CN104818809A - Construction method for combined plate staircase - Google Patents

Construction method for combined plate staircase Download PDF

Info

Publication number
CN104818809A
CN104818809A CN201510178530.XA CN201510178530A CN104818809A CN 104818809 A CN104818809 A CN 104818809A CN 201510178530 A CN201510178530 A CN 201510178530A CN 104818809 A CN104818809 A CN 104818809A
Authority
CN
China
Prior art keywords
template
stair
time
steel plate
staircase
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510178530.XA
Other languages
Chinese (zh)
Other versions
CN104818809B (en
Inventor
荣彬
刘睿
吴辽
荣成
卓孝领
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin University
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201510178530.XA priority Critical patent/CN104818809B/en
Publication of CN104818809A publication Critical patent/CN104818809A/en
Application granted granted Critical
Publication of CN104818809B publication Critical patent/CN104818809B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The invention relates to a construction method for a combined plate staircase. The construction method comprises the following steps that: a corresponding number of steel templates with the corresponding dimensions are manufactured according to the dimension of the staircase, wherein the steel templates comprise a bottom integral steel plate (1), middle standard pedaling templates (2) with the same number as the staircase steps, an upper pedaling template (3) and a lower pedaling template (4); the bottom integral steel plate (1) is manufactured according to the dimension of the staircase; the two ends of the bottom integral steel plate are bent; the bent upper end is used for being connected with an upper platform plate, and the bent lower end is used for being connected with a lower platform plate; the length of the bent upper end is identical to the width of the upper pedaling template (3), and the length of the bent lower end is identical to the width of the lower pedaling template (4); the staircase template is installed; a hoisting ring (6) is fixed; hanging to proper positions are performed, the upper pedaling template (3) is fixed on an upper platform beam through screw bolts, and the lower pedaling template (4) is fixed on a lower platform beam through screw bolts; and concrete is cast. The construction method has the advantages that the staircase construction operation can be simple; the staircase quality is improved; and the cost is reduced.

