral plate, 2-standard are marked time template, 5a, high-strength bolt, 5b-crab-bolt, 6-hoisting ring, 7-bolt hole, the 8-anchor hole of marking time under template, 4-that template, 3-mark time.
Detailed description of the invention
Below in conjunction with accompanying drawing, embodiments of the invention are described in detail.
See Fig. 1, stair process of the present invention is as follows:
(1) size of stair is measured and checked, mainly comprise the width of stair, length, step number of marking time, the width etc. of marking time.
(2) template is made.According to the steel form of data make corresponding size and quantity, mark time under template 3, that template 2, that described steel form comprises integral plate 1, a stair exponent number Central Standard is marked time is marked time template 4, high-strength bolt 5a, crab-bolt 5b and hoisting ring 6.
Template concrete construction method is as follows:
First make described bottom integrated steel plate 1 according to stair size, bending is carried out in template width position of marking time up and down, described integral plate two ends, and bending angle is consistent with the slope of stairs, and opens bolt hole at the bolt position place be connected with described template 2,3,4 of marking time;
Make respectively described standard mark time template 2, on mark time template 3 and under to mark time template 4, and open bolt hole in relevant position, as shown in Figures 2 and 3;
Be connected between described standard form 2, between standard form 2 with described bottom steel plate 1 with described high-strength bolt 5a, described template 3,4 of marking time up and down is connected with described standard form 2 respectively, does not now connect mark time up and down template 3,4 and bottom steel plate 1;
At relevant position welding hoisting ring 6, hoisting ring diameter must meet lifting load requirement, and moment of flexure mechanical calculation must be carried out in welding position, guarantees that stair template can held stationary in lifting process.
(3) installation form.By steel form hoisted in position, the anchor hole of template of marking time up and down and steel plate junction should with reserved anchor hole aligned in position on upper and lower landing beam, with crab-bolt 5b, template of marking time up and down is separately fixed on upper and lower landing beam, after having lifted, cuts away hoisting ring.Note in model sheetinstallat work progress carrying out suitable adjustment to stair step absolute altitude, original position and levelness.
(4) concreting.From stair template template penetration concrete of marking time topmost, upper level mark time template build full after, under gravity, concrete automatically flows into next stage and marks time in template, until whole steel form build full till.After having built, concrete surface is automatically smooth, and outward appearance is good.
(5) concrete curing.Note the destruction artificial to concrete, until can normally use, without the need to dismantling template, steel form is stayed in stair as permanent template, can replace the arrangement of reinforcement in concrete at the steel plate of concrete base, effectively improves concrete bearing capacity.
The advantage that the present invention has and good effect are: steel form rigidity stability is strong, and concrete is not yielding, and presentation quality is good, ensure that workmanship; Steel form, can direct installation in position during construction as permanent formwork, without the need to dismounting, simple to operate, saves man-hour, construction safety; Save timber, protection of the environment; Steel form and concrete can be bonded to overall co-operation, thus effectively improve the bearing capacity of stair.
Although be described the preferred embodiments of the present invention by reference to the accompanying drawings above; but the present invention is not limited to above-mentioned detailed description of the invention; above-mentioned detailed description of the invention is only schematic; be not restrictive; those of ordinary skill in the art is under enlightenment of the present invention; do not departing under the ambit that present inventive concept and claim protect, can also make a lot of form, these all belong within protection scope of the present invention.
Claims (1)
1. a construction method for compoboard stair, comprises the following steps:
1) determine the size of stair, mainly comprise the width of stair, length, step number of marking time, the width of marking time.
