CN203474271U - Special assembly type rail base for portal crane - Google Patents

Special assembly type rail base for portal crane Download PDF

Info

Publication number
CN203474271U
CN203474271U CN201320546308.7U CN201320546308U CN203474271U CN 203474271 U CN203474271 U CN 203474271U CN 201320546308 U CN201320546308 U CN 201320546308U CN 203474271 U CN203474271 U CN 203474271U
Authority
CN
China
Prior art keywords
build
prefabricated components
type track
standard prefabricated
assembly type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201320546308.7U
Other languages
Chinese (zh)
Inventor
何文锋
李伟
曹金鼎
刘少然
胡铭洋
张鸣洲
刘耀军
庞林
顾殿杰
钟金玉
石小军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Communications Engineering Group Co Ltd
Original Assignee
China Construction Communications Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Communications Engineering Group Co Ltd filed Critical China Construction Communications Engineering Group Co Ltd
Priority to CN201320546308.7U priority Critical patent/CN203474271U/en
Application granted granted Critical
Publication of CN203474271U publication Critical patent/CN203474271U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a special assembly type rail base for a portal crane. At least one standard prefabricated component, a plurality of groups of embedded bolts, a plurality of steel rail pressure plates and a steel rail form an assembly type rail base standard piece; the special assembly type rail base for the portal crane is formed by longitudinally connecting at least two assembly type rail base standard pieces. The standard prefabricated component is produced by a component factory, can be produced in batches, and is high in quality stability precision, and template fabrication on site is eliminated; the standard prefabricated component is laid in stages according to construction conditions and good in flexibility; a forklift and a small crane can be used on the construction site. The special assembly type rail base for the portal crane disclosed by the utility model is used for shield tunnel, and convenient to mount and dismount, so that time limit for project is shortened; after the shield tunnel construction is finished, the assembly type rail base piece can be immediately loaded and carried away for being recycled, so that construction cost is reduced, and resources are saved.