Description

A kind of construction method of compoboard stair
Art
The invention belongs to building engineering field, be specifically related to a kind of stair construction method.
Background technology
Stair are the vertical transportation facilities in building, and its quality has vital effect for the process of normal use and emergency case.Current stair adopt loose spelling of wooden template to construct usually, and formwork rigidity poor stability often occurs to run the phenomenon such as mould, displacement, affects workmanship; And the formwork time is long, installation and removal inconvenience, may damage when concrete strength is inadequate, and construction is complicated, and efficiency is low; It is less that wooden form makes material source, welding and cost is higher.Therefore, fall apart by wooden template and spell the method for carrying out stair construction and have much room for improvement.
Summary of the invention
The present invention provides a kind of stair construction method for solving the above-mentioned problems in the prior art.This can make stair constructing operation simple and can improve stair quality and reduce costs.The technical solution used in the present invention is:
A construction method for compoboard stair, comprises the following steps:
1) determine the size of stair, mainly comprise the width of stair, length, step number of marking time, the width of marking time.
2) make the steel form of corresponding size and quantity, comprise bottom integrated steel plate (1), a stair exponent number Central Standard marks time template (2), template (3) that is marked time, template (4) of marking time under; Described bottom integrated steel plate (1) is made according to stair size, the bending of described bottom integrated steel plate two ends, upper end after bending is used for being connected with upper mounting plate plate, lower end is used for being connected with lower platform plate, and the top and bottom length after bending is suitable with the mark time width of template (4) under template of above marking time (3) and respectively;
3) stair template is installed: marked time by each adjacent Central Standard between template (2), between Central Standard template (2) with described bottom integrated steel plate (1) and be fixedly connected with, by mark time template (3) with under template (4) template (2) of marking time with corresponding Central Standard respectively of marking time be fixedly connected with; The mark time both sides of template (2) of each Central Standard are right-angled trapezium, and the slope of trapezoidal hypotenuse is consistent with stair slope, and the slope of bottom integrated steel plate (1) is consistent with stair slope;
4) guaranteeing that stair template can held stationary part fixed hoisting ring (6) in lifting process, hoisting ring diameter must meet lifting load requirement.
5) by stair template hoisted in position that step (3) connects, on mark time template (3) and under mark time template (4) and bottom integrated steel plate junction anchor hole should respectively with reserved anchor hole aligned in position on upper mounting plate beam and lower platform beam, with crab-bolt by mark time template (3) and under template (4) of marking time be separately fixed on upper mounting plate beam and lower platform beam, cut away hoisting ring after having lifted;
6) concreting: to mark time template penetration concrete from stair template intermediate standard topmost, upper level mark time template build full after, under gravity, concrete automatically flows into next stage and marks time in template, until whole stair template build full till.
The advantage that the present invention has and good effect are:
(1) steel form rigidity stability is strong, and concrete is not yielding, and presentation quality is good, ensure that workmanship;
(2) steel form is as permanent formwork, can direct installation in position during construction, without the need to dismounting, simple to operate, saves man-hour, construction safety;
(3) timber is saved, protection of the environment;
(4) steel form and concrete can be bonded to overall co-operation, thus effectively improve the bearing capacity of stair.
Accompanying drawing explanation
Fig. 1 is the structural representation of this combined staircase;
Fig. 2 is that standard is marked time template schematic diagram;
Fig. 3 is template schematic diagram of marking time up and down;
In figure: 1-integral plate, 2-standard are marked time template, 5a, high-strength bolt, 5b-crab-bolt, 6-hoisting ring, 7-bolt hole, the 8-anchor hole of marking time under template, 4-that template, 3-mark time.
Detailed description of the invention
Below in conjunction with accompanying drawing, embodiments of the invention are described in detail.
See Fig. 1, stair process of the present invention is as follows:
(1) size of stair is measured and checked, mainly comprise the width of stair, length, step number of marking time, the width etc. of marking time.
(2) template is made.According to the steel form of data make corresponding size and quantity, mark time under template 3, that template 2, that described steel form comprises integral plate 1, a stair exponent number Central Standard is marked time is marked time template 4, high-strength bolt 5a, crab-bolt 5b and hoisting ring 6.
Template concrete construction method is as follows:
First make described bottom integrated steel plate 1 according to stair size, bending is carried out in template width position of marking time up and down, described integral plate two ends, and bending angle is consistent with the slope of stairs, and opens bolt hole at the bolt position place be connected with described template 2,3,4 of marking time;
Make respectively described standard mark time template 2, on mark time template 3 and under to mark time template 4, and open bolt hole in relevant position, as shown in Figures 2 and 3;
Be connected between described standard form 2, between standard form 2 with described bottom steel plate 1 with described high-strength bolt 5a, described template 3,4 of marking time up and down is connected with described standard form 2 respectively, does not now connect mark time up and down template 3,4 and bottom steel plate 1;
At relevant position welding hoisting ring 6, hoisting ring diameter must meet lifting load requirement, and moment of flexure mechanical calculation must be carried out in welding position, guarantees that stair template can held stationary in lifting process.
(3) installation form.By steel form hoisted in position, the anchor hole of template of marking time up and down and steel plate junction should with reserved anchor hole aligned in position on upper and lower landing beam, with crab-bolt 5b, template of marking time up and down is separately fixed on upper and lower landing beam, after having lifted, cuts away hoisting ring.Note in model sheetinstallat work progress carrying out suitable adjustment to stair step absolute altitude, original position and levelness.
(4) concreting.From stair template template penetration concrete of marking time topmost, upper level mark time template build full after, under gravity, concrete automatically flows into next stage and marks time in template, until whole steel form build full till.After having built, concrete surface is automatically smooth, and outward appearance is good.
(5) concrete curing.Note the destruction artificial to concrete, until can normally use, without the need to dismantling template, steel form is stayed in stair as permanent template, can replace the arrangement of reinforcement in concrete at the steel plate of concrete base, effectively improves concrete bearing capacity.
The advantage that the present invention has and good effect are: steel form rigidity stability is strong, and concrete is not yielding, and presentation quality is good, ensure that workmanship; Steel form, can direct installation in position during construction as permanent formwork, without the need to dismounting, simple to operate, saves man-hour, construction safety; Save timber, protection of the environment; Steel form and concrete can be bonded to overall co-operation, thus effectively improve the bearing capacity of stair.
Although be described the preferred embodiments of the present invention by reference to the accompanying drawings above; but the present invention is not limited to above-mentioned detailed description of the invention; above-mentioned detailed description of the invention is only schematic; be not restrictive; those of ordinary skill in the art is under enlightenment of the present invention; do not departing under the ambit that present inventive concept and claim protect, can also make a lot of form, these all belong within protection scope of the present invention.