2) make the steel form of corresponding size and quantity, comprise bottom integrated steel plate (1), a stair exponent number Central Standard marks time template (2), template (3) that is marked time, template (4) of marking time under; Described bottom integrated steel plate (1) is made according to stair size, the bending of described bottom integrated steel plate two ends, upper end after bending is used for being connected with upper mounting plate plate, lower end is used for being connected with lower platform plate, and the top and bottom length after bending is suitable with the mark time width of template (4) under template of above marking time (3) and respectively;
3) stair template is installed: marked time by each adjacent Central Standard between template (2), between Central Standard template (2) with described bottom integrated steel plate (1) and be fixedly connected with, by mark time template (3) with under template (4) template (2) of marking time with corresponding Central Standard respectively of marking time be fixedly connected with; The mark time both sides of template (2) of each Central Standard are right-angled trapezium, and the slope of trapezoidal hypotenuse is consistent with stair slope, and the slope of bottom integrated steel plate (1) is consistent with stair slope;
4) guaranteeing that stair template can held stationary part fixed hoisting ring (6) in lifting process, hoisting ring diameter must meet lifting load requirement.
5) by stair template hoisted in position that step (3) connects, on mark time template (3) and under mark time template (4) and bottom integrated steel plate junction anchor hole should respectively with reserved anchor hole aligned in position on upper mounting plate beam and lower platform beam, with crab-bolt by mark time template (3) and under template (4) of marking time be separately fixed on upper mounting plate beam and lower platform beam, cut away hoisting ring after having lifted;
6) concreting: to mark time template penetration concrete from stair template intermediate standard topmost, upper level mark time template build full after, under gravity, concrete automatically flows into next stage and marks time in template, until whole stair template build full till.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510178530.XA CN104818809B (en) | 2015-04-15 | 2015-04-15 | Construction method for combined plate staircase |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510178530.XA CN104818809B (en) | 2015-04-15 | 2015-04-15 | Construction method for combined plate staircase |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104818809A true CN104818809A (en) | 2015-08-05 |
CN104818809B CN104818809B (en) | 2017-04-19 |
Family
ID=53729270
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510178530.XA Expired - Fee Related CN104818809B (en) | 2015-04-15 | 2015-04-15 | Construction method for combined plate staircase |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104818809B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107283606A (en) * | 2017-08-22 | 2017-10-24 | 程丹松 | Stair pour mould and stair |
CN108505747A (en) * | 2017-02-27 | 2018-09-07 | 五冶集团上海有限公司 | A kind of stair concreting steel form |
CN109763647A (en) * | 2019-03-13 | 2019-05-17 | 中国五冶集团有限公司 | Adjustable entirety stair tread formwork and construction method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2345624Y (en) * | 1998-12-01 | 1999-10-27 | 黑龙江省第一建筑工程公司 | Shaping formwork for cast-in-place concrete stairs |
CN102251664A (en) * | 2011-04-26 | 2011-11-23 | 湖南省沙坪建筑有限公司 | One-time forming construction method for cast-in-place stair tread template |
CN202220439U (en) * | 2011-08-26 | 2012-05-16 | 河南省大成建设工程有限公司 | Combined steel formwork of integral stair tread |
CN102747837A (en) * | 2012-07-06 | 2012-10-24 | 中国十七冶集团有限公司 | Cleaning method for cast-in-place reinforced concrete stair segment timber template |
CN103195215A (en) * | 2013-04-11 | 2013-07-10 | 北京工业大学 | Reinforced concrete stringer stairway with slidable end structures and method for constructing reinforced concrete stringer stairway |
JP5378877B2 (en) * | 2009-05-20 | 2013-12-25 | 寛 石川 | Steel frame stair tread manufacturing method |
CN103669840A (en) * | 2013-11-29 | 2014-03-26 | 重庆智锐德科技有限公司 | Stair tread for building construction reinforcement |
-
2015
- 2015-04-15 CN CN201510178530.XA patent/CN104818809B/en not_active Expired - Fee Related