Description

The special-purpose build-up type track foundation of transfer crane
Technical field
The utility model relates to a kind of track of shield-tunneling construction, particularly relates to the special-purpose build-up type track foundation of a kind of transfer crane.
Background technology
Transfer crane is a kind of conventional auxiliary facility of current earth pressure balanced shield, EPBS construction, an important supplement as earth pressure balanced shield, EPBS construction, transfer crane is the important preparation of construction of vertical transport between tunnel and ground in work progress, is widely used in shield tunnel civil engineering.Transfer crane is compared with equipment such as tower crane, crane in bridge type, and the load-carrying ability of transfer crane is large, can be under the situation of load, and complete machine is walked along horizontal rail, and therefore, horizontal rail basis is also the necessary component of transfer crane.At present, track foundation mostly is cast-type reinforced concrete bed beam, construct cast-type reinforced concrete bed beam, first on-the-spot place all to be emptied, then carry out assembling reinforcement, installation form, built-in fitting is installed, the work such as casting concrete, also need the 28 day length of time of maintenance could load after concreting, finally on cast-type reinforced concrete bed beam, transfer crane is installed; Constructing tunnel finishes after hoisting crane dismounting, then removes grade beam.The shortcoming on this kind of cast-type reinforced concrete bed beam basis is long construction period; Restricted by place, can not construct in advance; Construction precision is low, and construction quality fluctuation is large; Basis can only disposablely be used, and also wants defrayment during dismounting.
Utility model content
The purpose of this utility model is to provide a kind of framing member by standard to constitute, simple and convenient assembly, and energy repeated usage, productive costs is low, can improve the operating efficiency of track foundation and the special-purpose build-up type track foundation of the transfer crane of construction precision of transfer crane.
The purpose of this utility model can realize.The special-purpose build-up type track foundation of transfer crane of the present utility model is characterised in that: the standard prefabricated components that include concreting in a special-purpose build-up type track foundation of transfer crane, the transversal surface of described standard prefabricated components is ' protruding ' font, axis direction along standard prefabricated components, on the bossing of standard prefabricated components, be embedded with as the crow flies the some groups of pre-embedded bolts of every two group, in the recessed part in both sides, be arranged with some groups of hangers, described standard prefabricated components become integral structure with described pre-embedded bolt and hanger, , described standard prefabricated components become integral structure with described pre-embedded bolt, described in each, on pre-embedded bolt, be all connected with a rail pressing plate, between two described pre-embedded bolts of same group, be equipped with rail, described rail by rail pressing plate, by pre-embedded bolt, be fixed on described standard prefabricated components bossing above, the common fixing rail track in alignment of pre-embedded bolt of described some groups, at least one standard prefabricated components, some groups of pre-embedded bolts, several rail pressing plates and a rail form a build-up type track foundation gauge member.
The special-purpose build-up type track foundation of the utility model transfer crane, wherein a special-purpose build-up type track foundation of described transfer crane is is longitudinally connected and composed by least two build-up type track foundation gauge members.
The special-purpose build-up type track foundation of the utility model transfer crane difference from prior art be the special-purpose build-up type track foundation of the utility model transfer crane adopt section be ' protruding ' font type, by concreting and be embedded with the standard prefabricated components of some pre-embedded bolts as the grade beam of shield construction track, standard prefabricated components are fixed a rail by some groups of pre-embedded bolts and rail pressing plate and are formed a build-up type track foundation part.Standard prefabricated components in the utility model are produced by member station-service Standard Module, have improved on the one hand structure precision, on the other hand can batch production, than field fabrication, saved template; Standard prefabricated components are produced in advance in factory, and maintenance in advance, is assembled into afterwards build-up type track foundation part again and dispatches from the factory, and quality is more stable; Build-up type track foundation part can break the whole up into parts, and according to tunnel construction site condition broken-up laying, has improved the alerting ability of construction; The weight control of standard prefabricated components is at 3~4t, and build-up type track foundation gauge member just can be laid by fork truck and small crane after being transported to scene, easy construction; Transfer crane can be installed after laying in basis at once, has shortened the duration, and after shield tunnel construction finishes, transfer crane dismounting is complete, and build-up type track foundation part can be entrucked and carried away at once, without going, removes the basis that traditional concrete cast-in-situ is lived again; Build-up type track foundation part can reuse, and saves construction material and resource.
Below in conjunction with accompanying drawing, the special-purpose build-up type track foundation of transfer crane of the present utility model is described further.
Accompanying drawing explanation
Fig. 1 is the build-up type track foundation gauge member structural upright schematic diagram of the special-purpose build-up type track foundation of transfer crane.
Fig. 2 is the cross-sectional view of build-up type track foundation gauge member.
Fig. 3 is the schematic top plan view of build-up type track foundation gauge member.
Fig. 4 is the schematic side view of build-up type track foundation gauge member.
Fig. 5 is the application schematic diagram of the special-purpose build-up type track foundation of transfer crane.
The specific embodiment
The transfer crane dedicated track of earth pressure balanced shield, EPBS construction forms by two.
As shown in Figure 1, Figure 2, Figure 3, Figure 4, the special-purpose build-up type track of transfer crane of the present utility model be take one as example.Article one, in the special-purpose build-up type track foundation of transfer crane, include the standard prefabricated components 1 of some concretings, the transversal surface of described standard prefabricated components 1 is ' protruding ' font, axis direction along standard prefabricated components 1, on the bossing of standard prefabricated components 1, be embedded with as the crow flies the some groups of pre-embedded bolts 2 of every two group, in the recessed part in both sides, be arranged with some groups of hangers 5, described standard prefabricated components 1 and described pre-embedded bolt 2 and 5 one-tenth integral structures of hanger, 2 one-tenth integral structures of described standard prefabricated components 1 and described pre-embedded bolt, described in each, on pre-embedded bolt 2, be all connected with a rail pressing plate 3, between two described pre-embedded bolts 2 of same group, be equipped with rail 4, described rail 4 by rail pressing plate 3, by pre-embedded bolt 2, be fixed on described standard prefabricated components 1 bossing above, fixing 4 one-tenth longitudinal rectilinear orbits of rail between the pre-embedded bolt 2 of described some groups, described standard prefabricated components 1, some groups of pre-embedded bolts 2, several rail pressing plates 3 and a rail 4 form a build-up type track foundation gauge member.
Article one, the special-purpose build-up type track foundation of described transfer crane is is longitudinally connected and composed by least two build-up type track foundation gauge members.
Effect of the present utility model is referring to Fig. 5.
The second embodiment of the special-purpose build-up type track foundation of the utility model transfer crane is: a member producer production standard prefabricated component 1, standard prefabricated components 1 are transported to behind workyard, again rail 4 is installed on standard prefabricated components 1 by the pre-embedded bolt 2 on standard prefabricated components 1 and rail pressing plate 3, be assembled into build-up type track foundation gauge member, by build-up type track foundation gauge member, be assembled into the special-purpose build-up type track foundation of transfer crane more afterwards.
The construction method of build-up type track foundation, its step is as follows:
Step 1, according to Fig. 2 build-up type track foundation gauge member section-drawing, Fig. 3 build-up type track foundation gauge member birds-eye view and Fig. 4 build-up type track foundation gauge member lateral plan in advance at member Workshop Production build-up type track foundation gauge member, the production mould of standard prefabricated components 1 adopts the high steel mold of precision, in workshop, strict control vibrated and the operation such as maintenance, and the quantity of standard prefabricated components 1 is determined according to the walking in a horizontal state scope of on-the-spot transfer crane.
Step 2, pre-embedded bolt 2 will be installed before casting concrete, and build and become integral body with standard prefabricated components 1; After scene satisfies the requirements, with low-grade concrete or Detritus construction bed course, bed course requires maintenance level; Laying standard prefabricated components 1, laying length according to actual needs segmentation carries out; Rail 4 is installed, and is carried out, after straight and horizontal alignment, with rail pressing plate 3, compressing.
Above-described embodiment is described preferred implementation of the present utility model; not scope of the present utility model is limited; do not departing under the prerequisite of the utility model design spirit; various distortion and improvement that those of ordinary skills make the technical solution of the utility model, all should fall in the definite protection domain of the utility model claims.