Claims (1)

1. a construction method for compoboard stair, comprises the following steps:
1) determine the size of stair, mainly comprise the width of stair, length, step number of marking time, the width of marking time.
2) make the steel form of corresponding size and quantity, comprise bottom integrated steel plate (1), a stair exponent number Central Standard marks time template (2), template (3) that is marked time, template (4) of marking time under; Described bottom integrated steel plate (1) is made according to stair size, the bending of described bottom integrated steel plate two ends, upper end after bending is used for being connected with upper mounting plate plate, lower end is used for being connected with lower platform plate, and the top and bottom length after bending is suitable with the mark time width of template (4) under template of above marking time (3) and respectively;
3) stair template is installed: marked time by each adjacent Central Standard between template (2), between Central Standard template (2) with described bottom integrated steel plate (1) and be fixedly connected with, by mark time template (3) with under template (4) template (2) of marking time with corresponding Central Standard respectively of marking time be fixedly connected with; The mark time both sides of template (2) of each Central Standard are right-angled trapezium, and the slope of trapezoidal hypotenuse is consistent with stair slope, and the slope of bottom integrated steel plate (1) is consistent with stair slope;
4) guaranteeing that stair template can held stationary part fixed hoisting ring (6) in lifting process, hoisting ring diameter must meet lifting load requirement.
5) by stair template hoisted in position that step (3) connects, on mark time template (3) and under mark time template (4) and bottom integrated steel plate junction anchor hole should respectively with reserved anchor hole aligned in position on upper mounting plate beam and lower platform beam, with crab-bolt by mark time template (3) and under template (4) of marking time be separately fixed on upper mounting plate beam and lower platform beam, cut away hoisting ring after having lifted;
6) concreting: to mark time template penetration concrete from stair template intermediate standard topmost, upper level mark time template build full after, under gravity, concrete automatically flows into next stage and marks time in template, until whole stair template build full till.
CN201510178530.XA 2015-04-15 2015-04-15 Construction method for combined plate staircase Expired - Fee Related CN104818809B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510178530.XA CN104818809B (en) 2015-04-15 2015-04-15 Construction method for combined plate staircase

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510178530.XA CN104818809B (en) 2015-04-15 2015-04-15 Construction method for combined plate staircase

Publications (2)

Publication Number Publication Date
CN104818809A true CN104818809A (en) 2015-08-05
CN104818809B CN104818809B (en) 2017-04-19

Family

ID=53729270

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510178530.XA Expired - Fee Related CN104818809B (en) 2015-04-15 2015-04-15 Construction method for combined plate staircase

Country Status (1)

Country Link
CN (1) CN104818809B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107283606A (en) * 2017-08-22 2017-10-24 程丹松 Stair pour mould and stair
CN108505747A (en) * 2017-02-27 2018-09-07 五冶集团上海有限公司 A kind of stair concreting steel form
CN109763647A (en) * 2019-03-13 2019-05-17 中国五冶集团有限公司 Adjustable entirety stair tread formwork and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2345624Y (en) * 1998-12-01 1999-10-27 黑龙江省第一建筑工程公司 Shaping formwork for cast-in-place concrete stairs
CN102251664A (en) * 2011-04-26 2011-11-23 湖南省沙坪建筑有限公司 One-time forming construction method for cast-in-place stair tread template
CN202220439U (en) * 2011-08-26 2012-05-16 河南省大成建设工程有限公司 Combined steel formwork of integral stair tread
CN102747837A (en) * 2012-07-06 2012-10-24 中国十七冶集团有限公司 Cleaning method for cast-in-place reinforced concrete stair segment timber template
CN103195215A (en) * 2013-04-11 2013-07-10 北京工业大学 Reinforced concrete stringer stairway with slidable end structures and method for constructing reinforced concrete stringer stairway
JP5378877B2 (en) * 2009-05-20 2013-12-25 寛 石川 Steel frame stair tread manufacturing method
CN103669840A (en) * 2013-11-29 2014-03-26 重庆智锐德科技有限公司 Stair tread for building construction reinforcement