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2345624Y (en) * | 1998-12-01 | 1999-10-27 | 黑龙江省第一建筑工程公司 | Shaping formwork for cast-in-place concrete stairs |
JP5378877B2 (en) * | 2009-05-20 | 2013-12-25 | 寛 石川 | Steel frame stair tread manufacturing method |
CN102251664A (en) * | 2011-04-26 | 2011-11-23 | 湖南省沙坪建筑有限公司 | One-time forming construction method for cast-in-place stair tread template |
CN202220439U (en) * | 2011-08-26 | 2012-05-16 | 河南省大成建设工程有限公司 | Combined steel formwork of integral stair tread |
CN102747837A (en) * | 2012-07-06 | 2012-10-24 | 中国十七冶集团有限公司 | Cleaning method for cast-in-place reinforced concrete stair segment timber template |
CN103195215A (en) * | 2013-04-11 | 2013-07-10 | 北京工业大学 | Reinforced concrete stringer stairway with slidable end structures and method for constructing reinforced concrete stringer stairway |
CN103669840A (en) * | 2013-11-29 | 2014-03-26 | 重庆智锐德科技有限公司 | Stair tread for building construction reinforcement |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108505747A (en) * | 2017-02-27 | 2018-09-07 | 五冶集团上海有限公司 | A kind of stair concreting steel form |
CN107283606A (en) * | 2017-08-22 | 2017-10-24 | 程丹松 | Stair pour mould and stair |
CN109763647A (en) * | 2019-03-13 | 2019-05-17 | 中国五冶集团有限公司 | Adjustable entirety stair tread formwork and construction method |
Also Published As
Publication number | Publication date |
---|---|
CN104818809B (en) | 2017-04-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105971271B (en) | Unilateral cantilever form and its construction method of climbing certainly | |
CN103161126A (en) | Road bridge variable section hollow high pier slip-form construction method | |
CN106192758A (en) | Construction method for constructing large high pier column by using cantilever formwork | |
CN104583510A (en) | A lift truck operated stacking formwork table system and a method of operation thereof | |
CN109025291A (en) | A kind of construction method of separate type precast stair | |
CN205840191U (en) | A kind of thin webbed girder formula precast stair separated with bench of marking time | |
CN104818809A (en) | Construction method for combined plate staircase | |
CN203474271U (en) | Special assembly type rail base for portal crane | |
CN113482312A (en) | Guide type double-layer structure elevator shaft operating platform and construction method based on platform | |
CN104876131A (en) | Method for dismantling large tower crane by using small tower crane | |
CN204781927U (en) | Elevartor shaft formwork and elevartor shaft concrete placement operation platform | |
CN101298796A (en) | Self-bearing type preprocessing component, self-bearing type preprocessing concrete structure and construction method thereof | |
CN204738536U (en) | Subway station side wall concrete form support frame | |
CN104499706B (en) | Hoistway formwork platform and construction method thereof | |
CN104404888A (en) | Large hoisting system allowing gradient to be adjusted in air and application | |
CN204059906U (en) | Elevator hoistways Integral lifting type steel scaffold | |
CN203113515U (en) | Slip form jacking integrated device | |
CN208456122U (en) | A kind of stair, which pour, uses steel form | |
CN103726449B (en) | Automatically fall Liangping table apparatus and the construction method for changing railway beam thereof | |
CN213774481U (en) | A template supporting construction for building engineering construction | |
CN104818808A (en) | Permanent stair steel template | |
CN101457587A (en) | Template mutual-lifting type climbing formwork device and method | |
CN204040442U (en) | Integral lifting type elevator shaft operating platform | |
CN204199691U (en) | A kind of handrail formwork for placing structure of spiral stairs | |
CN209163450U (en) | A kind of tool-type prefabricated reinforced concrete composite beam support device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP02 | Change in the address of a patent holder |
Address after: 300350 District, Jinnan District, Tianjin Haihe Education Park, 135 beautiful road, Beiyang campus of Tianjin University Patentee after: Tianjin University Address before: 300072 Tianjin City, Nankai District Wei Jin Road No. 92 Patentee before: Tianjin University |
|
CP02 | Change in the address of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170419 Termination date: 20210415 |
|
CF01 | Termination of patent right due to non-payment of annual fee |