Claims (2)

1. the special-purpose build-up type track foundation of a transfer crane, it is characterized in that: the standard prefabricated components (1) that include concreting in a special-purpose build-up type track foundation of transfer crane, the transversal surface of described standard prefabricated components (1) is ' protruding ' font, axis direction along standard prefabricated components (1), on the bossing of standard prefabricated components (1), be embedded with as the crow flies the some groups of pre-embedded bolts (2) of every two group, in the recessed part in both sides, be arranged with some groups of hangers (5), described standard prefabricated components (1) become integral structure with described pre-embedded bolt (2) and hanger (5), on pre-embedded bolt described in each (2), be all connected with a rail pressing plate (3), between two described pre-embedded bolts (2) of same group, be equipped with rail (4), described rail (4) by rail pressing plate (3), by pre-embedded bolt (2), be fixed on described standard prefabricated components (1) bossing above, common fixing rail (4) track in alignment of the pre-embedded bolt of described some groups (2), at least one standard prefabricated components (1), some groups of pre-embedded bolts (2), several rail pressing plates (3) and a rail (4) form a build-up type track foundation gauge member.
2. the special-purpose build-up type track foundation of transfer crane according to claim 1, is characterized in that: a special-purpose build-up type track foundation of described transfer crane is is longitudinally connected and composed by least two build-up type track foundation gauge members.
CN201320546308.7U 2013-09-04 2013-09-04 Special assembly type rail base for portal crane Expired - Fee Related CN203474271U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320546308.7U CN203474271U (en) 2013-09-04 2013-09-04 Special assembly type rail base for portal crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320546308.7U CN203474271U (en) 2013-09-04 2013-09-04 Special assembly type rail base for portal crane

Publications (1)

Publication Number Publication Date
CN203474271U true CN203474271U (en) 2014-03-12

Family

ID=50222645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320546308.7U Expired - Fee Related CN203474271U (en) 2013-09-04 2013-09-04 Special assembly type rail base for portal crane