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2345624Y (en) * 1998-12-01 1999-10-27 黑龙江省第一建筑工程公司 Shaping formwork for cast-in-place concrete stairs
JP5378877B2 (en) * 2009-05-20 2013-12-25 寛 石川 Steel frame stair tread manufacturing method
CN102251664A (en) * 2011-04-26 2011-11-23 湖南省沙坪建筑有限公司 One-time forming construction method for cast-in-place stair tread template
CN202220439U (en) * 2011-08-26 2012-05-16 河南省大成建设工程有限公司 Combined steel formwork of integral stair tread
CN102747837A (en) * 2012-07-06 2012-10-24 中国十七冶集团有限公司 Cleaning method for cast-in-place reinforced concrete stair segment timber template
CN103195215A (en) * 2013-04-11 2013-07-10 北京工业大学 Reinforced concrete stringer stairway with slidable end structures and method for constructing reinforced concrete stringer stairway
CN103669840A (en) * 2013-11-29 2014-03-26 重庆智锐德科技有限公司 Stair tread for building construction reinforcement

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108505747A (en) * 2017-02-27 2018-09-07 五冶集团上海有限公司 A kind of stair concreting steel form
CN107283606A (en) * 2017-08-22 2017-10-24 程丹松 Stair pour mould and stair
CN109763647A (en) * 2019-03-13 2019-05-17 中国五冶集团有限公司 Adjustable entirety stair tread formwork and construction method

Also Published As

Publication number Publication date
CN104818809B (en) 2017-04-19

Similar Documents

Publication Publication Date Title
CN105971271B (en) Unilateral cantilever form and its construction method of climbing certainly
CN103161126A (en) Road bridge variable section hollow high pier slip-form construction method
CN106192758A (en) Construction method for constructing large high pier column by using cantilever formwork
CN104583510A (en) A lift truck operated stacking formwork table system and a method of operation thereof
CN109025291A (en) A kind of construction method of separate type precast stair
CN205840191U (en) A kind of thin webbed girder formula precast stair separated with bench of marking time
CN104818809A (en) Construction method for combined plate staircase
CN203474271U (en) Special assembly type rail base for portal crane
CN113482312A (en) Guide type double-layer structure elevator shaft operating platform and construction method based on platform
CN104876131A (en) Method for dismantling large tower crane by using small tower crane
CN204781927U (en) Elevartor shaft formwork and elevartor shaft concrete placement operation platform
CN101298796A (en) Self-bearing type preprocessing component, self-bearing type preprocessing concrete structure and construction method thereof
CN204738536U (en) Subway station side wall concrete form support frame
CN104499706B (en) Hoistway formwork platform and construction method thereof
CN104404888A (en) Large hoisting system allowing gradient to be adjusted in air and application
CN204059906U (en) Elevator hoistways Integral lifting type steel scaffold
CN203113515U (en) Slip form jacking integrated device
CN208456122U (en) A kind of stair, which pour, uses steel form
CN103726449B (en) Automatically fall Liangping table apparatus and the construction method for changing railway beam thereof
CN213774481U (en) A template supporting construction for building engineering construction
CN104818808A (en) Permanent stair steel template
CN101457587A (en) Template mutual-lifting type climbing formwork device and method
CN204040442U (en) Integral lifting type elevator shaft operating platform
CN204199691U (en) A kind of handrail formwork for placing structure of spiral stairs
CN209163450U (en) A kind of tool-type prefabricated reinforced concrete composite beam support device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
EXSB Decision made by sipo to initiate substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 300350 District, Jinnan District, Tianjin Haihe Education Park, 135 beautiful road, Beiyang campus of Tianjin University

Patentee after: Tianjin University

Address before: 300072 Tianjin City, Nankai District Wei Jin Road No. 92

Patentee before: Tianjin University

CP02 Change in the address of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170419

Termination date: 20210415

CF01 Termination of patent right due to non-payment of annual fee