Country Status (1)

Country Link
CN (1) CN203474271U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105236265A (en) * 2015-11-06 2016-01-13 中冶辽宁德龙钢管有限公司 Reinforcing method and reinforcing structure for rail of portal crane
CN105984020A (en) * 2015-02-02 2016-10-05 任丘市永基建筑安装工程有限公司 Concrete box-type combined die rail mounting technology
CN106032029A (en) * 2015-03-09 2016-10-19 任丘市永基建筑安装工程有限公司 A combination die steel rail arrangement technology
CN109056541A (en) * 2018-08-28 2018-12-21 中国二十冶集团有限公司 Transportation resources from ground transport I-beam to bridge floor
CN109911766A (en) * 2019-04-23 2019-06-21 哈尔滨军鼎混凝土制品有限公司佳木斯分公司 A kind of removable beam of gantry crane automobile-used track
CN112479027A (en) * 2020-12-11 2021-03-12 中国十九冶集团有限公司 Gantry crane prefabricated foundation and installation method thereof

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105984020A (en) * 2015-02-02 2016-10-05 任丘市永基建筑安装工程有限公司 Concrete box-type combined die rail mounting technology
CN106032029A (en) * 2015-03-09 2016-10-19 任丘市永基建筑安装工程有限公司 A combination die steel rail arrangement technology
CN105236265A (en) * 2015-11-06 2016-01-13 中冶辽宁德龙钢管有限公司 Reinforcing method and reinforcing structure for rail of portal crane
CN109056541A (en) * 2018-08-28 2018-12-21 中国二十冶集团有限公司 Transportation resources from ground transport I-beam to bridge floor
CN109911766A (en) * 2019-04-23 2019-06-21 哈尔滨军鼎混凝土制品有限公司佳木斯分公司 A kind of removable beam of gantry crane automobile-used track
CN112479027A (en) * 2020-12-11 2021-03-12 中国十九冶集团有限公司 Gantry crane prefabricated foundation and installation method thereof

Similar Documents

Publication Publication Date Title
CN203474271U (en) Special assembly type rail base for portal crane
CN108678775B (en) Transverse oval deformation resistant shield tunnel reinforcing structure of embedded steel plate and construction method
CN104097253B (en) Cross-saddle single-track traffic environment protection movable formula pre-track beam forms system
CN105152032A (en) Installing method for bridge crane in enclosed environment workshop
CN104594204B (en) Urban light rail viaduct mountain type U beam Construction Supporting System and construction method
CN103215893A (en) Method for prefabricated assembly of middle-divided sections of large-sized capping beam and assembly structure of middle-divided sections of large-sized capping beam
CN109868726A (en) A kind of prefabricated assembled cylindricality bridge pier and its construction method
CN103603435B (en) A kind of assembly concrete antidetonation beam column frame and construction method thereof
CN103452350B (en) Assembling electronic workshop and construction method thereof
CN204475184U (en) Urban light rail viaduct mountain type U beam Construction Supporting System
CN103147454A (en) Pre-fabricated foundation structure of steel structure factory building
CN103967332B (en) The construction method of a kind of building site enclosing
CN203947381U (en) A kind of steel concrete chain type plate
CN203755171U (en) Bridge back-pulling bearing construction support
CN203603542U (en) Fabricated electronic workshop
CN203891066U (en) Underground structure prefabricated ribbed-plate type component
CN105442855A (en) High-precision burying method for large-size pre-buried board
CN205348214U (en) Column formula reinforced concrete and shaped steel hybrid portal crane basis
CN104653222A (en) Prefabricated evacuation platform for shield interval tunnel
CN214574621U (en) Node dry joining method assembly structure
CN201915420U (en) Foundation of temporary gate building
CN212771950U (en) Movable operation platform for mounting transverse beam of I-shaped steel-concrete combined beam
CN211229701U (en) Assembled maintenance stand column and train maintenance platform
CN204491630U (en) A kind of reusable assembling vertical shaft collar tie beam
CN210684349U (en) Assembled gantry crane track foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140312

Termination date: 20210904